Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Systems engineering and integration and management for manned space flight programs

This paper discusses the history of SE&I management of the overall program architecture, organizational structure and the relationship of SE&I to other program organizational elements. A brief discussion of the method of executing the SE&I process, a summary of some of the major lessons learned, and identification of things that have proven successful are included.

Morris, Owen↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

Johnstone, Paul M.↗

Laboratory Directed Research and Development FY2008 Annual Report

The Laboratory Directed Research and Development (LDRD) Program, authorized by Congress in 1991 and administered by the Institutional Science and Technology Office at Lawrence Livermore, is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the full spectrum of national security interests encompassed by the missions of the Laboratory, the Department of Energy, and National Nuclear Security Administration. The accomplishments described in this annual report demonstrate the strong alignment of the LDRD portfolio with these missions and contribute to the Laboratory's success in meeting its goals. The LDRD budget of $91.5 million for fiscal year 2008 sponsored 176 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific quality and mission relevance. Each year, the number of deserving proposals far exceeds the funding available, making the selection a tough one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory's multidisciplinary team approach to science and technology. Safeguarding the nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle for attracting and retaining the best and the brightest technical staff and for establishing collaborations with universities, industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

STS-92 Preflight Briefings Video Feed and International Space Station Overview

The first half of this video is a collection of video feeds from various preflight conferences and simulations show the payload bay and payload equipment. The International Space Station's (ISS) structure is seen, as are close-up shots of the Z-1 truss. Footage shows extravehicular activity (EVA) underwater training. The second half of the video is a preflight conference on the mission objectives concerning the ISS. Tommy Halloway, Manager, ISS Program, and Robert Cabana, ISS Manager for International Operations, discuss the STS-92 mission in terms of the ISS and the role of ISS in the future. Mr. Cabana gives the status of present and future ISS hardware. The men then answer questions from the press.

Source record↗

Portfolio Management

Enterprise Business Information Services Division (EBIS) supports the Laboratory and its functions through the implementation and support of business information systems on behalf of its business community. EBIS Five Strategic Focus Areas: (1) Improve project estimating, planning and delivery capability (2) Improve maintainability and sustainability of EBIS Application Portfolio (3) Leap forward in IT Leadership (4) Comprehensive Talent Management (5) Continuous IT Security Program. Portfolio Management is a strategy in which software applications are managed as assets

Information Technology Applications↗

Routing Options for Transporting Commercial Spent Nuclear Fuel in the Continental United States - 17504

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel and high-level radioactive waste. The DOE is planning for an integrated waste management system to transport, store, and dispose of spent nuclear fuel and high-level radioactive waste from commercial electricity generation, as well national defense activities. The DOE Office of Nuclear Energy (DOE-NE), Office of Spent Fuel and Waste Disposition's (SFWD) Integrated Waste Management (IWM) program is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management system is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to destinations where waste management facilities, such as an interim storage facility, would be located. Example rail transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. - chosen as hypothetical locations for future waste management system facilities - were evaluated in 2014 using DOE's GIS-based Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of that evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. The analysis presented herein considers rail transportation routes from commercial nuclear reactor sites to hypothetical destinations within the continental U.S. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Scalable and Distributed Algorithm for Managing Residential Demand Response Programs using Alternating Direction Method of Multipliers (ADMM)

For effective engagement of residential demand-side resources and to ensure efficient operation of distribution networks, we must overcome the challenges of controlling and coordinating residential components and devices at scale. To overcome this challenge, we present a distributed and scalable algorithm with a three-level hierarchical information exchange architecture for managing the residential demand response programs. First, a centralized optimization model is formulated to maximize community social welfare. Then, this centralized model is solved in a distributed manner with alternating direction method of multipliers (ADMM) by decomposing the original problem to utility-level and house-level problems. The information exchange between the different layers is limited to the primary residual (i.e., supply-demand mismatch), Lagrangian multipliers, and the total load of each house to protect each customer’s privacy. Simulation studies are performed on the IEEE 33 bus test system with 605 residential customers. The results demonstrate that the proposed approach can save customers’ electricity bills and reduce the peak load at the utility level without much affecting customers’ comfort and privacy. Finally, a quantitative comparison of the distributed and centralized algorithms shows the scalability advantage of the proposed ADMM-based approach, and it gives benchmarking results with achievable value for future research works.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Aeropropulsion facilities configuration control: Procedures manual

Lewis Research Center senior management directed that the aeropropulsion facilities be put under configuration control. A Configuration Management (CM) program was established by the Facilities Management Branch of the Aeropropulsion Facilities and Experiments Division. Under the CM program, a support service contractor was engaged to staff and implement the program. The Aeronautics Directorate has over 30 facilities at Lewis of various sizes and complexities. Under the program, a Facility Baseline List (FBL) was established for each facility, listing which systems and their documents were to be placed under configuration control. A Change Control System (CCS) was established requiring that any proposed changes to FBL systems or their documents were to be processed as per the CCS. Limited access control of the FBL master drawings was implemented and an audit system established to ensure all facility changes are properly processed. This procedures manual sets forth the policy and responsibilities to ensure all key documents constituting a facilities configuration are kept current, modified as needed, and verified to reflect any proposed change. This is the essence of the CM program.

Lavelle, James J.↗

Impact of Different Trajectory Option Set Participation Levels within an Air Traffic Management Collaborative Trajectory Option Program

This paper presents the methodology and results of a Human-In-The-Loop (HITL) simulation study conducted in the Airspace Operations Laboratory at NASA Ames Research Center. This study is a part of NASA's ongoing research into developing an Integrated Demand Management (IDM) concept, whose aim is to improve traffic flow management (TFM) by coordinating the FAA's strategic Traffic Flow Management System (TFMS) with its more tactical Time-Based Flow Management (TBFM) system. The purpose of TFM is to regulate air traffic demand so that it is delivered efficiently through constrained airspace resources without exceeding their capacity limits. The IDM concept leverages a new TFMS capability called the Collaborative Trajectory Options Program (CTOP) to strategically pre-condition traffic demand flowing into a TBFM-managed arrival environment, where TBFM is responsible for managing traffic tactically by generating precise arrival schedules. Unlike other TFM tools, CTOP gives flight operators the option of submitting a set of user-preferred alternative trajectories for each flight. CTOP can then use these trajectory option sets (or TOSs) to find user-preferred alternative routes to reduce demand on an overloaded resource. CTOP's effectiveness in redistributing demand is limited, however, by the availability of flights with alternative routes. The research presented in this paper focuses on evaluating the impact on TFM operations by varying the percentage of flights that submit a multiple-option TOS ('TOS participation levels'). Results show the impact on overall system performance and on the rerouted flights themselves. The simulation used a Newark (EWR) airport arrival scenario, with en route weather affecting traffic inbound from the west. Participants were asked to control each of the three arrival flows (north, west, and south) to meet their individual capacity constraints while simultaneously ensuring efficient utilization of the capacity at the destination airport. A large, permeable convective weather cell located southeast of Chicago severely reduced the capacity of the west flow. The study evaluated the impact of five different TOS participation levels on CTOP's ability to re-allocate traffic from the west and improve TFM performance in terms of delay assignment and traffic delivery rate to the airport. Overall, the results showed that increasing TOS submissions allowed the overall system delays to be reduced and fairly distributed among the three arrival flows, at the same time achieving the airport throughput rate. Moreover, it was found that aircraft who submitted a TOS saw a greater reduction in delay, even when they were assigned longer routes. This was particularly true when fewer aircraft submitted a TOS. The results confirm that the CTOP operations with higher TOS participation levels helped utilize the overall National Airspace System (NAS) resources as well as benefited the users who participated.

Yoo, Hyo-Sang↗

Research on the application of satellite remote sensing to local, state, regional, and national programs involved with resource management and environmental quality

Project summaries and project reports are presented in the area of satellite remote sensing as applied to local, regional, and national environmental programs. Projects reports include: (1) Douglas County applications program; (2) vegetation damage and heavy metal concentration in new lead belt; (3) evaluating reclamation of strip-mined land; (4) remote sensing applied to land use planning at Clinton Reservoir; and (5) detailed land use mapping in Kansas City, Kansas.

Walters, R. L.↗