At least 1,783 records · Page 99

Los Alamos National Laboratory and Lawrence Livermore National Laboratory Plutonium Sustainment Monthly Program Report September 2012

In September of 2012 the Plutonium Sustainment program at LANL completed or addressed the following high-level activities: 1) Completed assembly, inspection, packing, and approvals for Pollux. Completed shipment to DAF in early October in accordance with the Gemini Core Team’s schedule. 2) Delivered the draft Program Implementation Plan and revised repeatedly. 3) Met with Kansas City Plant staff to “kick-off” the non-nuclear pit-component production mission. All MRT L2 Milestones 4195-4198 or the relevant PBIs associated with Plutonium Sustainment have been met and evidence packages submitted. The year-end budget/performance indices were 0.96 (S.P.I.) and 1.00 (C.P.I.). Table 1 identifies all Baseline Change Requests (BCRs) that were initiated, in process, or completed during the month. The earned value metrics overall for LANL are within acceptable thresholds, so no high-level recovery plan is required. Note that the planned (budget) and earned value for September includes planned carryover holdbacks (no allocation) with no associated FY12 costs. This has a minor (positive) impact on S.P.I. and a significant (positive) impact on the C.P.I. For Pu Sustainment overall, the C.P.I. in September neglecting the $10.75M holdback is 0.90. Likewise, the C.P.I. for FY12 is 1.004. With the facility infrastructure element removed, the C.P.I. in September becomes 0.92. Likewise, the C.P.I. for FY12 is 0.992. Again neglecting the holdback, the S.P.I. numbers for Pu Sustainment overall are 0.94 (Sept) and 0.96 (FY12) and with the facility infrastructure element removed 0.95 (Sept) and 0.95 (FY12).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impacted groundwater

54 ENVIRONMENTAL SCIENCES↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cementitious Barriers Partnership - FY2015 End-Year Report

The DOE-EM Office of Tank Waste Management Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. Therefore, the CBP ultimate purpose is to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex. This status report highlights the CBP 2015 Software and Experimental Program efforts and accomplishments that support DOE needs in environmental cleanup and waste disposal. DOE needs in this area include: Long-term performance predictions to provide credibility (i.e., a defensible technical basis) for regulator and DOE review and approvals, Facility flow sheet development/enhancements, and Conceptual designs for new disposal facilities. In 2015, the CBP developed a beta release of the CBP Software Toolbox – “Version 3.0”, which includes new STADIUM carbonation and damage models, a new SRNL module for estimating hydraulic properties and flow in fractured and intact cementitious materials, and a new LeachXS/ORCHESTRA (LXO) oxidation module. In addition, the STADIUM sulfate attack and chloride models have been improved as well as the LXO modules for sulfate attack, carbonation, constituent leaching, and percolation with radial diffusion (for leaching and transport in cracked cementitious materials). These STADIUM and LXO models are applicable to and can be used by both DOE and the Nuclear Regulatory Commission (NRC) end-users for service life prediction and long-term leaching evaluations of radioactive waste containment structures across the DOE complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rad-NESHAP Review of TA-21-257 Remediation Activities

Environmental Protection and Compliance (EPC) Division personnel reviewed the remediation work at Technical Area 21, Building 257 (TA-21-257) for compliance with Radionuclide NESHAP1 requirements. Remediation activities include removal of Building 257, the associated waste lines, and waste storage tanks. We used project data and the most recent CAP88 plume dispersion model to estimate the emissions source term and the resulting off-site dose to members of the public. Emissions monitoring requirements from this work are being met by measuring ambient air concentrations at public receptor locations using LANL’s Airnet system. All requirements under 40 CFR 61 Subpart H are being met for the currently planned scope of operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARSAME Release Report for TA46 Building 1

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has identified materials associated with technical area 46, Building 1 (TA-46-001) that meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1 Radiation Protection for the Public and the Environment (DOE 2013). We have also identified materials in certain rooms, e.g., ventilation systems and liquid drains and piping, which do not meet the criteria for unrestricted release and are to be treated as Low Level Waste (LLW). These conclusions are based on the known history of the structures combined with radiation survey data collected in 2018, and findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL 2017). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2009) and LANL procedures (LANL 2015). Final approvals for waste disposition will come from LANL’s Waste Management Program. The scope of this final release report includes structure TA-46-001. Floorplans for building 46-001 are provided in Figures 2 through 4. Metal materials included in this report are not subject to the DOE metal moratorium. While MARSAME provides guidance on statistical sampling for residual radionuclides in bulk materials, smaller miscellaneous items can be released via the release procedures outlined in LANL Policy 121 Radiation Protection (LANL 2018).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

Transitioning Coal Power Plants to Nuclear Power

Most large U.S. power companies are setting zero-carbon-emission goals and is a reflection of utility commitments to carbon reduction and policies at the Federal and State levels. Increasing the rate of coal power plant (CPP) retirements has been seen across the industry. Previous transitions of coal to gas fuel are becoming less desirable as having zero carbon emissions become ever more import. As CPPs are retired, a reliable and affordable zero-emission power replacement is desired. Nuclear power plants (NPP) is the only existing dispatchable and clean source of energy that can directly replace a CPP. The report covers different factors that affect CPP to NPP projects.

20 FOSSIL-FUELED POWER PLANTS↗

Preconceptual Design of Irradiated Fuel Salt Management System

The National Reactor Innovation Center was established by the U.S. Department of Energy to accelerate the demonstration and deployment of advanced nuclear reactors. To meet this mission, the National Reactor Innovation Center has developed the Laboratory for Operations and Testing in the U.S. (LOTUS) to support the first fast-spectrum molten salt reactor demonstration. The goal of this research is to understand the system requirements that may be applied to a molten salt reactor experiment in the LOTUS test bed and to perform systems analyses and preconceptual development of a storage container for the management of the irradiated molten salt fuel. This study proposes a set of irradiated fuel salt management processes for the molten salt reactor, from defueling to storage or disposal. For that, the historic Molten Salt Reactor Experiment (MSRE) at Oak Ridge National Laboratory has served as a crucial source of data for a mock application. This paper proposes a potential geometry for storing irradiated fuel salt based on MSRE data and the Monte Carlo N-Particle radiation transport code. The geometry was analyzed for criticality safety under abnormal situations, such as water ingress and interaction between containers. Based on the determined configuration of the storage system, the decay heat produced from the irradiated fuel salts was calculated to provide a reasonable time scale of the dormancy period. Using the same geometry assumed above, the neutron and gamma dose rates from the irradiated fuel salt at the end of the dormancy period were estimated, which will be useful for understanding the handling and radiation protection requirements for handling the irradiated fuel salt. Lastly, a reactor in the LOTUS test bed could use chloride-based fuel as opposed to the fluoride-based fuel used in MSRE. Thus, a literature study provided data to understand the similarities and differences between the characteristics of fluoride- and chloride-based salts in terms of salt chemistry, material characteristics, postirradiation behavior, neutronics, thermal hydraulics, and heat removal. This study, together with the proposed irradiated fuel salt management processes, preliminary criticality calculations, decay heat, and dose rate estimates, provides a strong basis for future investigation into the management of irradiated fuel salts generated during molten salt reactor technology demonstrations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗