Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Earth Observing System. Science and Mission Requirements, Volume 1, Part 1

The Earth Observing System (EOS) is a planned NASA program, which will carry the multidisciplinary Earth science studies employing a variety of remote sensing techniques in the 1990's, as a prime mission, using the Space Station polar platform. The scientific rationale, recommended observational needs, the broad system configuration and a recommended implementation strategy to achieve the stated mission goals are provided.

Source record↗

An overview of the evolution of Landsat-4

Landsat-4 was launched on July 16, 1982, from Vandenberg Air Force Base in California. This launch culminated over a decade of planning, design, and implementation effort. During this period, many decisions and choices had to be made involving such items as the characteristics of the second-generation observing instrument named the Thematic Mapper (TM), the orbital altitude and coverage pattern, the configuration of the ground processing systems, etc. In total, the design and operation of Landsat-4 depart substantially from those of the successful Landsat 1, 2, and 3 series. Results derived from the operation of Landsat-4 systems and analyses of data products indicate that there have been very significant successes associated with Landsat-4. The TM provides observations that are considerably improved over the Multispectral Scanner (MSS). The middle-infrared bands at 1.6 and 2.2 micrometers, for example, are providing land-cover classification results that meet or exceed expectations. It is now hoped that successful operation of Landsat-4, Landsat-D' (D-prime), and the Tracking and Data Relay Satellite System (TDRSS) will permit the acquisition of a worldwide set of TM and MSS observations.

Salomonson, V. V.↗

Distributed control for COFS 1

An overview is given of the work being done at NASA LaRC on developing the Control of Flexible Structures (COFS) 1 Flight Experiment Baseline Control Law. This control law currently evolving to a generic control system software package designed to supply many, but not all, guest investigators. A system simulator is also described. It is currently being developed for COFS-1 and will be used to develop the Baseline Control Law and to evaluate guest investigator control schemes. It will be available for use whether or not control schemes fall into the category of the Baseline Control Law. First, the hardware configuration for control experiments is described. This is followed by a description of the simulation software. Open-loop sinusoid excitation time histories are next presented both with and without a local controller for the Linear DC Motor (LDCM) actuators currently planned for the flight. The generic control law follows and algorithm processing requirements are cited for a nominal case of interest. Finally, a closed-loop simulation study is presented, and the state of the work is summarized in the concluding remarks.

Montgomery, R. C.↗

The International Space Station complex - Promise and problems

The current planning status of the International Space Station is reviewed from a NASA perspective, with a focus on aspects affecting the contributions of the international partners ESA, Japan, and Canada. The modifications implied by the shift from the previous double-keel configuration to the current phased-deployment (Block 1 - Block 2) approach are considered in detail and illustrated with drawings and a table listing the baseline assembly sequence. It is pointed out that the originally proposed non-NASA components can all be accommodated in the new configuration. The need for intermodule commonality of equipment form, fit, and function is discussed, and it is recommended that independent user boards be set up to select and coordinate experiments, and that the user boards of the partners open channels of cooperation and mutual support.

Halpern, Richard E.↗

U.S. Laboratory Module - Its capabilities and accommodations to support user payloads

The U.S. Laboratory Module of the Space Station is discussed, focusing on user accommodations. The configuration and subsystems capabilities of the module are described, including the power, thermal, environmental control, and data management subsystems, the vacuum system, process materials management, and laboratory support equipment. The experimental facilities included in the laboratory are listed. The experiment operations planned for the laboratory are examined and compared with the experimental activities in other manned space laboratories.

Powell, Luther E.↗

NextGen Operational Improvements: Will they Improve Human Performance

Modernization of the National Airspace System depends critically on the development of advanced technology, including cutting-edge automation, controller decision-support tools and integrated on-demand information. The Next Generation Air Transportation System national plan envisions air traffic control tower automation that proposes solutions for seven problems: 1) departure metering, 2) taxi routing, 3) taxi and runway scheduling, 4) departure runway assignments, 5) departure flow management, 6) integrated arrival and departure scheduling and 7) runway configuration management. Government, academia and industry are simultaneously pursuing the development of these tools. For each tool, the development process typically begins by assessing its potential benefits, and then progresses to designing preliminary versions of the tool, followed by testing the tool's strengths and weaknesses using computational modeling, human-in-the-loop simulation and/or field tests. We compiled the literature, evaluated the methodological rigor of the studies and served as referee for partisan conclusions that were sometimes overly optimistic. Here we provide the results of this review.

Beard, Bettina L.↗

WINS. Market Simulation Tool for Facilitating Wind Energy Integration

Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practices can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.

17 WIND ENERGY↗

The ISS 2B PVTCS Ammonia Leak: An Operational History

In 2006, the Photovoltaic Thermal Control System (PVTCS) for the International Space Station's 2B power channel began leaking ammonia at a rate of approximately 1.5lbm/year (out of a starting approximately 53lbm system ammonia mass). Initially, the operations strategy was "feed the leak," a strategy successfully put into action via Extra Vehicular Activity during the STS‐134 mission. During this mission the system was topped off with ammonia piped over from a separate thermal control system. This recharge was to have allowed for continued power channel operation into 2014 or 2015, at which point another EVA would have been required. Without these periodic EVAs to refill the 2B coolant system, the channel would eventually leak enough fluid as to risk pump cavitation and system failure, resulting in the loss of the 2B power channel - the most critical of the Space Station's 8 power channels. In mid‐2012, the leak rate increased to approximately 5lbm/year. Once discovered, an EVA was planned and executed within a 5 week timeframe to drastically alter the architecture of the PVTCS via connection to a dormant thermal control system not intended to be utilized as anything other than spare components. The purpose of this rerouting of the TCS was to increase system volume and to isolate the photovoltaic radiator, thought to be the likely leak source. This EVA was successfully executed on November 1st, 2012 and left the 2B PVTCS in a configuration where the system was now being adequately cooled via a totally different radiator than what the system was designed to utilize. Unfortunately, data monitoring over the next several months showed that the isolated radiator was not leaking, and the system itself continued to leak steadily until May 9th, 2013. It was on this day that the ISS crew noticed the visible presence of ammonia crystals escaping from the 2B channel's truss segment, signifying a rapid acceleration of the leak from 5lbm/year to 5lbm/day. Within 48 hours of the crew noticing the leak, an EVA was in progress to replace the coolant pump - the only other replaceable leak source. This paper will explore the management of the 2B PVTCS leak from the operations perspective. It will discuss the methodology of performing the STS‐134 refill, the considerations and contingency plans which went into the architectural overhaul of the system in 2012, and the unprecedented effort which went into the EVA response to the visible leak of May 2013. In particular the paper will focus on the techniques utilized by flight controllers to monitor the system health and to respond to such instances as the rapid May 2013 leak by putting the electrical system in a safe configuration for loss of cooling, and will use recorded telemetry of these events to describe system response to EVA crew and ground actions. It will discuss the innovative design for redundancy of the integrated truss structure's cooling systems which allowed for this leak to be managed with minimal impact to other ISS operations and electrical services, contrasted against the real unintended operations consequences of utilizing the flexibility of the spacecraft's design in this manner. The paper will discuss how the training of the crew and flight controller personnel has adapted to the changing architecture of the power system and the unpredictable nature of the 2B leak.

Vareha, Anthony↗

A One Chip Hardened Solution for High Speed SpaceWire System Implementations. Session: Components

An Application Specific Integrated Circuit (ASIC) that implements the SpaceWire protocol has been developed in a radiation hardened 0.25 micron CMOS technology. This effort began in March 2003 as a joint development between the NASA Goddard Space Flight Center (GSFC) and BAE Systems. The BAE Systems SpaceWire ASIC is comprised entirely of reusable core elements, many of which are already flight-proven. It incorporates a router with 4 SpaceWire ports and two local ports, dual PC1 bus interfaces, a microcontroller, 32KB of internal memory, and a memory controller for additional external memory use. The SpaceWire cores are also reused in other ASICs under development. The SpaceWire ASIC is planned for use on the Geostationary Operational Environmental Satellites (GOES)-R, the Lunar Reconnaissance Orbiter (LRO) and other missions. Engineering and flight parts have been delivered to programs and users. This paper reviews the SpaceWire protocol and those elements of it that have been built into the current and next SpaceWire reusable cores and features within the core that go beyond the current standard and can be enabled or disabled by the user. The adaptation of SpaceWire to BAE Systems' On Chip Bus (OCB) for compatibility with the other reusable cores will be reviewed and highlighted. Optional configurations within user systems and test boards will be shown. The physical implementation of the design will be described and test results from the hardware will be discussed. Application of this ASIC and other ASICs containing the SpaceWire cores and embedded microcontroller to Plug and Play and reconfigurable implementations will be described. Finally, the BAE Systems roadmap for SpaceWire developments will be updated, including some products already in design as well as longer term plans.

Marshall, Joseph R.↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experiments on Material Differentiation

In the initial LCP proposal it was expected that experiments on material differentiation would be performed as one of the tasks in FY14. Due to funding being lower than projected, these experiments were put on hold for FY14 but initial planning for future experiments was performed. In parallel with this task, Task 3 continued work on improving the capabilities for correlating muons with secondary particles such as gammas or neutrons. Potential facilities for future experiments were identified and ROM costs were determined. By establishing communications early, this will facilitate a more efficient movement into experimental facilities in the future. The primary component of the planning was to identify possible locations for the experiments along with ROM estimates for use of these facilities.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advanced space engine preliminary design

Analysis and design of an optimum LO2/LH2, combustion topping cycle, 88,964 Newtons (20,000-pound) thrust, liquid rocket engine was conducted. The design selected is well suited to high-energy, upper-stage engine applications such as the Space Tug and embodies features directed toward optimization of vehicle performance. A configuration selection was conducted based on prior Air Force Contracts, and additional criteria for optimum stage performance. Following configuration selection, analyses and design of the major components and engine systems were conducted to sufficient depth to provide layout drawings suitable for subsequent detailing. In addition, engine packaging to a common interface and a retractable nozzle concept were defined. Alternative development plans and related costs were also established. The design embodies high-performance, low-weight, low NPSH requirements (saturated propellant inlet conditions at start), idle-mode operation, and autogenous pressurization. The design is the result of the significant past and current LO2/LH2 technology efforts of the NASA centers and the Air Force, as well as company-funded programs.

Zachary, A. T.↗

Heat transfer tests of an 0.006-scale thin-skin space shuttle thermocouple model (41-OTS) in the Langley Research Center unitary plan wind tunnel at M equals 3.7 (IH16)

The results are presented of supersonic heat transfer tests performed on the .006 scale space shuttle vehicle model (41-OTS) in the Langley Research Center Unitary Plan Wind Tunnel. These tests were conducted to parametrically investigate ascent heating of the integrated vehicle and its components. The tests were conducted at a nominal Mach number of 3.7 and Reynolds numbers per foot of 2 and 5 million. The model configurations investigated were the integrated vehicle and each component alone (i.e. orbiter, tank and SRB). All the configurations were run with and without transition strips and through an angle of attack range of 0 deg to minus 5 deg with the exception of the SRB which was tested through an angle of attack range of minus 5 deg to 90 deg. The heat transfer data were obtained from 223 iron constantan thermocouples attached to stainless steel thin-skin areas of the model.

Walstad, D. G.↗

Entry dynamics performance predictions for Pioneer Venus probes

The scientific experiments planned for the Pioneer Venus entry probes require that the probes provide a stable platform at a controlled roll rate throughout the atmospheric phase of the mission. The 45-degree half-cone forebody common to both the small and large probe configurations provides a design which meets all stability and attitude requirements. The uncertainty in the dynamic stability parameter coupled with the possible variability of roll rate due to ablation induced roll torques could, however, result in slight angle of attack divergence in the transonic flight regime. Minimum roll rate requirements on the small probe are passively achieved by a vane mounted on the pressure-temperature sensing arm. The vane was sized to provide minimum dynamic disturbance.

Mccloy, R. D.↗

System dynamics and simulation of LSS

Large Space Structures have many unique problems arising from mission objectives and the resulting configuration. Inherent in these configurations is a strong coupling among several of the designing disciplines. In particular, the coupling between structural dynamics and control is a key design consideration. The solution to these interactive problems requires efficient and accurate analysis, simulation and test techniques, and properly planned and conducted design trade studies. The discussion presented deals with these subjects and concludes with a brief look at some NASA capabilities which can support these technology studies.

Ryan, R. F.↗

Concept considerations for a small orbital transfer vehicle

This paper summarizes a study of small orbital transfer vehicles to place payloads in orbits with altitudes above those of the standard Shuttle operations. The overall objective of the study is to examine the role of the small orbital transfer vehicle (SOTV) in Shuttle operations and to identify typical propulsion concepts for accomplishing the mission. Consideration is given to existing and planned systems and upper stages, along with new propulsion stages. The new propulsion concept development examines tandem and clustered solids, controlled solids, monopropellant and bipropellant liquids, and staged solid/liquid combinations. The paper presents considerations of the mission requirements, tradeoffs of the various configurations, and candidate selections. For the selected candidate concepts the performance, support equipment, operational considerations and program costs were determined. The results show that a new modular liquid stage system is cost effective in handling the majority of the payloads considered. The remainder of the payloads can be accomodated by existing systems.

Green, M.↗

Conceptual planning for Space Station life sciences human research project

The Life Sciences Research Facility dedicated laboratory is currently undergoing system definition within the NASA Space Station program. Attention is presently given to the Humam Research Project portion of the Facility, in view of representative experimentation requirement scenarios and with the intention of accommodating the Facility within the Initial Operational Capability configuration of the Space Station. Such basic engineering questions as orbital and ground logistics operations and hardware maintenance/servicing requirements are addressed. Biospherics, calcium homeostasis, endocrinology, exercise physiology, hematology, immunology, muscle physiology, neurosciences, radiation effects, and reproduction and development, are among the fields of inquiry encompassed by the Facility.

Primeaux, Gary R.↗