COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol (Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

Kanefsky, Bob↗

Automating Surface Attitude Positioning and Pointing Operations for Mars 2020

The Surface Attitude Positioning and Pointing (SAPP) subsystem of the Mars Perseverance rover keeps track of the rover’s position and attitude on the surface of Mars. The SAPP Downlink Engineering Operations team members receive data from the rover on a daily basis. They must interpret the data to make sure the rover is staying safe and to support uplink planning. The SAPP team keeps track of the error growth in the rover’s attitude estimate due to noise in the Rover Inertial Measurement Unit’s (RIMU) gyroscopes used to propagate that attitude estimate whenever the rover is moving. Whenever this error grows to a particular threshold, SAPP is responsible for updating the onboard attitude knowledge using the RIMU’s accelerometers to estimate rover roll and pitch and sun imaging to estimate rover yaw, thereby reducing this attitude estimation error. Accurate attitude estimation is required so that the rover can successfully point its High Gain Antenna (HGA) to receive information from Earth and as a backup to the Mars orbiters used for sending data from the rover to Earth, point instruments on its Remote Sensing Mast (RSM), and support safe movement and placement of instruments by the rover’s ARM relative to the Martian surface. The Mars 2020 Engineering Operations team has been working to increase the operational efficiency of the mission and eventually move to a five-hour timeline for daily operations. In pursuit of this goal, the SAPP Engineering Operations team has automated their downlink process by developing a centralized Jupyter notebook to analyze the data received daily from the rover. The SAPP downlink Jupyter notebook automatically collects the data relevant to the SAPP subsystem and visualizes this information in plots and tables that can be easily read by downlink operators to aid them in assessing the status of the subsystem. Various Application Programming Interfaces (APIs) have been incorporated into the downlink daily notebook to automate the collection and posting of data, such as gathering and posting data products to the cloud. The SAPP team has also developed a SAPP downlink software library that includes functions to aid the notebook in processing data. In addition to assessing the SAPP subsystem on a daily basis, operators need to assess the long-term trending behavior of the subsystem over time. An automated trending process has been developed to collect information from the daily notebooks in order to plot and analyze that data in a centralized place. These daily and trending processes have expedited the SAPP downlink assessment and laid the groundwork to completely automate the SAPP downlink process so that SAPP operators are unnecessary unless something unexpected occurs. This paper will provide an overview of the functions that the SAPP subsystem carries out on a daily basis, and will then dive into the automations that have been developed for daily and trending downlink assessment. An assessment of the downlink efficiency will be provided, along with a summary of lessons learned and work to go. Finally, the authors will discuss how these types of automated spacecraft health assessments could be more broadly used within mission operations.

Zarifian, Anais↗

Testing the Exploration Conops (Excon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Passive Water Assurance Delivery System

This report provides an analysis and evaluation of proposed design improvements to the internal water delivery system of NASA’s passive vegetable growing system. The VEGGIE system is designed to provide fresh vegetables and psychological benefits for astronauts aboard the International Space Station. Preliminary testing conducted by NASA for the VEGGIE system revealed flaws in the water delivery system. In these tests, the interface between the plants and the water reservoir failed to provide passive water delivery through the system both in microgravity experiments and experiments conducted on Earth. Our team’s goal was to fix this interface such that water can be passively delivered from the water reservoir to the plant rooting pillows to grow vegetative crops from seed to harvest. The system requirements outlined by NASA include: minimal total mass, on-demand passive water delivery, same dimensions as existing fixtures, minimal pressure on system to prevent leaking, zero mold growth, minimal swelling or clogging for non-flammable capillary materials, pressure stabilization between the water reservoir and plant pillow bags, even dispersal of water during initial priming, minimal bubble obstruction of capillary interface, maximum gas availability to plant roots, growth in a mixed artificial media (50:50 Arcillite:Fafard #2), and to avoid overwatering and drought conditions for plants. The major proposed design improvements are to use a single-interface capillary cord design to directly connect the water reservoir to the plant-rooting pillows, and to alter the water reservoir to model a propellant management device (PMD) in order to ensure consistent and long term watering for the VEGGIE system. The plant rooting pillow required minimal changes outside of replacing the capillary mat on the bottom of the pillow with O-ring insertion points the single-interface capillary system. - Research was conducted to determine which materials are able to uptake water through capillary action to grow Outredgeous Lettuce plants from seed to harvest. The primary requirements to be met by the team's design and evaluation of the capillary interface were: continuous passive watering for 90 days using non-flammable capillary materials and a peak water delivery rate of 30 mL/hr./0.15 m 2 . The results of the team's experimentation showed that the capillary material Nomex displayed the highest capillary water delivery potential with a maximum flow rate of 3.6 mL/hr. The Nomex capillary systems were the only capillary material to consistently grow Outredgeous Lettuce plants from seed to harvest, and displayed the highest average flow rate for multiple experiment sets. The Nomex material was previously incorporated into the VEGGIE system using a matted version of the capillary material, though the team recommends using a cord configuration in the single-interface capillary system for greater system stability. Nomex has proven to be a promising material, as it has passed both health and fire standards for use aboard the International Space Station. PMDs are made of materials that utilize surface tension and adhesive forces to overcome adverse accelerations to improve stability and ensure fluid delivery. PMDs are typically used in fuel tanks to ensure fuel delivery. The team recommends using a sponge PMD in order to mitigate bubble obstruction, decrease system weight, and ensure reliable water delivery to the capillary interface. The PMD water reservoir requires a rigid water reservoir and a vent tube for pressure stabilization. Since PMD’s cannot be tested in 1-G (Earth conditions), further theoretical modeling and testing is required for the proposed water reservoir design. The intent of this proposed system is to passively water plants in microgravity, though the technology is not limited to microgravity applications. The testing at The Ohio State University has proven that the design is highly effective on Earth, demonstrating that it could serve as a simple water delivery system in home and office applications. This would make vegetative crops more accessible in all indoor applications, thereby improving indoor air quality and occupant comfort. Additionally, this technology has great potential to be utilized in greenhouse plant production, cutting back on more sophisticated watering system energy and time requirements.

Alexandria Jensen↗

Overview of Lightning Science at NASA Marshall Space Flight Center

NASA Marshall Space Flight Center (MSFC) is a recognized world leader in the science of lightning. To date, MSFC has led three space-based global lightning observing missions and has helped lead multiple suborbital field campaigns involving lightning observations. Recently, the MSFC Lightning Team is closing out the recently completed International Space Station Lightning Imaging Sensor (ISS LIS) mission, including developing a nearly three-decade global climatology of lightning from space. This work also includes integrating lightning observations with data from NASA precipitation missions. The Team is also busy analyzing data from a recent airborne field campaign that observed dozens of terrestrial gamma-ray flashes (TGFs) from intense tropical thunderstorms. Lightning Team members are also leaders in validation of the Geostationary Lightning Mapper (GLM) operated by NOAA, and in developing lightning safety applications and studying the relationship between lightning and wildfires. The Lightning Team also studies chemical production by lightning and contributes to the National Climate Assessment (NCA). Finally, the Lightning Team is busy developing the next generation of spaceborne lightning sensors to broaden our understanding of the relationships between lightning, weather, climate, and atmospheric composition.

Timothy Lang↗

Northern Brazil Agriculture: Measuring Soybean Yields in Northern Brazil During El Niño-Southern Oscillation Conditions to Evaluate Trends in Agricultural Production and Support Crop Forecasting, 1984 – 2023

As one of the largest agricultural exporters in the world, Brazil’s crop productivity is highly influential to the world’s food supply. Crop productivity across Brazil is heavily influenced by climatic factors, such as the El Niño-Southern Oscillation (ENSO), which drives spatially heterogenous effects on growing conditions. To understand the relationship between ENSO conditions and staple crop productivity, the team used 1984 – 2023 climatic data and vegetation indices for four Brazilian states: Bahia, Mato Grosso, Pará, and Tocantins. The team focused on soybean growing areas in each state derived from annual land use/land cover classifications. Monthly mean Normalized Difference Vegetation Index (NDVI) per state were calculated using multispectral imagery from the Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), and Landsat 8 Operational Land Imagery (OLI) sensors. In addition, the team used crop production indices, ENSO anomalies, temperature, and precipitation data in this study. The team found that although monthly ENSO anomaly did have a positive relationship between temperature and a slight negative relationship with precipitation, ENSO and monthly soy NDVI were not significantly correlated. Results find no association between ENSO conditions and NDVI in the study area at the state level spatial resolution during the study period. Furthermore, the team found that there was no correlation between cumulative growing season soy NDVI and detrended soy production yield for this study region at the spatial and temporal scale of the analysis. Findings from this project will be used by the United States Department of Agriculture’s Foreign Agriculture Service to inform crop productivity forecasting.

remote sensing↗

Astrobee: Five years of Completed, Current, and Future Research on the International Space Station using Free Flying Robots.

After five years on the International Space Station (ISS), the Astrobee Research Facility, has completed over 160 Test Sessions logging over 1200 hours of operations. Managed by the NASA ISS Program OZ office and supported by NASA Ames Research Center (ARC) in California, the Astrobee Team currently maintains two identical free-flying Astrobee robots and a Docking Station for research on the ISS. As a technology demonstration platform, the Astrobee Robots are available for Guest Scientists to use for a spectrum of research capabilities. Using ambient air on the ISS, propelled by battery-operated fans, Astrobee is designed to autonomously operate throughout most of the USOS (US Orbital Segment), with the objective of minimizing the need for astronaut support. Astrobee carries a suite of six cameras, a two degree-of-freedom (DOF) arm with a gripper that can grasp ISS handrails and other objects, and three payload bays that provide power and data for guest science hardware. Astrobee can autonomously execute hours-long flight plans or be tele-operated from the ground. While the Astrobee Team continues to improve mapping and autonomous flight capabilities, one of the main goals of Astrobee Robots is to provide research opportunities for Guest Scientists. The Astrobee Robot Software (ARS) makes extensive use of the open-source Robot Operating System (ROS). The ARS can be used interchangeably with an Astrobee Simulator or as Astrobee’s onboard software. ARS features include autonomous docking and perching, real-time teleoperations from the ground, plan based autonomous tasks, multi Astrobee communication, among other capabilities. Through simulation software and ground testing laboratories, the Astrobee Team is available to support Guest Scientists during development and testing and lead real-time ISS operations. The Astrobee Team and Guest Scientists have completed research including Astrobatics maneuvers, RFID and sound sensing capabilities, Gecko materials studies, student Robotics Programming Challenges, and Free Flyer formation flight investigations. Current science with the Astrobee Robots is investigating new docking capabilities through software only research as well as testing new docking hardware installed on the Astrobees. The Astrobee Team and other researchers at NASA Ames continue to explore robotics applications for future NASA missions such as Gateway and potential experiments involving human-robot interactions. Continued advanced mapping resolution capabilities, and high-resolution panoramic imagery also remains areas of research. Exciting in development research involves docking for rendezvous proximity operation (CLINGERS), multi resolution 3D scanning (MRS), space debris removal in microgravity (REACCH). This presentation will mainly focus on completed research over the past year and current science being performed on the Astrobees. This presentation will also focus on how a Guest Scientist/Researcher progresses from conception to running their science on the Astrobees on the ISS, as well as discuss the Astrobee Facility resources available for supporting ground testing and real-time ISS operations.

Astrobee↗

An Expert Elicitation Based Study of the Proliferation Resistance of a Suite of Nuclear Power Plants

In 2008, a multi-laboratory research team completed a study evaluating the proliferation resistance (PR) characteristics of a diverse suite of four advanced nuclear reactor designs. The systems evaluated included: • a light water reactor (a pressurized-water reactor), • a heavy water reactor, • a high temperature gas reactor (with a prismatic-block reactor core), • a sodium-cooled fast reactor. The team used an expert elicitation assessment approach based on the Generation IV International Forum (GIF) Proliferation Resistance and Physical Protection (PR&PP) methodology. The team evaluated three general types of proliferation threats: 1) concealed diversion of material, 2) concealed misuse of the reactor to produce material, and 3) breakout. The evaluations took into account the intrinsic PR characteristics of each reactor and the extrinsic PR characteristics provided by generic safeguards the team considered appropriate for each reactor, based on the team’s experience and available conceptual design information.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dysfunctional Scrum: Making it work in a matrixed environment

While we may be operating as dysfunctional Scrum teams at PNNL, where consistency of implementation will remain an ongoing goal, our experiences are showing a pattern of benefit from following the process as best we can. We have found value in socializing stories and user narratives to describe the user experience. We have teams that meet daily for 30 minutes and sit down while they do it, but it has proven valuable to them. We have had several successful teams deliver products even in our dysfunctional environment. Our ScrumMasters work multiple projects and strive for consistency but in our environment (R&D, engineering, and software development) we need to be adaptable and implement those aspects of the discipline that provide benefits to the teams and clients. Our implementations are not 'by the book,' but as long as teams and customers find value in it and our communication and quality of our software products are improved, then we expect to continue using Agile with Scrum.

99 GENERAL AND MISCELLANEOUS↗

NARAC Modeling During the Response to the Fukushima Dai-ichi Nuclear Power Plant Emergency

This paper summarizes the activities of the National Atmospheric Release Advisory Center (NARAC) during the Fukushima Dai-ichi nuclear power plant crisis. NARAC provided a wide range of products and analyses as part of its support including: (1) Daily Japanese weather forecasts and hypothetical release (generic source term) dispersion predictions to provide situational awareness and inform planning for U.S. measurement data collection and field operations; (2) Estimates of potential dose in Japan for hypothetical scenarios developed by the Nuclear Regulatory Commission (NRC) to inform federal government considerations of possible actions that might be needed to protect U.S. citizens in Japan; (3) Estimates of possible plume arrival times and dose for U.S. locations; and (4) Plume model refinement and source estimation based on meteorological analyses and available field data. The Department of Energy/National Nuclear Security Administration (DOE/NNSA) deployed personnel to Japan and stood up 'home team' assets across the DOE complex to aid in assessing the consequences of the releases from the Fukushima Dai-ichi Nuclear Power Plant. The DOE Nuclear Incident Team (NIT) coordinated response activities, while DOE personnel provided predictive modeling, air and ground monitoring, sample collection, laboratory analysis, and data assessment and interpretation. DOE deployed the Aerial Measuring System (AMS), Radiological Assistance Program (RAP) personnel, and the Consequence Management Response Team (CMRT) to Japan. DOE/NNSA home team assets included the Consequence Management Home Team (CMHT); National Atmospheric Release Advisory Center (NARAC); Radiation Emergency Assistance Center/Training Site (REAC/TS); and Radiological Triage. NARAC was activated by the DOE/NNSA on March 11, shortly after the Tohoku earthquake and tsunami occurred. The center remained on active operations through late May when DOE ended its deployment to Japan. Over 32 NARAC staff members, supplemented by other LLNL scientists, invested over 5000 person-hours of time and generated over 300 analyses and predictions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Secret Objective Standoff: International Safeguards Educational Exercise

The International Safeguards Regime, being so multi-faceted, can be overwhelming to those first introduced to its many components. The organizers and lecturers of workshops and courses on nonproliferation often provide a series of independent lectures and must somehow demonstrate the cohesive and effective nature of the system. An exercise titled The Secret Objective Standoff was developed to complement lectures with hands-on learning to assist participants in bringing all the many components (IAEA agreements, export controls, treaty obligations, international diplomacy, etc.) of the International Safeguards Regime together. This exercise divides participants into teams that are assigned the role of either a country or the IAEA and asks that they fully immerse themselves in their roles. The teams are then randomly assigned three unique and secret objectives that are intended to represent realistic and current geopolitical scenarios. Through construction, trading, or hoarding of four resources (experts, technology, money, and uranium), the teams have a finite number of turns to accomplish their objectives. Each turn has three phases random dispersal of resources, a timed discussion where teams can coordinate and strategize with others, and an action phase. During the action phase, teams inform the moderator individually and secretly what they will be doing that turn. The exercise has been tested twice with Oak Ridge National Laboratory personnel, and has been conducted with outside participants twice, in each case the experience was well received by both participants and instructors. This exercise provides instructors the ability to modify the exercise before or during game play to best fit their educational goals. By offering a range of experiences, from an in-depth look at specific components to a generalized overview, this exercise is an effective tool in helping participants achieve a full understanding the International Safeguards Regime.

Okowita, Samantha L↗

My Green Car: Painting Motor City Green (Ep. 2) – DOE Lab-Corps Video Series

The Lab’s MyGreenCar team kicks off its customer discovery process in Detroit with a business boot camp designed for scientists developing energy-related technologies. Customer interviews lead to late night discussions and insights on less-than-receptive consumers. Back in Berkeley, the team decides to fine tune targeted customer segments. What makes a new technology compelling enough to transition out of the lab and become a consumer product? That’s the question Berkeley Lab researchers Samveg Saxena, Nihar Shah, and Dana Hansen plus industry mentor Russell Carrington set out to answer for MyGreenCar, an app providing personalized fuel economy or electric vehicle range estimates for consumers researching new cars. DOE’s Lab-Corps program offered the technology team some answers. The EERE-funded program, based on the National Science Foundation’s I-Corps™ model for entrepreneurial training, provides tools and training to move energy-related inventions to the marketplace. During Lab-Corp’s intensive six-week session, technology teams interview 100 customer and value chain members to discover which potential products based on their technologies will have significant market pull. A six video series follows the MyGreenCar team’s Lab-Corps experience, from pre-training preparation with the Lab’s Innovation and Partnerships Office through the ups and downs of the customer discovery process. Will the app make it to the marketplace? You’ll just have to watch.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

U.S. Department of Energy Solar Decathlon Competition Guide: 2021 Design Challenge and 2023 Build Challenge

The U.S. Department of Energy (DOE) Solar Decathlon® is a collegiate competition, comprising 10 Contests, that challenges student teams to design and build highly efficient and innovative buildings powered by renewable energy. The competition gives teams the option to participate in one of two Challenges: the Design Challenge or the Build Challenge. Teams entering the Design Challenge must select from seven allowable building types ("Divisions") to create their design. Teams entering the Build Challenge will build a residential unit locally and compete nationally. Whether participating in the Design Challenge or the Build Challenge, all teams are evaluated across 10 Contests. The Competition Guide outlines competition history and structure, descriptions of the 10 Contests, and competition details for both the 2021 Design Challenge and 2023 Build Challenge.

30 DIRECT ENERGY CONVERSION↗

Development of dispensing hardware for safe fueling of heavy duty vehicles

The development of safe dispensing equipment for the fueling of heavy duty (HD) vehicles is critical to the expansion of this newly and quickly expanding market. This paper discusses the development of a HD dispenser and nozzles assembly (nozzle, hose, breakaway) for these new, larger vehicles where flow rates are more than double compared to light duty (LD) vehicles. This equipment must operate at nominal pressures of 700 bar, -40o C gas temperature, and average flow rate of 5-10 kg/min at a high throughput commercial hydrogen fueling station without leaking hydrogen. The project surveyed HD vehicle manufacturers, station developers, and component suppliers to determine the basic specifications of the dispensing equipment and nozzle assembly. The team also examined existing codes and standards to determine necessary changes to accommodate HD components. From this information, the team developed a set of specifications which will be used to design the dispensing equipment. In order to meet these goals, the team performed computational fluid dynamic, pressure modelling, and temperature analysis in order to determine the necessary parameters to meet existing safety standards modified for HD fueling. The team also considered user, operational, and maintenance requirements, such as freeze lock which has been an issue which prevents the removal of the nozzle from LD vehicles. The team also performed a failure mode and effects analysis (FMEA) to identify the possible failures in the design. The dispenser and nozzle assembly will be tested separately, and then installed on an innovative, HD fueling station which will use a HD vehicle simulator to test the entire system.

08 HYDROGEN↗

A Multidisciplinary Paradigm and Approach to Protecting Human Health and the Environment, Society, and Stakeholders at Nuclear Facilities - 12244

As the Department of Energy (DOE) continues to remediate its lands, and to consider moving toward long-term stewardship and the development of energy parks on its industrial, remediated land, it is essential to adequately characterize the environment around such facilities to protect society, human health, and the environment. While DOE sites re considering several different land-use scenarios, all of them require adequate protection of the environment. Even if DOE lands are developed for energy parks that are mainly for industrializes sections of DOE lands that will not be remediated to residential standards, there is still the need to consider the protection of human health and the environment. We present an approach to characterization and establishment of teams that will gather the information, and integrate that information for a full range of stakeholders from technical personnel, to public policy makers, and that public. Such information is needed to establish baselines, site new energy facilities in energy parks, protect existing nuclear facilities and nuclear wastes, improve the basis for emergency planning, devise suitable monitoring schemes to ensure continued protection, provide data to track local and regional response changes, and for mitigation, remediation and decommissioning planning. We suggest that there are five categories of information or data needs, including 1) geophysical, sources, fate and transport, 2) biological systems, 3) human health, 4) stakeholder and environmental justice, and 5) societal, economic, and political. These informational needs are more expansive than the traditional site characterization, but encompass a suite of physical, biological, and societal needs to protect all aspects of human health and the environment, not just physical health. We suggest a Site Committee be established that oversees technical teams for each of the major informational categories, with appropriate representation among teams and with a broad involvement of a range of governmental personnel, natural and social scientists, Native Americans, environmental justice communities, and other stakeholders. Such informational teams (and Oversight Committee) would report to a DOE-designated authority or Citizen's Advisory Board. Although designed for nuclear facilities and energy parks on DOE lands, the templates and information teams can be adapted for other hazardous facilities, such as a mercury storage facility at Oak Ridge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Second Opinion is Worth the Cost - 12479

This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear disciplines and by performing a Line by Line, WBS element by WBS element review of the Projects' CD-2 baseline package helped the DOE Project Team experience success. The second opinion that PT and C provide by conducting a Pre-EIR review of the Project baseline package and the cost review of the TPC helped the DOE Team pass the CD-2 EIR and reduced the TPC. The Line-by-Line review of the DOE Project identified opportunities to reduce the TPC from $1.1 billion to $740.8 million, thus realizing a saving of approximately $359.2 million, or roughly 32% of the original TPC. This significant cost savings underscores the cost in obtaining the second opinion. This same Line by Line review can be applied to any DOE project in the Energy Management or Weapons complex. In the case of this DOE Project a second opinion was worth the cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The future of RADCALC- the radioactive material and waste transportation software program - 15154

This paper provides a thorough review of RADCALC, the U.S. Department of Energy (DOE)-developed software tool to assist DOE sites in making radioactive material and waste packaging and transportation determinations in compliance with applicable Federal regulations and DOE Orders and Standards. There are more than 400 registered users of the RADCALC tool across the DOE complex. DOE has also authorized a limited number of users from certain universities and foreign countries. DOE periodically upgrades the software consistent with changing domestic and international requirements, as well as needs unique to DOE. Due to recent changes in regulatory requirements by the Department of Transportation (DOT), it is necessary that the current version of RADCALC should be updated in a timely manner. Prior to investing funds in software upgrades, DOE decided to evaluate the nature of changes required and level of operational support and looked for alternatives for meeting sites' operational needs. DOE formed a joint review team consisting of experts from Energy Facility Contractors Group (EFCOG) sites, commercial waste treatment facilities and the National Laboratories. This team evaluated the RADCALC software, commercially available software packages, and internal DOE site-developed programs against an established set of criteria. The team also reviewed and prioritized regulatory changes and user-recommended enhancements. Based on extensive review, the team recommended that DOE continue to support RADCALC noting that RADCALC is a cost-effective, technically robust tool that can perform complicated radioactive material shipping determinations. The tool promotes accuracy, consistency, and completeness between shipments by a single shipper, between shippers at a given site, and between sites. The isotopic coverage, decay algorithm and the range of calculations are without compare either within DOE or in industry in a tool of this kind. The team also recommended that DOE should actively promote RADCALC use throughout the DOE complex and consider cooperative arrangements with the Department of Defense or other government entities that may have similar needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗