Reference Fuel Assembly for Dry Storage Demonstration of L Basin Spent Fuel

A “Reference Fuel Assembly – Dry” has been constructed for planning and designing of a system for a dry storage demonstration and its safety evaluation at the Savannah River Site. This “RFA-Dry” is based on fuel with the Materials Test Reactor Equivalent design presently in, or expected to be received in the L Basin.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Day-Ahead Bidding and Scheduling Method of a PV + Storage Plant

A Hybrid PV plant refers to the paradigm combining a PV farm with a battery energy storage system (BESS). Our study aims to answer the following questions. a) when the renewable penetration reaches 70%, a hybrid PV plant should bid as a thermal plant in the future electricity market. How should a hybrid PV plant bid in this market? b) the BESS can be used for arbitrage and/or capacity firming. How to schedule the BESS's operation in coordination with the bid decision?

Huang, Xiaoge↗

Uninterruptible Power Supply Systems, UTrain Course 58423 [Slides]

Identify the principles of operation of uninterruptible power supply (UPS) systems, focusing on double conversion and offline/standby/backup types. The traditional UPS is now referred to as a “double conversion” UPS. The AC input power is rectified into DC. The DC feeds an inverter which provides the AC output. The DC bus is also connected to batteries. It is called double conversion because the first conversion is from AC to DC and the second conversion is from DC to AC. The inverter creates the output waveform to match the bypass input. Because of this, the static bypass switch may be switched between inverter and bypass seamlessly.

42 ENGINEERING↗

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Compatibility Assessment of Metallic Dispenser Materials for Service in Ethanol Fuel Blends

The compatibility of selected metals representative of those commonly used in dispensing systems was evaluated in an aggressive E20 formulation (CE20a) and in synthetic gasoline (Reference Fuel C) in identical testing to facilitate comparison of results. The testing was performed at modestly elevated temperature (nominally 60 C) and with constant fluid flow in an effort to accelerate potential interactions in the screening test. Based on weight change, the general corrosion of all individual coupons exposed in the vapor phase above Reference Fuel C and CE20a as well as all coupons immersed in Reference Fuel C was essentially nil (<0.3 {micro}m/y), with no evidence of localized corrosion such as pitting/crevice corrosion or selective leaching at any location. Modest discoloration was observed on the copper-based alloys (cartridge brass and phosphor bronze), but the associated corrosion films were quite thin and apparently protective. For coupons immersed in CE20a, four different materials exhibited net weight loss over the entire course of the experiment: cartridge brass, phosphor bronze, galvanized steel, and terne-plated steel. None of these exhibited substantial incompatibility with the test fluid, with the largest general corrosion rate calculated from coupon weight loss to be approximately 4 {micro}m/y for the cartridge brass specimens. Selective leaching of zinc (from brass) and tin (from bronze) was observed, as well as the presence of sulfide surface films rich in these elements, suggesting the importance of the role of sulfuric acid in the CE20a formulation. Analysis of weight loss data for the slightly corroded metals indicated that the corrosivity of the test environment decreased with exposure time for brass and bronze and increased for galvanized and terne-plated steel. Other materials immersed in CE20a - type 1020 mild steel, type 1100 aluminum, type 201 nickel, and type 304 stainless steel - each appeared essentially immune to corrosion at the test conditions.

02 PETROLEUM↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence 4 - Raw Data

Sequence 4: Static Pressure Calibration (P) This test sequence used a downwind, teetered turbine with a 3.4° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 30° were achieved. The blade tip pitch was 3°. The rotor rotated at 72 RPM. Blade and probe pressure measurements were collected. A static pitot probe was installed on a boom 2.3 m upwind of the nacelle at hub height and connected to the reference side of the Mensor digital differential pressure transducer through the pneumatic rotary coupling. This provided the reference pressure for all blade-mounted pressure transducers, as opposed to the NASA atmospheric pressure reference that was used for all other test sequences. This simulates the pressure system connections used in field measurements where the static pressure was unknown.

17 WIND ENERGY↗

MIRC-X: A Highly Sensitive Six-telescope Interferometric Imager at the CHARA Array

Michigan InfraRed Combiner-eXeter (MIRC-X) is a new highly sensitive six-telescope interferometric imager installed at the CHARA Array that provides an angular resolution equivalent of up to a 330 m diameter baseline telescope in J- and H-band wavelengths ((λ/(2B))∼0.6 mas). We upgraded the original Michigan InfraRed Combiner (MIRC) instrument to improve sensitivity and wavelength coverage in two phases. First, a revolutionary sub-electron noise and fast-frame-rate C-RED ONE camera based on an SAPHIRA detector was installed. Second, a new-generation beam combiner was designed and commissioned to (i) maximize sensitivity, (ii) extend the wavelength coverage to J band, and (iii) enable polarization observations. A low-latency and fast-frame-rate control software enables high-efficiency observations and fringe tracking for the forthcoming instruments of the CHARA Array. Since mid-2017, MIRC-X has been offered to the community and has demonstrated best-case H-band sensitivity down to 8.2 correlated magnitude. MIRC-X uses single-mode fibers to coherently combine the light from six telescopes simultaneously with an image-plane combination scheme and delivers a visibility precision better than 1%, and closure phase precision better than 1°. MIRC-X aims at (i) imaging protoplanetary disks, (ii) detecting exoplanets with precise astrometry, and (iii) imaging stellar surfaces and starspots at an unprecedented angular resolution in the near-infrared. In this paper, we present the instrument design, installation, operation, and on-sky results, and demonstrate the imaging capability of MIRC-X on the binary system ι Peg. The purpose of this paper is to provide a solid reference for studies based on MIRC-X data and to inspire future instruments in optical interferometry.

79 ASTRONOMY AND ASTROPHYSICS↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology’s total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

Zolan, Alexander (ORCID:0000000326017604)↗

Untuned resonance traced gas sensing

Methods and systems for detecting a gas or liquid in an environment include measuring a reference signal at each of a set of wavelengths by passing a signal at each wavelength through a reference cell having a gas or liquid to be detected. A sensing signal is measured at each of the plurality of wavelengths by coupling each wavelength to a ring resonator in the environment. A set of wavelengths that correspond to an absorption curve of the gas or liquid to be detected is determined. A concentration of the gas or liquid to be detected in the environment is determined based on amplitudes of the sensing signal at each of the set of wavelengths.

47 OTHER INSTRUMENTATION↗

Natural and Engineered Features Supporting Environmental Performance of Idaho National Laboratory’s Remote-Handled Low-Level Waste Disposal Facility

The Idaho National Laboratory’s (INL’s) Remote-Handled Low-Level Waste (RH LLW) Disposal Facility has been designed and constructed to receive waste generated at the INL site in support of the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) and Naval Reactors (NR) missions. The facility has been designed to receive legacy RH LLW currently in storage at INL facilities and new waste generated by nuclear research programs. RH LLW to be received at the facility is solid waste consisting of surface contaminated debris; ion exchange resins used to purify cooling and canal water; activated metals generated during reactor core change outs and Naval spent fuel management; and nuclear Research & Development. Disposal of INL's RH LLW poses unique disposal challenges due to high radiation levels (contact rates up to 600 Sv/hr [60,000 Rem/hr]) that require remote handling and adequate shielding for transportation and disposal. The facility has been designed to meet the requirements of DOE Order 435.1 [1], including the all-pathways dose, air pathway dose, inadvertent intruder doses, and radon emissions limits. This paper presents an overview of natural and engineered design features that support the safety case and enhance the environmental performance of the facility. These include location selection, use of reinforced pre-cast concrete vaults; a robust hydraulic drainage system; use of steel waste canisters for waste disposal; the facility monitoring system; facility layout; and crediting waste forms. The facility performance assessment (PA) [2] developed to meet the requirements of DOE Order 435.1 “Radioactive Waste Management” credits each of these protective features. Releases from waste forms disposed of at this facility are limited by corrosion of the steel waste canisters which will ultimately allow contact with infiltrating water followed by transport of radionuclides from the vault system. The steel waste canisters were credited for their ability to limit water contact with the waste based on the demonstrated ability of the reinforced pre-caste concrete vaults to provide long-term structural protection of the steel waste canisters. Verification of hydraulic and concrete performance was conducted through laboratory data, field infiltration tests supported by a robust monitoring system, and numerical modeling. Releases into the vault system from activated metals are based on site-specific corrosion data. Radionuclide transport from the vault system from all waste forms is based on site-specific climatological, hydrologic, and stratigraphic data. At INL, the groundwater pathway historically and appropriately has received the most attention. By crediting aspects of the natural system, the engineered vault system, and the waste, estimated radiologic doses via the groundwater pathway are minimal. Air pathway doses were reduced by differentially crediting corrosion of aluminum and stainless steel activated metals resulting in the pathway being screened out of the PA. Groundwater and inadvertent intruder doses were reduced through selective facility layout. This paper provides an overview of the system-wide protective features incorporated into the facility design along with an extensive reference list to supporting technical papers and analyses that provide data and interpretation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind Energy Modeling and Simulation, Volume 1: Atmosphere and Plant

In order to optimise the yield of wind power from existing and future wind plants, the entire breadth of the system of a plant, from the wind field to the turbine components, needs to be modelled in the design process. The modelling and simulation approaches used in each subsystem as well as the system-wide solution methods to optimize across subsystem boundaries are described in this reference. Chapters are written by technical experts in each field, describing the current state of the art in modelling and simulation for wind plant design. This comprehensive, two-volume research reference will provide long-lasting insight into the methods that will need to be developed for the technology to advance into its next generation. Volume 1 covers the computing challenges in full turbine modelling, then discusses bridging scales in the atmosphere and turbulence modelling, wind forecasting, wind plant flow, and plant level controller design.

17 WIND ENERGY↗

Transformative remedial action scheme tool (TRAST)

Techniques and apparatuses are described that enable transformative Remedial Action Scheme (RAS) analyses and methodologies for a bulk electric power system, including methods of designing, reviewing, revising, testing, implementing, verifying, or validating a RAS. An improved RAS improves operation of the power system, including performance, reliability, control, and asset utilization. The example methodologies discussed—also referred to as a transformative Remedial Action Scheme tool (TRAST)—provide an end-to-end solution for adaptively setting RAS parameters based on realistic and near real-time operation conditions to improve power grid reliability and grid asset utilization, by leveraging utility data analysis and employing dynamic simulations and machine learning to significantly simplify and shorten the entire RAS process.

Fan, Xiaoyuan↗

Detection of an internal short circuit in a battery

An electrical device comprises a battery cell; a pressure sensor for measuring swelling forces of the battery cell, optionally with voltage, temperature and current sensors, and a battery management system including a controller. The controller executes a program to: (i) determine a reference swelling force corresponding to a reference electrical signal received from the pressure sensor at an earlier reference time, (ii) determine a second swelling force corresponding to a second electrical signal received from the pressure sensor at a later second time, and (iii) determine whether a risk of internal short circuit of the battery cell exists by comparing a reference level of the reference electrical signal and a signal representative of the second electrical signal. When the signal representative of the second electrical signal exceeds the reference level of the reference electrical signal by a threshold amount, a risk of internal short circuit of the cell exists.

Stefanopoulou, Anna G.↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements: Preprint

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology's total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

concentrating solar power↗

Carrier and sampling frequency offset estimation for RF communication with crystal-less nodes

When the ultra-low power mm-scale sensor node does not have a crystal oscillator and phase-lock loop, it inevitably exhibits significant carrier frequency offset (CFO) and sampling frequency offset (SFO) with respect to the reference frequencies in the gateway. This disclosure enables efficient real-time calculation of accurate SFO and CFO at the gateway, thus the ultra-low power mm-scale sensor node can be realized without a costly and bulky clock reference crystal and also power-hungry phase lock loop. In the proposed system, the crystal-less sensor starts transmission with repetitive RF pulses with a constant interval, followed by the data payload using pulse-position modulation (PPM). A proposed algorithm uses a two-dimensional (2D) fast Fourier transform (FFT) based process that identifies the SFO and CFO at the same time to establish successful wireless communication between the gateway and crystal-less sensor nodes.

Kim, Hun-Seok↗

Explicit temperature treatment in Monte Carlo neutron tracking routines - First results

This article discusses the preliminary implementation of the new explicit temperature treatment method to the development version Monte Carlo reactor physics code Serpent 2 and presents the first practical results calculated using the method. The explicit temperature treatment method, as introduced in [1], is a stochastic method for taking the effect of thermal motion into account on-the-fly in a Monte Carlo neutron transport calculation. The method is based on explicit treatment of the motion of target nuclei at collision sites and requires cross sections at 0 K temperature only, regardless of the number of temperatures in the problem geometry. The method includes a novel capability of modelling continuous temperature distributions. Test calculations are performed for two test cases, a PWR pin-cell and a HTGR system. The resulting k{sub eff} and flux spectra are compared to a reference solution calculated using Serpent 1.1.16 with Doppler-broadening rejection correction [2]. The results are in very good agreement with the reference and also the increase in calculation time due to the new method is on acceptable level although not fully insignificant. On the basis of the current study, the explicit treatment method can be considered feasible for practical calculations. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sub-nanosecond RF synchronization for MIMO software defined radio sensor networks

This disclosure presents distributed and decentralized synchronization for wireless transceivers. The disclosed system, device, and method achieve sub-nanosecond synchronization using low-cost commercial off the shelf software defined radios. By providing a decentralized mechanism that does not rely on a hierarchical master-slave structure, networks constructed as disclosed are robust to sensor drop-out in contested or harsh environments. Such networks may be used to create phased array radars and communication systems without requiring wired connections to distribute a common clock or local oscillator reference.

Moghaddam, Mahta↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)