Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Discharge Permit-1845 Quarterly Status Report October 2018

Trichloroethene (TCE) and nitrate have been identified as constituents of concern in groundwater at the Sandia National Laboratories, New Mexico (SNL/NM) Technical Area (TA)-V Groundwater (TAVG) Area of Concern (AOC) based on detections above the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) in samples collected from monitoring wells. The EPA MCLs and the State of New Mexico drinking water standards for TCE and nitrate are 5 micrograms per liter and 10 milligrams per liter (as nitrogen), respectively. A phased Treatability Study/Interim Measure (TS/IM) of in-situ bioremediation (ISB) is being implemented to evaluate the effectiveness of ISB as a potential technology to treat the groundwater contamination at the TAVG AOC (New Mexico Environment Department [NMED] April 2016). The NMED Hazardous Waste Bureau (HWB) approved the Revised Treatability Study Work Plan (TSWP) (SNL/NM March 2016) in May 2016 (NMED May 2016). The SNL/NM Environmental Restoration Operations personnel are responsible for implementing the TS/IM of ISB at TAVG AOC in accordance with the Revised TSWP. Per the Revised TSWP, up to three injection wells (TAV-INJ1, TAV-INJ2, and TAV-INJ3) would be installed at TA-V in the vicinity of the highest contaminant concentrations detected in groundwater at monitoring wells LWDS-MW1, TAV-MW6, and TAV-MW10. The injection wells would be used to gravity-inject substrate solution and biodegradation bacteria to groundwater. The substrate solution consists of an inert tracer as well as essential food and nutrients for biostimulation. The substrate solution would be prepared in aboveground tanks. The TS/IM would be conducted in two phases: Phase I includes a pilot test followed by full-scale injection at the first injection well (TAV-INJ1); Phase II includes full-scale injections at the second and third injection wells (TAV-INJ2 and TAV-INJ3). The NMED Ground Water Quality Bureau (GWQB) requires a groundwater Discharge Permit (DP) for the operation of injection wells. NMED GWQB issued the DP-1845 to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) for the SNL/NM TA-V Treatability Study injection wells on May 26, 2017 (NMED May 2017). The DP-1845 term started on May 30, 2017 and ends on May 30, 2022. Attachment A provides a copy of DP-1845. This quarterly report provides responses to DP-1845 Operating Conditions Terms and Conditions #3 through #8 and Monitoring and Reporting Terms and Conditions #10 through #17 for the April 1 to June 30, 2018 reporting period. The other Terms and Conditions are NMED statements of fact and do not require a response.

54 ENVIRONMENTAL SCIENCES↗

Adverse Event Prediction Using Graph-Augmented Temporal Analysis (Final Report)

This report summarizes the work performed under the Sandia LDRD project "Adverse Event Prediction Using Graph-Augmented Temporal Analysis." The goal of the project was to develop a method for analyzing multiple time-series data streams to identify precursors providing advance warning of the potential occurrence of events of interest. The proposed approach combined temporal analysis of each data stream with reasoning about relationships between data streams using a geospatial-temporal semantic graph. This class of problems is relevant to several important topics of national interest. In the course of this work we developed new temporal analysis techniques, including temporal analysis using Markov Chain Monte Carlo techniques, temporal shift algorithms to refine forecasts, and a version of Ripley's K-function extended to support temporal precursor identification. This report summarizes the project's major accomplishments, and gathers the abstracts and references for the publication submissions and reports that were prepared as part of this work. We then describe work in progress that is not yet ready for publication.

97 MATHEMATICS AND COMPUTING↗

Eyes On the Ground: Final Report

This report summarizes the work performed under the Sandia LDRD project "Eyes on the Ground: Visual Verification for On-Site Inspection." The goal of the project was to develop methods and tools to assist an IAEA inspector in assessing visual and other information encountered during an inspection. Effective IAEA inspections are key to verifying states' compliance with nuclear non-proliferation treaties. In the course of this work we developed a taxonomy of candidate inspector assistance tasks, selected key tasks to focus on, identified hardware and software solution approaches, and made progress in implementing them. In particular, we demonstrated the use of multiple types of 3-d scanning technology applied to simulated inspection environments, and implemented a preliminary prototype of a novel inspector assistance tool. This report summarizes the project's major accomplishments, and gathers the abstracts and references for the publication and reports that were prepared as part of this work. We then describe work in progress that is not yet ready for publication. Approved for public release; further dissemination unlimited.

47 OTHER INSTRUMENTATION↗

ATLAS Railcar Design Project Status Report

This report documents work performed supporting the US Department of Energy (DOE) Office of Nuclear Energy (NE) Fuel Cycle Technologies (FCT) Nuclear Fuels Storage and Transportation Planning Project (NFST) under work breakdown structure element 1.02.09.13 TR,“Hardware.” In particular, this report satisfies the requirements of M2 milestone M2FT-15OR0913016, “Railcar Design Report” within work package ORNL-FT-15OR091301.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Human Factors Engineering Design Phase Report for Control Room Modernization

In this report, we review recent work performed at the Human System Simulation Laboratory (HSSL) at the Idaho National Laboratory. The U.S. Department of Energy has sponsored work under the Light Water Reactor Sustainabilty (LWRS) program to assist U.S. utilities in extending the operating life of the U.S. fleet of commercial reactors. Control room modernization is a key research and demonstration area within LWRS. The U.S. Nuclear Regulatory Commission’s Human Factors Engineering Program Review Model (NUREG-0711) outlines four phases of developing a new human-system interface (HSI). One of the key steps in NUREG-0711 is the design phase. In this report, we outline the process and findings from several simulator workshops, which centered on early design phase activities. Prototypes for a turbine control system upgrade for a main control room at a commercial nuclear power plant were developed and evaluated using licensed reactor operators at the HSSL. This iterative design-evaluation cycle succeeded in refining the design of the HSI and readying it for final implementation and formal validation and verification exercises. This report serves as a useful template to explicate design steps that are not currently required by NUREG-0711 but that ensure a usable and safe control room replacement system.

99 GENERAL AND MISCELLANEOUS↗

Final Report: SECA Core Technology Program - PNNL

This report summarizes results from experimental and modeling studies performed by researchers at Pacific Northwest National Laboratory on behalf of the Solid-State Energy Conversion Alliance (SECA) Core Technology Program. The work was performed from 1999 through 2014, under FWP 40552. PNNL’s scientific and technical contributions included development/evaluation of improved materials and fabrication processes for solid oxide fuel cell (SOFC) components, development/implementation of modeling tools to facilitate cell and stack design and optimization, and improved understanding/mitigation of SOFC performance degradation mechanisms. Primary areas of contribution were 1) Materials and fabrication processes, 2) Modeling and simulation tools, 3) Understanding of degradation mechanisms, and 4) New test protocols. The report contains brief descriptions of primary scientific and technical achievements; references to detailed descriptions of the work (patents, papers, and reports) are also provided.

30 DIRECT ENERGY CONVERSION↗

LP CO 2 Compressor Final Technical Report

This report summarizes work performed by Dresser-Rand, A Siemens Business and subcontractors, under DOE award number DE-FE0026727, in pursuit of the design, construction and test of a 10:1 pressure ratio “Low Pressure” (LP) supersonic CO 2 compressor suitable for use as a first stage in a two stage 100:1 compression system. This LP compressor, in conjunction with a corresponding 10:1 high pressure compressor, provide the overall 100:1 compression ratio required to compress CO 2 from 22 psia (as generated by a CO 2 capture system) to the 2215 psia required to transport CO 2 via a pipeline to a suitable sequestration site. The compressor demonstrates application of Dresser-Rand’s supersonic compression technology at an industrial scale using CO 2 in a closed-loop testing facility. This scope of this technical report is to summarize all phases of the program executed from August 5, 2015 to the June 30, 2018. This program included the final testing of a “high pressure” (HP) compressor that had previously been built by Dresser-Rand and the design, fabrication, assembly and test of a corresponding LP compressor. In summary, the LP compressor exceeded the target pressure ratio and efficiency goals for the program at CO 2 flowrates suitable for those expected in coal fired power plant carbon capture systems. Initial and Final Techno-Economic Analysis reports were generated to show the value this compression solution brings to carbon capture and sequestration (CC&S) systems for the Case B12B coal fired power plant model. Integration of the DATUM S compression technology into a carbon capture and sequestration system was shown to result in a 27% reduction in the Cost of Electricity for the compression system, as well as a 21,500 gallon per hour reduction in required cooling water flow for the plant.

20 FOSSIL-FUELED POWER PLANTS↗

Final report: Understanding influence of thermal history and glass chemistry on kinetics of phase separation and crystallization in borosilicate glass-ceramic waste forms for aqueous reprocessed high level waste

This report provides an overview of the research activities conducted over the three-year period, October 1, 2015 to September 30, 2018. The project consisted of the US DOE component and a parallel project funded by the UK’s EPSRC. The US project is reported here, with some overview of the UK project results. The project was designed to be highly collaborative, including work in the US by Washington State University and Rutgers University, and in the UK by the University of Sheffield and the University of Warwick. Pacific Northwest National Laboratory supported the US project with some synthesis and some characterization. The overall program had two aims: (Aim 1) Understand fundamental mechanisms of the phase transitions leading to the conversion of melt to multiphase glass-ceramic as a function of composition and cooling rate; (Aim 2) Understand influence of glass chemistry on kinetics of phase separation and crystallization. This report includes the summary of the project objectives, approaches, results and deliverables.

36 MATERIALS SCIENCE↗

Analysis of 2016 Occurrence Reports Involving Electrical Energy

The 04100 Center Director requested an analysis of 2016 occurrence reports (ORs) involving electrical energy be performed to facilitate learning through use of performance assurance methodologies. Preliminarily, 11 reportable events were identified for review; however, this population was updated to 12 during the review. Appendix 1 includes the analysis protocol and a listing of the ORs reviewed. The Team completed its review at the end of October 2016. At that time, causal analysis and associated corrective action information was available for eight events. Elements of this analysis included determining the following: common weaknesses that contributed to electrical events; the quality of causal analysis products with the goal of providing sustainable long-term corrective actions; and how learning from issues, causes, and corrective actions from prior similar events is incorporated into causal analyses for today’s events. As used in this report, the term “trends” was used as a catalyst to determine categories of events for deeper analysis. The content of ORs is important. The information in an OR for a past event can be useful in addressing today’s issues because it provides information on systemic issues that were found and past actions addressing those issues. The effectiveness of those actions as viewed from today’s vantage point is useful input to the determination of corrective actions for current problems. Additionally, as a means of communication to DOE and NNSA, ORs provide a measure of Sandia’s maturity in understanding problems and their solutions.

42 ENGINEERING↗

Environmental Report Summary 2017

Los Alamos is committed not only to excellence in science and technology but also to completing all work in an environmentally responsible manner. Every year, the Laboratory produces an Annual Site Environmental Report (ASER) in compliance with U.S. Department of Energy (DOE) Order 231.1B—Environment, Safety, and Health Reporting.For the full ASER text, see Los Alamos National Laboratory document LA-UR-18-28565. Through the ASER, the Laboratory communicates to the public the impacts its operations might have on the surrounding environment and the approaches used to mitigate these impacts. This Environmental Report Summary magazine, produced primarily by Laboratory students, provides a nontechnical overview of the ASER and highlights many of the Laboratory’s environmental programs. The Environmental Report Summary recognizes efforts to create a sustainable future, control present processes to minimize impacts, and clean up past releases of chemicals, including radionuclides, to the environment. This publication summarizes data and findings from 2017, which was published in 2018. Comments are welcome at envoutreach@lanl.gov.

54 ENVIRONMENTAL SCIENCES↗

Commercial Building Technology Demonstration (Final Scientific/Technical Report)

The background for this project was a unique and innovative concept that had been proposed and demonstrated by enVerid Systems, reducing the energy consumption in HVAC systems in commercial and public buildings by up to 50% at peak loads. The concept involves selective scrubbing of gas contaminants from indoor air as a practical substitute for outside air ventilation, the latter being the conventional practice today. This scrubbing enables recycling of most of the indoor air and significantly decreasing the amount of outside air, resulting in a reduced HVAC load and commensurate energy savings for the facility. Key to our approach is low cost scrubbing of all gas contaminants from indoor air using novel, efficient and regenerable sorbent materials. The total solution, labeled HLR (HVAC Load Reduction) is implemented by means of compact modules that can be retrofitted onto virtually any building, and utilizes novel sorbents that have been developed and brought to scale production by enVerid. Although the technology had been deployed and demonstrated, the US commercial building and HVAC markets, famously conservative with respect to innovation and new technologies, had yet to embrace the idea or the product. The overarching goal of the project was to help overcome market hesitancy and enable widespread adoption, by creating a critical mass of success stories across different regions and building types, all under oversight and verification of the DOE and NREL, to ensure credibility and accuracy. The project, overall, was a resounding success. Several installations were deployed and tested comprehensively for the impact on both energy consumption and indoor air quality, and results were not only excellent, but quantitatively in line with expectations. A total number of eight (8) installations were attempted, with 2 aborted due to building issues. Of the six successful installations, however, complete M&V was performed by NREL on 2 (Miami and NYC) and partial analysis on a third site (ArcBest), and these three, along with their results, were therefore presented from a financial and reporting standpoint. Although the number of case studies fell short of the original target of 10, we nevertheless had excellent demonstrations in vastly different climate zones: Southeast, Northeast and Midwest, and in very different building types. This included a modern high-rise office building in New York City and a University Campus health center in Miami, and a mid-rise high-density office in Arkansas. The cooling load reduction was shown to be significant, averaging 37% during the final cooling season in the Miami site. In the NYC site, the cooling energy savings were generally less, at around 12%, as expected. While this is a lower number for average/total savings, two comments are important to note: (i) the outside airflow (OA) reduction was not consistent during the data collection period, at least in part understating the attainable savings through incorrect measurement of the “high energy” reference state; and (ii) the peak impact in NYC is almost certainly as high as Miami, with critical ramifications for peak load reduction and equipment downsizing ability. Importantly, the measured energy savings in all locations were related to the outdoor climate conditions and the actual achievable reduction in outside air, very much in line with models and calculations; this leaves us with increased confidence in our understanding of the interaction between the technology and the building, and our ability to project the impact of this innovation in the future, through broad adoption. Simply put: the energy savings and load reduction impact of the HLR solution has been confirmed quantitatively. The results also confirmed the air quality objective. This may be even more significant, in that air quality is more complex and harder to measure and quantify, and the performance of the HLR as an air scrubber is the linchpin of the entire solution. In all sites, indoor air quality met or exceeded the required parameters, in terms of achieving the target (low) levels of indoor pollutants. Furthermore, the concentrations of outdoor sourced pollutants were markedly lower, as expected, mostly due to the reduction in outside air intake although in part also due to the scrubbing. The success was not immediate nor easy, and early challenges with the systems, especially (but not only) around controls and communication, caused delays in commissioning and undermined some of our M&V schedules. The good news is no fundamental issues were encountered and the number of such glitches was declining quickly by the end of the project. Other challenges had to do with coordinating the control of the building OA dampers, which the HLR needs to have in order to deliver the load reduction, but which the facility manager controls regularly and independently. This is not necessarily a problem for normal HLR operation but interferes with accurate M&V, where switching OA settings back and forth on a precise timetable is essential for clean data. The project provided valuable experience in retrofitting buildings that had been originally designed to operate with less recirculation and more outside air, and some key learnings related to the cyclical regeneration of the sorbents in the operational environment of the building. Some of these learnings gave already been incorporated into ongoing improvements in the design of the HLR module as well as the software that is used to control its operation. The cost and time of retrofit installations is much better understood; so is the test and balance procedure of the building that determines the available range of outside air reduction, which in turn determines the amount of load reduced. We had also implemented at least one annual cycle of sorbent cartridge replacement in the field, after which we tested the used sorbent to assess the rate of degradation of sorbent potency – an important factor affecting the long-term economics of HLR deployments. A notable shortfall of the project, other than the fact that the number of sites was below target, was that we had not (yet) completed testing to measure and verify (M&V) the winter energy savings. This is primarily due to late start on the NYC sites (Miami does not portend any heating savings associated with reduced outside air), combined with the issues of OA damper control. It is by no means suggested that such savings cannot be captured, only that the M&V with respect to winter in NYC has been incomplete. The value of this project and its interest to the general public are hard to overstate. The case studies created from Miami and especially from NYC have, without a doubt, opened up the interest of the broad HVAC industry to HLR in the past year. Major manufacturer reps have signed up to represent and promote the product, and dozens of top tier engineering consultants have introduced HLR as a base of design in upcoming construction and renovation projects – precisely the overarching goal of this project. These would not have happened without the highly visible installation in NYC and its ultimately satisfied customer. Furthermore, the DOE itself issued a report in late 2017 analyzing hundreds of candidate technologies for reducing energy consumption in HVAC; remarkably, the budding HLR solution ranked among the top 3(!); no doubt, its status as a viable and significant contender on this list is informed by the success of these demonstrations. And furthermore, in the wake of these demos, several major energy utilities, led by ConEdison in NYC, have endorsed the HLR solution and now routinely provide substantial cash rebates for customers choosing to incorporate the HLR in their buildings and reap the benefit of the reduced peak load as well as reduced cumulative energy demand. Last but not least, in January of 2019, as this report was being written, the HLR module won the AHR Expo Innovation Award for Green Buildings and, remarkably, the prestigious and only Product of the Year 2019, being selected by an independent professional panel of judges from AHR and ASHRAE. Given the confirmation of the enormous energy saving potential of HLR in widescale deployment, as well as ancillary but significant benefits in terms of equipment downsizing and indoor air quality, the benefit of this effort to the public speaks for itself. Accelerating adoption of HLR, without dependence on subsidies and driven by the private sector, is well under way. There is still much work to be done in terms of educating the HVAC and construction ecosystems and improving the product’s robustness and simplicity, to further facilitate the adoption of this technology and the capture of its potential value. But the American public will greatly benefit both directly and indirectly in the immediate future and beyond.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Waste Shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex, FY19 First Quarter Transportation Report

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 3 and Area 5. This report summarizes the first quarter of fiscal year (FY) 2019 and serves as a quarterly report for the following types of shipments: Low-Level Radioactive Waste (LLW) Mixed Low-Level Radioactive Waste (MLLW) Classified Non-Radioactive (CNR) Waste Classified Non-Radioactive Hazardous (CNRH) Waste

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report

Land and facility use planning and decisions at the Idaho National Laboratory (INL) Site are guided by a comprehensive site planning process in accordance with Department of Energy Policy 430.1, “Land and Facility Use Policy,” that integrates mission, economic, ecologic, social, and cultural factors. The INL Ten-Year Site Plan, prepared in accordance with Department of Energy Order 430.1B, “Real Property Asset Management,” outlines the vision and strategy to transform INL to deliver world-leading capabilities that will enable the Department of Energy to accomplish its mission. Land use planning is the overarching function within real property asset management that integrates the other functions of acquisition, recapitalization, maintenance, disposition, real property utilization, and long-term stewardship into a coordinated effort to ensure current and future mission needs are met. All land and facility use projects planned at the INL Site are considered through a formal planning process that supports the Ten-Year Site Plan. This Comprehensive Land Use and Environmental Stewardship Report describes that process. The land use planning process identifies the current condition of existing land and facility assets and the scope of constraints across INL and in the surrounding region. Current land use conditions are included in the Comprehensive Land Use and Environmental Stewardship Report and facility assets and scope of constraints are discussed in the Ten-Year Site Plan. This report also presents the past, present, and future uses of land at the INL Site that are considered during the planning process, as well as outlining the future of the INL Site for the 10, 30, and 100-year timeframes.

99 GENERAL AND MISCELLANEOUS↗

4th Quarter / Annual Transportation Report FY2017: Waste Shipments To and From the Nevada National Security Site (NNSS), Radioactive Waste Management Complex

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex at Area 5. This report summarizes the 4th quarter of fiscal year (FY) 2017 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW), which includes classified LLW and MLLW, classified non-radioactive and classified non-radioactive hazardous shipments. There were no shipments sent for offsite treatment from an NNSS facility and returned to the NNSS this quarter of FY2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flexible Geothermal Power Generation utilizing Geologic Thermal Energy Storage (Final Seedling Project Report)

This report concludes that there is a cost-effective strategy for seasonal storage of heat that will provide firm, but dispatchable, electrical generating capacity in times when other renewable energy is not available to meet demand. Deployment of the technology appears to require no new technology, but instead combines solar, geothermal, and conventional oil and gas drilling technologies in a novel way. The study basis is the use of sedimentary geologic formations as a medium for thermal energy storage (TES), specifically for heat collected in concentrating solar collectors. The study identifies methodologies that could be used to transport this heat into and out of the subsurface in order to produce dispatchable electrical power, and reports on initial optimization results. The GeoTES system (heat input, storage, heat recovery, and heat to electric conversion) described in this analysis has the potential to provide a unique pathway for increasing the grid penetration of renewable energy in large blocks of power and across many states and regions. Further, the system can be used both to meet the nation’s flexible energy needs while also improving grid stability and reliability. The present study evaluated the use of a large number of dedicated wells to store and recover the heat, essentially creating a synthetic geothermal reservoir. The use of sedimentary geology allows the wells to be drilled at low cost. Dedicated hot and cold wells are used, arranged in a five-spot well pattern with each hot or cold well surrounded at an appropriate distance by the opposite type of well. In large numbers this becomes alternating rows of hot and cold wells. Each hot and cold well is operated using a push-pull strategy. This configuration provides the ability to immediately recover stored hot fluid from a GeoTES reservoir, or to store the heat over many months for recovery at low loss when needed. This is a practical approach for managing the system’s fluid inventory and reducing parasitic load. The production and injection power requirements are reduced because the rows of wells operating in “push” mode provide help to the wells operating in “pull” mode, and vice-versa. Initial charging of a GeoTES system increases the heat recovery temperature. Increasing the duration of the charging period decreases the magnitude of the temperature fluctuations that occur following prolonged system operation. Because of direct contact of the heated water with the reservoir formation, the production of both hot water and steam from the TES, and the temperature ranges of the recovered fluid (190 – 230°C or 375 – 445°F), conventional geothermal power cycles were used to convert the stored heat to electricity. A power cycle configuration for the GeoTES system was selected following a screening study of a number of flash, and flash/binary hybrid options. This analysis concluded that, of the configurations evaluated, a dual-stage flash steam cycle provides the lowest capital costs per unit net power generation with an acceptable hot brine inlet fluid flow rate. The evaluation included the power plant cost estimate, the cost and number of wells and the associated parasitic loads. Annual power generation performance was simulated to evaluate capacity factor and LCOE. The LCOE calculated for the inherently high capacity GeoTES system was $\$$0.13/kWhe. This value was calculated for the case where the solar thermal collector was sized in such a way that the solar collectors permitted an annual power plant capacity factor of up to 97%. The power cycle was able to provide power to the grid every night of the year, and flexible base-load power during the winter, if needed. This LCOE value compares favorably with reported values for solar photovoltaic plus battery energy storage (PV+BES) systems in the open literature, i.e. $\$$0.148/kWhe for a PV+BES system with 4 hours of electrochemical battery energy storage capacity. Addition of battery energy storage with more hours of storage would further increase PV+BES system LCOE and increase the separation between GeoTES and PV+BES. A GeoTES system would therefore provide superior economics for high capacity and long duration solar energy storage.

14 SOLAR ENERGY↗

India 2030 Wind and Solar Integration Study (Interim Report)

India has established several targets for renewable energy capacity growth in the coming years, most notably the target of deploying 175 gigawatts (GW) of generation capacity from wind, solar, biomass, and small hydropower by 2022, and furthering that vision with India's Nationally Determined Contribution target of 40% renewable electricity capacity (including hydro) by 2030 (GOI 2015). Given the rapid and significant changes to India's power system to help meet these targets, the objective of this interim report is to understand the operational challenges for India's power grid in 2030. The primary contribution of this report is to establish a 2030 unit commitment and dispatch model of India's grid, with hourly temporal resolution, high spatial resolution of renewable energy resources, interstate transmission constraints, and unit-level generator characteristics. Annual simulations of 2030 operations demonstrate that a 22% annual penetration of wind and solar is manageable by India's grid. Most days in the year do not show signs of stress, and 99.97% of energy is served with the plans as presented. Average coal plant load factors are 70% for the year, up from relatively low plant load factors in recent years (Patel 2018). However, the results highlight specific challenges the grid may face during a small number of high-demand periods, resulting in unserved energy. The drivers behind the unserved energy suggest that this could be avoided with better coordination in scheduling. This report is part of a broader set of analyses under the Energy Transitions Commission (ETC), which includes collaborations with The Energy and Resources Institute (TERI), Climate Policy Initiative (CPI), and a broad stakeholder community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Second Quarter Transportation Report Fiscal Year 2019 Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex

This report satisfies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 3 and Area 5. This report summarizes the second quarter of fiscal year (FY) 2019 and serves as a quarterly report for the following types of shipments: Low-Level Radioactive Waste (LLW), Mixed Low-Level Radioactive Waste (MLLW), Classified Non-Radioactive (CNR) Waste, Classified Non-Radioactive Hazardous (CNRH) Waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2017

This report provides a synopsis of ongoing environmental management performance and compliance activities conducted during 2017, to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment. The report addresses the operations that occur on the PNNL Richland Campus in Richland, Washington, and at the PNNL Marine Sciences Laboratory (MSL) near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with all applicable DOE, federal, state, and local regulations and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification.

54 ENVIRONMENTAL SCIENCES↗