Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Somatic Mutation in Space/NASA Ames

We study the rate of somatic mutation accumulation in space, compared to Earth, with a view toward developing a new tool for cancer risk assessment. We believe that somatic mutation analysis may serve as a new tool for cancer risk assessment that may complement other cancer risk prediction methods currently in use. We propose to use high-performance computing power of the NASA Ames Supercomputer (NAS) to advance clinically relevant data mining in collaboration with the UCSF Cancer Moonshot Initiative. Somatic mutation analysis may have an important role to play in longitudinal studies of cancer development in selected populations and in astronauts.

somatic mutation↗

Quantifying Risk to Improve Medical System Design for Long Duration Artemis Missions: A Demonstration of NASA's IMPACT Tradespace Analysis Tool

BACKGROUND NASA’s human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. A greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and constraints on the evacuation of ill or injured crew. Mass, volume, and power will be limited while higher demands will be placed on the crews to manage medical events. NASA’s Moon to Mars exploration strategy outlines increasingly complex Artemis missions both in terms of duration and operations. In these more challenging deep space missions, it is important to quantitatively estimate the human system risk attributable to medical conditions and use these estimates to advance medical system design. METHODS IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a probabilistic risk assessment (PRA) and tradespace analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 includes a novel evidence library baselined to exploration environments; an expanded list of 119 medical conditions; a large increase in the number of medical resources and the flexibility of their use; and the ability for rapid and iterative analysis. Medical system risk estimates include loss of crew life, consideration of the need for return to definitive care (medical evacuation), and an estimate of crew time affected due to medical conditions. A notional long duration lunar orbit and lunar surface design reference mission (DRM) was chosen with a 4-astronaut crew to mimic a foundational exploration Artemis mission. The DRM profile includes outbound transit on Orion, Gateway space station rendezvous in lunar orbit, 6 months on the Lunar surface with extravehicular activity (EVA), return rendezvous with Gateway, and transit back to Earth. RESULTS/DISCUSSION: Overall, IMPACT successfully quantified medical risk and derived an optimal medical system to support crew on a long duration lunar mission. In this DRM, the calculated loss of crew life from a medical event was 0.008 events per mission, risk of potential need for evacuation was 0.30 events per mission, and cumulative crew time affected by medical conditions was 103 days. The medical conditions that most contributed to medical risk were decompression sickness, trauma, and respiratory failure. The conditions that had the largest effects on crew performance included musculoskeletal injuries and lunar dust exposure. The IMPACT-generated medical system included resources that target the most common and highest risk conditions and performed as expected. This demonstrates the value of the IMPACT tool in medical system design for human exploration spaceflight missions.

Arian Anderson↗

Effect Modification by Age on the Benefit or Harm of Antihypertensive Treatment for Elderly Hypertensives: A Systematic Review and Meta-analysis

Abstract BACKGROUND The influence of age on balance of benefit vs. potential harm of blood pressure (BP)-lowering therapy for elderly hypertensives is unclear. We evaluated the modifying effects of age on BP lowering for various adverse outcomes in hypertensive patients older than 60 years without specified comorbidities. METHODS All relevant randomized controlled trials (RCTs) were systematically identified. Coronary heart disease, stroke, heart failure (HF), cardiovascular death, major adverse cardiovascular events (MACE), renal failure (RF), and all-cause death were assessed. Meta-regression analysis was used to explore the relationship between achieved systolic BP (SBP) and the risk of adverse events. Random-effects meta-analysis was used to pool the estimates. RESULTS Our study included 18 RCTs (n = 53,993). Meta-regression analysis showed a lower achieved SBP related with a lower risk of stroke and cardiovascular death, but an increased risk of RF. The regression slopes were comparable between populations stratifying by age 75 years. In subgroup analysis, the relative risks of a more aggressive BP lowering strategy were similar between patients aged older or less than 75 years for all outcomes except for RF (P for interaction = 0.02). Compared to treatment with final achieved SBP 140–150 mm Hg, a lower achieved SBP (<140 mm Hg) was significantly associated with decreased risk of stroke (relative risk = 0.68; 95% confidence interval = 0.55–0.85), HF (0.77; 0.60–0.99), cardiovascular death (0.68; 0.52–0.89), and MACE (0.83; 0.69–0.99). CONCLUSIONS To treat hypertension in the elderly, age had trivial effect modification on most outcomes, except for renal failure. Close monitoring of renal function may be warranted in the management of elderly hypertension.

Huang, Chi-Jung↗

Continuing Developments in PV Risk Management: Strategies, Solutions, and Implications

As the PV industry matures, successful risk management practices will become more imperative to ensure investor confidence, control costs, and facilitate further growth. This report discusses several key aspects of risk management during the commercial- and utility-scale project life cycle, from identification of risks, to the process of mitigating and allocating those risks among project parties, to transferring those risks through insurance. The report also explores novel techniques in PV risk management, options to offload risks onto the capital markets, and innovative insurance policies (namely warranty policies) that address risks unique to the PV sector. One of the major justifications for robust risk management in the PV industry is the cost-reduction opportunities it affords. If the PV industry can demonstrate the capability to successfully manage its risks, thereby inspiring confidence in financiers, it may be able to obtain a lower cost of capital in future transactions. A lower cost of capital translates to a lower cost of energy, which will in turn enhance PV's competitiveness at a time when it will have to rely less on subsidies to support its market penetration.

14 SOLAR ENERGY↗

Fibroblast Growth Factor 2-A Predictor of Outcome for Patients Irradiated for Stage II-III Non-Small-Cell Lung Cancer

Purpose: The prognostic value of the tumor cell expression of the fibroblast growth factor 2 (FGF-2) in patients with non-small-cell lung cancer (NSCLC) is unclear. The present study investigated the effect of tumor cell expression of FGF-2 on the outcome of 60 patients irradiated for Stage II-III NSCLC. Methods and Materials: The effect of FGF-2 expression and 13 additional factors on locoregional control (LRC), metastasis-free survival (MFS), and overall survival (OS) were retrospectively evaluated. These additional factors included age, gender, Karnofsky performance status, histologic type, histologic grade, T and N category, American Joint Committee on Cancer stage, surgery, chemotherapy, pack-years, smoking during radiotherapy, and hemoglobin during radiotherapy. Locoregional failure was identified by endoscopy or computed tomography. Univariate analyses were performed with the Kaplan-Meier method and the Wilcoxon test and multivariate analyses with the Cox proportional hazard model. Results: On univariate analysis, improved LRC was associated with surgery (p = .017), greater hemoglobin levels (p = .036), and FGF-2 negativity (p <.001). On multivariate analysis of LRC, surgery (relative risk [RR], 2.44; p = .037), and FGF-2 expression (RR, 5.06; p <.001) maintained significance. On univariate analysis, improved MFS was associated with squamous cell carcinoma (p = .020), greater hemoglobin levels (p = .007), and FGF-2 negativity (p = .001). On multivariate analysis of MFS, the hemoglobin levels (RR, 2.65; p = .019) and FGF-2 expression (RR, 3.05; p = .004) were significant. On univariate analysis, improved OS was associated with a lower N category (p = .048), greater hemoglobin levels (p <.001), and FGF-2 negativity (p <.001). On multivariate analysis of OS, greater hemoglobin levels (RR, 4.62; p = .002) and FGF-2 expression (RR, 3.25; p = .002) maintained significance. Conclusions: Tumor cell expression of FGF-2 appeared to be an independent negative predictor of LRC, MFS, and OS.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

CRITICAL RADIONUCLIDE AND PATHWAY ANALYSIS FOR THE SAVANNAH RIVER SITE

This report is an update to the analysis, Assessment of SRS Radiological Liquid and Airborne Contaminants and Pathways, that was performed in 1997. An electronic version of this large original report is included in the attached CD to this report. During the operational history (1954 to the present) of the Savannah River Site (SRS), many different radionuclides have been released to the environment from the various production facilities. However, as will be shown by this updated radiological critical contaminant/critical pathway analysis, only a small number of the released radionuclides have been significant contributors to potential doses and risks to offsite people. The analysis covers radiological releases to the atmosphere and to surface waters, the principal media that carry contaminants offsite. These releases potentially result in exposure to offsite people. The groundwater monitoring performed at the site shows that an estimated 5 to 10% of SRS has been contaminated by radionuclides, no evidence exists from the extensive monitoring performed that groundwater contaminated with these constituents has migrated off the site (SRS 2011). Therefore, with the notable exception of radiological source terms originating from shallow surface water migration into site streams, onsite groundwater was not considered as a potential exposure pathway to offsite people. In addition, in response to the Department of Energy's (DOE) Order 435.1, several Performance Assessments (WSRC 2008; LWO 2009; SRR 2010; SRR 2011) and a Comprehensive SRS Composite Analysis (SRNO 2010) have recently been completed at SRS. The critical radionuclides and pathways identified in these extensive reports are discussed and, where applicable, included in this analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RISK MONITORING CAPABILITES FROM DYNAMIC PRA DATA

Risk Monitors (RMs) are software tools that are employed in nuclear power plants to monitor the safety properties of the plant itself during operation. These safety properties are generated using classical PRA methods which are typically based on static Boolean structures such as Fault-Trees (FTs) and Event-Trees (ETs). The outcomes of these methods are Core Damage Frequency (CDF) and risk importance values of plant components (e.g., valves and pumps). Examples of Risk Importance Measures (RIMs) commonly used are: Risk Achievement Worth (RAW), Risk Reduction Worth (RRW), Birnbaum (B) and Fussell-Vesely (FV) [1,2]. In a RM these values are updated in real time once plant components status is updated (e.g., under maintenance, off-line, testing). In addition, RMs can be used to optimize maintenance schedules so those safety features of the plant are below plant standard values. This paper presents an approach to create temporal profiles of RIMs (i.e., RM capabilities) given a temporal change of the plant configuration. Instead of employing data generated by ETs and FTs, the proposed approach will employ data generated by Dynamic PRA methods. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. We will describe how classical RIMs can be generated by Dynamic PRA data and then we will show how the temporal profiles of the RIMs can be generated given a temporal profile of the system configuration.

97 MATHEMATICS AND COMPUTING↗

CYBER/PHYSICAL SECURITY VULNERABILITY ASSESSMENT INTEGRATION

This internally funded Laboratory-Directed R&D project by the Pacific Northwest National Laboratory, in conjunction with QinetiQ North America, is intended to identify and properly assess areas of overlap (and interaction) in the vulnerability assessment process between cyber security and physical protection. Existing vulnerability analysis (VA) processes and software tools exist, and these are heavily utilized in the determination of predicted vulnerability within the physical and cyber security domains. These determinations are normally performed independently of one another, and only interact on a superficial level. Both physical and cyber security subject matter experts have come to realize that though the various interactive elements exist, they are not currently quantified in most periodic security assessments. This endeavor aims to evaluate both physical and cyber VA techniques and provide a strategic approach to integrate the interdependent relationships of each into a single VA capability. This effort will also transform the existing suite of software currently utilized in the physical protection world to more accurately quantify the risk associated with a blended attack scenario. Performance databases will be created to support the characterization of the cyber security elements, and roll them into prototype software tools. This new methodology and software capability will enable analysts to better identify and assess the overall risk during a vulnerability analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dry Eye Syndrome After Proton Therapy of Ocular Melanomas

Purpose: To investigate whether proton therapy (PT) performs safely in superotemporal melanomas, in terms of risk of dry-eye syndrome (DES). Methods and Materials: Tumor location, DES grade, and dose to ocular structures were analyzed in patients undergoing PT (2005-2015) with 52 Gy (prescribed dose, not accounting for biologic effectiveness correction of 1.1). Prognostic factors of DES and severe DES (sDES, grades 2-3) were determined with Cox proportional hazard models. Visual acuity deterioration and enucleation rates were compared by sDES and tumor locations. Results: Median follow-up was 44 months (interquartile range, 18-60 months). Of 853 patients (mean age, 64 years), 30.5% had temporal and 11.4% superotemporal tumors. Five-year incidence of DES and sDES was 23.0% (95% confidence interval [CI] 19.0%-27.7%) and 10.9% (95% CI 8.2%-14.4%), respectively. Multivariable analysis showed a higher risk for sDES in superotemporal (hazard ratio [HR] 5.82, 95% CI 2.72-12.45) and temporal tumors (HR 2.63, 95% CI 1.28-5.42), age ≥70 years (HR 1.90, 95% CI 1.09-3.32), distance to optic disk ≥5 mm (HR 2.71, 95% CI 1.52-4.84), ≥35% of retina receiving 12 Gy (HR 2.98, 95% CI 1.54-5.77), and eyelid rim irradiation (HR 2.68, 95% CI 1.49-4.80). The same risk factors were found for DES. Visual acuity deteriorated more in patients with sDES (0.86 ± 1.10 vs 0.64 ± 0.98 logMAR, P=.034) but not between superotemporal/temporal and other locations (P=.890). Enucleation rates were independent of sDES (P=.707) and tumor locations (P=.729). Conclusions: Severe DES was more frequent in superotemporal/temporal melanomas. Incidence of vision deterioration and enucleation was no higher in patients with superotemporal melanoma than in patients with tumors in other locations. Tumor location should not contraindicate PT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Modeling Framework to Analyze Performance and Structural Reliability of Solid Oxide Electrolysis Cells

Solid oxide electrolysis cells (SOEC) have been receiving significant attention recently because of their high energy efficiency and fast hydrogen production. In this study a multi-physics model to simulate the SOEC performance and structural reliability of a state-of-the-art planar SOEC design was developed. The electrochemical reactions, fluid dynamics, species transport, electron transfer, and heat transfer were modeled in the commercial computational fluid dynamics (CFD) software STAR-CCM+. The thermomechanical analysis and the associated structural reliability evaluations were conducted using the commercial finite element analysis software ANSYS. The electrochemistry model was validated by using the experimentally obtained current-voltage (I-V) characteristics of the electrode-supported SOECs. The reliability analysis using a risk-of-rupture approach showed low failure probabilities under standard operating conditions considered in this study. For cells operated at voltages well above a thermoneutral voltage, the reliability evaluations indicated a potential risk of cell failure, but the damage was concentrated locally in specific areas of the cell which typically do not lead to total loss of cell function. The presented approach provides insights for evaluating representative cell and stack performances and structural reliability without intensive testing and for developing optimally performing and structurally reliable SOECs for efficient hydrogen generation.

25 ENERGY STORAGE↗

Low Temperature Geothermal Play Fairway Analysis For The Appalachian Basin: Phase 1 Revised Report November 18, 2016

Geothermal energy is an attractive sustainable energy source. Yet project developers need confirmation of the resource base to warrant their time and financial resources. The Geothermal Play Fairway Analysis of the Appalachian Basin evaluated risk metrics that communicate the favorability of potential low-temperature geothermal energy resources in reservoirs more than 1000 m below the surface. This analysis is focused on the direct use of the heat, rather than on electricity production. Four risk factors of concern for direct-use geothermal plays in the Appalachian Basin portions of New York, Pennsylvania, and West Virginia are examined individually, and then in combination: 1) thermal resource quality, 2) natural reservoir quality, 3) induced seismicity, and 4) utilization opportunities. Uncertainty in the risk estimation is quantified. Based on these metrics, geothermal plays in the Appalachian Basin were identified as potentially viable for a variety of direct-use-heat applications. The methodologies developed in this project may be applied in other sedimentary basins as a foundation for low temperature (50-150 °C), direct use geothermal resource, risk, and uncertainty assessment. Three methods with which to combine the four risk factors were used. Among these, the averaging of the individual risk factors indicates the most favorable counties within the study area are the West Virginia counties of Monongalia, Harrison, Lewis (dubbed the Morgantown–Clarksburg play fairway), Putnam, and Kanawha (Charleston play fairway), the New York counties of Chemung and Steuben plus adjacent Bradford county in Pennsylvania (Corning–Ithaca play fairway), and the Pennsylvania counties of Mercer, Crawford, Erie, and Warren, and adjacent Chautauqua county in New York (together, the Meadville–Jamestown play fairway). These higher priority regions are surrounded by broader medium priority zones. Also worthy of additional exploration is a broad region near Pittsburgh Pennsylvania, for which the available geological data are insufficient to fully analyze the geological risks but yet the population is high. First, to assess the spatial variation in the depth to which one would need to drill to obtain geothermal temperatures that are useful to a future project, the project used bottom-hole temperature data from Appalachian Basin oil and gas exploration. These bottom hole temperature data are abundant but of low quality. Second, the project examined the potential for sufficient water flow rates through rocks to harvest heat from a geothermal well field, considering only natural reservoirs. This analysis provides a very incomplete picture of spatial variability of natural reservoirs because the oil and gas reservoir data lack key properties and are spatially biased toward those locations with profitable amounts of hydrocarbons in the rock pore spaces. Third, in light of the fact that earthquake activity has been induced in several states by subsurface work related to the oil and gas industry, this project examined the potential for similar activity in the Appalachian Basin. Acknowledging that data for such a task are insufficient, we utilized what was available: records of seismic activity, regional estimates of the orientations of stress in the rocks, and locations and orientations of zones of lateral change in rock properties at depths down to several kilometers below Earth’s surface. With these data, we created a first approximation of spatially variable risks for induced earthquakes. Because no data existed with which to test the reliability of these methods, the results have a high degree of uncertainty. Fourth, we examined the spatial variability of the above-the-ground factors that contribute to the economical viability of projects to tap low-temperature geothermal resources for direct-use. We worked principally with population density as a regionally known variable that would impact the cost of district heating. The resulting maps omit the costs of producing the hot water from the ground, because the below-ground costs are directly coupled to the thermal resource risk factor and natural reservoir risk factor – later analyses of those costs will be needed. The result of the district heating analysis is highly skewed: few census locations yielded a low estimated surface cost. The team also identified more than 165 prospects for high value direct-use geothermal energy opportunities such as industrial sites, university campuses, and federal facilities, among others. At the closure of this regional analysis, the most significant technical uncertainties are 1) reservoir distribution and capacities; 2) validity of thermal resource maps, and 3) the holistic estimation of Levelized Cost of Heat for favorable geological situations.

15 GEOTHERMAL ENERGY↗

Industrial battery operation and utilization in the presence of electrical load uncertainty using Bayesian decision theory

Behind the meter battery storage is becoming increasing popular in all sectors, though enthusiasm has recently lagged in the industrial sector. Even though there may be many factors contributing to this including lack of innovation, prohibitive costs, and undesirable rate structures, a difficulty arises in accounting for uncertainty of electrical load in industrial facilities while still attempting to utilize battery storage as much as possible all while trying to achieve fiscal profitability. Here this study utilizes Gaussian process regression and Bayesian decision theory to organize load data and quantify electrical load uncertainty to properly and effectively discharge industrial battery storage. The study employs a simulation model to set battery load setpoints for the span of the utility billing period according to the degree of risk aversion. This combination of economic analysis according to utility billing period and utilization of degree of risk aversion to make decisions on the uncertainty of the data has not before been applied to battery storage. The method resulted in an annual average reduction of peak demand by 3.8 % at the lowest amount of savings and lowest risk aversion. The highest risk aversion resulted in an annual average reduction of peak demand of 7.5 %. The maximum reduction of peak load in any month was 13.8 % in the month of December with a relatively high risk aversion. With a the highest amount risk aversion tested, the model reduced demand ten of the twelve months of the year.

25 ENERGY STORAGE↗

Assessing pellet-clad interaction with VERA: WBN1, cycles 6-7

The Consortium for Advanced Simulation of Light Water Reactors (CASL) aims to provide high fidelity simulations of nuclear reactors through the development of the Virtual Environment for Reactor Applications (VERA). One of the primary goals of CASL is to estimate local cladding failure through pellet-clad interaction (PCI). While this capability is being pursued through several different approaches, the procedure presented here focuses on running independent fuel performance calculations with the BISON fuel performance code being developed by Idaho National Laboratory using the multicycle output data from coupled neutron transport/thermal-hydraulics simulations generated by MPACT, CTF, and MAMBA. This type of approach is consistent with traditional fuel performance analysis methods, where the fuel performance analyses are typically separate from core simulation analyses. Recent work simulating 12 cycles of Watts Bar Unit 1 (WBN1) with VERA are capitalized upon, and stand-alone quarter-core BISON results can be obtained for several cycles, assessing parameters of interest to PCI (e.g., maximum centerline fuel temperature, maximum clad hoop stress, minimum gap thickness, and cumulative damage index). This is accomplished by using the coupled neutronics/thermal-hydraulics output power and temperature distributions as inputs for each BISON fuel rod case. Building on previous work which demonstrated this capability for Cycles 1 through 3, this paper presents the results for Cycles 6 and 7. Cycle 7 is of particular interest because significant CRUD-induced power shift was observed. While the current results do not immediately indicate that any rods are at an extreme risk of failure, further analysis on rods highlighted by this work may shed additional light on the likelihood of failure. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comparison of Slack Variable and Mixture Experiment Approaches

In a mixture experiment, the response variable depends on the proportions of the components, which must sum to one. Because of this constraint, standard polynomial models cannot be used to analyze mixture experiment data. To get around this, some researchers ignore one of the components and use standard polynomial models in the remaining components. Because the component proportions must sum to one, the ignored component (referred to as the slack variable (SV)) makes up the remaining proportion of the mixture. In the literature, there have been many examples of researchers using the SV approach instead of a mixture approach. We have analyzed data from several of these examples using both approaches. For examples whose goal was to screen the mixture components (screening examples), we fit full linear models and identified which components were important using both approaches. In the screening examples, the mixture approach revealed that the SV had a significant effect on the response. For examples that had sufficient data to fit quadratic models to the data (quadratic examples), we used stepwise regression to develop reduced quadratic models for the SV approach, and partial quadratic mixture (PQM) models for the mixture approach. In three quadratic examples, the PQM models identified the SV and/or one of its quadratic blending terms as having a significant effect on the response variable. Hence, by completely ignoring a component’s effect on the response, SV analysis carries an inherent risk of wrong conclusions. There are fewer possible reduced quadratic SV models than possible PQM models because the reduced quadratic SV models are a subset of the class of PQM models. As a result, the PQM models will always fit the data as well as, or better than, the best reduced quadratic SV model. Our research concludes that it is better to analyze mixture experiments using methods specifically developed for them instead of using standard methods with the SV approach.

97 MATHEMATICS AND COMPUTING↗

Approaches to cancer assessment in EPA's Integrated Risk Information System

The U.S. Environmental Protection Agency's (EPA) Integrated Risk Information System (IRIS) Program develops assessments of health effects that may result from chronic exposure to chemicals in the environment. The IRIS database contains more than 540 assessments. When supported by available data, IRIS assessments provide quantitative analyses of carcinogenic effects. Since publication of EPA's 2005 Guidelines for Carcinogen Risk Assessment, IRIS cancer assessments have implemented new approaches recommended in these guidelines and expanded the use of complex scientific methods to perform quantitative dose-response assessments. Two case studies of the application of the mode of action framework from the 2005 Cancer Guidelines are presented in this paper. The first is a case study of 1,2,3-trichloropropane, as an example of a chemical with a mutagenic mode of carcinogenic action thus warranting the application of age-dependent adjustment factors for early-life exposure; the second is a case study of ethylene glycol monobutyl ether, as an example of a chemical with a carcinogenic action consistent with a nonlinear extrapolation approach. The use of physiologically based pharmacokinetic (PBPK) modeling to quantify interindividual variability and account for human parameter uncertainty as part of a quantitative cancer assessment is illustrated using a case study involving probabilistic PBPK modeling for dichloromethane. We also discuss statistical issues in assessing trends and model fit for tumor dose-response data, analysis of the combined risk from multiple types of tumors, and application of life-table methods for using human data to derive cancer risk estimates. These issues reflect the complexity and challenges faced in assessing the carcinogenic risks from exposure to environmental chemicals, and provide a view of the current trends in IRIS carcinogenicity risk assessment.

60 APPLIED LIFE SCIENCES↗

Dynamic Event Tree advancements and control logic improvements

The RAVEN code has been under development at the Idaho National Laboratory since 2012. Its main goal is to create a multi-purpose platform for the deploying of all the capabilities needed for Probabilistic Risk Assessment, uncertainty quantification, data mining analysis and optimization studies. RAVEN is currently equipped with three different sampling categories: Forward samplers (Monte Carlo, Latin Hyper Cube, Stratified, Grid Sampler, Factorials, etc.), Adaptive Samplers (Limit Surface search, Adaptive Polynomial Chaos, etc.) and Dynamic Event Tree (DET) samplers (Deterministic and Adaptive Dynamic Event Trees). The main subject of this document is to report the activities that have been done in order to: start the migration of the RAVEN/RELAP-7 control logic system into MOOSE, and develop advanced dynamic sampling capabilities based on the Dynamic Event Tree approach. In order to provide to all MOOSE-based applications a control logic capability, in this Fiscal Year an initial migration activity has been initiated, moving the control logic system, designed for RELAP-7 by the RAVEN team, into the MOOSE framework. In this document, a brief explanation of what has been done is going to be reported. The second and most important subject of this report is about the development of a Dynamic Event Tree (DET) sampler named “Hybrid Dynamic Event Tree” (HDET) and its Adaptive variant “Adaptive Hybrid Dynamic Event Tree” (AHDET). As other authors have already reported, among the different types of uncertainties, it is possible to discern two principle types: aleatory and epistemic uncertainties. The classical Dynamic Event Tree is in charge of treating the first class (aleatory) uncertainties; the dependence of the probabilistic risk assessment and analysis on the epistemic uncertainties are treated by an initial Monte Carlo sampling (MCDET). From each Monte Carlo sample, a DET analysis is run (in total, N trees). The Monte Carlo employs a pre-sampling of the input space characterized by epistemic uncertainties. The consequent Dynamic Event Tree performs the exploration of the aleatory space. In the RAVEN code, a more general approach has been developed, not limiting the exploration of the epistemic space through a Monte Carlo method but using all the forward sampling strategies RAVEN currently employs. The user can combine a Latin Hyper Cube, Grid, Stratified and Monte Carlo sampling in order to explore the epistemic space, without any limitation. From this pre-sampling, the Dynamic Event Tree sampler starts its aleatory space exploration. As reported by the authors, the Dynamic Event Tree is a good fit to develop a goal-oriented sampling strategy. The DET is used to drive a Limit Surface search. The methodology that has been developed by the authors last year, performs a Limit Surface search in the aleatory space only. This report documents how this approach has been extended in order to consider the epistemic space interacting with the Hybrid Dynamic Event Tree methodology.

97 MATHEMATICS AND COMPUTING↗

Micro-channel catalytic reactor integration in CAPER and research/development on highly tritiated water handling and processing

The CAPER facility of the Tritium Laboratory Karlsruhe has demonstrated the technology for the tokamak exhaust processing. CAPER has been significantly upgraded to pursue research/development programs towards highly tritiated water (HTW) handling and processing. The preliminary tests using a metal oxide reactor producing HTW afterward de-tritiated with PERMCAT were successful. In a later stage, a micro-channel catalytic reactor was installed in view of long term research program on HTW. The integration of this new system in CAPER was carried out along with a careful safety analysis due to high risk associated with such experiments. First experiments using the μ-CCR were performed trouble free, and HTW up to 360 kCi/kg was produced at a rate of 0.5 g/h. Such HTW was collected into a platinum zeolite bed (2 g of HTW for 20 g of Pt-zeolite), and in-situ detritiation was performed via isotopic exchange with deuterium. These first experimental results with tritium confirmed the potential for the capture and exchange method to be used for HTW in ITER. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗