Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Interns”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

High-Rate Communications Outage Recorder Operations for Optimal Payload and Science Telemetry Management Onboard the International Space Station

All International Space Station (ISS) Ku-band telemetry transmits through the High-Rate Communications Outage Recorder (HCOR). The HCOR provides the recording and playback capability for all payload, science, and International Partner data streams transmitting through NASA's Ku-band antenna system. The HCOR is a solid-state memory recorder that provides recording capability to record all eight ISS high-rate data during ISS Loss-of-Signal periods. NASA payloads in the Destiny module are prime users of the HCOR; however, NASDA and ESA will also utilize the HCOR for data capture and playback of their high data rate links from the Kibo and Columbus modules. Marshall Space Flight Center's Payload Operations Integration Center manages the HCOR for nominal functions, including system configurations and playback operations. The purpose of this paper is to present the nominal operations plan for the HCOR and the plans for handling contingency operations affecting payload operations. In addition, the paper will address HCOR operation limitations and the expected effects on payload operations. The HCOR is manifested for ISS delivery on flight 9A with the HCOR backup manifested on flight 11A. The HCOR replaces the Medium-Rate Communications Outage Recorder (MCOR), which has supported payloads since flight 5A.1.

Shell, Michael T.↗

Amateur Radio on the International Space Station: The First Operational Payload on the ISS

As astronauts and cosmonauts have adapted to life on the International Space Station (ISS), they have found amateur radio and its connection to life on Earth to be a important on-board companion and a substantial psychological boost. Since its first use in November 2000, the first five expedition crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. This paper will discuss the development, qualification, installation and operation of the amateur radio system. It will also discuss some of the challenges that the amateur radio international team of volunteers overcame to bring its first phase of equipment on ISS to fruition.

Bauer, Frank H.↗

International Laser Ranging Services (ILRS) 2001 Annual Report

This 2001 Annual Report of the International Laser Ranging Services (ILRS) is comprised of individual contributions from ILRS components within the international geodetic community. This report documents the work of the ILRS components for the year 2001. The report documents changes and progress of the ILRS. This document is also available on the ILRS Web site at http://ilrs.gsfc.nasa.gov/reports/ilrs_reports/ilrsar_2001.html.

Pearlman, Michael↗

Flight Test Comparison of Synthetic Vision Display Concepts at Dallas/Fort Worth International Airport

Limited visibility is the single most critical factor affecting the safety and capacity of worldwide aviation operations. Synthetic Vision Systems (SVS) technology can solve this visibility problem with a visibility solution. These displays employ computer-generated terrain imagery to present 3D, perspective out-the-window scenes with sufficient information and realism to enable operations equivalent to those of a bright, clear day, regardless of weather conditions. To introduce SVS display technology into as many existing aircraft as possible, a retrofit approach was defined that employs existing HDD display capabilities for glass cockpits and HUD capabilities for the other aircraft. This retrofit approach was evaluated for typical nighttime airline operations at a major international airport. Overall, 6 evaluation pilots performed 75 research approaches, accumulating 18 hours flight time evaluating SVS display concepts that used the NASA LaRC's Boeing B-757-200 aircraft at Dallas/Fort Worth International Airport. Results from this flight test establish the SVS retrofit concept, regardless of display size, as viable for tested conditions. Future assessments need to extend evaluation of the approach to operations in an appropriate, terrain-challenged environment with daytime test conditions.

Glaab, Louis J.↗

EXPRESS Rack: The Extension of International Space Station Resources for Multi-Discipline Subrack Payloads

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette↗

Investigation Leads to Improved Understanding of Space Shuttle RSRM Internal Insulation Joints

The Space Shuttle Reusable Solid Rocket Motor (RSRM) uses an internal insulation J-joint design for the mated insulation interface between two assembled RSRM segments. In this assembled (mated) segment configuration, this J-joint design serves as a thermal barrier to prevent hot gases from affecting the case field joint metal surfaces and O-rings. A pressure sensitive adhesive (PSA) provides some adhesion between the two mated insulation surfaces. In 1995, after extensive testing, a new ODC-free PSA (free of ozone depleting chemicals) was selected for flight on RSRM-55 (STS-78). Post-flight inspection revealed that the J-joint, equipped with the new ODC-free PSA, did not perform well. Hot gas seeped inside the J-joint interface. Although not a flight safety threat, the J-joint hot gas intrusion on RSRM-55 was a mystery to the investigators since the PSA had previously worked well on a full-scale static test. A team was assembled to study the J-joint and PSA further. All J-joint design parameters, measured data, and historical performance data were re-reviewed and evaluated by subscale testing and analysis. Although both the ODC-free and old PSA were weakened by humidity, the ODC-free PSA strength was lower to start with. Another RSRM full-scale static test was conducted in 1998 and intentionally duplicated the gas intrusion. This test, along with many concurring tests, showed that if a J-joint was 1) mated with the new ODC-free PSA, 2) exposed to a history of high humidity (Kennedy Space Center levels), and 3) also a joint which experienced significant but normal joint motion (J-joint deformation resulting from motor pressurization dynamics) then that J-joint would open (allow gas intrusion) during motor operation. When all of the data from the analyses, subscale tests, and full-scale tests were considered together, a theory emerged. Most of the joint motion on the RSRM occurs early in motor operation at which point the J-joints are pulled into tension. If the new PSA has been weakened due to humidity, then the J-joint will partially pull apart (inboard side), and the J-joint surfaces will be charred by exposure to hot gases. After early operation, a J-joint that has been pulled apart will come back together as the J-joint deformation decreases. This J-joint heating event is relatively short and occurs only during the first part of motor operation. Internal instrumentation was developed for another full-scale static test in February 2000. The static test instrumentation did indeed prove this theory to be correct. Post-test inspection revealed very similar charring characteristics as observed on RSRM-55. This experience of the development of a new PSA, its testing, the RSRM-55 flight, followed by the J-joint investigation led to good 'lessons learned' and to an additional fundamental understanding of the RSRM J-joint function.

McWhorter, Bruce B.↗

Operational Experience with the Internal Thermal Control System Dual-Membrane Gas Trap

A dual-membrane gas trap is currently used to remove non-condensed gases (NCG) from the Internal Thermal Control System (ITCS) coolant on board the International Space Station. The gas trap consists of concentric tube membrane pairs, comprised of outer hydrophilic tubes and inner hydrophobic fibers. Liquid coolant passes through the outer hydrophilic membrane, which traps the NCG. The inner hydrophobic fiber allows the trapped NCG to pass through and vent to the ambient atmosphere in the cabin. The purpose of the gas trap is to prevent gas bubbles from causing depriming, overspeed, and shutdown of the ITCS pump, and the current gas trap has performed flawlessly in this regard. However, because of actual operational conditions on-orbit, its gas removal performance and operational lifetime have been affected. This paper discusses experiences with several of these dual- membrane gas traps, including on-orbit gas venting rate, effects due to the presence of nickel in the ITCS coolant, and subsequent refurbishing to remove the nickel from the gas trap.

Leimkuehler, Thomas O.↗

Development of the Next Generation Gas Trap for the Space Station Internal Thermal Control System

The current dual-membrane gas trap is designed to remove non-condensed gases (NCG) from the Internal Thermal Control System (ITCS) coolant on board the International Space Station (ISS). To date it has successfully served its purpose of preventing depriming, overspeed, and shutdown of the ITCS pump. However, contamination in the ITCS coolant has adversely affected the gas venting rate and lifetime of the gas trap, warranting a development effort for a next-generation gas trap. Design goals are to meet or exceed the current requirements to (1) include greater operating ranges and conditions, (2) eliminate reliance on the current hydrophilic tube fabrication process, and (3) increase operational life and tolerance to particulate and microbial growth fouling. In addition, the next generation gas trap will essentially be a 'dropin" design such that no modifications to the ITCS pump package assembly (PPA) will be required, and the implementation of the new design will not affect changes to the ITCS operational conditions, interfaces, or software. This paper will present the initial membrane module design and development work which has included (1) a trade study among several conceptual designs, (2) performance modeling of a hydrophobic-only design, and (3) small-scale development test data for the hydrophobic-only design. Testing has shown that the hydrophobic-only design is capable of performing even better than the current dual-membrane design for both steady-state gas removal and gas slug removal.

Leimkuehler, Thomas O.↗

International Space Station Laboratory "Destiny" Hardware Move From MSFC to KSC

The transportation and handling of space flight hardware always demands the utmost care and planning. This was especially true when it came time to move the International Space Station lab module "Destiny" from its manufacturing facility at the Marshall Space Flight Center (MSFC) to the launch facility at the Kennedy Space Center in Florida. Good logistics management was the key to the coordination of the large team required to move the lab from the MSFC manufacturing facility 12 miles to the Huntsville International Airport. Overhead signs, power lines, and traffic lights had to be removed, law enforcement had to be coordinated and a major highway had to be completely shut down during the transportation phase of the move. The team responded well, and the move was accomplished on time with no major difficulties.

Welch, Andrew C.↗

Reusable Rack Interface Controller Common Software for Various Science Research Racks on the International Space Station

The purpose of the EXPRESS (Expedite the PRocessing of Experiments to Space Station) rack project is to provide a set of predefined interfaces for scientific payloads which allow rapid integration into a payload rack on International Space Station (ISS). VxWorks' was selected as the operating system for the rack and payload resource controller, primarily based on the proliferation of VME (Versa Module Eurocard) products. These products provide needed flexibility for future hardware upgrades to meet everchanging science research rack configuration requirements. On the International Space Station, there are multiple science research rack configurations, including: 1) Human Research Facility (HRF); 2) EXPRESS ARIS (Active Rack Isolation System); 3) WORF (Window Observational Research Facility); and 4) HHR (Habitat Holding Rack). The RIC (Rack Interface Controller) connects payloads to the ISS bus architecture for data transfer between the payload and ground control. The RIC is a general purpose embedded computer which supports multiple communication protocols, including fiber optic communication buses, Ethernet buses, EIA-422, Mil-Std-1553 buses, SMPTE (Society Motion Picture Television Engineers)-170M video, and audio interfaces to payloads and the ISS. As a cost saving and software reliability strategy, the Boeing Payload Software Organization developed reusable common software where appropriate. These reusable modules included a set of low-level driver software interfaces to 1553B. RS232, RS422, Ethernet buses, HRDL (High Rate Data Link), video switch functionality, telemetry processing, and executive software hosted on the FUC computer. These drivers formed the basis for software development of the HRF, EXPRESS, EXPRESS ARIS, WORF, and HHR RIC executable modules. The reusable RIC common software has provided extensive benefits, including: 1) Significant reduction in development flow time; 2) Minimal rework and maintenance; 3) Improved reliability; and 4) Overall reduction in software life cycle cost. Due to the limited number of crew hours available on ISS for science research, operational efficiency is a critical customer concern. The current method of upgrading RIC software is a time consuming process; thus, an improved methodology for uploading RIC software is currently under evaluation.

Lu, George C.↗

Internal Rb-Sr Age and Initial Sr-87/Sr-86 of a Silicate Inclusion from the Campo Del Cielo Iron Meteorite

The largest group of iron meteorites, IAB, is distinguished by the presence of diverse silicate inclusions. In principle, Rb-Sr and Sm-Nd radiometric dating of these silicate inclusions by internal isochron techniques can determine both the times of melting and parent/daughter ratios in the precursor materials via initial Sr-87/Sr-86 and Nd-143/Nd-144 ratios. The Sr-87/Sr-86 and Nd-143/Nd-144 ratios could distinguish chondritic precursors from already differentiated silicates. We reported Rb-Sr and Sm-Nd internal ischron ages of 4.52+/-0.03 Ga and 4.50+/-0.04 Ga, respectively, for plagioclase-diopside-rich material in the Caddo County IAB iron meteorite. These results are essentially identical to literature values of its Ar-Ar age of 4.520+/-0.005 Ga and its Sm-Nd age of 4.53+/-0.02 Ga. The purpose of this study is to evaluate the formation and evolution of silicate inclusions in IAB iron meteorites by determination of their initial Sr-87/Sr-86 ratios combined with higher-resolution chronology and mineralogical and geochemical studies.

Liu, Y.↗

Internal Structure of the Southern Polar Cap of Mars and Formation Implications

The surfaces of the Martian polar caps have been studied in detail but little is known about their internal structure. Exposures of the cap interior can be seen in the many troughs and scarps which incise them. The layered sequences visible in these topographic features have been known to exist for many years, however first order questions concerning the internal stratigraphy remain. We have identified a prominent bench forming layer near the top of the southern layered deposits. We have mapped its exposure in high-resolution MOC images on the eastern and western scarps. These images have been carefully registered to a MOLA derived DEM so topographic measurements along this bench can be extracted along with the location of each trace. What results are a set of measurements of the top of the bench forming layer in three dimensions. The top of this layer represents a distinct stratigraphic horizon. The prominent bench outcrops on both the eastern and western scarps which bound the highest portion of the southern layered deposits. Confirmation that these are two benches are indeed the same stratigraphic surface comes from the similarity of surrounding (nonbench forming) layers.

Byrne, S.↗

Student Interns Work on Mars

The exceptional imagery and data acquired by the Mars Exploration Rovers since their January 2004 landing have captured the attention of scientists, the public, and students and teachers worldwide. One aspect of particular interest lies with a group of high school teachers and students actively engaged in the Athena Student Interns Program. The Athena Student Interns Program (ASIP) is a joint effort between NASA s Mars Public Engagement Office and the Athena Science Investigation that began in early 1999 as a pilot student-scientist research partnership program associated with the FIDO prototype Mars rover field test . The program is designed to actively engage high school students and their teachers in Mars exploration and scientific inquiry. In ASIP, groups of students and teachers from around the country work with mentors from the mission s Athena Science Team to carry out an aspect of the mission.

Bowman, C. D.↗

International Conference: Milky Way Surveys: The Structure and Evolution of Our Galaxy

We were granted NASA support for partial sponsorship of an international conference on Galactic science, held June 15-17, 2003 and hosted by the Institute for Astrophysical Research at Boston University. This conference, entitled 'Milky Way Surveys: The Structure and Evolution of Our Galaxy' drew some 125 scientific experts, researchers, and graduate students to Boston to: (1) Present large area survey plans and findings; (2) Discuss important remaining questions and puzzles in Galactic science; and (3) To inform and excite students and researchers about the potential for using large area survey databases to address key Galactic science questions. An international Scientific Organizing Committee for this conference crafted a tightly packed two-day conference designed to highlight many recent and upcoming large area surveys (including 2MASS, SDSS, MSX, VLA-HI, GRS, and SIRTF/GLIMPSE) and current theoretical understandings and questions. By bringing together experts in the conduct of Galactic surveys and leading theorists, new ways of attacking long-standing scientific questions were encouraged. The titles of most of the talks and posters presented are attached to the end of this report.

Clemens, Dan↗

Cargo Assured Access to International Space Station

Boeing's Cargo Assured Access logistics delivery system will provide a means to transport cargo to/from the International Space Station, Low Earth Orbit and the moon using Expendable Launch Vehicles. For Space Station, this capability will reduce cargo resupply backlog during nominal operations (e.g., supplement Shuttle, Progress, ATV and HTV) and augment cargo resupply capability during contingency operations (e.g., Shuttle delay and/or unavailability of International Partner launch or transfer vehicles). This capability can also provide an autonomous means to deliver cargo to lunar orbit, a lunar orbit refueling and work platform, and a contingency crew safe haven in support of NASA's new Exploration Initiative.

Smith, David A.↗

Case Study of Risk Mitigation Based on Hardware/Software Integration (HSI) Testing for the International Space Station (ISS) Node 2 Module

Within the pressurized elements of the International Space Station (ISS), requirements exist to ensure a safe, habitable environment for the crew. In order to provide this environment, thermal control components work in conjunction with software controls to provide heat rejection for subsystem avionics equipment, for the environmental control system and for experiment payloads. It is essential to ISS operations, mission success and crew safety that necessary testing incorporates the extreme conditions to ensure proper performance. This paper provides a general description and methodology applied to thermal related Hardware/Software Integration (HSI) tests for the ISS Node 2 module. A detailed test plan was developed and implemented with two objectives: the first was for risk mitigation of the thermal control algorithms and software qualification, and the second was for data collection which will substantiate thermalhydraulic models of the Internal Active Thermal Control System (IATCS). Analytical models are utilized to determine on-orbit performance for conditions and scenarios where the simulation of actual on-orbit system performance is limited by test configuration constraints. Node 2 IATCS HSI activities were performed at the Alenia Spazio facility in Torino, Italy with participation from the National Aeronautics and Space Administration (NASA), Alenia Spazio, Jacobs Engineering Sverdrup (JE Sverdrup) and Boeing.

Holt, James Mike↗

Structural Stability of a Stiffened Aluminum Fuselage Panel Subjected to Combined Mechanical and Internal Pressure Loads

Results from an experimental and analytical study of a curved stiffened aluminum panel subjected to combined mechanical and internal pressure loads are presented. The panel loading conditions were simulated using a D-box test fixture. Analytical buckling load results calculated from a finite element analysis are presented and compared to experimental results. Buckling results presented indicate that the buckling load of the fuselage panel is significantly influenced by internal pressure loading. The experimental results suggest that the stress distribution is uniform in the panel prior to buckling. Nonlinear finite element analysis results correlates well with experimental results up to buckling.

Rouse, Marshall↗

Recent Operational Experience with the Internal Thermal Control System Dual-Membrane Gas Trap

A dual-membrane gas trap is currently used to remove gas bubbles from the Internal Thermal Control System (ITCS) coolant on board the International Space Station. The gas trap consists of concentric tube membrane pairs, comprised of outer hydrophilic tubes and inner hydrophobic fibers. Liquid coolant passes through the outer hydrophilic membrane, which traps the gas bubbles. The inner hydrophobic fiber allows the trapped gas bubbles to pass through and vent to the ambient atmosphere in the cabin. The gas removal performance and operational lifetime of the gas trap have been affected by contamination in the ITCS coolant. However, the gas trap has performed flawlessly with regard to its purpose of preventing gas bubbles from causing depriming, overspeed, and shutdown of the ITCS pump. This paper discusses on-orbit events over the course of the last year related to the performance and functioning of the gas trap.

Leimkuehler, Thomas O.↗