Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Impacts of LEU+ and HBU Fuel on Decay Heat and Radiation Source Term

Using low-enriched uranium with 235 U enrichment slightly greater than 5.0 wt % (LEU+) fuel is desirable for light water reactors (LWR) because it can enable longer cycles and/or smaller fresh fuel batches. This report analyzes the impact of LEU+ on back-end considerations, such as its impact on the spent fuel pool, and on the thermal and shielding performance of dry storage systems. For both pressurized water reactor (PWR) and boiling water reactor LEU+ fuel, this report concludes that additional cooling time or regionalized loading plans are required to maintain the same level of thermal and shielding performance of dry storage systems loaded with LEU fuel. For PWR fuel, this report concludes that the impact of LEU+ fuel on the time-to-boil of a spent fuel pool (SFP) is minimal and does not require considerable changes in SFP management.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Best Practices in Electricity Load Modeling and Forecasting for Long-Term Power System Planning

This document highlights the best practices on data acquisition and management, modeling and stakeholder engagement required for enhanced load modeling and forecasting. Each section is interspersed with case studies to highlight lessons from different country contexts to highlight both cross-cutting and location specific best practices needed to conduct robust load modeling and forecasting.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Northwest — Advanced Grid Interactive Load Efficiency (AGILE) : A Techno-economic Assessment

The Advanced Grid Interactive Load Efficiency project team, led by Energy Northwest, was awarded funding as part of the fourth round of the Clean Energy Fund program to investigate, co-create, and complete a preliminary design for grid-interactive efficient buildings (GEBs) for a number of schools served by Grays Harbor PUD. The project team has evaluated different combinations of systems at selected school buildings and the potential to respond to grid and customer needs, and develop a preliminary system technical design, including specifying desired GEB technology options, determining communication and electrical interface requirements, assessing control software sensor requirements, and interfacing with building management systems. PNNL led the techno-economic assessment efforts, leveraging its advanced modeling and analytical methods and tools developed for building-to-grid integration. This report documents the economic assessment for different GEB design options, encompassing an in-depth examination of use cases and value propositions, assumptions and inputs, models, methods, case studies, as well as key findings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Time Sensitive Chemical Testing and Reduction at LANL [Slides]

Mission critical operations and other research in the past and present require the use of Time Sensitive Chemicals (TSC). TSC generate additional hazards over time and require routine testing or evaluation for safe usage and storage. in January 2023, testing and evaluation on TSC fell below 50% compliance and multiple containers required controlled destruction, leading to management action.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Water Reactor Sustainability Program: Materials Research Pathway: FY 23 Technical Program Plan

Components in operating commercial nuclear power plants must withstand very harsh environments that include extended time at neutron and gamma irradiation, stress, and temperature, as well as possible exposure to corrosive media. The many modes of materials degradation are complex and often include synergies between multiple environmental variables and conditions that vary depending on locations and materials. Understanding and managing materials degradation is a requirement for the continued safe and reliable operation of nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Secure Software Central-The VOLTTRON Case

The SSC work arose from VOLTTRON’s PNNL campus deployment and resulted in a Threat Profile containing critical assets, prioritized threats, and controls for mitigating those threats. The Threat Profile outlines controls already in place, controls not yet in place, and recommendations for implementing controls. As a companion to the software, the Threat Profile shows due diligence in cybersecurity risk management in terms of security requirements, security recommendations, security budgeting, justification, and prioritization. This report describes the SSC offerings in general and the specific offerings applied to VOLTTRON.

97 MATHEMATICS AND COMPUTING↗

Water Quality: 2007 Data, BPA-51; Preliminary Report, January 26, 2009.

Print Out No.1 presents a listing of the initial data. The variables included were: SITE, REP, NH4, NO2{_}3, SRP, TDP, TN, TP, and JULIAN , representing site code, replication number, ammonia nitrogen, nitrate and nitrite nitrogen, soluble reactive phosphorus, total dissolved phosphorus, total nitrogen, total phosphorus, and Julian date, respectively. All values for nitrogen, phosphorus, and carbon variables are recorded as {micro}g/L. The 2007 water quality data received by SCS required considerable manipulation and data management prior to analysis. If it is anticipated that water quality data received by SCS in the future will be of the same format, the time to carry out the necessary reformatting of the data should be taken into consideration. The levels of SRP from water quality data of previous years were often below detection limits. The data from 2007 showed elevated levels for this and other responses. This pattern was seemingly unrelated to nutrient addition treatments, however, as they appeared consistently across the study area. The river fertilization program was begun in 2005. Because the procedures for detection of nutrients and metals are quite sensitive, SCS recommends that any future water quality samples taken on, or close to, the dates of fertilizer application be carried out with the utmost care to avoid contamination issues. Doing so will ensure consistency and reliability in the resulting data.

13 HYDRO ENERGY↗

Improved Engine Design Concepts Using the Second Law of Thermodynamics

This project was aimed at developing and using numerical tools which incorporate the second law of thermodynamics to better understand engine operation and particularly the combustion process. A major activity of this project was the continual enhancement and use of an existing engine cycle simulation to investigate a wide range of engine parameters and concepts. The major motivation of these investigations was to improve engine efficiency. These improvements were examined from both the first law and second law perspective. One of the most important aspects of this work was the identification of the combustion irreversibilities as functions of engine design and operating parameters. The combustion irreversibility may be quantified in a number of ways but one especially useful way is by determining the destruction of exergy (availability) during the combustion process. This destruction is the penalty due to converting the fuel exergy to thermal energy for producing work. The engine cycle simulation was used to examine the performance of an automotive (5.7 liter), V-8 spark-ignition engine. A base case was defined for operation at 1400 rpm, stoichiometric, MBT spark timing with a bmep of 325 kPa. For this condition, the destruction of exergy during the combustion process was 21.0%. Variations of many engine parameters (including speed, load, and spark timing) did not alter the level of destruction very much (with these variations, the exergy destruction was within the range of 20.5-21.5%). Also, the use of turbocharging or the use of an over-expanded engine design did not significantly change the exergy destruction. The exergy destruction during combustion was most affected by increased inlet oxygen concentration (which reduced the destruction due to the higher combustion temperatures) and by the use of cooled EGR (which increased the destruction). This work has demonstrated that, in general, the exergy destruction for conventional engines is fairly constant ({approx}21%) for a range of operating and design parameters. Further, to achieve high efficiency engines requires that the exergy be managed and not necessarily reduced. The overall thermodynamics is the final discriminator regarding high efficiency engines.

33 ADVANCED PROPULSION SYSTEMS↗

Conceptual Design of a HTS Dipole Insert Based on Bi2212 Rutherford Cable

The U.S. Magnet Development Program (US-MDP) is aimed at developing high-field accelerator magnets with magnetic fields beyond the limits of Nb 3 Sn technology. Recent progress with composite wires and Rutherford cables based on the first generation high-temperature superconductor Bi 2 Sr 2 CaCu 2 O 8-x (Bi2212) allows considering them for this purpose. However, Bi2212 wires and cables are sensitive to transverse stresses and strains, which are large in high-field accelerator magnets. This requires magnet designs with stress management concepts to control azimuthal and radial strains in the coil windings and prevent the degradation of the current carrying capability of Bi2212 conductor or even its permanent damage. This paper describes a novel stress management approach, which was developed at Fermilab for high-field large-aperture Nb 3 Sn accelerator magnets, and is now being applied to high-field dipole inserts based on Bi2212 Rutherford cables. The insert conceptual design and main parameters, including the superconducting wire and cable, as well as the coil stress management structure, key technological steps and approaches, test configurations and their target parameters, are presented and discussed.

43 PARTICLE ACCELERATORS↗

Quantifying Apparent Groundwater Ages near Managed Aquifer Recharge Operations Using Radio-Sulfur ( 35 S) as an Intrinsic Tracer

The application of the cosmogenic radioisotope sulfur-35 ( 35 S) as a chronometer near spreading basins is evaluated at two well-established Managed Aquifer Recharge (MAR) sites: the Atlantis facility (South Africa) and Orange County Water District’s (OCWD’s) Kraemer Basin (Northern Orange County, CA, USA). Source water for both of these sites includes recycled wastewater. Despite lying nearer to the outlet end of their respective watersheds than to the headwaters, 35 S was detected in most of the water sampled, including from wells found close to the spreading ponds and in the source water. Dilution with 35 S-dead continental SO 4 was minimal, a surprising finding given its short ~3 month half-life. The initial work at the Atlantis MAR site demonstrated that remote laboratories could be set up and that small volume samples—saline solutions collected after the resin elution step from the recently developed batch method described below—can be stored and transported to the counting laboratory. This study also showed that the batch method needed to be altered to remove unknown compounds eluted from the resin along with SO 4 . Using the improved batch method, times series measurements of both source and well water from OCWD’s MAR site showed significant temporal variations. Finally, this result indicates that during future studies, monthly to semi-monthly sampling should be conducted. Nevertheless, both of these initial studies suggest the 35 S chronometer may become a valuable tool for managing MAR sites where regulations require minimum retention times.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Pilot impressions of lifting body vehicles

Piloting aspects of the lifting body vehicles are discussed in this paper by two of the pilots assigned to the flight program. Subjects discussed include: approach, landing, and energy management considerations; field of view requirements, stability considerations, and vehicle riding qualities, including the effects of turbulence. Remarks pertinent to the various subject areas are made by each pilot.

William H Dana↗

Task 6: IFYGL (lake Ontario), 1384

The author has identified the following significant results. The Lake Ontario drainage basin covers over 32,000 miles of U.S. and Canadian territory. ERTS-1 data is contributing to the comprehensive study of this basin as part of the International Field Year for the Great Lakes (IFYGL). A processing approach is described for obtaining detailed and objective synoptive synoptic information thought to be applicable to terrestrial water balance studies of such a large area. A simple ratio algorithm was tested for minimizing daily variations in ERTS-1 data and for allowing the discrimination of surface features and land use classes of hydrologic significance. These steps are necessary if ERTS-1 data is to provide the quantitative information required for the study and management of areas of regional size.

Polcyn, F. C.↗

Development of simulation computer complex specification

The Training Simulation Computer Complex Study was one of three studies contracted in support of preparations for procurement of a shuttle mission simulator for shuttle crew training. The subject study was concerned with definition of the software loads to be imposed on the computer complex to be associated with the shuttle mission simulator and the development of procurement specifications based on the resulting computer requirements. These procurement specifications cover the computer hardware and system software as well as the data conversion equipment required to interface the computer to the simulator hardware. The development of the necessary hardware and software specifications required the execution of a number of related tasks which included, (1) simulation software sizing, (2) computer requirements definition, (3) data conversion equipment requirements definition, (4) system software requirements definition, (5) a simulation management plan, (6) a background survey, and (7) preparation of the specifications.

Source record↗

Progress of an ERTS-1 program for Lake Ontario and its basin

The Lake Ontario drainage basin covers over 32,000 square miles of U.S. and Canadian territory. ERTS-1 data is contributing to the comprehensive study of this basin as part of the International Field Year for the Great Lakes (IFYGL). This paper details a processing approach for obtaining detailed and objective synoptic information thought to be applicable to terrestrial water balance studies of such a large area. A simple ratio algorithm was tested for minimizing daily variations in ERTS data and for allowing the discrimination of surface features and land use classes of hydrologic significance. These steps are necessary if ERTS data is to provide the quantitative information required for the study and management of areas of regional size.

Wagner, T. W.↗

Earth Observatory Satellite system definition study. Report no. 5: System design and specifications. Part 2: Ground system element specifications

The Ground System requirements for the Land Resources Management (LRM) type-A and type-B missions of the Earth Observatory Satellite (EOS) program are presented. Specifications for the Thematic Mapper data processing are provided (LRM A mission). The specifications also cover the R and D instruments (Thematic Mapper and High Resolution Pointable Imager) data processing for the LRM type-B mission.

Source record↗

Centaur zero gravity coast and engine restart demonstration on the Titan/Centaur (TC-2) extended mission

The Centaur propellant management and thermal control techniques required for zero gravity coasting were successfully demonstrated during an extended mission following spacecraft separation on the TC-2 flight. As part of the demonstration, two successful engine starts were accomplished. The first engine start followed a one-hour zero gravity coast, and the second engine start followed a three-hour zero gravity coast. All of the Centaur systems performed satisfactorily, the design parameters for zero gravity coasting were verified, and no significant problems were encountered. The flight results showed that the propellant location and behavior, propellant heating, and tank pressure rise rates observed during the zero-gravity coasts were less severe than expected. Consequently, the majority of the propellants remained at the tank bottom, the propellant collection times were very short, and more than 7 hours of coast could have been achieved before a tank venting was required. The tank pressurization prior to the engine starts provided boost pump Net Positive Suction Head values well in excess of the values required. The LO2 tank pressurization was accomplished by a new bubbler method that greatly reduced the helium usage.

Lacovic, R. F.↗

The solar-terrestrial observatory as a major module of a space station

The solar-terrestrial environment is a dynamic, tightly coupled system in which variable solar energy is transmitted through electromagnetic radiation and the solar wind to the earth's magnetosphere and atmosphere. The constantly changing solar input and the continuous redistribution of energy near the earth combine to determine the characteristics of our global environment. An understanding and subsequent management of this environment will require a coordinated set of observations of solar processes and the accompanying magnetospheric and atmospheric responses. A major element in this observational plan should be a Solar-Terrestrial Observatory module of a manned Space Station in which instruments and experimental techniques developed during short-duration Spacelab flights will be applied to extended missions in both low-altitude and geosynchronous orbits.

Chappell, C. R.↗

A report of a Conference on Advanced Composites: An Assessment of the Future

A conference was held to evaluate the current status and future commitment to composites by government and industry. This reassessment, was felt needed because of an apparent transition in the acceptance of composites. The management of government agencies restated their progress and commitment to the development of composites and industrial management defined their concerns and requirements to commit to the future use of composites.

Harris, L. A.↗