Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

The SWOT Mission Environmental Verification Program

The objective of the Surface Water and Ocean Topography (SWOT) Mission is to make global measurements of sea surface and terrestrial water heights. The SWOT Observatory consists of the Spacecraft Bus, supplied by CNES, and the Payload Module, provided by JPL. The Spacecraft Bus is a carrier of the Payload Module, which includes all the science instruments. The Spacecraft Bus components have been environmentally verified by CNES and the Payload Module components verified by JPL. The Payload Module was delivered to CNES in June 2021 for integration with the Spacecraft Bus to form the Observatory, which is in the process of undergoing a full set of environmental tests before launch. This paper focuses on the environmental test and analysis program at the assembly (unit), subsystem, and module level for the Payload Module hardware that JPL is responsible for verifying. Even though an Earth-orbiting mission like SWOT is not considered to be at extreme environments, SWOT’s environmental verification program does illustrate the standard System Integration and Test (SIT) process for hardware integration and environmental testing to ensure all hardware have been properly qualified to meet all mission environments. Typical space environmental test and analysis campaign includes acoustics vibration, shock, thermal vacuum, venting/pressure, radiation, electrostatic discharge, EMC/EMI/magnetics, and meteoroids. Environmental test and analysis metrics are presented in this paper. This paper also shows the complex integration process that involves multi-organizations and the latest status on the Observatory environmental test campaign.

Man, Kin F.↗

Erectable beam experiment

The erectable beam applicability to the MAST/STEP experiment is summarized. High manual assembly rates were demonstrated in neutral buoyancy tests and it is suggested that use of an erectable beam would eliminate extension/retraction complexity associated with deployable beams. The erectable beam assembly aid is easily adaptable to general truss configurations and structural appendages could be accommodated with the use of actuators. The ACCESS flight experiment precedes MAST by 2 to 3 years and will provide mature, space proven assembly/disassembly technology on which to base the MAST experiment.

Heard, W. L., Jr.↗

System level verification applying the Space Shuttle experience to the Space Station

The applicability of the verification process for the Shuttle guidance, navigation and control (GNC) and data management system (DMS) for the development of the Space Station are described. Shuttle avionics hardware/software integration was delayed to finalize the hardware design before detailed definition and testing of the software. A block diagram is provided of the flight simulation laboratory used to test the GNC programs before flight data were available. The Station will have distributed computers, unlike the Orbiter, and will only be assembled fully in space. Standardized integration simulation test equipment are being defined to guide the development of hardware and software. The simulation capability may become part of nominal in-flight operations to initiate new capabilities as they are added to the Station. The Station GNC and DMS systems development will be somewhat simplified relative to those of the Shuttle because ascent and reentry will not be considered for the Station.

Gilbert, David W.↗

Progress on Passive Sensor for Ultra-Precise Measurement of Carbon Dioxide from Space

Global measurements of atmospheric carbon dioxides (CO2) are needed to resolve significant discrepancies that exist in our understanding of the global carbon budget and, therefore, man's role in global climate change. The science measurement requirements for CO2 are extremely demanding (precision c .3%) No atmospheric chemical species has ever been measured from space with this precision. We are developing a novel application of a Fabry-Perot interferometer to detect spectral absorption of reflected sunlight by CO2 and O2 in the atmosphere. Preliminary design studies indicate that the method will be able to achieve the sensitivity and signal-to-noise required to measure column CO2 at the target specification. We are presently engaged in the construction of a prototype instrument for deployment on an aircraft to test the instrument performance and our ability to retrieve the data in the real atmosphere. In the first 6 months we have assembled a laboratory bench system to begin testing the optical and electronic components. We are also undertaking some measurements of signal and noise levels for actual sunlight reflecting from the ground. We shall present results from some of these ground based studies and discuss their implications for a space based system.

Heaps, William S.↗

Fermilab Cryogenic Test Facilities

Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.

43 PARTICLE ACCELERATORS↗

JPS heater and sensor lightning qualification

Simulated lightning strike testing of the Redesigned Solid Rocket Motor (RSRM) field joint protection system heater assembly was performed at Thiokol Corp., Wendover Lightning Facility. Testing consisted of subjecting the lightning evaluation test article to simulated lightning strikes and evaluating the effects of heater cable transients on cables within the systems tunnel. The maximum short circuit current coupled onto a United Space Boosters, Inc. operational flight cable within the systems tunnel, induced by transients from all cables external to the systems tunnel, was 92 amperes. The maximum open-circuit voltage coupled was 316 volts. The maximum short circuit current coupled onto a United Space Boosters, Inc. operational flight cable within the systems tunnel, induced by heater power cable transients only, was 2.7 amperes; the maximum open-circuit voltage coupled was 39 volts. All heater power cable induced coupling was due to simulated lightning discharges only, no heater operating power was applied during the test. The results showed that, for a worst-case lightning discharge, the heater power cable is responsible for a 3.9 decibel increase in voltage coupling to operational flight cables within the systems tunnel. Testing also showed that current and voltage levels coupled onto cables within the systems tunnel are partially dependant on the relative locations of the cables within the systems tunnel.

Cook, M.↗

Magnetic Measurements of $\mathrm{HL-LHC AUP}$ Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profiles. A multi-probe, PCB-based rotating coil and a Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. Here this paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Development of Lead Free Energy Absorber for Space Shuttle Blast Container

The Space Shuttle vehicle (SSV) is connected to the mobile launch platform (MLP) by four aft skirt hold down studs on each solid rocket booster (SRB). Prior to lift-off, the frangible nuts inside the aft skirt blast containers (BC) are severed into two nut halves by two pyrotechnic booster cartridges. This action releases the SSV and allows the hold down studs to eject through the aft skirt bore and then down into the MLP. USBI has been tasked to upgrade the BC for two specific reasons; 1. to eliminate lead for environmental concerns, and 2. to reduce the chance of nut recontact with the holddown stud. Nut recontact with the stud has been identified as a likely contributor to stud hangups. This upgrade will replace the lead liner with an aluminum foam material. The aluminum foam used as a energy absorber is a proven design in many other aerospace/defense applications. Additional benefits of using the open cell, energy absorbent aluminum foam in place of the solid lead liner are: A. Lead handling/ exposure, and possible contamination, along with hazardous waste disposal will be eliminated; B. Approximately 200 lbs. weight savings will be contributed to each Space Shuttle flight by using aluminum foam over lead; C. The new aluminum liner is designed to catch all shrapnel from frangible nuts thus virtually eliminating chance of foreign object debris (FOD) exiting the HDP, and causing potential damage to the vehicle; D. Potential of using the lighter aluminum liner over lead, allows for easier assembly and disassembly of blast container elements, also allowing for improvements in safety, operator handling, and efficiency of operations. Six BC firing tests will be required to determine if the new liner material will perform in a way to decrease the chance of stud hangups and enhance the ability of the BC to retain blast debris. Testing will be performed at the Kennedy Space Center (KSC) facility known as the Launch Equipment Test Facility (LETF), and will simulate the SRB hold- down post, with actual BC hardware and pyrotechnics assembled, and then test fired. Initial testing was performed in 1997 using a frangible nut in a static drop test over lead and aluminum foam sheet materials. The aluminum foam showed a dramatic improvement of energy absorption over the lead liner material. Proof-of-Principle testing at the KSC-LETF commenced in May, 1998, and is expected to be completed by June, 1998.

Ingram, T.↗

Experimental Validation of Subsystem Models for a Novel Variable Displacement Hydraulic Motor

A novel, variable displacement, low-speed high-torque hydraulic motor is being developed that is expected to be highly efficient across a broad operating range. To ensure the final hardware achieves the expected performance, the models used in the development of the motor must be experimentally validated and revised, as necessary. The specific focus in this work is on mechanical energy loss models that were used to guide the design of a single-cylinder motor prototype and on experimental tests used for model validation. Ideally each model, whether friction loss in a piston/cylinder interface or energy loss due to leakage in a valve , would be individually validated by an independent test. This granular approach would remove any question of where the error lies and result in highly accurate models. However, many motor components have multiple forms of energy loss, creating difficulty in validating individual losses. Additionally, it is not physically realizable to divide many components into an individual model equivalent test. Testing the motor as a full assembly is possible, but pinpointing the source of discrepancies between the model and the hardware becomes difficult with dozens of models potentially being partially responsible. A compromise was found by separating the motor into functional component groups that are characterized by the type of loss and ability to test each subcomponent independently. By checking for correlation between test observations and model predictions, revisions could be implemented into the models. This allows future solutions to be more accurately predicted in the design phase to drive the design of better machines.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space Station Freedom NiH2 cell testing program

Testing for the Space Station Freedom Nickel Hydrogen Cell Test Program began in 1990 at Crave Division, Naval Surface Warfare Center. The program has included receipt inspection, random vibration, acceptance, characterization, and life cycle testing of Ni-H2 cells in accordance with the NASA LeRC Interagency Order C-31001-J. A total of 400 Ni-H2 cells have been received at NAVSURFWARCENDIV Crane from three separate manufacturers; Yardney Technical Products (Yardney), Eagle Picher Industries (Eagle Picher), and Gates Energy Products (Gates). Of those, 308 cells distributed among 39 packs have undergone life cycle testing under a test regime simulating low earth orbit conditions. As of 30 September 1993, there are 252 cells assembled into 32 packs still on life cycle test. Since the beginning of the program, failed cells have been detected in all phases of testing. The failures include the following; seven 65 AmpHr and 81 AmpHr Yardney cells were found to be leaking KOH on receipt, one 65 AmpHr Eagle Picher cell failed the acceptance test, one 65 AmpHr Gates cell failed during the characterization test, and six 65 AmpHr Gates cells failed the random vibration test. Of the 39 life cycle packs, testing on seven packs, 56 cells, has been suspended because of low end of discharge voltages. All of the failed life cycle packs were cycled at 60% depth of discharge.

Moore, Bruce↗

Backward assembly planning with DFA analysis

An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

Lee, Sukhan↗

Hardware-in-the-Loop Simulation of Modular Antenna Assembly

Robots are playing an increasing role in space exploration and in-space servicing. Robotic arms are good for performing in-space tasks such as modular assembly. The SPIDER arm (SPace Infrastructure Dexterous Robot) of the OSAM-1 mission represents an example of a system that can perform modular antenna assembly tasks in environmental conditions that would be dangerous for astronauts. One of the WVRTC activities is to perform independent verification and validation of the SPIDER assembly operations. Space robotic systems adopting large manipulators such as the SPIDER arm are complex to test and verify under normal 1-G conditions. Our work involves proof-of-principle testing of a hardware-inthe-loop (HIL) simulator operating in 1-g conditions, which replicates the motion of the space robot end-effector under the same geometric, kinematic and dynamic conditions, and in response to externally applied forces from its space environment. In particular, our software simulates in real-time the robot dynamics inclusive of flexibility, an important aspect in case of a long robotic arms operating in 0-G conditions. For example, the same oscillatory motions of the space manipulator’s end-effector can be mimicked on ground through our industrial manipulator, allowing us to test the feasibility of complex operation such as assembling modular components.

Robotic Assembly↗

A Hybrid Parachute Simulation Environment for the Orion Parachute Development Project

A parachute simulation environment (PSE) has been developed that aims to take advantage of legacy parachute simulation codes and modern object-oriented programming techniques. This hybrid simulation environment provides the parachute analyst with a natural and intuitive way to construct simulation tasks while preserving the pedigree and authority of established parachute simulations. NASA currently employs four simulation tools for developing and analyzing air-drop tests performed by the CEV Parachute Assembly System (CPAS) Project. These tools were developed at different times, in different languages, and with different capabilities in mind. As a result, each tool has a distinct interface and set of inputs and outputs. However, regardless of the simulation code that is most appropriate for the type of test, engineers typically perform similar tasks for each drop test such as prediction of loads, assessment of altitude, and sequencing of disreefs or cut-aways. An object-oriented approach to simulation configuration allows the analyst to choose models of real physical test articles (parachutes, vehicles, etc.) and sequence them to achieve the desired test conditions. Once configured, these objects are translated into traditional input lists and processed by the legacy simulation codes. This approach minimizes the number of sim inputs that the engineer must track while configuring an input file. An object oriented approach to simulation output allows a common set of post-processing functions to perform routine tasks such as plotting and timeline generation with minimal sensitivity to the simulation that generated the data. Flight test data may also be translated into the common output class to simplify test reconstruction and analysis.

Moore, James W.↗

Modeling and Analysis for Spent Nuclear Fuel Seismic Testing

Note: This is the final public release version of PNNL-31671 Draft, which was previously released to the sponsor for review. The intent is the public release version will be PNNL-31671. There are no significant changes from the earlier draft version. This unlimited distribution report is the deliverable for M3SF-21PN010202014: Modeling and Analysis for Spent Nuclear Fuel Seismic Testing. This report summarizes the modeling, analysis, and test plan support completed by Pacific Northwest National Laboratory for the spent nuclear fuel dry storage system seismic test plan through May of 2021. Test plan preparation is planned to continue until the seismic test is completed in July of 2022. This report covers preliminary structural dynamic model development and computer-aided design of test hardware. Based on preliminary modeling, the strongest earthquakes under consideration in this test program provide mechanical loading on the spent nuclear fuel that is comparable to the 30 cm cask drop scenario, although the loads do not appear to be strong enough to cause significant permanent deformation of the fuel assembly spacer grids. The potential for grid deformation during the test will be assessed when the proposed shake table motion becomes available. The weakest earthquakes considered in this test are expected to be comparable to the mechanical loads witnessed in the multimodal transportation test of 2017. The horizontal canister system is predicted to provide nearly-uniform loading condition on the fuel assemblies it contains, while the vertical cask system is predicted to cause non-uniform dynamic loads on the fuel assemblies. In the horizontal case, gravity keeps the fuel assemblies in contact with one basket wall surface unless the loads are strong enough to cause a separation. In the vertical case, the fuel assemblies are relatively long and slender, and seismic motion in the anticipated test range is predicted to cause the assemblies to lean, tilt, and impact the basket walls throughout the seismic event. These gap closures are a nonlinear force transmission condition, so the vertical system is expected to have more variation and variability than the horizontal system. While the horizontal system is expected to have a relatively more linear response than the vertical system, there is still the potential for nonlinear behavior in the horizontal system because the fuel assemblies are free to slide, bounce, and impact the basket walls if the seismic loads are strong enough. One major conclusion of this study is that the use of mixed fuel assemblies in the canister will be acceptable. There are differences in overall system response when the mass, center of gravity, or gaps are changed, but the changes in response are within the bounds of a system that contains completely homogeneous fuel assemblies. One important observation is that the loading for each individual fuel assembly within the vertical canister is expected to be different from that of the others because of nonlinearities in the system. The horizontal canister system is expected to have a more uniform and more predictable response than the vertical canister, making variations in fuel assembly characteristics easier to account for. One important recommendation that comes from this modeling work is to repeat some of the strongest shake tests at different angles, particularly for the vertical cask system. Modeling predicts that strong seismic motion will cause the fuel assemblies to close initial gaps and impact the fuel basket walls when the canister is in the vertical cask configuration. Each shake test will impose a pre-defined three-dimensional time history on the cask system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Magnetic Measurements of HL-LHC AUP Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profile. A multi-probe, PCB-based rotating coil and Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. This paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

43 PARTICLE ACCELERATORS↗

Engineering analysis and test results of the pre-stage planetary gear trains for wrist rotation and pitch assembly and azimuth and elevation assembly of the extendable stiff arm manipulator kit assembly

In order to improve the performance capability of the Extendable Stiff Arm Manipulator (ESAM) it was necessary to increase the overall gear ratio by a factor of approximately four. This is accomplished with minimum effect to existing hardware by the interposition of a planetary gear transmission between the respective drive motors and the harmonic drive transmissions. The engineering analysis in support of this design approach and the subsequent no-load test results are reported.

Morris, R. N.↗

Ground testing of the Li-ion batteries in support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(deg)C to +4O(deg)C), withstand long storage periods (e.g., cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing performed includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory corrections), (d) simulating the entry, decent, and landing pulse load profile (if required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by LithiodYardney, Inc.) were demonstrated to far exceed the requirements defined by the mission, and are projected to support an extended mission (> 2 years) with margin to spare.

Li-ion batteries↗

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes↗