Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status Report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2013

This report is the seventh in an annual series of reports that summarize the progress of fuel cell electric bus (FCEB) development in the United States and discuss the achievements and challenges of introducing fuel cell propulsion in transit. The report also provides a snapshot of current FCEB performance results from August 2012 through July 2013 for five FCEB demonstrations at four transit agencies.

08 HYDROGEN↗

Instrumentation: Nondestructive Examination for Verification of Canister and Cladding Integrity. FY2014 Status Update

This report documents FY14 efforts for two instrumentation subtasks under storage and transportation. These instrumentation tasks relate to developing effective nondestructive evaluation (NDE) methods and techniques to (1) verify the integrity of metal canisters for the storage of used nuclear fuel (UNF) and to (2) verify the integrity of dry storage cask internals.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2016

This report, published annually, summarizes the progress of fuel cell electric bus development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of results from evaluations performed by the National Renewable Energy Laboratory. Funding for this effort is provided by the U.S. Department of Energy's Fuel Cell Technologies Office within the Office of Energy Efficiency and Renewable Energy and by the U.S. Department of Transportation's Federal Transit Administration. The 2016 summary results primarily focus on the most recent year for each demonstration, from August 2015 through July 2016. The results for these buses account for more than 550,000 miles traveled and 59,500 hours of fuel cell power system operation. The primary results presented in the report are from three demonstrations of two different fuel-cell-dominant bus designs: Zero Emission Bay Area Demonstration Group led by Alameda-Contra Costa Transit District (AC Transit) in California; American Fuel Cell Bus Project at SunLine Transit Agency in California; and American Fuel Cell Bus Project at the University of California at Irvine.

30 DIRECT ENERGY CONVERSION↗

Estimating Effects of Various Factors on Corrosion of Pipeline Grade Carbon Steel Under Disbonded Coating (Status Update)

This report provides description of the activities, associated data and results for a work focused on understanding corrosion of pipeline grade carbon steel under coating disbondment. Specifically, the work reported here was for a pipeline that was installed in 1968 with the following characteristics. The line was coated with polyethylene tape coat (brand Polyken), and the line joints were electric-flash welded. The line joints are 34-inch outer diameter, and made of API 5L X52 grade carbon steel. The line was initially operated at 55 °F, but subsequently the line temperature increased to 105 °F due to higher fluid flow rate inside the pipe. Due to age and type of the pipeline coating, coating disbondment has occurred at several locations. The increase in operating temperature, coupled with age of the coating, is likely to have resulted in migration in corrosive species from the soil underneath the coating. As a result, the pipeline is experiencing enhanced corrosion. The objective of this study was to evaluate whether the change in operating temperature has affected the corrosion rate of the pipeline external surfaces under areas of disbonded coating.

36 MATERIALS SCIENCE↗

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2020

This report summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of results from evaluations performed by the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL). The 2020 summary results primarily focus on the most recent data on these FCEBs, from January 2020 through July 2020. The primary results presented in the report are from 25 FCEBs deployed at three agencies: Alameda-Contra Costa Transit District (AC Transit) in Oakland, California (10 FCEBs); Orange County Transportation Authority (OCTA) in Santa Ana, California (10 FCEBs); SunLine Transit Agency in Thousand Palms, California (5 FCEBs).

08 HYDROGEN↗

NASA Redox Project status summary

This report is a summary of the results of the Redox Project effort during Cy 1982. It was presented at the Fifth U.S. Department of Energy Battery and Electrochemical Contractors Conference, Arlington, Va., Dec. 7-9, 1982. The major development during 1982 was the shift from Redox system operation at 25 C with unmixed reactants to operation at 65 C with mixed reactants. This change has made possible a two- or three-fold increase in operating current density, to about 65 mA/sq cm, and an increase in reactant utilization from 40% to about 90%. Both of these improvements will lead to significant system cost reductions. Contract studies have indicated that Redox reactant costs also will be moderate. A new catalyst for the chromuim electrode offers all the advantages of the conventional gold-lead catalyst while being easier to apply and more forgiving in use.

Hagedorn, N. H.↗

SOLAR-B Mission Extreme Ultraviolet (EUV) Imaging Spectrometer (EIS) Instrument Components

This Monthly Progress Report covers the reporting period through June 2001, Phase C/D, Detailed Design and Development Through Launch Plus Thirty Days, for selected components and subsystems of the Extreme ultraviolet Imaging Spectrometer (EIS) instrument, hereafter referred to as EIS Instrument Components. This document contains the program status through the reporting period and forecasts the status for the upcoming reporting period.

Doschek, George A.↗

SOLAR-B Mission Extreme Ultraviolet (EUV) Imaging Spectrometer (EIS) Instrument Components

This Monthly Progress Report covers the reporting period July 2001 of the Detailed Design and Development through Launch plus Thirty Days, Phase C/D, for selected components and subsystems of the Extreme Ultraviolet Imaging Spectrometer (EIS) instrument, hereafter referred to as EIS Instrument Components. This document contains the program status through the reporting period and forecasts the status for the upcoming reporting period.

Doschek, George A.↗

Solar-B Mission Extreme Ultraviolet (EUV) Imaging Spectrometer (EIS) Instrument Components

This Monthly Progress Report covers the reporting period August 2002 of the Detailed Design and Development through Launch plus Thirty Days, Phase C/D, for selected components and subsystems of the Extreme ultraviolet Imaging Spectrometer (EIS) instrument, hereafter referred to as EIS Instrument Components. This document contains the program status through the reporting period and forecasts the status for the upcoming reporting period.

Doschek, George A.↗

DE-EE0006714 Final Report-Project Icebreaker™

Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electrical System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.

17 WIND ENERGY↗

Pioneers 10 through 12 support

The activities of the Deep Space Network in support of the Pioneer 10 and 11 and Pioneer 12 (Pioneer-Venus) Missions from 16 December 1979 through 31 May 1980 are reported. The mission status for each of the spacecraft is also reported.

Nevarez, R. E.↗

Increasing the Operational Value of Event Messages

Assessing the health of a space mission has traditionally been performed using telemetry analysis tools. Parameter values are compared to known operational limits and are plotted over various time periods. This presentation begins with the notion that there is an incredible amount of untapped information contained within the mission s event message logs. Through creative advancements in message handling tools, the event message logs can be used to better assess spacecraft and ground system status and to highlight and report on conditions not readily apparent when messages are evaluated one-at-a-time during a real-time pass. Work in this area is being funded as part of a larger NASA effort at the Goddard Space Flight Center to create component-based, middleware-based, standards-based general purpose ground system architecture referred to as GMSEC - the GSFC Mission Services Evolution Center. The new capabilities and operational concepts for event display, event data analyses and data mining are being developed by Lockheed Martin and the new subsystem has been named GREAT - the GMSEC Reusable Event Analysis Toolkit. Planned for use on existing and future missions, GREAT has the potential to increase operational efficiency in areas of problem detection and analysis, general status reporting, and real-time situational awareness.

Li, Zhenping↗

Annual Status Update for OWL

This report represents completion of milestone deliverable M2SF-22SN010309082 Annual Status Update for OWL, which is due on November 30, 2021 as part of the fiscal year 2022 (FY2022) work package SF-22SN01030908. This report provides an annual update on status of FY2021 activities for the work package “OWL - Inventory – SNL”. The Online Waste Library (OWL) has been designed to contain information regarding United States (U.S.) Department of Energy (DOE)-managed (as) high-level waste (DHLW), DOE-managed spent nuclear fuel (DSNF), and other wastes that are likely candidates for deep geologic disposal. Links to the current supporting documents for the data are provided when possible; however, no classified or official-use-only (OUO) data are planned to be included in OWL. There may be up to several hundred different DOE-managed wastes that are likely to require deep geologic disposal. This report contains new information on sodium-bonded spent fuel waste types and wastes forms, which are included in the next release of OWL, Version 3.0, on the Sandia National Laboratories (SNL) External Collaboration Network (ECN). The report also provides an update on the effort to include information regarding the types of vessels capable of disposing of DOE-managed waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗