Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reasoning about programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements

This report is a scoping study that identifies issues associated with developing a national evaluation, measurement and verification (EM&V) standard for end-use, non-transportation, energy efficiency activities. The objectives of this study are to identify the scope of such a standard and define EM&V requirements and issues that will need to be addressed in a standard. To explore these issues, we provide and discuss: (1) a set of definitions applicable to an EM&V standard; (2) a literature review of existing guidelines, standards, and 'initiatives' relating to EM&V standards as well as a review of 'bottom-up' versus 'top-down' evaluation approaches; (3) a summary of EM&V related provisions of two recent federal legislative proposals (Congressman Waxman's and Markey's American Clean Energy and Security Act of 2009 and Senator Bingaman's American Clean Energy Leadership Act of 2009) that include national efficiency resource requirements; (4) an annotated list of issues that that are likely to be central to, and need to be considered when, developing a national EM&V standard; and (5) a discussion of the implications of such issues. There are three primary reasons for developing a national efficiency EM&V standard. First, some policy makers, regulators and practitioners believe that a national standard would streamline EM&V implementation, reduce costs and complexity, and improve comparability of results across jurisdictions; although there are benefits associated with each jurisdiction setting its own EM&V requirements based on their specific portfolio and evaluation budgets and objectives. Secondly, if energy efficiency is determined by the US Environmental Protection Agency to be a Best Available Control Technology (BACT) for avoiding criteria pollutant and/or greenhouse gas emissions, then a standard can be required for documenting the emission reductions resulting from efficiency actions. The third reason for a national EM&V standard is that such a standard is likely to be required as a result of future federal energy legislation that includes end-use energy efficiency, either as a stand-alone energy-efficiency resource standard (EERS) or as part of a clean energy or renewable energy standard. This study is focused primarily on this third reason and thus explores issues associated with a national EM&V standard if energy efficiency is a qualifying resource in federal clean energy legislation. Developing a national EM&V standard is likely to be a lengthy process; this study focuses on the critical first step of identifying the issues that must be addressed in a future standard. Perhaps the most fundamental of these issues is 'how good is good enough?' This has always been the fundamental issue of EM&V for energy efficiency and is a result of the counter-factual nature of efficiency. Counter-factual in that savings are not measured, but estimated to varying degrees of accuracy by comparing energy consumption after a project (program) is implemented with what is assumed to have been the consumption of energy in the absence of the project (program). Therefore, the how good is good enough question is a short version of asking how certain does one have to be of the energy savings estimate that results from EM&V activities and is that level of certainty properly balanced against the amount of effort (resources, time, money) that is utilized to obtain that level of certainty. The implication is that not only should energy efficiency investments be cost-effective, but EM&V investments should consider risk management principles and thus also balance the costs and value of information derived from EM&V (EM&V should also be cost-effective).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Search for scattered X-ray halos around variable sources - The X-ray halo of Cygnus X-1

The results of a program to search for the presence of halos due to X-ray scattering by interstellar grains in the line-of-sight to variable X-ray sources are reported. As part of this program, four Einstein HRI images of Cyg X-1 were examined. The analysis technique exploits the intrinsic aperiodic variability of this source to map the point response function of the optics. Any scattered halo present will not reflect short-term central source time variability, since such variability is smoothed by differential time delays of order days. Thus, a residual, nonvariable component to the surface brightness distribution (comprising about 12 percent or more of the source flux) is interpreted as a scattered halo. The Cyg X-1 halo is consistent with those of other sources found in previous studies using different techniques. Comparison is also made with a scattering model and, despite uncertainties in source spectrum and distance, reasonable agreement with the observatons is found using a standard interstellar grain model. The potential of X-ray scattering as a probe of the properties of interstellar grains is demonstrated.

Bode, M. F.↗

Structural Life and Reliability Metrics: Benchmarking and Verification of Probabilistic Life Prediction Codes

Over the past two decades there has been considerable effort by NASA Glenn and others to develop probabilistic codes to predict with reasonable engineering certainty the life and reliability of critical components in rotating machinery and, more specifically, in the rotating sections of airbreathing and rocket engines. These codes have, to a very limited extent, been verified with relatively small bench rig type specimens under uniaxial loading. Because of the small and very narrow database the acceptance of these codes within the aerospace community has been limited. An alternate approach to generating statistically significant data under complex loading and environments simulating aircraft and rocket engine conditions is to obtain, catalog and statistically analyze actual field data. End users of the engines, such as commercial airlines and the military, record and store operational and maintenance information. This presentation describes a cooperative program between the NASA GRC, United Airlines, USAF Wright Laboratory, U.S. Army Research Laboratory and Australian Aeronautical & Maritime Research Laboratory to obtain and analyze these airline data for selected components such as blades, disks and combustors. These airline data will be used to benchmark and compare existing life prediction codes.

Litt, Jonathan S.↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iron-Based Amorphous Metals: High-Performance Corrosion-Resistant Material Development

In this study, an overview of the High-Performance Corrosion-Resistant Materials (HPCRM) Program, which was cosponsored by the Defense Advanced Research Projects Agency (DARPA) Defense Sciences Office (DSO) and the U.S. Department of Energy (DOE) Office of Civilian and Radioactive Waste Management (OCRWM), is discussed. Programmatic investigations have included a broad range of topics: alloy design and composition, materials synthesis, thermal stability, corrosion resistance, environmental cracking, mechanical properties, damage tolerance, radiation effects, and important potential applications. Amorphous alloys identified as SAM2X5 (Fe 49.7 Cr 17.7 Mn 1.9 Mo 7.4 W 1.6 B 15.2 C 3.8 Si 2.4 ) and SAM1651 (Fe 48 Mo 14 Cr 15 Y 2 C 15 B 6 ) have been produced as meltspun ribbons (MSRs), dropcast ingots, and thermal-spray coatings. Chromium (Cr), molybdenum (Mo), and tungsten (W) additions provided corrosion resistance, while boron (B) enabled glass formation. Earlier electrochemical studies of MSRs and ingots of these amorphous alloys demonstrated outstanding passive film stability. More recently, thermal-spray coatings of these amorphous alloys have been made and subjected to long-term salt-fog and immersion tests; good corrosion resistance has been observed during salt-fog testing. Corrosion rates were measured in situ with linear polarization, while the open-circuit corrosion potentials (OCPs) were simultaneously monitored; reasonably good performance was observed. The sensitivity of these measurements to electrolyte composition and temperature was determined. The high boron content of this particular amorphous metal makes this amorphous alloy an effective neutron absorber and suitable for criticality-control applications. In general, the corrosion resistance of such iron-based amorphous metals is maintained at operating temperatures up to the glass transition temperature. These materials are much harder than conventional stainless steel and Ni-based materials, and are proving to have excellent wear properties, sufficient to warrant their use in earth excavation, drilling, and tunnel-boring applications. Large areas have been successfully coated with these materials, with thicknesses of approximately 1 cm. The observed corrosion resistance may enable applications of importance in industries such as oil and gas production, refining, nuclear power generation, shipping, etc.

36 MATERIALS SCIENCE↗

Review of Criticality Evaluations for Direct Disposal of DPCs and Recommendations

There are currently 2,462 dual-purpose canisters (DPCs) containing spent nuclear fuel (SNF) across the United States. Repackaging DPCs into specialized disposal canisters can be financially and operationally costly with undue risks. Technical feasibility of direct disposal of DPCs has been evaluated by the Department of Energy (DOE) and industry over the past 15 years. A concerted effort most recently conducted by DOE Office of Nuclear Energy (NE) Spent Fuel and Waste Science and Technology (SFWST) research and development (R&D) programs is evaluating the technical feasibility of direct disposal of DPCs in various geologies. This report focuses on reviewing the work completed by SFWST for the criticality considerations of DPC geologic disposal. Disposal of DPCs is not only viable, but assured from a technical and assumed regulatory perspective (similar to 10 CFR 63). The analysis approach should be multi-faceted to ensure effective implementation of a licensing basis. Recommendations are provided in this report that could enhance the bases for direct disposal of DPCs by exploiting all technically attainable and regulatorily defensible options. The review objectives, including addressing several questions regarding the value of accumulating asloaded fuel and DPC design data, suitability of DPC designs for disposal, and reasonable modifications for loading of DPCs that could facilitate eventual disposal, are also addressed in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human and Technology Integration Evaluation of Advanced Automation and Data Visualization

While the existing United States (U.S.) light water reactors are highly reliable, safe, and provide a significant proportion of carbon-free electricity, the cost of operating and maintaining them has become less competitive compared to other electricity generating sources. The reason for the gap in operating and maintenance (O&M) costs can be at least in part attributed to the advent of new digital technologies that other electricity generating industries are currently using. Advanced capabilities including digital instrumentation and control (I&C) systems, advanced automation and analytics, and greater span of data integration (i.e., connectedness) across these non-nuclear plants has transformed the way work is performed and ultimately given them a competitive advantage in terms of the cost required for operating, maintaining, and supporting them. To reduce O&M cost and address obsolescence of the aging I&C infrastructure of the existing U.S. light water reactors, the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program Plant Modernization Pathway is conducting targeting multidisciplinary research that 1) delivers a sustainable business model to enable a cost-competitive U.S. nuclear industry and 2) is developing technology modernization solutions that address aging and obsolescence challenges. The work described in this report supports these two objectives and describes the demonstration of human and technology integration across recent industry collaborations to support their large-scale digital I&C modifications. This technical report describes the demonstration of the human and technology integration methodology in performing full-scale performance-based human-in-the-loop tests to evaluate plant-specific advanced automation and data visualization applications within these collaborators’ digital modifications. This technical report also documents future applications of human and technology integration that expand beyond main control room modernization and digital I&C upgrades, which have been a central focus to date. Thus, this technical report discusses how to implement human and technology integration across new business opportunities and how to develop an evaluation plan that defines measures and criteria, and documents key assumptions to support full plant modernization.

99 GENERAL AND MISCELLANEOUS↗

Scheduling periodic jobs using imprecise results

One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

Chung, Jen-Yao↗

A parallel strategy for implementing real-time expert systems using CLIPS

As evidenced by current literature, there appears to be a continued interest in the study of real-time expert systems. It is generally recognized that speed of execution is only one consideration when designing an effective real-time expert system. Some other features one must consider are the expert system's ability to perform temporal reasoning, handle interrupts, prioritize data, contend with data uncertainty, and perform context focusing as dictated by the incoming data to the expert system. This paper presents a strategy for implementing a real time expert system on the iPSC/860 hypercube parallel computer using CLIPS. The strategy takes into consideration not only the execution time of the software, but also those features which define a true real-time expert system. The methodology is then demonstrated using a practical implementation of an expert system which performs diagnostics on the Space Shuttle Main Engine (SSME). This particular implementation uses an eight node hypercube to process ten sensor measurements in order to simultaneously diagnose five different failure modes within the SSME. The main program is written in ANSI C and embeds CLIPS to better facilitate and debug the rule based expert system.

Ilyes, Laszlo A.↗

Analysis of MMU FDIR expert system

This paper describes the analysis of a rulebase for fault diagnosis, isolation, and recovery for NASA's Manned Maneuvering Unit (MMU). The MMU is used by a human astronaut to move around a spacecraft in space. In order to provide maneuverability, there are several thrusters oriented in various directions, and hand-controlled devices for useful groups of them. The rulebase describes some error detection procedures, and corrective actions that can be applied in a few cases. The approach taken in this paper is to treat rulebases as symbolic objects and compute correctness and 'reasonableness' criteria that use the statistical distribution of various syntactic structures within the rulebase. The criteria should identify awkward situations, and otherwise signal anomalies that may be errors. The rulebase analysis agorithms are derived from mathematical and computational criteria that implement certain principles developed for rulebase evaluation. The principles are Consistency, Completeness, Irredundancy, Connectivity, and finally, Distribution. Several errors were detected in the delivered rulebase. Some of these errors were easily fixed. Some errors could not be fixed with the available information. A geometric model of the thruster arrangement is needed to show how to correct certain other distribution nomalies that are in fact errors. The investigations reported here were partially supported by The Aerospace Corporation's Sponsored Research Program.

Landauer, Christopher↗

Investigations for Supersonic Transports at Transonic and Supersonic Conditions

Several computational studies were conducted as part of NASA s High Speed Research Program. Results of turbulence model comparisons from two studies on supersonic transport configurations performed during the NASA High-Speed Research program are given. The effects of grid topology and the representation of the actual wind tunnel model geometry are also investigated. Results are presented for both transonic conditions at Mach 0.90 and supersonic conditions at Mach 2.48. A feature of these two studies was the availability of higher Reynolds number wind tunnel data with which to compare the computational results. The transonic wind tunnel data was obtained in the National Transonic Facility at NASA Langley, and the supersonic data was obtained in the Boeing Polysonic Wind Tunnel. The computational data was acquired using a state of the art Navier-Stokes flow solver with a wide range of turbulence models implemented. The results show that the computed forces compare reasonably well with the experimental data, with the Baldwin-Lomax with Degani-Schiff modifications and the Baldwin-Barth models showing the best agreement for the transonic conditions and the Spalart-Allmaras model showing the best agreement for the supersonic conditions. The transonic results were more sensitive to the choice of turbulence model than were the supersonic results.

Rivers, S. Melissa B.↗

Comparison of Ocular Outcomes in Two 14-Day Bed Rest Studies

Reports of astronauts visual changes raised concern about ocular health during long-duration spaceflight. Some of these findings included hyperopic shifts, choroidal folds, optic disc edema, retinal nerve fiber layer (RNFL) thickening, and cotton wool spots. While the etiology remains unknown, hypotheses speculate that hypertension in the brain caused by cephalad fluid shifts during spaceflight is a possible mechanism for these ocular changes. Head-down tilt (HDT) bed rest is a spaceflight analog that induces cephalad fluid shifts. In addition, previous studies of the HDT position demonstrated body fluid shifts associated with changes in intraocular pressure (IOP). For these reasons, vision monitoring of HDT bed rest subjects was implemented for NASA bed rest studies. Subjects selected for these studies were healthy adults (14 males and 5 females). Average age was 37.5 plus or minus 9.1 years, weight was 77.4 plus or minus 11.3 Kg, and height was 173.4 plus or minus 7.2 14 cm. Controlled conditions followed for all NASA bed rest studies were implemented. These conditions included factors such as eating a standardized diet, maintaining a strict sleep wake cycle, and remaining in bed for 24 hours each day. In one study, subjects maintained a horizontal (0 degree) position while in bed and were exercised six days per week with an integrated resistance and aerobic training (iRAT) program. In the other study, subjects were placed at 6 degrees HDT while in bed and did not engage in exercise. All subjects underwent pre- and post bed rest vision testing. While the battery of vision tests for each study was not identical, measures common to both studies will be presented. These measures included IOP and measures that provided an indication of optic disc swelling as derived from optical coherence tomography (OCT) testing: average retinal nerve fiber layer (RNFL) thickness (millimeters), disc area (square millimeters), rim area (square millimters), and average cup to disc (C/D) ratio. For all measures, there was no significant difference between subject groups for pre-bed rest testing. Post bed rest values also remained similar between groups. Comparison of pre- to post bed rest testing within each group did not demonstrate any statistical differences. These preliminary results from 14-day bed rest studies suggest that the combination of exercise and horizontal bed rest as compared to 6 degrees HDT bed rest did not produce differences in the ocular response with regard to IOP and optic disc parameters. The ocular measures reported here only included pre- and post bed rest time points. Further investigation is needed to examine both the acute response and long term adaptation of structural and functional ocular parameters in the bed rest platform and determine its usefulness for studying spaceflight phenomena. From a clinical perspective, the ability to study ocular responses in the controlled environment of the bed rest platform can provide valuable information for the care of patients restricted to bed rest.

Cromwell, R. L.↗

Portable Life Support System 2.5 Fan Design and Development

NASA is building a high-fidelity prototype of an advanced Portable Life Support System (PLSS) as part of the Advanced Exploration Systems Program. This new PLSS, designated as PLSS 2.5, will advance component technologies and systems knowledge to inform a future flight program. The oxygen ventilation loop of its predecessor, PLSS 2.0, was driven by a centrifugal fan developed using specifications from the Constellation Program. PLSS technology and system parameters have matured to the point where the existing fan will not perform adequately for the new prototype. In addition, areas of potential improvement were identified with the PLSS 2.0 fan that could be addressed in a new design. As a result, a new fan was designed and tested for the PLSS 2.5. The PLSS 2.5 fan is a derivative of the one used in PLSS 2.0, and it uses the same nonmetallic, canned motor, with a larger volute and impeller to meet the higher pressure drop requirements of the PLSS 2.5 ventilation loop. The larger impeller allows it to operate at rotational speeds that are matched to rolling element bearings, and which create reasonably low impeller tip speeds consistent with prior, oxygen-rated fans. Development of the fan also considered a shrouded impeller design that could allow larger clearances for greater oxygen safety, assembly tolerances and particle ingestion. This paper discusses the design, manufacturing and performance testing of the new fans.

Quinn, Gregory↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period October 1, 2007 - September 30, 2008. Table 2 shows the summary of cumulative users for the period October 1, 2007 - September 30, 2008. For the fourth quarter of FY 2008, the overall number of users is down substantially (about 30%) from last quarter. Most of this decrease resulted from a reduction in the ACRF Infrastructure users (e.g., site visits, research accounts, on-site device accounts, etc.) associated with the AMF China deployment. While users had easy access to the previous AMF deployment in Germany that resulted in all-time high user statistics, physical and remote access to on-site accounts are extremely limited for the AMF deployment in China. Furthermore, AMF data have not yet been released from China to the Data Management Facility for processing, which affects Archive user statistics. However, Archive users are only down about 10% from last quarter. Another reason for the apparent reduction in Archive users is that data from the Indirect and Semi-Direct Aerosol Campaign (ISDAC), a major field campaign conducted on the North Slope of Alaska, are not yet available to users. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period July 1 - September 30, 2008. There were no incidents this reporting period.

54 ENVIRONMENTAL SCIENCES↗

Optimal Allocation of Water Resources Using a Two-Stage Stochastic Programming Method with Interval and Fuzzy Parameters

Efficient water allocation is one of the most prominent issues in water resources management. In this research, a two-stage interval-parameter stochastic fuzzy programming with type 2 membership functions was used to allocate water resources optimally to different users under uncertainty. This method can handle uncertainties expressed as probability distributions, discrete intervals, and fuzzy sets. The model considers treated wastewater as an allocable water resource in a scenario, in addition to water that is extracted from wellheads, springs, and qanats. Moreover, the loss rate of water during distribution, surplus water in the reservoir in the previous and the next period, and treated wastewater parameters have been incorporated into the model. This model was applied to a case study of water resources allocation within a multi-user and multi-reservoir context in the Zarand region of Kerman, Iran. The results indicate that reasonable solutions have been generated, in the form of interval and fuzzy information under different scenarios that could help managers provide optimal water resources allocation plans. The results also demonstrate that establishing a wastewater treatment station increases the system net benefits, surplus water in wellheads for the next period, and system reliability (level of satisfying the fuzzy goal and constraints), and decreases encountering water shortages.

58 GEOSCIENCES↗

Formulation and Comparison of Two Real-Time Predictive Gear Shift Algorithms for Connected/Automated Heavy-Duty Vehicles

Our work investigates the problem of predictive gear scheduling for fuel consumption minimization in connected/automated heavy trucks. The literature highlights the fuel economy benefits of such predictive scheduling, but there is a need to optimize such scheduling online, in real time. To address this need, we begin by using dynamic programming (DP) to schedule gear shifting offline, in a manner that achieves a globally optimal Pareto tradeoff between the conflicting objectives of minimizing fuel consumption and shift frequency. The computational cost of DP is unfavorable for online implementation, but we present two algorithms addressing this issue. Both algorithms rely on the fact that in the Pareto limit where fuel consumption minimization is the sole objective, DP furnishes a simple static shift map . Our first algorithm trains a recurrent neural network to prune the shift schedule generated by this map. The second algorithm performs this pruning in a direct manner tailored to reduce the schedule's rain flow count. We simulate these algorithms for different drive cycles. Both algorithms achieve a reasonable tradeoff between fuel consumption and gear shift frequency. Yet, the rain flow count algorithm is both more effective in approaching the DP-based Pareto front and more computationally efficient.

33 ADVANCED PROPULSION SYSTEMS↗

Implementation and Rejection of Industrial Steam System Energy Efficiency Measures

Steam systems consume approximately one third of energy applied at U.S. industrial facilities. To reduce energy consumption, steam system energy assessments have been conducted on a wide range of industry types over the course of five years through the Energy Savings Assessment (ESA) program administered by the U.S. Department of Energy (U.S. DOE). ESA energy assessments result in energy efficiency measure recommendations that are given potential energy and energy cost savings and potential implementation cost values. Saving and cost metrics that measure the impact recommended measures will have at facilities, described as percentages of facility baseline energy and energy cost, are developed from ESA data and used in analyses. Developed savings and cost metrics are examined along with implementation and rejection rates of recommended steam system energy efficiency measures. Based on analyses, implementation of steam system energy efficiency measures is driven primarily by cost metrics: payback period and measure implementation cost as a percentage of facility baseline energy cost (implementation cost percentage). Stated reasons for rejecting recommended measures are primarily based upon economic concerns. Additionally, implementation rates of measures are not only functions of savings and cost metrics, but time as well.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Verification and Validation of TMAP7

The Tritium Migration Analysis Program, Version 7 (TMAP7) code is an update of TMAP4, an earlier version that was verified and validated in support of the International Thermonuclear Experimental Reactor (ITER) program and of the intermediate version TMAP2000. It has undergone several revisions. The current one includes radioactive decay, multiple trap capability, more realistic treatment of heteronuclear molecular formation at surfaces, processes that involve surface-only species, and a number of other improvements. Prior to code utilization, it needed to be verified and validated to ensure that the code is performing as it was intended and that its predictions are consistent with physical reality. To that end, the demonstration and comparison problems cited here show that the code results agree with analytical solutions for select problems where analytical solutions are straightforward or with results from other verified and validated codes, and that actual experimental results can be accurately replicated using reasonable models with this code. These results and their documentation in this report are necessary steps in the qualification of TMAP7 for its intended service.

08 HYDROGEN↗