Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Complexity management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Smart Sensor Node Development, Testing and Implementation for Rocket Propulsion Systems

Successful design and implementation of an Integrated System Health Management (ISHM) approach for rocket propulsion systems requires the capability improve the reliability of complex systems by detecting and diagnosing problems. One of the critical elements in the ISHM is an intelligent sensor node for data acquisition that meets specific requirements for rocket motor testing including accuracy, sample rate and size/weight. Traditional data acquisition systems are calibrated in a controlled environment and guaranteed to perform bounded by their tested conditions. In a real world ISHM system, the data acquisition and signal conditioning needs to function in an uncontrolled environment. Development and testing of this sensor node focuses on a design with the ability to self check in order to extend calibration times, report internal faults and drifts and notify the overall system when the data acquisition is not performing as it should. All of this will be designed within a system that is flexible, requiring little re-design to be deployed on a wide variety of systems. Progress in this design and initial testing of prototype units will be reported.

Mengers, Timothy R.↗

Project Management Using Modern Guidance, Navigation and Control Theory

The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

Hill, Terry↗

From Diagnosis to Action: An Automated Failure Advisor for Human Deep Space Missions

The major goal of current space system development at NASA is to enable human travel to deep space locations such as Mars and asteroids. At that distance, round trip communication with ground operators may take close to an hour, thus it becomes unfeasible to seek ground operator advice for problems that require immediate attention, either for crew safety or for activities that need to be performed at specific times for the attainment of scientific results. To achieve this goal, major reliance will need to be placed on automation systems capable of aiding the crew in detecting and diagnosing failures, assessing consequences of these failures, and providing guidance in repair activities that may be required. We report here on the most current step in the continuing development of such a system, and that is the addition of a Failure Response Advisor. In simple terms, we have a system in place the Advanced Caution and Warning System (ACAWS) to tell us what happened (failure diagnosis) and what happened because that happened (failure effects). The Failure Response Advisor will tell us what to do about it, how long until something must be done and why its important that something be done and will begin to approach the complex reasoning that is generally required for an optimal approach to automated system health management. This advice is based on the criticality and various timing elements, such as durations of activities and of component repairs, failure effects delay, and other factors. The failure advice is provided to operators (crew and mission controllers) together with the diagnostic and effects information. The operators also have the option to drill down for more information about the failure and the reasons for any suggested priorities.

spacecraft health maintenance↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

Program Options to Explore Ocean Worlds

Including Earth, roughly a dozen water ocean worlds exist in the solar system: the relict worlds Ceres and Mars, vast oceans inside most of the large Jovian and Saturnian icy moons, and Kuiper Belt Objects like Triton, Charon, and Pluto whose geologies are dominated by water and ammonia. Key pieces of the ocean-world science puzzle – which when completed may reveal whether life is widespread in the cosmos, why it exists where it does, and how it originates – are distributed among them. The eventual exploration of all these worlds will yield humanity’s total tangible knowledge about life in the universe, essentially forever. Thus, their exploration has existential significance for humanity’s self-regard, and indeed perhaps of our place in the natural scheme. The matter of planning how to pursue such a difficult and unprecedented exploration opportunity is therefore historic. The technical challenges are formidable, far harder than at Mars: missions to the Jovian and Saturnian ocean worlds are severely power-limited; trip times can be as much as a half decade and decade, respectively. And the science targets are global-scale oceans beneath kilometers of cryogenic ice. Reaching and exploring them would be a multi-generational undertaking, so again it is essential to plan and prepare. Today, we lack the instrumentation, subsystems, and remote operational-intelligence technologies needed to build and use exploration avatars as good as what we can envision needing. Each ocean world holds a piece of the puzzle, but the three priority targets are Europa at Jupiter, and Enceladus and Titan at Saturn. As with the systematic exploration of Mars, exploring these diverse worlds poses a complex technical and programmatic challenge – a strategic challenge – that needs to be designed and managed if each generation is to see its work bear fruit, and if the space science community is to make most effective use of the public money devoted to the quest. Strategic programs benefit from coherence. In only 15 years, the Mars Exploration Program (MEP) has transformed humanity’s view of Mars as a once and future habitable place, a world quite possibly holding relict evidence of life. Finding such evidence, we would study it to know if that life shared an origin common with Earth life. However, life in the ocean worlds could not have shared our origin, so exploring them opens another level in our quest to understand life in the universe: not only to places with vast salt-water seas known to contain organics and hydrothermal seafloors active today, but to places where anything alive cannot be related to us. MEP’s success – from its presence in the public consciousness to its rewriting of planetary habitability – make it an obvious template and source of lessons learned for a viable ocean worlds exploration program (OWEP). Six attributes of the MEP are analyzed for application to a potential OWEP. From this, five hypothetical programmatic scenarios are compared to the default case, and conclusions drawn. A coherent OWEP should have several parts: first, dedicated continuous investment in enabling technologies; and second, two directed-purpose, medium-class (~$1B) missions per decade that conduct pivotal investigations on a documented roadmap. Science could start in 2035, informing development of decadal flagship missions after Europa Clipper, to the places revealed to hold the most promise. The fastest pace of scientific discoveries would require access to high-performance propulsion infrastructure, e.g., the Space Launch System, Falcon Heavy, and high-power in-space solar electric propulsion, all capable of halving trip time. Not including these boosts, such a program would cost about a half-billion dollars more per year than NASA’s existing mission portfolio; the program architecture funded today cannot deliver a strategic OWEP while also sustaining balance among other solar system exploration priorities and opportunities.

Naderi, F.↗

Uncrewed Aerial System Traffic Management Beyond Visual Line of Sight Multi Operator Technology Assessment Simulation

UAS Traffic Management (UTM) is a rapidly evolving space with increasing demand for regulation surrounding more complex operations. Beyond visual line of sight (BVLOS) operations are among these complex operations. The NASA UTM BVLOS sub-project is focusing on enabling more routine BVLOS operations through data collection for support of standards formulation. The Multi Operator Technology Assessment (MOTA) simulation is one of these activities that collects data on BVLOS operations within the same geographical area while sharing operational intents through a USS. Data collected includes workload, situation awareness, and usability on nominal and off-nominal operations. Results of this study are intended to provide recommendations for standards as well as provide insight on improvements to the systems under test. NASA intends to incorporate those improvements into their operations to support and updated BVLOS waiver from the FAA’s Near-Term Approval Process (NTAP).

Bryan J Petty↗

Uncrewed Aerial System Traffic Management Beyond Visual Line of Sight Multi Operator Technology Assessment Simulation

UAS Traffic Management (UTM) is a rapidly evolving space with increasing demand for regulation surrounding more complex operations. Beyond visual line of sight (BVLOS) operations are among these complex operations. The NASA UTM BVLOS sub-project is focusing on enabling more routine BVLOS operations through data collection for support of standards formulation. The Multi Operator Technology Assessment (MOTA) simulation is one of these activities that collects data on BVLOS operations within the same geographical area while sharing operational intents through a USS. Data collected includes workload, situation awareness, and usability on nominal and off-nominal operations. Results of this study are intended to provide recommendations for standards as well as provide insight on improvements to the systems under test. NASA intends to incorporate those improvements into their operations to support and updated BVLOS waiver from the FAA’s Near-Term Approval Process (NTAP).

Bryan J Petty↗

Managing Increased Electric Vehicle Shares on Decarbonized Bulk Power Systems

Transportation electrification and power sector decarbonization - the convergence of these two trends present a complex planning problem requiring realistic, region-specific modeling and analysis to ensure that both can happen rapidly and cost effectively. This project, funded through the U.S. Department of Energy's Vehicle Technologies Office, models the evolution of the U.S. bulk power system (through 2050) in response to large-scale EV charging across all on-road vehicle segments. We will assess the opportunity and value of demand-side flexibility (i.e., "smart" charging) for reducing energy costs, increasing renewable generation shares, and managing future EV loads on the bulk power system. Overall, this study aims to provide an improved understanding of least-cost solutions for managing EV load growth on the grid and will make high-resolution EV load data sets publicly available for further analysis.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

A National Disposal Facility for Radioactive Waste for Iraq - 16610

Radioactive waste resulted in the past in Iraq from a number of nuclear activities and facilities all of them seriously damaged or destroyed during the Gulf war. The task of decommissioning such facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Union (EU), and the United States (US). A national policy for radioactive waste management for Iraq has been drafted by the Ministry of Science and Technology (MoST); a draft strategy for radioactive waste management implementation is in preparation. In this framework, Iraq is considering locating a radioactive waste disposal facility at the Al-Tuwaitha site, near the capital city of Bagdad. In the framework of its Instrument for Nuclear Safety Cooperation the EU has recently started a cooperation project named 'Feasibility Study, Basic Design, and Engineering Design of an Engineered Radioactive Waste Disposal Facility' for Iraq (Project IQ4.01/11). The project aims at producing the design of a repository for the radioactive waste resulting from the decommissioning activities and from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The contract for this cooperation project was awarded by the European Commission in April 2015 to the consortium of two international engineering companies, Nukem Technologies Engineering Services GmbH and DBE Technology GmbH, both of Germany, and Javys a.s., the national waste management agency of Slovakia. The planned Iraqi near-surface repository is constrained by the complex security conditions in the country. This has led to the decision of using whenever possible the Al-Tuwaitha site, were most of the waste is located, as the repository location. The project work will therefore focus on assessing whether and which part of the waste expected to result from the decommissioning and remediation activities is amenable for surface disposal in an appropriately engineered facility. In addition, careful review of the site characteristics shall provide enough elements to justify and validate the political decision of disposing of the waste in Al Tuwaitha. Thereafter, the project work will focus on the conceptual and later the engineering design of the repository. Finally, a Safety Analysis will provide the basis for regulatory decisions about the further steps for realization of the Iraqi final disposal facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultra-Scale Computing for Emergency Evacuation

Emergency evacuations are carried out in anticipation of a disaster such as hurricane landfall or flooding, and in response to a disaster that strikes without a warning. Existing emergency evacuation modeling and simulation tools are primarily designed for evacuation planning and are of limited value in operational support for real time evacuation management. In order to align with desktop computing, these models reduce the data and computational complexities through simple approximations and representations of real network conditions and traffic behaviors, which rarely represent real-world scenarios. With the emergence of high resolution physiographic, demographic, and socioeconomic data and supercomputing platforms, it is possible to develop micro-simulation based emergency evacuation models that can foster development of novel algorithms for human behavior and traffic assignments, and can simulate evacuation of millions of people over a large geographic area. However, such advances in evacuation modeling and simulations demand computational capacity beyond the desktop scales and can be supported by high performance computing platforms. This paper explores the motivation and feasibility of ultra-scale computing for increasing the speed of high resolution emergency evacuation simulations.

99 GENERAL AND MISCELLANEOUS↗

Planner-Based Control of Advanced Life Support Systems

The paper describes an approach to the integration of qualitative and quantitative modeling techniques for advanced life support (ALS) systems. Developing reliable control strategies that scale up to fully integrated life support systems requires augmenting quantitative models and control algorithms with the abstractions provided by qualitative, symbolic models and their associated high-level control strategies. This will allow for effective management of the combinatorics due to the integration of a large number of ALS subsystems. By focusing control actions at different levels of detail and reactivity we can use faster: simpler responses at the lowest level and predictive but complex responses at the higher levels of abstraction. In particular, methods from model-based planning and scheduling can provide effective resource management over long time periods. We describe reference implementation of an advanced control system using the IDEA control architecture developed at NASA Ames Research Center. IDEA uses planning/scheduling as the sole reasoning method for predictive and reactive closed loop control. We describe preliminary experiments in planner-based control of ALS carried out on an integrated ALS simulation developed at NASA Johnson Space Center.

Muscettola, Nicola↗

The Future of Safety Management

As the pace of aviation evolution accelerates, our approach to safety and risk management needs to evolve to cover expanded current day operations as well as participants not traditionally included in the airspace. To assure safety of an increasingly complex aviation system it is essential to leverage new processes and techniques that can more quickly identify and respond to emerging risks. The concept of an In-Time Aviation Safety Management System (IASMS) presents an advanced SMS framework designed to enable integrated safety management and assurance. To assure safety of future aviation operations and technologies, advanced SMS concepts must be designed such that they can evolve to keep pace as aviation continues to change and as new safety and risk management tools and techniques emerge.

safety↗

Incorporating the Role(s) of Human Actors in Complex System Design for Safety and Security

Traditional systems engineering demonstrates the importance of customer needs in scoping and defining design requirements; yet, in practice, other human stakeholders are often absent from early lifecycle phases. Human factors are often omitted in practice when evaluating and down-selecting design options due to constraints such as time, money, access to user populations, or difficulty in proving system robustness through the inclusion of human behaviors. Advances in systems engineering increasingly include non-technical influences into the design, deployment, operations, and maintenance of interacting components to achieve common performance objectives. Furthermore, such advances highlight the need to better account for the various roles of human actors to achieve desired performance outcomes in complex systems. Many of these efforts seek to infuse lessons and concepts from human factors (enhanced decision-making through Crew Resource Management), systems safety (Rasmussen's “drift toward danger”) and organization science (Giddens' recurrent human acts leading to emergent behaviors) into systems engineering to better understand how socio-technical interactions impact emergent system performance. Safety and security are examples of complex system performance outcomes that are directly impacted by varying roles of human actors. Using security performance of high consequence facilities as a representative use case, this article will outline the System Context Lenses to understand how to include various roles of human actors into systems engineering design. Several exemplar applications of this organizing lenses will be summarized and used to highlight more generalized insights for the broader systems engineering community.

42 ENGINEERING↗

Adding Hierarchical Objects to Relational Database General-Purpose XML-Based Information Managements

NETMARK is a flexible, high-throughput software system for managing, storing, and rapid searching of unstructured and semi-structured documents. NETMARK transforms such documents from their original highly complex, constantly changing, heterogeneous data formats into well-structured, common data formats in using Hypertext Markup Language (HTML) and/or Extensible Markup Language (XML). The software implements an object-relational database system that combines the best practices of the relational model utilizing Structured Query Language (SQL) with those of the object-oriented, semantic database model for creating complex data. In particular, NETMARK takes advantage of the Oracle 8i object-relational database model using physical-address data types for very efficient keyword searches of records across both context and content. NETMARK also supports multiple international standards such as WEBDAV for drag-and-drop file management and SOAP for integrated information management using Web services. The document-organization and -searching capabilities afforded by NETMARK are likely to make this software attractive for use in disciplines as diverse as science, auditing, and law enforcement.

Lin, Shu-Chun↗

NMESys: An expert system for network fault detection

The problem of network management is becoming an increasingly difficult and challenging task. It is very common today to find heterogeneous networks consisting of many different types of computers, operating systems, and protocols. The complexity of implementing a network with this many components is difficult enough, while the maintenance of such a network is an even larger problem. A prototype network management expert system, NMESys, implemented in the C Language Integrated Production System (CLIPS). NMESys concentrates on solving some of the critical problems encountered in managing a large network. The major goal of NMESys is to provide a network operator with an expert system tool to quickly and accurately detect hard failures, potential failures, and to minimize or eliminate user down time in a large network.

Nelson, Peter C.↗

Robotics Technologies on Knowledge Management Information Tool (KM-IT) Platform - 16465

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. New information, including vendors and technologies related to D and D, are researched and added to KM-IT on an ongoing basis. In late 2014, DOE EM provided a database of 471 robotic technologies, originally developed by NuVision Engineering and Cogentus Consulting, with a request to evaluate the potential for integrating the data into the KM-IT framework for ongoing hosting/maintenance of the information. All of the data from the original database as well as photographs, documents, and videos are now available on KM-IT. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Magnetospheric MultiScale (MMS) System Manager

The Magnetospheric MultiScale (MMS) mission is an ambitious NASA space science mission in which 4 spacecraft are flown in tight formation about a highly elliptical orbit. Each spacecraft has multiple instruments that measure particle and field compositions in the Earths magnetosphere. By controlling the members relative motion, MMS can distinguish temporal and spatial fluctuations in a way that a single spacecraft cannot.To achieve this control, 2 sets of four maneuvers, distributed evenly across the spacecraft must be performed approximately every 14 days. Performing a single maneuver on an individual spacecraft is usually labor intensive and the complexity becomes clearly increases with four. As a result, the MMS flight dynamics team turned to the System Manager to put the routine or error-prone under machine control freeing the analysts for activities that require human judgment.The System Manager is an expert system that is capable of handling operations activities associated with performing MMS maneuvers. As an expert system, it can work off a known schedule, launching jobs based on a one-time occurrence or on a set reoccurring schedule. It is also able to detect situational changes and use event-driven programming to change schedules, adapt activities, or call for help.

Ground System Expert Automation↗

Annual Storm Water Report for the Y-12 National Security Complex, Oak Ridge, Tennessee

The storm water pollution prevention program at the Y-12 National Security Complex (Y-12 Complex) intends to protect the quality of storm water runoff through: (1) reducing the exposure of metal accumulation areas to precipitation, (2) implementation of Best Management Practices, (3) sampling during rain events and subsequent analysis, and (4) routine surveillances. When prescribed, the analytical data is compared to a set of cut-off concentration values to determine how the Y-12 Complex relates to other metal fabrication industries in the state of Tennessee. The quality of the storm water exiting the Y-12 Complex via East Fork Poplar Creek indicated some improvement in 2011. This improvement is attributable to the completion of several construction, demolition and remediation projects which occurred in 2010 and 2011. Emphasis will continue to be placed on site inspections and the timely implementation of improved storm water control measures as deemed necessary.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗