Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Retrofit-ability: A supplementary metric to inform energy efficiency policies and programs

Building Energy Use Intensity (EUI) has been commonly used to facilitate policy makers and utilities to design energy efficacy programs and help building managers prioritize investment in building upgrades. Buildings with higher EUIs are usually chosen as better candidates for retrofit. Our study of nearly one hundred buildings in Seattle’s Building Tune Up Accelerator program and thousands of buildings in the Asset Score database reveals that EUI (after weather/location/use type normalization) alone is not the best indicator of a building’s potential to save energy, especially for those buildings in the mid-range (30-70 percentile EUI). In this paper, we introduce the concept of “retrofit-ability” — a building’s real potential to reduce its energy use cost-effectively — as a supplementary metric to inform energy efficiency policy and investment. Currently, such potential analyses are predicted for a building stock using prototypical building models or statistical data. However, typical buildings or general historical data may not sufficiently represent building configurations in a portfolio and predict their saving potentials. We utilized machine learning to investigate how key building characteristics (such as envelope attributes, HVAC type, location, use type, etc.) affect a building’s improvement potentials and developed a low-cost method to quantify such potentials for a portfolio of buildings. The supplementary perspective provided by “retrofit-ability” highlights which building assets correlate most with a building’s energy savings potential across region, building use type and more.

Wang, Na↗

Management of Pu-242 Inventories at Oak Ridge National Laboratory

ORNL has an inventory of radioisotopes that are being managed for ongoing research programs and being held for reuse because they have potential intrinsic value to DOE. There is an increasing interest in Pu-242 by user communities. This paper describes the actions ORNL is taking to manage the inventories of Pu-242 and making it available to potential users.

Robinson, Sharon [ORNL] (ORCID:0000000194204474)↗

To the 'Safety related?' Question: What is Related to Safety? - 18430

Most, if not all, national programs for radioactive waste management (RWM) pledge their overall commitment to safety or - in the case of radioactive waste disposal - to long-term safety. Therefore, it may be somewhat surprising to find that the term 'safety' is hardly defined in these programs. The same holds for some of the core international guidance literature on the deep geological repository (DGR) 'safety case' concept. With respect to stakeholder concern over the safety of geological disposal, it seems, however, advisable to seek common ground in the understanding of the idea of 'safety'. In this paper, we review and discuss the most relevant international guidance literature's provision (or non-provision) of definitions of 'safety' in the context of radioactive waste disposal. Against this background, we develop a tentative, practical, glossary-style definition of 'safety' in the DGR context. As a seed of discussion, it may help to eventually expose possible mismatches in the base assumptions of safety experts and other stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Thermo-physical Characterization Project: Evaluation of Models to Calculate Thermal Diffusivity of Layered Composites

The Office of Material Management and Minimization Fuel Thermo-physical Characterization Project at Pacific Northwest National Laboratory (PNNL) is tasked with using PNNL facilities and processes to receive irradiated low enriched uranium-molybdenum fuel plate samples and perform analyses in support of the Office of Material Management and Minimization Reactor Conversion Program. This work is in support of the Fuel Development Pillar that is managed by Idaho National Laboratory. A key portion of the scope associated with this project was to measure the thermal properties of fuel segments harvested from plates that were irradiated in the Advanced Test Reactor. Thermal diffusivity of samples prepared from the fuel segments was measured using laser flash analysis. Two models, one developed by PNNL and the other developed by the Technische Universität München (TUM), were evaluated to extract the thermal diffusivity of the uranium-molybdenum alloy from measurements made on the irradiated, layered composites. The experimental data of the “TC” irradiated fuel segment was evaluated using both models considering a three-layer and five-layer system. Both models are in acceptable agreement with one another and indicate that the zirconium diffusion barrier has a minimal impact on the overall thermal diffusivity of the monolithic U-Mo fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Australian Safeguards and Non-Proliferation Office Visit: Nuclear Nonproliferation and Security Program at LANL [Slides]

The Laboratory’s nuclear nonproliferation and security portfolio is managed by the GS-NNS program office: NNSA’s Defense Nuclear Nonproliferation office (DNN) makes up ~80% of our work. We also support State Dept activities closely aligned with our work for DNN and NASAprograms. Our work is executed across the entire Laboratory, approximately half in the Global Security directorate and a third in the Weapons Program.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

2009 Biomass Program Peer Review Report: An Independent Evaluation of Program Activities for FY2008 and FY2009

This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the U.S. Department of Energy Biomass Program‘s 2009 peer review meeting, held on July 14–15, 2009, in Arlington, Virginia. The document also includes summary information from the six separate platform reviews conducted between March and April 2009 in the Washington, D.C., and Denver, Colorado, areas. The platform reviews provide evaluations of the program‘s projects in applied research, development, and demonstration as well as analysis and deployment activities. The July program peer review was an evaluation of the program‘s overall strategic planning, management approach, priorities across research areas, and resource allocation.

09 BIOMASS FUELS↗

Appendix K - GPRA06 Weatherization and Intergovernmental Program (WIP) Documentation

The State Energy Program provides financial assistance to States, enabling State governments to target their own high priority energy needs and expand clean energy choices for their citizens and businesses. With these funds and the resources leveraged by them, the State and Territory Energy Offices develop and manage a variety of programs designed to increase energy efficiency, reduce energy use and costs, develop alternative energy and renewable energy sources, promote environmentally conscious economic development and reduce reliance on oil produced outside of the United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Appendix K: GPRA05 Weatherization and Intergovernmental Program documentation

The State Energy Program provides financial assistance to States, enabling State governments to target their own high priority energy needs and expand clean energy choices for their residents and businesses. With these funds and the resources leveraged by them, the State and Territory Energy Offices develop and manage a variety of programs geared to increase energy efficiency, reduce energy use and costs, develop alternative energy and renewable energy sources, promote environmentally conscious economic development, and reduce reliance on oil produced outside of the United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Water Efficiency Improvements at Various Environmental Protection Agency Sites: Best Management Practice Case Study #12 - Laboratory/Medical Equipment (Brochure)

The U.S. Environmental Protection Agency (EPA) built a successful water conservation program and reduced potable water use through a series of initiatives at EPA laboratories. The projects highlighted in this case study demonstrate EPA's ability to reduce water use in laboratory and medical equipment by implementing vacuum pump and steam sterilizer replacements and retrofits. Due to the successof the initial vacuum pump and steam sterilizer projects described here, EPA is implementing similar projects at several laboratories throughout the nation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 2008 Annual Report.

The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program is designed to rapidly increase numbers of Chinook salmon in stocks that are in imminent danger of extirpation in Catherine Creek (CC), Lostine River (LR) and upper Grande Ronde River (GR). Natural parr are captured and reared to adulthood in captivity, spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation. Presmolt rearing was initially conducted at Lookingglass Fish Hatchery (LFH) but parr collected in 2003 and later were reared at Wallowa Fish Hatchery (WFH). Post-smolt rearing is conducted at Bonneville Fish Hatchery (BOH - freshwater) and at Manchester Research Station (MRS - saltwater). The CC and LR programs are being terminated, as these populations have achieved the goal of a consistent return of 150 naturally spawning adults, so the 2005 brood year was the last brood year collected for theses populations. The Grande Ronde River program continued with 300 fish collected each year. Currently, we are attempting to collect 150 natural parr and incorporate 150 parr collected as eggs from females with low ELISA levels from the upper Grande Ronde River Conventional Hatchery Program. This is part of a comparison of two methods of obtaining fish for a captive broodstock program: natural fish vs. those spawned in captivity. In August 2007, we collected 152 parr (BY 2006) from the upper Grande Ronde River and also have 155 Grande Ronde River parr (BY 2006) that were hatched from eyed eggs at LFH. During 2008, we were unable to collect natural parr from the upper Grande Ronde River. Therefore, we obtained 300 fish from low ELISA females from the upper Grande Ronde River Conventional Program. In October 2008 we obtained 170 eyed eggs from the upper Grande Ronde river Conventional Hatchery Program. We will attempt to collect natural parr in August 2009. This year 752 fish were removed from the captive population: 629 fish survived to gamete production and 123 fish died from various causes prior to spawning. Growth of the Captive Broodstock fish was similar to previous years. The saltwater fish have grown more slowly than those reared in freshwater. A total of 720 fish were sorted as maturing and 629 (87.4%) of them survived to spawn. We collected gametes from 273 females and 350 males from the 2002-2006 brood years in 2008, using 111 spawning matrices and collected 474,187 green eggs (1,737 eggs/female). All ripe males were spawned and no semen was collected for cryo-preservation. Of the 474,187 eggs collected for the BY 2008 F1 generation, 448,373 (94.6%) survived to the eyed stage. 68,612 (15.3%) were culled from females with high ELISA OD values for BKD prevention. For BY 2007, we collected a total of 477,048 eggs from all three populations and 407,369 (85.4%) reached the eyed stage, while 95,024 eyed eggs (23.3%) were culled for BKD prevention. Eyed eggs were hatched at Lookingglass Fish Hatchery, producing 267,131 fry. As parr, 153,371 fish were coded-wire tagged (CWT). For the 2006 F1 brood year, we collected 177,890 eggs and 149,073 (83.8%) reached the eyed stage. 83,826 eyed eggs (56.2%) were culled at the eyed stage for BKD prevention. 61,044 fry were produced (93.6%), 53,688 (88 %) survived to smolt. There were 54 bacterial kidney disease (BKD) mortalities at BOH and MRS, combined in this reporting period. Overall, there were fewer BKD mortalities in 2008 due to a reduced number of fish coming into the Captive Broodstock Program and a shift away from collecting wild parr to using eyed eggs from low ELISA females from the Conventional Hatchery Program. Unknown causes of death accounted for 32 deaths at MRS and BOH, combined in 2008. We continually examine and modify the operations of the Captive Broodstock Program to make improvements wherever possible. We continue to have difficulty with prevention and treatment of BKD outbreaks and continue to use erythromycin and azithromycin to treat this disease. We are also continuing to investigate other possible treatments and prophylactic measures. To reduce the incidence of BKD in offspring of the Captive Broodstock Program, we continue to allow culling of eyed eggs from females with high BKD ELISA values (generally >0.800 OD units but the cull level varies annually, depending on the distribution of ELISA values, number of eggs collected, and management considerations). We are also using ultrasound to determine maturity and sex of fish early in the maturation process and are now able to determine maturity and sex of most maturing fish in early April. This allows us to transfer maturing fish from saltwater to freshwater at a more natural time, which should improve fecundity and egg quality of saltwater-reared fish.

13 HYDRO ENERGY↗

Data Quality Assurance Program Plan for NRC Division of Risk Analysis Programs at the INL

The Division of Risk Analysis (DRA), Office of Nuclear Regulatory Research (RES), must ensure that the quality of the data that feed into its programs follow Office of Management and Budget (OMB) and U.S. Nuclear Regulatory Commission (NRC) guidelines and possibly other standards and guidelines used in nuclear power plant risk analyses. This report documents the steps taken in DRA’s Data Quality Improvement project (Job Control Number N6145) to develop a Data Quality Assurance Program Plan. These steps were 1. Conduct a review of data quality requirements 2. Review current data programs, products, and data quality control activities 3. Review the Institute of Nuclear Power Operation (INPO) Equipment Performance and Information Exchange (EPIX) data quality programs and characterize the EPIX data quality and uncertainty 4. Compare these programs, products, and activities against the requirements 5. Develop a program plan that provides assurance that data quality is being maintained. It is expected that the Data Quality Assurance Program Plan will be routinely implemented in all aspects of future data collection and processing efforts and that specific portions will be executed annually to provide assurance that data quality is being maintained.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data-driven reinforcement learning–based real-time energy management system for plug-in hybrid electric vehicles

Plug-in hybrid electric vehicles (PHEVs) show great promise in reducing transportation-related fossil fuel consumption and greenhouse gas emissions. Designing an efficient energy management system (EMS) for PHEVs to achieve better fuel economy has been an active research topic for decades. Most of the advanced systems rely either on a priori knowledge of future driving conditions to achieve the optimal but not real-time solution (e.g., using a dynamic programming strategy) or on only current driving situations to achieve a real-time but nonoptimal solution (e.g., rule-based strategy). This paper proposes a reinforcement learning–based real-time EMS for PHEVs to address the trade-off between real-time performance and optimal energy savings. The proposed model can optimize the power-split control in real time while learning the optimal decisions from historical driving cycles. Here, a case study on a real-world commute trip shows that about a 12% fuel saving can be achieved without considering charging opportunities; further, an 8% fuel saving can be achieved when charging opportunities are considered, compared with the standard binary mode control strategy.

33 ADVANCED PROPULSION SYSTEMS↗

MANAGEMENT OF RESEARCH AND TEST REACTOR ALUMINUM SPENT NUCLEAR FUEL - A TECHNOLOGY ASSESSMENT

The Department of Energy's Environmental Management (DOE-EM) Program is responsible for the receipt and storage of aluminum research reactor spent nuclear fuel or used fuel until ultimate disposition. Aluminum research reactor used fuel is currently being stored or is anticipated to be returned to the U.S. and stored at DOE-EM storage facilities at the Savannah River Site and the Idaho Nuclear Technology and Engineering Center. This paper assesses the technologies and the options for safe transportation/receipt and interim storage of aluminum research reactor spent fuel and reviews the comprehensive strategy for its management. The U.S. Department of Energy uses the Appendix A, Spent Nuclear Fuel Acceptance Criteria, to identify the physical, chemical, and isotopic characteristics of spent nuclear fuel to be returned to the United States under the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program. The fuel is further evaluated for acceptance through assessments of the fuel at the foreign sites that include corrosion damage and handleability. Transport involves use of commercial shipping casks with defined leakage rates that can provide containment of the fuel, some of which are breached. Options for safe storage include wet storage and dry storage. Both options must fully address potential degradation of the aluminum during the storage period. This paper focuses on the various options for safe transport and storage with respect to technology maturity and application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis.

In order to effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thorough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗