Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

State Policies Provide Critical Support for Renewable Electricity

Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important types of state policies for supporting electricity generation from geothermal and other forms of renewable energy: renewables portfolio standards and utility integrated resource planning requirements. Within the Western U.S., where the vast majority of the nation's readily-accessible geothermal resource potential resides, these two types of state policies have been critical to the growth of renewable energy, and both promise to continue to play a fundamental role for the foreseeable future. In its essence, a renewables portfolio standard (RPS) requires utilities and other retail electricity suppliers to produce or purchase a minimum quantity or percentage of their generation supply from renewable resources. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, although most states have incorporated some type of cost-containment provision, such as a cost cap or a cap on retail rate impacts, which could conceivably allow utilities to avoid (full) compliance with their RPS target. Currently, 27 states and the District of Columbia have mandatory RPS requirements. Within the eleven states of the contiguous Western U.S., all but three (Idaho, Utah, and Wyoming) now have a mandatory RPS legislation (Utah has a more-voluntary renewable energy goal), covering almost 80% of retail electricity sales in the region. Although many of these state policies have only recently been established, their impact is already evident: almost 1800 MW of new renewable capacity has been installed in Western states following the implementation of RPS policies. To date, wind energy has been the primary beneficiary of state RPS policies, representing approximately 83% of RPS-driven renewable capacity growth in the West through 2007. Geothermal energy occupies a distant second place, providing 7% of RPS-driven new renewable capacity in the West since the late 1990s, though geothermal's contribution on an energy (MWh) basis is higher. Looking to the future, a sizable quantity of renewable capacity beyond pre-RPS levels will be needed to meet state RPS mandates: about 25,000 MW by 2025 within the Western U.S. Geothermal energy is beginning to provide an increasingly significant contribution, as evidenced by the spate of new projects recently announced to meet state RPS requirements. Most of this activity has been driven by the RPS policies in California and Nevada, where the Geothermal Energy Association has identified 47 new geothermal projects, totaling more than 2,100 MW, in various stages of development. Additional geothermal projects in Arizona, New Mexico, Oregon, and Washington are also under development to meet those states RPS requirements. The other major state policy driver for renewable electricity growth, particularly in the West, is integrated resource planning (IRP). IRP was first formalized as a practice in the 1980s, but the practice was suspended in some states as electricity restructuring efforts began. A renewed interest in IRP has emerged in the past several years, however, with several Western states (California, Montana, and New Mexico) reestablishing IRP and others developing new rules to strengthen their existing processes. In its barest form, IRP simply requires that utilities periodically submit long-term resource procurement plans in which they evaluate alternative strategies for meeting their resource needs over the following ten to twenty years. However, many states have developed specific requirements for the IRP process that directly or indirectly support renewable energy. The most general of these is an explicit requirement that utilities evaluate renewables, and that they do so on an 'equivalent' or 'comparable' basis to conventional supply-side generation options. Many states also require that utilities include various types of risk analyses within their IRP. For example, utilities are often required to evaluate fuel price risk within their resource plan, which can reveal the value of renewables as a hedge against rising and volatile fuel prices. Of particular importance for supporting renewable energy is the increasingly common requirement that utilities evaluate the potential costs and risks associated with future greenhouse gas regulations. Virtually all of the major Western utilities that prepare IRPs incorporated future carbon dioxide regulations in their analyses of alternative resource strategies in their most recent resource plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implementation of Software QA for SAS4A/SASSYS-1 Rev. 1

In an effort to support closure of gaps in advanced reactor licensing pathways, a multi-year task to systematically develop sodium-cooled fast reactor (SFR) codes and methods for use in a licensing framework was launched as part of the DOE-NE Advanced Reactor Technologies (ART) Program’s Regulatory Technology Development Plan (RTDP). This report documents Phase 2 of this task, which was focused on the finalization and initial implementation of a software quality assurance (SQA) program for SAS4A/SASSYS-1 and completion of high-priority SQA-related technical activities. The ultimate goal of this ongoing RTDP task is to develop an SQA framework that satisfies the fundamental requirements of relevant SQA standards and guidance while still maintaining sufficient flexibility and efficiency such that the framework can be sustained with modest resources.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Harmonic analysis for the characterization and correction of geometric distortion in MRI

Purpose: Magnetic resonance imaging (MRI) is gaining widespread use in radiation therapy planning, patient setup verification, and real-time guidance of radiation delivery. Successful implementation of these technologies relies on the development of simple and efficient methods to characterize and monitor the geometric distortions arising due to system imperfections and gradient nonlinearities. To this end, the authors present the theory and validation of a novel harmonic approach to the quantification of system-related distortions in MRI. Methods: The theory of spatial encoding in MRI is applied to demonstrate that the 3D distortion vector field (DVF) is given by the solution of a second-order boundary value problem (BVP). This BVP is comprised of Laplace’s equation and a limited measurement of the distortion on the boundary of a specified region of interest (ROI). An analytical series expansion solving this BVP within a spherical ROI is obtained, and a statistical uncertainty analysis is performed to determine how random errors in the boundary measurements propagate to the ROI interior. This series expansion is then evaluated to obtain volumetric DVF mappings that are compared to reference data obtained on a 3 T full-body scanner. This validation is performed within two spheres of 20 cm diameter (one centered at the scanner origin and the other offset +3 cm along each of the transverse directions). Initially, a high-order mapping requiring measurements at 5810 boundary points is used. Then, after exploring the impact of the boundary sampling density and the effect of series truncation, a reduced-order mapping requiring measurements at 302 boundary points is evaluated. Results: The volumetric DVF mappings obtained from the harmonic analysis are in good agreement with the reference data. Following distortion correction using the high-order mapping, the authors estimate a reduction in the mean distortion magnitude from 0.86 to 0.42 mm and from 0.93 to 0.39 mm within the central and offset ROIs, respectively. In addition, the fraction of points with a distortion magnitude greater than 1 mm is reduced from 35.6% to 2.8% and from 40.4% to 1.5%, respectively. Similarly, following correction using the reduced-order mapping, the mean distortion magnitude reduces to 0.45–0.42 mm within the central and offset ROIs, and the fraction of points with a distortion magnitude greater than 1 mm is reduced to 2.8% and 1.5%, respectively. Conclusions: A novel harmonic approach to the characterization of system-related distortions in MRI is presented. This method permits a complete and accurate mapping of the DVF within a specified ROI using a limited measurement of the distortion on the ROI boundary. This technique eliminates the requirement to exhaustively sample the DVF at a dense 3D array of points, thereby permitting the design of simple, inexpensive phantoms that may incorporate additional modules for auxiliary quality assurance objectives.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Trying to predict the future: Resource planning and allocation in CMS

In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this paper we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spread-sheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impacts the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

Bloom, Kenneth↗

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Locating and targeting moving tumors with radiation beams

The current climate of rapid technological evolution is reflected in newer and better methods to modulate and direct radiation beams for cancer therapy. This Vision 20/20 paper focuses on part of this evolution, locating and targeting moving tumors. The two processes are somewhat independent and in principle different implementations of the locating and targeting processes can be interchanged. Advanced localization and targeting methods have an impact on treatment planning and also present new challenges for quality assurance (QA), that of verifying real-time delivery. Some methods to locate and target moving tumors with radiation beams are currently FDA approved for clinical use--and this availability and implementation will increase with time. Extensions of current capabilities will be the integration of higher order dimensionality, such as rotation and deformation in addition to translation, into the estimate of the patient pose and real-time reoptimization and adaption of delivery to the dynamically changing anatomy of cancer patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

DOE Progress on Implementing Recommendations of National Academy of Sciences for SNF Transportation - 17087

In 2006, the National Research Council of the United States' National Academy of Sciences (NAS) issued the report Going the Distance? The Safe Transport of Spent Nuclear Fuel and High-Level Radioactive Waste in the United States. The report's foremost finding was that there were 'no fundamental technical barriers to the safe transport of spent nuclear fuel and high-level radioactive waste in the United States.' However, it made a number of recommendations to improve safety, communicate risk, and conduct planning and other activities in anticipation of a large-scale transport campaign for spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Blue Ribbon Commission on America's Nuclear Future (BRC), formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of the back end of the nuclear fuel cycle and recommend a new plan, concluded that with respect to transportation issues, the NAS recommendations that had not yet been implemented should be revisited and addressed as appropriate. This paper discusses the NAS recommendations and the current status regarding their implementation, with a focus on actions being taken by DOE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-152: Building An Ultrafast, Earthquake Proof Treatment Planning System

Purpose: Situated 20 miles from 5 major fault lines in California’s Bay Area, Stanford Universityhas a critical need for IT infrastructure planning to handle the high probability devastating earthquakes. Recently, a multi-million dollar project has been underway to overhaul Stanford’s radiation oncology information systems, maximizing planning system performance and providing true disaster recovery abilities. An overview of the project will be given with particular focus on lessons learned throughout the build. Methods: In this implementation, two isolated external datacenters provide geographical redundancy to Stanford’s main campus datacenter. Real-time mirroring is made of all data stored to our serial attached network (SAN) storage. In each datacenter, hardware/software virtualization was heavily implemented to maximize server efficiency and provide a robust mechanism to seamlessly migrate users in the event of an earthquake. System performance is routinely assessed through the use of virtualized data robots, able to log in to the system at scheduled times, perform routine planning tasks and report timing results to a performance dashboard. A substantial dose calculation framework (608 CPU cores) has been constructed as part of the implementation. Results: Migration to a virtualized server environment with a high performance SAN has resulted in up to a 45% speed up of common treatment planning tasks. Switching to a 608 core DCF has resulted in a 280% speed increase in dose calculations. Server tuning was found to further improved read/write performance by 20%. Disaster recovery tests are carried out quarterly and, although successful, remain time consuming to perform and verify functionality. Conclusion: Achieving true disaster recovery capabilities is possible through server virtualization, support from skilled IT staff and leadership. Substantial performance improvements are also achievable through careful tuning of server resources and disk read/write operations. Developing a streamlined method to comprehensively test failover is a key requirement to the system’s success.

60 APPLIED LIFE SCIENCES↗

The United States' (DOE) Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The U.S. Department of Energy (DOE) is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change. This Action Plan, developed by DOE, is focused on federal actions for power sector decarbonization primarily led by DOE. There are many other actions being led by other U.S. government agencies, or at the state and local level, that are not featured in this Action Plan.

21st Century Power Partnership↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Canada's Actions for Rapid Decarbonization of Power Sector

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. Canada is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

SU-F-P-32: A Phantom Study of Accuracy of Four-Dimensional Cone-Beam CT (4D-CBCT) Vs. Three-Dimensional Cone Beam CT (3D-CBCT) in Image Guided Radiotherapy

Purpose: SymmetryTM 4D IGRT system of Elekta has been installed at our institution, which offers the 4D CBCT registration option. This study is to evaluate the accuracy of 4D CBCT system by using the CIRS 4D motion phantom and to perform a feasibility study on the implementation of 4D-CBCT as image guidance for SBRT treatment. Methods: The 3D and 4D CT image data sets are acquired using the CIRS motion phantom on a Philips large bore CT simulator. The motion was set as 0.5 cm superior and inferior directions with 6 seconds recycle time. The 4D CT data were sorted as 10 phases. One identifiable part of the 4D CT QA insert from CIRS phantom was used as the target. The ITV MIP was drawn based on maximum intensity projection (MIP) and transferred as a planning structure into 4D CBCT system. Then the 3D CBCT and 4D CBCT images were taken and registered with the free breath (3D), MIP (4D) and average intensity projection (AIP)(4D) reference data sets. The couch shifts (X, Y, Z) are recorded and compared. Results: Table 1 listed the twelve couch shifts based on the registration of MIP, AIP and free breath CT data sets with 3D CBCT and 4D CBCT for both whole body and local registration. X, Y and Z represent couch shifts in the direction of the right-left, superior-inferior and anterior-posterior. The biggest differences of 0.73 cm and 0.57 cm are noted in the free breath CT data with 4D CBCT and 3D CBCT data registration. Fig. 1 and Fig. 2 are the shift analysis in diagram. Fig. 3 shows the registration. Conclusion: Significant differences exist in the shifts corresponding with the direction of target motion. Further investigations are ongoing.

60 APPLIED LIFE SCIENCES↗

Tokamak DEMO-FNS: Concept of magnet system and vacuum chamber

The level of knowledge accumulated to date in the physics and technologies of controlled thermonuclear fusion (CTF) makes it possible to begin designing fusion—fission hybrid systems that would involve a fusion neutron source (FNS) and which would admit employment for the production of fissile materials and for the transmutation of spent nuclear fuel. Modern Russian strategies for CTF development plan the construction to 2023 of tokamak-based demonstration hybrid FNS for implementing steady-state plasma burning, testing hybrid blankets, and evolving nuclear technologies. Work on designing the DEMO-FNS facility is still in its infancy. The Efremov Institute began designing its magnet system and vacuum chamber, while the Kurchatov Institute developed plasma-physics design aspects and determined basic parameters of the facility. The major radius of the plasma in the DEMO-FNS facility is R = 2.75 m, while its minor radius is a = 1 m; the plasma elongation is k{sub 95} = 2. The fusion power is P{sub FUS} = 40 MW. The toroidal magnetic field on the plasma-filament axis is B{sub t0} = 5 T. The plasma current is I{sub p} = 5 MA. The application of superconductors in the magnet system permits drastically reducing the power consumed by its magnets but requires arranging a thick radiation shield between the plasma and magnet system. The central solenoid, toroidal-field coils, and poloidal-field coils are manufactured from, respectively, Nb{sub 3}Sn, NbTi and Nb{sub 3}Sn, and NbTi. The vacuum chamber is a double-wall vessel. The space between the walls manufactured from 316L austenitic steel is filled with an iron—water radiation shield (70% of stainless steel and 30% of water).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Inverter Ground Fault Overvoltage Testing

This report describes testing conducted at NREL to determine the duration and magnitude of transient overvoltages created by several commercial PV inverters during ground fault conditions. For this work, a test plan developed by the Forum on Inverter Grid Integration Issues (FIGII) has been implemented in a custom test setup at NREL. Load rejection overvoltage test results were reported previously in a separate technical report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

North American Board of Certified Energy Practitioners Final Report

The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of all five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.

14 SOLAR ENERGY↗

MN471017 Safety basis Manual

National Technology & Engineering Solutions of Sandia, LLC, manages the facilities and infrastructure of Sandia National Laboratories (SNL) on behalf of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA). Activities in support of the SNL mission take place at primary facilities located in Albuquerque, New Mexico, and Livermore, California, as well as at supporting facilities located in Nevada, Hawaii, Alaska, Texas, and Washington, D.C. As required by the Management and Operating (M&O) Contract (DE-NA0003525) and DOE orders, standards, and guidance, the M&O contractor maintain a safety basis process, which helps to identify and evaluate hazards related to facilities, operations, and activities at both Sandia-controlled premises (i.e., onsite) and non-Sandia-controlled premises (i.e., offsite) to adequately protect workers, the public, and the environment. This manual describes the SNL safety basis process, which is managed by the Environment, Safety, and Health (ES&H) Planning Department. Safety basis personnel ensure that a centralized and consistent process is implemented for safety basis development, documentation, and evaluation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗