Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “meter, test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

250-kW CW klystron amplifier for planetary radar

The design, construction, and performance testing is described of two Varian klystrons, model VKX-7864A, which replaced the aging and less efficient VA-949J klystrons in the X band planetary radar transmitter on the Goldstone, CA, 70 meter antenna. The project was carried out jointly by the JPL and Varian Assoc. Output power was increased from 200 to 250 kW continuous wave per klystron, and full dc beam power is dissipated in the collector (it was not possible to operate the VA-949J klystrons without RF drive because of limited collector dissipation capability). Replacement were made with a minimum of transmitter modifciations. The planetary radar transmitter is now operating successfully with these two klystrons.

Cormier, Reginald A.↗

The Swift MlDEX Mission

Swift is a NASA MIDEX mission that is in development for launch in 2004. It is a multiwavelength observatory for transient astronomy. The goals of the mission are to determine the origin of gamma-ray bursts and their afterglows and use bursts to probe the early Universe. The mission will also perform a hard x-ray survey at the 1 milliCrab level and will continuously monitor the sky for transients. A wide- field gamma-ray camera will detect more than a hundred GRBs per year to 3 times fainter than BATSE. Sensitive narrow-field X-ray and Uv/optical telescopes will be pointed at the burst location in 20 to 70 sec by an autonomously controlled "swift" spacecraft. For each burst, arcsec positions will be determined and optical/W/X-ray/gamma-ray spectrophotometry performed. The instrumentation is a combination of existing flight-spare hardware and design from XMM and Spectrum-X/JET-X contributed by collaborators in the UX and Italy and development of a coded-aperture camera with a large-area (-0.5 square meter) CdZnTe detector array. The ground station in Malindi is contributed by the Italian Space Agency. The instruments have now completed their fabrication phase and are currently being integrated on the observatory for final testing. up and outreach programs to engage the astronomical community and public in Swift.

Gehrels, Neil↗

The Imminent Swift MIDEX Mission

Swift is a NASA MIDEX mission that is in development for launch in Fall 2004. It is a multiwavelength observatory for transient astronomy. The goals of the mission are to determine the origin of gamma-ray bursts and their afterglows and use bursts to probe the early Universe. The mission will also perform a hard x-ray survey at the 1 milliCrab level and will continuously monitor the sky for transients. A wide-field gamma-ray camera will detect more than a hundred GRBs per year to 3 times fainter than BATSE. Sensitive narrow-field X-ray and UV/optical telescopes will be pointed at the burst. location in 20 to 70 sec by an autonomously controlled "swift" spacecraft. For each burst, arcsec positions will be determined and optical/UV/X-ray/gamma-ray spectrophotometry performed. The instrumentation is a combination of existing flight-spare hardware and design from XMM and Spectrum-X/JET-X contributed by collaborators in the UK and Italy and development of a coded-aperture camera with a large-area (approximately 0.5 square meter) CdZnTe detector array. The ground station in Malindi is contributed by the Italian Space Agency. The instruments have now completed their fabrication phase and are currently being integrated on the observatory for final testing. Key components of the mission are vigorous follow-up and outreach programs to engage the astronomical community and public in Swift.

Gehrels, Neil↗

Performance of a 16.6 Meter Diameter Cross Parachute in a Simulated Martian Environment

Inflation and drag characteristics of a 54.4-foot (16.6 meter) nominal-diameter cross parachute, deployed at a Mach number of 1.65 and a dynamic pressure of 12.68 lb/sq f t (607.1 N/m(exp2)), were obtained from the fourth balloon-launched flight test of the Planetary Entry Parachute Program (PEPP). After deployment, the parachute quickly inflated to a full condition, partially collapsed, and then gradually reinflated while undergoing rapid oscillations between over-inflation and under-inflation. The oscillations began while the parachute was still at supersonic speeds and continued to low subsonic speeds well below an altitude of 90,000 feet (27.4 km). These canopy instabilities produced large cyclic variations in the parachute's drag coefficient. The average value of drag coefficient was about 0.8 to 0.9 at subsonic speeds and slightly lower at supersonic speeds. These drag coefficient values were based on the actual fabric surface area of the parachute canopy. The parachute sustained minor damage consisting of two canopy tears and abrasions and tears on the riser line. It is believed that this damage did not produce a significant change in the performance of the parachute.

Lundstrom, Reginald R.↗

Resolution of Lava Tubes with Ground Penetrating Radar: The TubeX project

Remote sensing surveys of the Moon and Mars show evidence of lava tubes, which are potential safe havens for human crews and their equipment. Ground penetrating radar (GPR) can be used to map tubes because the void/rock interface at tube ceilings and floors strongly reflects radar pulses. We have tested the capacity of GPR to sense lava tube geometry at Lava Beds National Monument (LBNM) in California, USA. GPR and detailed LiDAR data are presented for two tubes: Skull Cave, with a few meters of overburden, diameter ~10-20 m, and a rubbly floor; and Valentine Cave, with similarly thin overburden, diameter ~1-3 meters, and a flatter smoother floor. On both caves GPR clearly resolves the ceiling and permits good estimates of the cave width as validated with LiDAR data. Where GPR fails, the primary cause is inferred to be strong out-of-plane effects due to complex 3D geometries. Recovery of the floor position requires migrating the GPR data with a 2D velocity model, as signal velocity is faster in void space. We find that floor position is recoverable in caves whose voids are taller than the radar wavelength (~3 m in this study). Forward modeling assuming planetary parameters suggests GPR should be similarly successful on the Moon or Mars.

S. Esmaeili↗

Feasibility of Micro-Multilayer Multifunctional Electrical Insulation (MMEI) System for High Voltage Applications

The newly patented micro-multilayer multifunctional electrical insulation (MMEI) system was developed for future electric aircraft applications which critically require lightweight but high voltage (HV), high temperature, and corona or partial discharge (PD) resistant insulation. During the initial development stages, the concept and practicability of the MMEI system were successfully validated with its exceptionally high dielectric breakdown voltages. The multilayer structures were optimized in terms of material type, individual layer thickness, and overall layer configuration along with potential mechanisms identified for its superior performance. Subsequently, scalability, manufacturability, and commercial applicability of the MMEI system were demonstrated with the 1 meter long, 3-phase HV, high power (HP) bus bar prototypes. Two prototypes, one with the conventional SOA insulation system including Mica sheet and the other with an optimized MMEI, were designed, fabricated, and tested successfully. Both prototypes passed both HiPot and PD tests up to the highest test voltage available, 15 kVAC, although the latter showed a slight increase in PD activities at 12.5 kV. However, the prototype with MMEI was 15% lighter or 12% thinner than the other one. Current efforts to significantly enhance the PD resistance of the MMEI system by employing semiconductive shielding layers, which can be also multifunctional, e.g., electromagnetic interference shielding, moisture blocking, heat dissipation, for various HV applications are also discussed in this paper.

Novel Electrical Insulation↗

Feasibility of Micro-Multilayer Multifunctional Electrical Insulation (MMEI) System for High Voltage Applications

The newly patented micro-multilayer multifunctional electrical insulation (MMEI) system was developed for future electric aircraft applications which critically require lightweight but high voltage (HV), high temperature, and corona or partial discharge (PD) resistant insulation. During the initial development stages, the concept and practicability of the MMEI system were successfully validated with its exceptionally high dielectric breakdown voltages. The multilayer structures were optimized in terms of material type, individual layer thickness, and overall layer configuration along with potential mechanisms identified for its superior performance. Subsequently, scalability, manufacturability, and commercial applicability of the MMEI system were demonstrated with the 1 meter long, 3-phase HV, high power (HP) bus bar prototypes. Two prototypes, one with the conventional SOA insulation system including Mica sheet and the other with an optimized MMEI, were designed, fabricated, and tested successfully. Both prototypes passed both HiPot and PD tests up to the highest test voltage available, 15 kVAC, although the latter showed a slight increase in PD activities at 12.5 kV. However, the prototype with MMEI was 15% lighter or 12% thinner than the other one. Current efforts to significantly enhance the PD resistance of the MMEI system by employing semiconductive shielding layers, which can be also multifunctional, e.g., electromagnetic interference shielding, moisture blocking, heat dissipation, for various HV applications are also discussed in this paper.

Novel Electrical Insulation↗

Laser Communications Relay Demonstration Optimetrics Experiment

Within this paper, we report on an Optimetrics experiment conducted on the National Aeronautics and Space Administration (NASA) Laser Communication Relay Demonstration (LCRD). The high precision two-way ranging is conducted on the optical communications link between the LCRD space terminal in a geosynchronous orbit and the Optical Ground Station 1 (OGS1) at Table Mountain, California, and is referred to as optimetrics ranging. The receiver to transmitter clock loopback is implemented in the LCRD space modem. A digital dual mixer time difference phase meter (DDMTD) is implemented in the OGS1 ground modem. The round-trip time is measured with the DDMTD by counting the frame and data clock ticks between transmitter and receiver frame synchronization markers for coarse range, and the relative phase of the transmit and receive clock for high precision range. This approach provides coverage for all potential ranges with no ranging ambiguity. The flight modem FPGA code was modified for frame and data clock loopback and the OGS1 FPGA code was modified for the DDMTD phase meter implementation. The experiment team conducted a 36-hour continuous ranging measurement. Preliminary two-way optimetrics ranging data show a noise floor of 3cm (rms). Based on our theoretical noise analysis and ground tests with spare flight modems, we expected one order of magnitude improvement on ranging precision. We are conducting detailed post data processing to identify the differences to further reduce the noise level and formulating an improved implementation approach for future missions. For reference and comparison, traditional Radio Frequency (RF) ranging between LCRD and OGS1 was conducted at the same time and indicates a ranging noise floor of 30cm(rms). Other telemetry and relevant environmental parameters such as weather and atmosphere temperature were also collected for offline data processing. The high precision ranging and range rate measurements from the laser communications data link clock and clock phase are performed simultaneously with continuous optical communication. No extra hardware added to existing system. This high precision optimetrics measurement implementation provides alternative ranging and range rate measurements for orbit determination (OD) and flight dynamics calculations with higher precision. We see significant improvement on OD for navigation upon implementation in future optical communication systems.

Rafael Garcia↗

Development of a new, completely implantable intraventricular pressure meter and preliminary report of its clinical experience

A completely implantable intracranial pressure sensor designed for long-term measurement of intraventricular pressure in hydrocephalic patients is described. The measurement principal of the device is discussed along with the electronic and component structure and sources of instrument error. Clinical tests of this implanted pressure device involving both humans and animals showed it to be comparable to other methods of intracranial pressure measurement.

Osaka, K.↗

Efficiency calibration of the DSS 13 34-meter diameter beam waveguide antenna at 8.45 and 32 GHz

Efficiency measurements at 8.45 and 32 GHz (X and Ka bands, respectively) were carried out on the new 34 m diameter beam waveguide antenna now in use at the NASA Goldstone Deep Space Communications Complex. The use of portable test packages enabled measurements at both the Cassegrain and beam waveguide focal points. Radio sources (quasars and Venus) were used as calibrators, and updated determinations of flux and source size correction were made during the period of the measurements. Gain and efficiency determinations as a function of elevation angle are presented, and the effects of the beam waveguide system and antenna structure are clearly seen. At the beam waveguide focus, an 8.45 GHz peak efficiency of 72.38 pct. was measured; at 32 GHz, 44.89 pct. was measured.

Slobin, S. D.↗

Cold Test Facility for the ITER Central Solenoid Coils

The United States, along with the European Union, Russia, Japan, China. South Korea and India, is a collaborative partner in the design, construction and operation of the ITER International Tokamak which will be located a Cadarache, France. One component of the US in kind contribution to the project is the Central Solenoid System for the tokamak magnet system. The Central Solenoid System is a massive assembly 4.4 meters outside diameter, 18.8 meters high and weighing ~ 1,000 tons. Operating conditions (not simultaneous) are 45kA and 13 T with a maximum field ramp rate of 1.3 T/s producing a maximum flux swing of 277 V s. This combination of performance parameters make the ITER Central Solenoid one the most challenging magnet system ever built Using CICC provide by Japan, the US will deliver the final CS System by fabricating the magnet from six (6) separate 100 ton coils supported and restrained by an external structure. Part of the US responsibilities in delivering this magnet system to the ITER International Organization is to acceptance test each Central Solenoid Coil separately at operating (4K) temperature. The principal acceptance test objectives are coil leak tightness, insulation integrity and overall coil joint quality. Peak test field and test current are reduced without field contributions from adjacent coils and practical installation considerations. This paper will describe an ITER Central Solenoid Cold Test Facility study undertaken by the National High Magnetic Field Laboratory at Florida State University and the United States ITER Project Office at Oak Ridge, TN.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NASA Space Environment Analog for Training, Engineering, Science, and Technology (SEATEST) 6 Detailed Final Report

After more than 50 years since the last crewed lunar landing, plans for more missions to the moon are in development. For these missions, efficient and sustainable logistics will be critical. Additionally, innovative methods of cargo transfer to and from a lunar outpost should be considered for successfully establishing a permanent presence on the moon. SEATEST (Space Environment Analog for Training, Engineering, Science, and Technology) is an immersive mission-analogous operational atmosphere where buoyancy effects and supplemental weights can simulate partial gravity conditions similar to those astronauts will experience on the moon. SEATEST 6 took place at the University of Southern California (USC) Wrigley Marine Science Center on Santa Catalina Island from July 18-30, 2023. The analog was used to collect preliminary logistics data on two different offloading conceptual methods (a davit and a zipline) during a simulated lunar mission. Pre-test analysis indicated for a crew of two on a 14-day mission, approximately three Medium Pressurized Logistics Containers (MPLC) sized logistics containers (or a total of 37.5 single Cargo Transfer Bag Equivalents (CTBE)) would be needed to support a mission. A Computer-Aided Design (CAD) analysis was employed on the SEATEST airlock mockup to determine how many logistic containers would fit with two suited crewmembers, don/doff stands, and hatch operations. It was determined that for SEATEST, a total of 15 1.0 Small Pressurized Logistics Containers (SPLCs) and 8 2.0 SPLCs would adequately fit into the approximate 9.5 cubic meter airlock volume. This does not fully represent a complete 14-day logistic supply; however, it does provide a preliminary estimate to initiate design conversations between logistics teams and crew at this early stage of development. Data were collected in eight logistics transfer scenarios over two days with four scenarios per day. Five test subject crew participated in scenarios as pairs. Scenarios included two sizes of logistics containers – 1.0 SPLC (equivalent to a single Cargo Transfer Bag (CTB) and 2.0 SPLC (equivalent to two CTBs). Planed evaluations included the use of a logistics port compared to transfer through an Airlock hatch, offloading methods based on either a davit or a zipline system, choreography of cargo in the airlock to permit ingress and suit doffing, and dust removal protocols for an understanding of the overall impact to transfer ops. Data collected included objective data (task times for conducting overall tasks and subtasks, full audio/video of test activities, and inadvertent “dings” on hardware) and subjective data (crew consensus of: task acceptability and capability assessment ratings related to best practices, considerations, and constraints for EVA-driven logistics transfer ConOps, sim quality of the test environment, and more general debrief comments). The two logistic offloading transfer concepts (davit, zipline) presented both advantages and limitations. The davit’s flexibility in allowing the crew to pick up the containers without physical interaction was well regarded by the crew. Some limitations of select davit hardware components were noted, but the overall concept was acceptable. The zipline system proved to be the most efficient way of moving logistics from the lander to the airlock and eliminated the need for dust operations. However, extended and repetitive lifting of containers to the line could be fatiguing. In conclusion, logistics transfer could hypothetically be achieved without an offloading method; however, the time requirement for such operations would be prohibitive. Results of crew subjective feedback proposed a combined or hybrid davit/zipline method to increase efficiency.

Logistics↗

Stirling Engine Controller

Stirling technology is being developed to replace RTG s (Radioisotope Thermoelectric Generators), more specifically a stirling convertor, which is a stirling engine coupled to a linear alternator. Over the past three decades, the stirling engine has been designed to perform different functions. Stirling convertors have been designed to decrease fuel consumption in automobiles. They have also been designed for terrestrial and space applications. Currently NASA Glenn is using the convertor for space based applications. A stiring converter is a better means of power for deep space mission and "dusty" mission, like the Mars Rovers, than solar panels because it is not affected by dust. Spirit and Opportunity, two Mars rovers currently navigating the planet, are losing their ability to generate electricity because dust is collecting on their solar panels. Opportunity is losing more energy because its robotic arm has a heater with a switch that can not be turned off. The heater is not needed at night, but yet still runs. This generates a greater loss of electricity and in turn diminishes the performance of the rover. The stirling cycle has the potential to provide very efficient conversion of heat energy to electric a1 energy, more so than RTG's. The stirling engine converts the thermal energy produced by the decaying radioisotope to mechanical energy; the linear alternator converts this into electricity. convertor. Since the early 1990's tests have been performed to maximize the efficiency of the stirling converter. Many months, even years, are dedicated to preparing and performing tests. Currently, two stirling convertors #'s 13 and 14, which were developed by Stirling Technology Company, are on an extended operation test. As of June 7th, the two convertors reached 7,500 hours each of operation. Before the convertors could run unattended, many safety precautions had to be examined. So, special instrumentation and circuits were developed to detect off nominal conditions and also safely shutdown the engines. The test will last for a period of 8000 to 9000 hours. Other types of tests that have been performed are: performance mapping, controller development, launch environment, and vibration emissions testing. Currently, the thermo-mechanical system branch is housing a RG-350, a stirling convertor. The convertor was used in previous tests such as a Hall Thruster test, world s first integrated test of a dynamic power system with electric propulsion. Another test performed was to conclude if free piston stirling convertors can be synchronized for vibration balancing, with no thermodynamic or electrical connections and not cause both to shutdown if one failed. The ability to reduce vibration by synchronizing convertor operation but still be able to operate when one partner fails is pertinent in space and terrestrial applications. The convertor is now being brought back into operation and a controller is in the process of being developed. This convertor will be used as a testbed for new controllers. I worked with Mary Ellen Roth on the electric engineering aspects of the RG-350. My main goal was to enhance the data collection process. I worked on different aspects of the RG-350, with a main focus on the engine controller. I drew a schematic of the wire connections in the engine controller, using PCB Express, so that a plan could be devised to connect the power meter properly between the output of the engine and the engine controller. I measured the power using two different instruments: Valhalla Scientific power meter and Ohio Semitronics power measurement device. The convertor is connected to an Agilent 34970A Data Acquisition/Switch Unit, which allows the user to measure, record, and monitor voltage, current, frequency, and temperature. I assisted in preparing the Data Acquisition for general operation. I also helped test a panel of transducers, which will be placed in the rack that powers and monitors the convertor.

Blaze, Gina M.↗

Development of the front end test stand and vessel for extraction and source plasma analyses negative hydrogen ion sources at the Rutherford Appleton Laboratory

The ISIS pulsed spallation neutron and muon facility at the Rutherford Appleton Laboratory (RAL) in the UK uses a Penning surface plasma negative hydrogen ion source. Upgrade options for the ISIS accelerator system demand a higher current, lower emittance beam with longer pulse lengths from the injector. The Front End Test Stand is being constructed at RAL to meet the upgrade requirements using a modified ISIS ion source. A new 10% duty cycle 25 kV pulsed extraction power supply has been commissioned and the first meter of 3 MeV radio frequency quadrupole has been delivered. Simultaneously, a Vessel for Extraction and Source Plasma Analyses is under construction in a new laboratory at RAL. The detailed measurements of the plasma and extracted beam characteristics will allow a radical overhaul of the transport optics, potentially yielding a simpler source configuration with greater output and lifetime.

43 PARTICLE ACCELERATORS↗

Matter-wave Atomic Gradiometer Interferometric Sensor (MAGIS-100)

MAGIS-100 is a next-generation quantum sensor under construction at Fermilab that aims to explore fundamental physics with atom interferometry over a 100 m baseline. This novel detector will search for ultralight dark matter, test quantum mechanics in new regimes, and serve as a technology pathfinder for future gravitational wave detectors in a previously unexplored frequency band. It combines techniques demonstrated in state-of-the-art 10-meter-scale atom interferometers with the latest technological advances of the world’s best atomic clocks. MAGIS-100 will provide a development platform for a future kilometer-scale detector that would be sufficiently sensitive to detect gravitational waves from known sources. Here we present the science case for the MAGIS concept, review the operating principles of the detector, describe the instrument design, and study the detector systematics.

47 OTHER INSTRUMENTATION↗

WISE-CASING: Seismic Experiment at Richmond Field Station, CA

This experiment is testing the tube waves reflected from the bottom of the well. We put six single-channel geophones on the surface and a 24-channel downhole hydrophone into the well. The well is about 30 meters deep. Just a steel casing in the sand formation, no cement.

15 GEOTHERMAL ENERGY↗

IMoFi - Intelligent Model Fidelity: Physics-Based Data-Driven Grid Modeling to Accelerate Accurate PV Integration (Final Report)

This report summarizes the work performed under a project funded by U.S. DOE Solar Energy Technologies Office (SETO) to use grid edge measurements to calibrate distribution system models for improved planning and grid integration of solar PV. Several physics-based data-driven algorithms are developed to identify inaccuracies in models and to bring increased visibility into distribution system planning. This includes phase identification, secondary system topology and parameter estimation, meter-to-transformer pairing, medium-voltage reconfiguration detection, determination of regulator and capacitor settings, PV system detection, PV parameter and setting estimation, PV dynamic models, and improved load modeling. Each of the algorithms is tested using simulation data and demonstrated on real feeders with our utility partners. The final algorithms demonstrate the potential for future planning and operations of the electric power grid to be more automated and data-driven, with more granularity, higher accuracy, and more comprehensive visibility into the system.

14 SOLAR ENERGY↗