Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pipeline Decommissioning Trial AWE Berkshire UK - 13619

This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An advanced materials irradiation facility for materials and fuels irradiations at the high flux isotope reactor

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is a pressurized, light-water-cooled and -moderated, beryllium-reflected, 85 MW research reactor fueled by Highly enriched {sup 235}U. The Materials Irradiation Facility (MIF) at HFIR) is one of the two experimental platforms in the US that can host fully instrumented and monitored experiments in a high-neutron-flux environment. The unique advantage of instrumented capsules is that the researcher can monitor and acquire in situ data and change capsule operating conditions in real time during the irradiation. Recently ORNL funded a Laboratory-Directed Research and Development (LDRD) project to strategically enhance the capabilities of MIF and provide researchers with a more flexible experimental platform. MIF comprises 4 systems: a gas supply system, a supervisory control system, an effluent system, and a standard gas routing system. The first 3 systems have common functionality for all types of experiments. The gas routing system provides the correct gases and gas mixtures for individual experiments and is unique to each experiment. MIF improvements include an updated and more sophisticated experiment monitoring system, a modular design allowing easier addition of simultaneous experiments, and features that allow rapid incorporation of additional instrumentation. The new design is both modular and re-configurable. It calls for a standard gas routing system module that can be configured with software to allow for easy expansion to multiple experiments. The ability to monitor the effluent activity during fissile material irradiation is a much needed enhancement for detecting fuel failures or determining fission product release. A gamma-ray spectrometry will be installed in a bypass gas line off the effluent main stream. The gas will flow through the detector for continuous detection of the particles of interest.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A French Industrial Management Plan for Very Low Level Radioactive Wastes (VLLW) at the CIRES Facility - 17012

Since 2003, very-low-level waste has been disposed of at the Andra CIRES disposal facility, the first disposal facility in the world for this type. It is now the main route in terms of volumes for the management of French radioactive waste. The 2015 national inventory has identified 1.1 million m{sup 3} of VLLW to be produced until 2030. Several waste management scenarios were then analyzed, including issues associated with the flow reduction of the waste to be stored. The key avenues to reduce the volumes of waste, technical and economic viability of which still needing to be challenged, are at this stage: - Favor the reuse of large amounts of metallic VLLW to be produced within the next decade. - To service the recycling of metals, different opportunities for reuse should be considered -including within the non-nuclear sector. - 30% to 50% of VLLW produced in the so-called 'nuclear waste' areas probably have zero or non-detectable radioactivity levels and questions about the introduction of a clearance level. - A disposal route based on a concept derived from waste storage facility for non-nuclear and non-hazardous wastes could be an alternative to the clearance level for the least active inert waste. Therefore volumetric optimizations appear possible, even if the waste management costs will be higher than the current route. Furthermore, efficiency gains and progresses in operating modes would increase the technical capacity of the CIRES of about 250 000 m{sup 3}. In all cases studied, it appears essential to create around 2030 a new VLLW disposal facility, particularly for the dismantling of the current fleet of reactors. According to the proposed optimizations, the necessary capacity for a second VLLW disposal facility would range between 600 000 m{sup 3} and 1.2 million m{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Does the Perfect Waste Package Exist? Development of a Decisional Tool Addressing this Challenge - 17053

The definition of a safe, technically, economically and societally acceptable waste management strategy is highly dependent on the Waste Acceptance Criteria in each country and on the already available disposal routes. It is the reason why there is not a single solution but a combination of optimized solutions depending on the type of waste and on each country's considerations. In fact, when operating a nuclear plant or performing its decommissioning or legacy waste management, one has to consider a large waste diversity in term of natures, types, volumes and radioactivity spectra. All nuclear operators have to take-up the challenge of implementing solutions for conditioning its waste in packages suitable for transport short to long term interim storage and final disposal of it (or prepare for final disposal if the repository is not yet available). Operators have then to answer the following dilemma: either define a complete strategy packaging the waste for final disposal, or 'containerising' it temporarily, pending final disposal. The strategy is highly country dependent; in the first case, one has to take into account the available information and future orientations relative to acceptability of the packages in order to define a robust solution. The approach implemented in France requires a close dialogue between the Operators, the Safety Authority, the Administration and the stakeholders. Moreover it pushes forward whenever possible standardization, contributing to cost minimization. If the second approach has the advantage of leaving the options open, and reducing the initial investments, it inevitably requires future retrieval and re-packaging with potential evolutions/degradation of the initial waste form. It also induces the potential risk to produce additional secondary waste. As an additional drawback, it introduces uncertainties and unknowns related to the future waste management criteria and to the costs. The general idea is that, depending on context, a given route (i.e., treatment, conditioning, and transport), could be considered as efficient or not. Assessing a waste package is certainly highly context dependent. However it should be possible to recognize and to lead an evaluation based on a number of fixed criteria, whatever the context, to be addressed when assessing the development of a final waste package in connection to the overall management route. A waste package is always a combination of a waste container and a waste form and will have to be transported one day from the production site to the final repository or to off-site interim storage facilities. AREVA's approach consists in defining an evaluation grid based on a set of criteria which aim (i) to evaluate whether the different waste treatments, conditionings, transport and packages deserve to be considered within different national contexts, and (ii) to evaluate R and D actions to be performed for improving existing solutions or developing new ones. One of the key lessons to be drawn from AREVA's experience in developing waste packages is that the perfect waste doesn't exist even though the vitrified canister is probably the most efficient one. The performance of a package resulting from a compromise depends on context and is a strength combination between the waste container and the waste form. The approach is to evaluate a waste package development against different set of criteria and to draw optimization diagrams. In such diagram, a given waste package is assessed with respect to selected criteria such as waste form and waste container, stability, level of waste incorporation, integrity lifetime, secondary waste generation, transport, long term behavior, and economical effectiveness, etc. Addressing a waste form is a very key point. This evaluation grid and comparative approach will be presented through examples and comparison providing from AREVA feedback on waste package development related to complex waste management such as problematic waste or legacy waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EDF industrial strategy for the management of radioactive waste - 15204

In France, EDF is in charge of electronuclear power operation since the sixties and consequently has to manage radioactive waste. Radioactive waste management is based on the control of each industrial step, taking into account the classification by activity level and radioactive half life. The main steps are to limit waste quantities at the generation stage, sort out non-rad and recoverable items from the waste, recycle, treat and package the radioactive waste as soon as it is generated, limit the use of interim storage, prepare and achieve as soon as reasonably practicable conditioning and disposal. EDF aims to empower operators in charge of NPP operating and of decommissioning and to centralize interfaces with the stakeholders in order to pool management routes and to guarantee the consistency of our industrial policy. The French regulatory framework for the management of radioactive waste and material is set by the French 2006 planning Act, in line with the European Directive. The legal framework structures interactions between EDF and the regulatory bodies (Nuclear Safety Authority, General Directorate for Energy and Climate), the French National Radioactive Waste Management Agency (ANDRA) and other waste producer (mainly AREVA Company and CEA). Regarding short lived waste, management routes are in current operation for the large majority of this waste generated both by power plants in service and during decommissioning. EDF is working on new management route for metallic materials knowing the future evolution of deposits is the field of large refit and decommissioning activities. Regarding long lived waste, disposal development represents a major stake for EDF. EDF contributes to design studies of the geological disposal center and collaborates with ANDRA for the acceptance of future national waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Community Public Mobility Using On-Demand, Low-Speed Electric Vehicles: A Case Study in Downtown St. Louis, Missouri

Legacy fixed route transit systems designed to serve commuters struggle to provide efficient and effective service for short neighborhood trips and for population groups unable to access and egress transit stops using active modes (e.g., elderly, disabled). Neighborhood on-demand transit (ODT) services using low-speed electric vehicles (LSEV) are an innovative technological solution that can help fill this gap in service (e.g., short, high-frequency trips) for diverse populations and trip types. This study evaluated user characteristics and travel behavior for a neighborhood ODT service (using LSEVs) in downtown St. Louis, Missouri using responses from a community survey (n=244), ridership data, and vehicle trajectory information. A comparative analysis between neighborhood ODT, fixed route transit, and transportation network companies (TNC) was also conducted from the perspectives of total travel time, cost, and greenhouse gas emissions. Ultimately, the goal of the analysis was to motivate and inform holistic public mobility systems where different services are optimized to meet specific community needs. Findings indicate that the neighborhood ODT was effective at reaching diverse populations (elderly (20%), lower income (27%), and households with limited access to private vehicles (34%)). ODT reduced total travel time by 32% compared to fixed route transit, produced 2.4 - 4.3 times less greenhouse gas emissions per passenger mile (compared to transit and TNCs), and was more affordable (free to users) than alternative options ($1 for transit, $10-12 for TNCs). Overall satisfaction rates were high, with 80% of respondents rating the service a 4 or 5 out of 5.

ADVANCED PROPULSION SYSTEMS↗

Proven Uranium Recovery Solutions for the Nuclear Fuel Manufacturing Market - 16060

During the Nuclear Fuel Manufacturing process a number of by-products and residues are generated from various sources. In recent years, Westinghouse has characterised and processed around 50,000 drums of residue comprising of numerous different types generated over 60 years from the manufacture of numerous types of fuel for greater than 50 reactors. These include, AGR, Magnox (uranium metal fuel), PWR, fast reactors and various test reactors. Different organisations have different definitions and names for each of these categories but essentially they fall into one of the following categories: Clean Scrap (U{sub 3}O{sub 8}, UO{sub 2}, UO{sub 3}, UF{sub 4}, powders, pellets), Dirty Scrap (U{sub 3}O{sub 8}, UO{sub 2}, UO{sub 3}, UF{sub 4}, powders, pellets), Gd Contaminated Scrap (U{sub 3}O{sub 8}, UO{sub 2}, powders, pellets), Ash, Sludge, Combustible / soft residues (e.g. ventilation filters, gloves, plastic bags), Contaminated metals (including contaminated scrap zirconium tubes), Materials arising from decommissioning. Routes have been developed across the industry for a number of the categories listed above, however in numerous examples, routes have not been established and materials have been stored creating a significant legacy. Westinghouse understands the issues regarding legacy uranic material and the financial and regulatory impact of storage. Interim storage of materials may seem like a low cost option in the short term; however ongoing costs for facilities, manpower and equipment, without a permanent and final solution can result in significant lifetime material management costs. Recovery of uranium and sending materials for safe disposal of enriched uranium residues is not easy because of the criticality risk both during processing and at a disposal site. Therefore quantities of materials than can be sent via permitted disposal routes are very limited The development of regulations often means that finding solutions is becoming more difficult. It is believed that timely resolution is ultimately the most cost effective solution. In addition, the intrinsic value of recycling this material is also high and in some cases can mitigate the cost of processing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Metals from Decommissioning of Nuclear Facilities - 18411

The EDF group companies within the Cyclife platform have for decades performed treatment and recycling of metals. With different approaches but all considered international Good Practice, as valuable materials are recovered for safe recycling and volumes in the repositories for radioactive waste are saved. For an efficient decommissioning project, a well-defined waste management process is one of the critical paths, not least when it comes to routes for clearance and recycling of materials. It is easy to underestimate the complexity and bottlenecks caused by shortage of logistic space. In order to mitigate these risks, activities such as strengthening categorization, quantification and adopting different routes based on the material properties should be implemented. By categorization of the of waste and materials considered/classified as contaminated or potentially contaminated it is obvious that the management of the metals is a key parameter in nuclear decommissioning. Analyses performed by the EDF companies shows that a majority of the materials, classified as contaminated, from a BWR/PWR plant are metals. Experience gives that a high percentage of these metals from decommissioning can be subject to recycling either directly upon completion of the clearance process or after certain treatment. Non-technical key parameters like the regulatory requirements on applying the waste hierarchy, the impact on repository programs as well as, not at least, the regulatory and public acceptance of recycling of materials from the nuclear industry are, together with costs essential factors when forming the routing of metals and other waste materials from a decommissioning project. Today the EDF group companies are positioned to provide a wide range of services for management of the contaminated metals from decommissioning projects, spanning from industrial management of metals which directly will be subject general clearance after verification measurements up to decontamination and melting of selected reactor internals for recycling to public domain or within the nuclear industry. In this paper the typical waste material composition for BWR and PWR plants, the different ways to treat/manage the radioactive and potentially radioactive metals including a comparison of the different approach commonly used in a technical, logistical and economical perspectives. A few success stories will be resented as well as lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of TiO{sub 2} and TiO{sub 2}/Au nanoparticles as a Potential Radiosensitizers by Decomposition of Methylene Blue

Nanomaterials are constantly used in several applications of science and engineering. Nanoparticles are currently utilized in computer circuits, clothes, luminescent devices, catalysis, medicine, among many others uses. In the clinical field nanomaterials have become an innovative alternative for early diagnosis and treatment of a significant number of medical conditions. Nanoparticles can be utilized in applications ranging from contrast agents for imaging purposes to carriers for drug delivery in cancerous tumors. The use of nanoparticles made of high atomic number elements as noble metals, is becoming an attractive approach for enhancing the radiation dose delivered to a tissue during radiation therapy. The enhancement effect that makes the cells more sensitive to radiation is known as radiosensitization. Materials such as gold (Au) and titanium dioxide (TiO{sub 2}) at the nanoscale have become promising radiosensitizers. When TiO{sub 2} is irradiated with high energy photons, electron-holes are created within the material. This species interacts with surrounding medium generating reactive oxygen species (ROS). ROS create a toxic environment for cancerous cells, ultimately causing their death. On the other hand gold has a different interaction with ionizing radiation. Upon radiation, gold releases a spray of secondary products such as photoelectrons, auger electrons, and characteristic X-rays. The energy created by the escaping electrons leads to DNA strands breaks in the cells causing their death. Therefore, if these nanoparticles are initially accumulated in the tissue to be treated, the dose delivered during radiation therapy is amplified. This represents a synergistic approach to enhance radiation therapy while substantially reducing side effects. Radiosensitization by nanoparticles often depends on their particle size, morphology and synthesis route. The most commonly used methods to synthesize metallic nanoparticles such as gold involves chemical reduction of a metal precursor. In this case, reducing agents are used in order to transform the metallic ions to metal atoms that will subsequently coalesce and grow to form the nanoparticles . Nevertheless there are alternative methods that do not require a chemical reducing agent. Radiation synthesis is one of those processes. The interaction of ionizing radiation with an aqueous solution containing a metal precursor, leads to a phenomena known as radiolysis of water. Radiolysis of water produces chemical species such as solvated electrons (e{sup -}{sub aq}), and hydrogen atoms (H{sup +}). These species are strong reducing agents that bring the metal ions existing in solution into stable metal atoms that will form nanoparticles. Radiation synthesis is a novel method that offers significant advantages over conventional approaches such as wet chemistry routes. In this approach, no further chemical reducing agents are needed, thus it does not generate byproducts that may affect the nanoparticles properties. This is particularly important in medical applications. Furthermore, this technique is designed to work at room temperature and under atmospheric pressures. Nonetheless the most outstanding feature of radiation synthesis is the possibility to control the particle size and size distribution. This route allows for narrow particle size distributions with size ranging from 2 to 30 nm. Furthermore, the availability of different ionizing radiation producing devices such as synchrotrons, X-ray irradiators, and gamma irradiators enables the possibility of manufacturing nanomaterials under various conditions. In this work, Au nanoparticles were deposited onto TiO{sub 2} using the radiation synthesis method. In addition, the radiosensitization characteristics of TiO{sub 2} and TiO{sub 2}/Au nanoparticles were evaluated through the decomposition of the organic dye Methylene Blue (MB). In order to analyze the degradation of the dye the TiO{sub 2} and TiO{sub 2}/Au nanoparticles were placed in an aqueous solution along with MB and subjected to X-ray irradiation. The samples were irradiated for 30 and 60 minutes. The degradation of the MB after irradiation in the presence and absence of the nanomaterials was measured by UV-Vis spectroscopy following the decrease in the absorbance of the dye at 664 nm. (authors)

36 MATERIALS SCIENCE↗

Electrification Analysis: All Aboard America!

This one-page highlight details the key takeaways from a project that utilized NREL's Fleet Research, Energy Data, and Insights (FleetREDI) data analysis pipeline, an electrification analysis for the Bustang motorcoach fleet operated by All Aboard America! Holdings Inc. (AAA). NREL installed logging devices and collected operational data on nine 40-foot Bustang motorcoaches operating on fixed routes from May 2022 through August 2022. The analysis determined that partial fleet electrification may be feasible with electrified motorcoach options currently on the market. While this fleet faces significant challenges to electrification given current market options due to demanding range requirements and relatively limited charging opportunities, vehicles operating on the shorter, lower-grade routes along the I-25 corridor show more immediately available electrification potential. Increases in available battery capacity and the availability of fast-charging locations along I-70 routes are likely critical for electrification of the full fleet.

AAA↗

System and method for vehicle coast control

A method for controlling vehicle propulsion includes identifying at least one route characteristic of a portion of a route being traversed by a vehicle. The method further includes determining a profile for a target vehicle speed based on the at least one route characteristic and a vehicle energy consumption profile. The method further includes selectively adjusting a vehicle speed control input based on the target vehicle speed profile. The method further includes communicating the vehicle speed control input to a vehicle propulsion controller to achieve the target vehicle speed profile.

Aggoune, Karim↗

On-Demand Transit: Features, Benefits, Challenges, Costs, and Evaluation

The U.S. Department of Energy's National Laboratory of the Rockies works in partnership with communities and transit agencies across North America to support and evaluate customized on-demand transit (ODT) systems. ODT, also known as on-demand mobility or microtransit, is a flexible form of public mobility. Unlike traditional fixed-route transit, ODT adjusts where and when service is provided rather than following predetermined schedules and routes. Having evolved from commercial ride-hailing business models, ODT leverages smartphone connectivity and real-time route optimization to provide highly responsive and dynamic service. ODT trips, which are usually shared, can function as a standalone service or as a first-/last-mile service connecting riders to other types of transit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards a Scalable and Reliable Real Time In-Network Data Analysis Infrastructure

The smart grid applications requires real time analysis, response within the order of milliseconds and high-reliability because of the mission critical structure of the power grid system. The only way to satisfy these requirements is in network data analysis and build-in redundancy routing for failures. To achieve this, we propose a data dissemination system that builds routes using network flow algorithms, have in network processing of the data and utilize data encoding to cope with high latencies.

99 GENERAL AND MISCELLANEOUS↗

The coastal streamflow flux in the Regional Arctic System Model

The coastal streamflow flux from the Arctic drainage basin is an important driver of dynamics in the coupled ice-ocean system. Comprising more than one third of the total freshwater flux into the Arctic Ocean, streamflow is a key component of the regional and global freshwater cycle. To better represent the coupling of the streamflow flux to the ocean, we have developed and applied the RVIC streamflow routing model within the Regional Arctic System Model (RASM). The RASM is a high-resolution regional Earth System Model whose domain includes all of the Arctic drainage basin. Here in this paper, we introduce the RVIC streamflow routing model, detailing its application within RASM and its advancements in terms of representing high-resolution streamflow processes. We evaluate model simulated streamflow relative to in situ observations and demonstrate a method for improving model performance using a simple optimization procedure. We also present a new, spatially and temporally consistent, high-resolution data set of coastal freshwater fluxes for the Arctic drainage basin and surrounding areas that is based on a fully coupled RASM simulation and intended for use in Arctic Ocean modeling applications. This data set is evaluated relative to other coastal streamflow data sets commonly used by the ocean modeling community. We demonstrate that the RASM-simulated streamflow flux better represents the annual cycle than existing data sets, especially in ungauged areas. Finally, we assess the impact that streamflow has on the coupled ice-ocean system, finding that the presence of streamflow leads to reduced sea surface salinity, increased sea surface temperatures, and decreased sea ice thickness.

54 ENVIRONMENTAL SCIENCES↗

Aerial drone fleet deployment optimization with endogenous battery replacements for direct delivery of time-sensitive products

Aerial drones offer a distinct potential to reduce the delivery time and energy consumption for the delivery of time-sensitive and small products. However, there is still a need in the relevant industry to understand the performance of drone-based delivery under different business needs and drone operating conditions. We studied a drone deployment optimization problem for direct delivery of time-sensitive products with release dates to customers maintaining a specified time window. This paper presents a new mixed-integer programming model, new valid inequalities, a new greedy heuristic algorithm, and a Genetic algorithm to help business owners optimally schedule and route their drone fleet minimizing the required fleet size, the required number of additional batteries, and total energy consumption. A realistic feature of the optimization method is that instead of replacing the drone battery after each return to the depot, it keeps track of the remaining energy in the drone battery and decides on battery replacements accounting for the drone routing and the user-specified minimum required battery energy. Numerical results based on real data from drone flight tests and prepared food delivery industry provide insights into the effect of different practical drone operating parameters on the required fleet size, the required number of battery replacements, and energy consumption. Here, results demonstrate that the proposed heuristic algorithm substantially outperforms the accelerated CPLEX in runtime while sacrificing the solution quality by a small amount. Additionally, results show that using a mixed fleet of hexacopter and quadcopter drones reduces the total energy consumption by 48.52% compared to using a homogeneous fleet of only hexacopters.

Drone energy consumption↗

Optimal assignment for the single-household shared autonomous vehicle problem

Autonomous vehicles have the potential to transform the way people are transported. While driverless technology may mean fewer vehicles are required to transport people to and from their daily activities, such changes may result in increased congestion or total miles traveled. In this study, we solve the single-household shared autonomous vehicle problem to identify cost-optimal routings of vehicles throughout the day. Such a tool will be useful for consumers seeking to minimize cost and for regulators seeking to understand and predict how people may behave in different scenarios. Here, we provide a thorough literature review and construct a mixed-integer linear program to minimize the daily travel cost of a household attending a given set of activities. Since solution time is a determinant for applicability of such a model, we present the model in a component-wise fashion. This approach allows us to understand which features most affect the problem complexity and solution time. We note that modeling carpooling is the feature that most increases time to find an optimal solution, and we therefore propose a novel modeling technique for carpooling two people. We illustrate the performance of our model by comparing it with other models from the literature and note that our model can solve significantly larger problem instances and in a time that is short enough to facilitate real-time scheduling. We also highlight the utility of our model for regulators, who can use it to analyze quickly produced optimal routes under different cost/tax scenarios.

33 ADVANCED PROPULSION SYSTEMS↗