Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Effects of multiple simultaneous faults on characteristic fault detection features of a heat pump in cooling mode

Faults in air-cooled vapor compression air-conditioning systems are known to reduce performance, including efficiency, capacity, and lifespan. Their effects have been studied, and fault detection and diagnostic (FDD) methods have been developed as tools for field technicians to install or repair systems, or for monitoring to alert operators to the fault’s presence. Most of this work has focused on faults that occur singly. It is likely that in some systems, multiple faults occur simultaneously, but it is uncertain what effects this may have on diagnostics. Here, this paper describes a laboratory study of a split system air source heat pump in which combinations of two, three, and four simultaneous faults occur. The study includes all combinations of: improper evaporator airflow; overcharge or undercharge of refrigerant; liquid line restrictions; and non-condensable gas in the refrigerant, each at multiple fault intensities. Fault features – those characteristics that can be determined from measurements, for use in diagnostics – are analyzed, and the key fault features are presented. A robust existing method for determining refrigerant charge, the virtual refrigerant charge sensor (VRC) is tested using the multiple fault data, in order to understand how its performance is impacted by the combined faults. The VRC performs well, typically able to correctly determine whether a system is undercharged or overcharged, but the magnitude estimates are impacted. The results suggest that simple subcooling-based methods of charging a system are likely to provide unsatisfactory results when other faults are present.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

IAEA Initiatives that Integrate Stakeholders, Models and Decision Making - 18646

The International Atomic Energy Agency (IAEA) has initiated an effort to provide stakeholder support services as part of Phase II of the Constraints to Implementing Decommissioning and Environmental Remediation (CIDER II) programs. The intent of this sub-group of CIDER II is to provide members states support in areas of stakeholder communication, engagement and participation, with the goal of building trust in decommissioning and environmental remediation (D and ER) decisions for radioactive contamination and facilities. IAEA has also initiated a follow-on effort to address Modeling and Data for Radiological Impact Assessments (MODARIA II), which is aimed at enhancing the capabilities of Member States to simulate radionuclide transfer in the environment, and to ensure appropriate levels of protection from ionizing radiation. Working Group 1 of MODARIA II is focused on the integration of modeling and decision analysis. These two groups have complementary and supporting objectives, which provides an opportunity for collaboration and mutual benefit. The technical integrator is the approach of structured decision making, which follows a five-step process that combines stakeholder values with models through a technically defensible decision analysis. Briefly, the steps are: 1. Provide the context and decision context for the problem; 2. Obtain costs, values and concerns from stakeholders, to develop objectives that need to be achieved (e.g., improve human health, minimize costs, increase jobs); 3. Identify options that might achieve the objectives (e.g., cleanup, institutional controls, education); 4. Develop probabilistic models that connect options to objectives so that the objectives can be evaluated collectively (e.g., a fate and transport and risk model to address the objective of reducing human health risk, a cost model to address costs of taking action); and, 5. Model evaluation, including sensitivity analysis, to determine if an action can be taken with sufficient certainty, or if collection of more data is needed to decrease uncertainty before a decision is made. This approach also supports adaptive management as new data are collected. This approach clarifies the roles of stakeholders and subject matter experts in the decision-making process, where stakeholders specify values, and subject matter experts focus on the models that are needed to evaluate the options. It also provides a technically defensible, reproducible, transparent and traceable approach to all of the components necessary to properly solve the types of complex decision problems that plague radioactive waste management, decommissioning and environmental remediation. This paper introduces the major challenges to implementing such a broad scale of decision analysis, and approaches to overcoming those challenges, which include not only the technical challenges, but also the need to develop capacity in a range of skills not usually accommodated in environmental modeling and includes the need for the IAEA to address decision making in different countries, and with different cultures, religions, political affiliations, and languages. This paper explores the potential for IAEA to benefit from both the CIDER II and MODARIA II programs, and hence to develop a fully integrated approach to effective decision making for radioactive waste management and environmental remediation. Note that there are many people involved in these efforts at the IAEA, and credit belongs to those people for the progress that has been made to date. Our intent here is simply to introduce these IAEA programs at the WM2018 Symposium to provide our perspective and some awareness of some of the directions in which IAEA appears to be headed regarding stakeholder engagement, environmental and risk modeling, data science, and decision analysis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status on the Component Models Developed in the Modelica Framework: High-Temperature Steam Electrolysis Plant & Gas Turbine Power Plant

This report has been prepared as part of an effort to design and build a modeling and simulation (M&S) framework to assess the economic viability of a nuclear-renewable hybrid energy system (N-R HES). In order to facilitate dynamic M&S of such an integrated system, research groups in multiple national laboratories have been developing various subsystems as dynamic physics-based components using the Modelica programming language. In fiscal year (FY) 2015, Idaho National Laboratory (INL) performed a dynamic analysis of two region-specific N-R HES configurations, including the gas-to-liquid (natural gas to Fischer-Tropsch synthetic fuel) and brackish water reverse osmosis desalination plants as industrial processes. In FY 2016, INL has developed two additional subsystems in the Modelica framework: a high-temperature steam electrolysis (HTSE) plant and a gas turbine power plant (GTPP). HTSE has been proposed as a high priority industrial process to be integrated with a light water reactor (LWR) in an N-R HES. This integrated energy system would be capable of dynamically apportioning thermal and electrical energy (1) to provide responsive generation to the power grid and (2) to produce alternative industrial products (i.e., hydrogen and oxygen) without generating any greenhouse gases. A dynamic performance analysis of the LWR/HTSE integration case was carried out to evaluate the technical feasibility (load-following capability) and safety of such a system operating under highly variable conditions requiring flexible output. To support the dynamic analysis, the detailed dynamic model and control design of the HTSE process, which employs solid oxide electrolysis cells, have been developed to predict the process behavior over a large range of operating conditions. As first-generation N-R HES technology will be based on LWRs, which provide thermal energy at a relatively low temperature, complementary temperature-boosting technology was suggested for integration with the HTSE process that requires higher temperature input. Simulation results involving several case studies show that the suggested control scheme could maintain the controlled variables (including the steam utilization factor, cathode stream inlet composition, and temperatures of the process streams at various locations) within desired limits under various plant operating conditions. The results also indicate that the proposed HTSE plant could provide operational flexibility to participate in energy management at the utility scale by dynamically optimizing the use of excess plant capacity within an N-R HES. A natural-gas fired GTPP has been proposed as a secondary energy supply to be included in an N-R HES. This auxiliary generator could be used to cover rapid dynamics in grid demand that cannot be met by the remainder of the N-R HES. To evaluate the operability and controllability of the proposed process during transients between load (demand) levels, the dynamic model and control design were developed. Special attention was given to the design of feedback controllers to regulate the power frequency, and exhaust gas and turbine firing temperatures. Several case studies were performed to investigate the system responses to the major disturbance (power load demand) in such a control system. The simulation results show that the performance of the proposed control strategies was satisfactory under each test when the GTPP experienced high rapid variations in the load.

08 HYDROGEN↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Report on the High-Temperature Steam Electrolysis Plant Model Developed in the Modelica Framework (FY17)

This report has been prepared as part of an effort to design and build a modeling and simulation (M&S) framework to assess the economic viability of a nuclear-renewable hybrid energy system (N-R HES). In order to facilitate dynamic M&S of such an integrated system, research groups in multiple national laboratories have been developing various subsystems as dynamic physics-based components using the Modelica programming language. In fiscal year 2015 (FY15), Idaho National Laboratory (INL) performed a dynamic analysis of two region-specific N-R HES configurations, including the gas-to-liquid (natural gas to Fischer-Tropsch synthetic fuel) and brackish water reverse osmosis desalination plants as industrial processes. In FY16, INL developed two additional subsystems in the Modelica framework: (1) a high-temperature steam electrolysis (HTSE) plant as a high priority industrial plant to be integrated with a light water reactor (LWR) within an N-R HES and (2) a gas turbine power plant as a secondary energy supply. In FY17, five new components (i.e., a feedwater pump, a multi-stage compression system, a sweep-gas turbine, flow control valves, and pressure control valves) have been incorporated into the HTSE system proposed in FY16, aiming to better realistically characterize all key components of concern. Special attention has been given to the controller settings based on process models (i.e., direct synthesis method), aiming to improve process dynamics and controllability. A dynamic performance analysis of the improved LWR/HTSE integration case was carried out to evaluate the technical feasibility (load-following capability) and safety of such a system operating under highly variable conditions requiring flexible output. The analysis (evaluated in terms of the step response) clearly shows that the FY17 model resulted in superior output responses with much smaller settling times and less oscillatory behavior in response to disturbances in the electric load than those observed with the FY16 model. Simulation results involving several case studies show that the suggested control scheme could maintain the controlled variables (including the steam utilization factor, cathode stream inlet composition, and temperatures and pressures of the process streams at various locations) within desired limits under various plant operating conditions. The results also indicate that the proposed HTSE plant could provide operational flexibility to participate in energy management at the utility scale by dynamically optimizing the use of excess plant capacity within an N-R HES.

08 HYDROGEN↗

Predicting the impacts of climate change on animal distributions: the importance of local adaptation and species' traits

The geographic range limits of many species are strongly affected by climate and are expected to change under global warming. For species that are able to track changing climate over broad geographic areas, we expect to see shifts in species distributions toward the poles and away from the equator. A number of ecological and evolutionary factors, however, could restrict this shifting or redistribution under climate change. These factors include restricted habitat availability, restricted capacity for or barriers to movement, or reduced abundance of colonists due the perturbation effect of climate change. This research project examined the last of these constraints - that climate change could perturb local conditions to which populations are adapted, reducing the likelihood that a species will shift its distribution by diminishing the number of potential colonists. In the most extreme cases, species ranges could collapse over a broad geographic area with no poleward migration and an increased risk of species extinction. Changes in individual species ranges are the processes that drive larger phenomena such as changes in land cover, ecosystem type, and even changes in carbon cycling. For example, consider the poleward range shift and population outbreaks of the mountain pine beetle that has decimated millions of acres of Douglas fir trees in the western US and Canada. Standing dead trees cause forest fires and release vast quantities of carbon to the atmosphere. The beetle likely shifted its range because it is not locally adapted across its range, and it appears to be limited by winter low temperatures that have steadily increased in the last decades. To understand range and abundance changes like the pine beetle, we must reveal the extent of adaptive variation across species ranges - and the physiological basis of that adaptation - to know if other species will change as readily as the pine beetle. Ecologists tend to assume that range shifts are the dominant response of species to climate change, but our experiments suggest that other processes may act in some species that reduce the likelihood of geographic range change. In the first part of our DOE grant (ending 2008) we argued that the process of local adaptation of populations within a species range, followed by climatic changes that occur too quickly for adaptive evolution, is an underappreciated mechanism by which climate change could affect biodiversity. When this process acts, species ranges may not shift readily toward the poles, slowing the rate of species and biome change. To test this claim, we performed an experiment comparing core and peripheral populations in a series of field observations, translocation experiments, and genetic analyses. The papers in Appendix A were generated from 2005-2008 funding. In the second part of the DOE grant (ending 2011) we studied which traits promote population differentiation and local adaptation by building genomic resources for our study species and using these resources to reveal differences in gene expression in peripheral and core populations. The papers in Appendix B were generated from 2008-2011 funding. This work was pursued with two butterfly species that have contrasting life history traits (body size and resource specialization) and occupy a common ecosystem and a latitudinal range. These species enabled us to test the following hypotheses using a single phylogenetic group.

54 ENVIRONMENTAL SCIENCES↗

LCA of local strategies for energy recovery from waste in England, applied to a large municipal flow

An intense waste management (WM) planning activity is currently undergoing in England to build the infrastructure necessary to treat residual wastes, increase recycling levels and the recovery of energy from waste. From the analyses of local WM strategic and planning documents we have identified the emerging of three different energy recovery strategies: established combustion of residual waste; pre-treatment of residual waste and energy recovery from Solid Recovered Fuel in a dedicated plant, usually assumed to be a gasifier; pre-treatment of residual waste and reliance on the market to accept the 'fuel from waste' so produced. Each energy recovery strategy will result in a different solution in terms of the technology selected; moreover, on the basis of the favoured solution, the total number, scale and location of thermal treatment plants built in England will dramatically change. To support the evaluation and comparison of these three WM strategy in terms of global environmental impacts, energy recovery possibilities and performance with respect to changing 'fuel from waste' market conditions, the LCA comparison of eight alternative WM scenarios for a real case study dealing with a large flow of municipal wastes was performed with the modelling tool WRATE. The large flow of waste modelled allowed to formulate and assess realistic alternative WM scenarios and to design infrastructural systems which are likely to correspond to those submitted for approval to the local authorities. The results show that all alternative scenarios contribute to saving abiotic resources and reducing global warming potential. Particularly relevant to the current English debate, the performance of a scenario was shown to depend not from the thermal treatment technology but from a combination of parameters, among which most relevant are the efficiency of energy recovery processes (both electricity and heat) and the calorific value of residual waste and pre-treated material. The contribution and relative importance of recycling and treatment/recovery processes change with the impact category. The lack of reprocessing plants in the area of the case study has shown the relevance of transport distances for recyclate material in reducing the efficiency of a WM system. Highly relevant to the current English WM infrastructural debate, these results for the first time highlight the risk of a significant reduction in the energy that could be recovered by local WM strategies relying only on the market to dispose of the 'fuel from waste' in a non dedicated plant in the case that the SRF had to be sent to landfill for lack of treatment capacity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coupled Aerodynamic and Hydrodynamic Hybrid Simulation of Floating Offshore Wind Turbines

The development and innovation of floating offshore wind energy in the U.S. requires detailed high-fidelity observations and measurements of turbine and platform loading due to wind, waves, and currents. However, full-scale and quasi-full-scale experiments require significant financial and temporal investments for construction, experimental testing, and long-term field campaigns. To support the commercial advancement of the offshore wind energy industry, specialized wind tunnel and wave basin experimental facilities are critical to be able to test FOWT designs at small scale under controlled conditions prior to full-scale deployment. Oregon State University (OSU) is internationally known as a leader in water and energy research, development, and testing. The O.H. Hinsdale Wave Research Laboratory (HWRL) and the Wallace Energy Systems and Renewables Facility (WESRF) at OSU have extensive experience building, modeling, monitoring, controlling, and actuating scaled systems. Experiments on wave-structure interaction have been performed at the HWRL since its establishment in 1972. Studies have included the interaction of waves with coastal structures (breakwaters, seawalls, buildings, cylinders, bridges, fixed foundations of offshore wind turbines, etc.) and with floating structures (e.g., wave energy converters, maneuvering of vessels, etc.). Hinsdale is actively used by marine energy technology developers, both for private testing and OSU-collaborative research projects. However, despite the availability of several large-scale facilities for hydrodynamic testing (at OSU and elsewhere in the U.S.), existing experimental laboratories are generally limited in their ability to accurately generate combined wind and wave conditions. The simulation of both wind and waves in experimental testing is complicated due to a number of constraints, including: [i] incompatible similitude laws governing the wind and waves for scaled experiments, [ii] producing accurate wind over a large enough control volume via fans, and [iii] generating wind that reasonably represents the atmospheric boundary layer in existing wave basins/flumes. Hence, physical test data providing insight into the simultaneous wave- and wind-structure response of floating offshore wind components can be difficult to generate. Given the aforementioned challenges in classic hydrodynamic experiments, the motivation of this project is to establish a real-time hybrid simulation (RTHS) approach that can apply aero- and hydro-dynamic loading by augmenting wave-only experimental facilities with virtual aerodynamic forces through numerical models representing the remaining dynamic forces. RTHS is a physical-numerical approach that partitions a prototype system into physical and numerical sub-assemblies that interact with each other through actuators and sensors in real time. In coupling physical and numerical models, the hybrid simulation approach applied herein is ideal for problems with: (1) structures subjected to different scaling laws, such as floating offshore wind turbines subjected to combined aero/hydro-dynamic loading, (2) structures that are too large or complex to be tested entirely in a laboratory setting, such as deep-water mooring applications, and (3) component testing, where the behavior of a portion of the assembly is uncertain but still interacts with other portions of the structure, such as testing the fatigue life of turbine blades. Few U.S. experimental facilities are able to test simultaneous aero- and hydro-dynamic loading and none can accurately produce aero/hydro-dynamic response on scaled FOWT models due to conflicting similitude laws between the wind (commonly Reynolds) and the waves (commonly Froude). To aid in accelerating the development of the U.S. floating offshore industry, there is a significant need to develop a flexible, modular framework that can expand the capacities of existing wave-only laboratories. The project goal is to demonstrate a hydrodynamic real-time hybrid simulation (hydro-RTHS) framework that couples numerical wind and physical waves acting on a FOWT, thus representing simultaneous aero/hydro-dynamic loading. The FOWT is partitioned into a full-scale numerical sub-assembly associated with the aerodynamics and a model-scale physical sub-assembly associated with the hydrodynamics. The numerical-physical partition associated with hydro-RTHS mitigates scaling constraints by supplying different scaling laws to the physical and numerical sub-assemblies. Herein, length, force, and time are scaled and exchanged between the sub-assemblies using Froude scaling to represent the open-channel flow in the physical sub-assembly. Other similitude laws could also be utilized depending on the problem definition. It is envisioned that the ability to model FOWTs under waves and wind, with mitigation of similitude distortions, would result in reduced development costs (currently, FOWT concept development is performed with full-size pro- totypes at enormous expense and risk) and increase the reliability of the FOWT industry (since extreme wave and wind conditions and contingency events can be tested safely in a controlled environment).

16 TIDAL AND WAVE POWER↗

Modeling, Analysis, and Control of Demand Response Resources

While the traditional goal of an electric power system has been to control supply to fulfill demand, the demand-side can plan an active role in power systems via Demand Response (DR), defined by the Department of Energy (DOE) as “a tariff or program established to motivate changes in electric use by end-use customers in response to changes in the price of electricity over time, or to give incentive payments designed to induce lower electricity use at times of high market prices or when grid reliability is jeopardized” [29]. DR can provide a variety of benefits including reducing peak electric loads when the power system is stressed and fast timescale energy balancing. Therefore, DR can improve grid reliability and reduce wholesale energy prices and their volatility. This dissertation focuses on analyzing both recent and emerging DR paradigms. Recent DR programs have focused on peak load reduction in commercial buildings and industrial facilities (C&I facilities). We present methods for using 15-minute-interval electric load data, commonly available from C&I facilities, to help building managers understand building energy consumption and ‘ask the right questions’ to discover opportunities for DR. Additionally, we present a regression-based model of whole building electric load, i.e., a baseline model, which allows us to quantify DR performance. We use this baseline model to understand the performance of 38 C&I facilities participating in an automated dynamic pricing DR program in California. In this program, facilities are expected to exhibit the same response each DR event. We find that baseline model error makes it difficult to precisely quantify changes in electricity consumption and understand if C&I facilities exhibit event-to-event variability in their response to DR signals. Therefore, we present a method to compute baseline model error and a metric to determine how much observed DR variability results from baseline model error rather than real variability in response. We find that, in general, baseline model error is large. Though some facilities exhibit real DR variability, most observed variability results from baseline model error. In some cases, however, aggregations of C&I facilities exhibit real DR variability, which could create challenges for power system operation. These results have implications for DR program design and deployment. Emerging DR paradigms focus on faster timescale DR. Here, we investigate methods to coordinate aggregations of residential thermostatically controlled loads (TCLs), including air conditioners and refrigerators, to manage frequency and energy imbalances in power systems. We focus on opportunities to centrally control loads with high accuracy but low requirements for sensing and communications infrastructure. Specifically, we compare cases when measured load state information (e.g., power consumption and temperature) is 1) available in real time; 2) available, but not in real time; and 3) not available. We develop Markov Chain models to describe the temperature state evolution of heterogeneous populations of TCLs, and use Kalman filtering for both state and joint parameter/state estimation. We present a look-ahead proportional controller to broadcast control signals to all TCLs, which always remain in their temperature dead-band. Simulations indicate that it is possible to achieve power tracking RMS errors in the range of 0.26–9.3% of steady state aggregated power consumption. Results depend upon the information available for system identification, state estimation, and control. We find that, depending upon the performance required, TCLs may not need to provide state information to the central controller in real time or at all. We also estimate the size of the TCL potential resource; potential revenue from participation in markets; and break-even costs associated with deploying DR-enabling technologies. We find that current TCL energy storage capacity in California is 8–11 GWh, with refrigerators contributing the most. Annual revenues from participation in regulation vary from $10 to $220 per TCL per year depending upon the type of TCL and climate zone, while load following and arbitrage revenues are more modest at $2 to $35 per TCL per year. These results lead to a number of policy recommendations that will make it easier to engage residential loads in fast timescale DR.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

Financial Analysis of Incentive Mechanisms to Promote Energy Efficiency: Case Study of a Prototypical Southwest Utility

Many state regulatory commissions and policymakers want utilities to aggressively pursue energy efficiency as a strategy to mitigate demand and energy growth, diversify the resource mix, and provide an alternative to building new, costly generation. However, as the National Action Plan for Energy Efficiency (NAPEE 2007) points out, many utilities continue to shy away from aggressively expanding their energy efficiency efforts when their shareholder's fundamental financial interests are placed at risk by doing so. Thus, there is increased interest in developing effective ratemaking and policy approaches that address utility disincentives to pursue energy efficiency or lack of incentives for more aggressive energy efficiency efforts. New regulatory initiatives to promote increased utility energy efficiency efforts also affect the interests of consumers. Ratepayers and their advocates are concerned with issues of fairness, impacts on rates, and total consumer costs. From the perspective of energy efficiency advocates, the quid pro quo for utility shareholder incentives is the obligation to acquire all, or nearly all, achievable cost-effective energy efficiency. A key issue for state regulators and policymakers is how to maximize the cost-effective energy efficiency savings attained while achieving an equitable sharing of benefits, costs and risks among the various stakeholders. In this study, we modeled a prototypical vertically-integrated electric investor-owned utility in the southwestern US that is considering implementing several energy efficiency portfolios. We analyze the impact of these energy efficiency portfolios on utility shareholders and ratepayers as well as the incremental effect on each party when lost fixed cost recovery and/or utility shareholder incentive mechanisms are implemented. A primary goal of our quantitative modeling is to provide regulators and policymakers with an analytic framework and tools that assess the financial impacts of alternative incentive approaches on utility shareholders and customers if energy efficiency is implemented under various utility operating, cost, and supply conditions.We used and adapted a spreadsheet-based financial model (the Benefits Calculator) which was developed originally as a tool to support the National Action Plan for Energy Efficiency (NAPEE). The major steps in our analysis are displayed graphically in Figure ES- 1. Two main inputs are required: (1) characterization of the utility which includes its initial financial and physical market position, a forecast of the utility?s future sales, peak demand, and resource strategy to meet projected growth; and (2) characterization of the Demand-Side Resource (DSR) portfolio ? projected electricity and demand savings, costs and economic lifetime of a portfolio of energy efficiency (and/or demand response) programs that the utility is planning or considering implementing during the analysis period. The Benefits Calculator also estimates total resource costs and benefits of the DSR portfolio using a forecast of avoided capacity and energy costs. The Benefits Calculator then uses inputs provided in the Utility Characterization to produce a ?business-as usual? base case as well as alternative scenarios that include energy efficiency resources, including the corresponding utility financial budgets required in each case. If a decoupling and/or a shareholder incentive mechanism are instituted, the Benefits Calculator model readjusts the utility?s revenue requirement and retail rates accordingly. Finally, for each scenario, the Benefits Calculator produces several metrics that provides insights on how energy efficiency resources, decoupling and/or a shareholder incentive mechanism impacts utility shareholders (e.g. overall earnings, return on equity), ratepayers (e.g., average customer bills and rates) and society (e.g. net resource benefits).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Drought Understanding, Monitoring and Prediction

Having the capacity to monitor droughts in near-real time and providing accurate drought prediction from weeks to seasons in advance can greatly reduce the severity of social and economic damage caused by drought, a leading natural hazard for North America. The congressional mandate to establish the National Integrated Drought Information System (NIDIS; Public Law 109-430) in 2006 was a major impulse to develop, integrate, and provide drought information to meet the challenges posed by this hazard. Significant progress has been made on many fronts. On the research front, efforts by the broad scientific community have resulted in improved understanding of North American droughts and improved monitoring and forecasting tools. We now have a better understanding of the droughts of the twentieth century including the 1930s "Dust Bowl"; we have developed a broader array of tools and datasets that enhance the official North American Drought Monitor based on different methodologies such as state-of-the-art land surface modeling (e.g., the North American Land Data Assimilation System) and remote sensing (e.g., the evaporative stress index) to better characterize the occurrence and severity of drought in its multiple manifestations. In addition, we have new tools for drought prediction [including the new National Centers for Environmental Prediction (NCEP) Climate Forecast System, version 2, for operational prediction and an experimental National Multimodel Ensemble] and have explored diverse methodologies including ensemble hydrologic prediction approaches. Broad NIDIS-inspired progress is influencing the development of a Global Drought Information System (GDIS) under the auspices of the World Climate Research Program. Despite these advances, current drought monitoring and forecasting capabilities still fall short of users' needs, especially the need for skillful and reliable drought forecasts at regional and local scales. To tackle this outstanding challenging problem, focused and coordinated research efforts are needed, drawing from excellence across the broad drought research community. To meet this challenge, National Oceanic and Atmospheric Administration (NOAA)'s Drought Task Force was established in October 2011 with the ambitious goal of achieving significant new advances in the ability to understand, monitor, and predict drought over North America. The Task Force (duration of October 2011-September 2014) is an initiative of NOAA's Climate Program Office Modeling, Analysis, Predictions, and Projections (MAPP) program in partnership with NIDIS. It brings together over 30 leading MAPP-funded drought scientists from multiple academic and federal institutions [involves scientists from NOAA's research laboratories and centers, the National Aeronautics and Space Administration (NASA), U.S. Department of Agriculture, National Center for Atmospheric Research (NCAR), and many universities] in a concerted research effort that builds on individual MAPP research projects. These projects span the wide spectrum of drought research needed to make fundamental advances, from those aimed at the basic understanding of drought mechanisms to those aimed at testing new drought monitoring and prediction tools for operational and service purposes (as part of NCEP's Climate Test Bed). The Drought Task Force provides focus and coordination to MAPP drought research activities and also facilitates synergies with other national and international drought research efforts, including those by the GDIS.

GDIS↗

Insights into Methodologies and Stochastic Optimization of Thermal Energy Storage-Coupled Advanced Reactor Systems: A Comparison of Methods for Accessing Long-Term Sub-System Sizing Adequacy

This paper investigates the potential of coupling Thermal Energy Storage (TES) with Advanced Reactors (ARs) to address uncertainties posed by climate change in deep decarbonized power systems. The TES Use-case Team at Idaho National Laboratory (INL) has examined the potential of storing thermal energy from ARs during low demand periods and optimizing discharge during peak-priced hours, in both steady-state and transient conditions. Building on this groundwork, this study bridges the gaps in optimal sizing of the sub-system of TES-coupled AR systems using Risk Analysis Virtual Environment (RAVEN) and Holistic Energy Resource Optimization Network (HERON), INL?s framework for grid optimization. By applying this framework, we present statistically-robust optimal charge, discharge including balance of plant (BOP), and storage sizing for the High-Temperature Gas-Cooled Reactor (HTGR) with 203 MWth output. To this end, we generated synthetic price samples for 30 years using 2018 ? 2021 real-time market data from ERCOT, PJM and MISO. Our results reveals that the TES-coupled HTGR system is highly effective in maximizing revenue from electricity sales. We observed a substantial increase of 40 % in ERCOT and a noteworthy 15 % increase in PJM and MISO when compared to the conventional BOP without TES. This improvement is achieved through regionally-tailored sub-system sizing, which ranges from 398 to 416 MWth for the discharge system and 610 to 1029 MWth for the TES. We find that the average electricity price directly impacts the overall economics, while price volatility influences storage size. Additional sensitivity analyses were performed to access the impact of key assumptions on system economics and sizing, differentiating the optimization window (i.e., 24 ? 219 hours of chronological observations) and by imposing storage continuity condition in tracking TES cycles. We observed that at the 120-hour of the optimization window, a reasonable balance between computation time and accuracy was achieved. Our analysis also highlights the significance of conducting multi-day cycle analysis (> 120-hour) for TES to capture interaction between electricity prices and storage dynamics, providing a comprehensive understanding of TES behavior that AR developers should integrate into their plant designs.

25 ENERGY STORAGE↗

Explainable Artificial Intelligence Technology for Predictive Maintenance

The domestic nuclear power plant fleet has relied on labor-intensive and time-consuming preventive maintenance programs, thus driving up operation and maintenance costs to achieve high-capacity factors. Artificial intelligence and machine learning can help simplify complex problems, such as diagnosing equipment degradation, to enable more effective decision-making. Benefits will be felt not only within existing analog and digital instrumentation and control, but also work processes, the integration of people with technology, and most importantly, the business case. Together, these hold promise to make nuclear power more efficient and reduce costs associated with operation and maintenance. While the artificial intelligence and machine learning technologies hold significant promise in the nuclear industry, there are challenges or barriers to their adoption. This report outlines the those different machine learning adoption barriers (categorized as historical, technical, economic, regulatory, and user) that the industry must overcome to realize the full benefits of artificial intelligence and machine learning capabilities for long-term economic sustainability. This report also provides solutions for some of these barriers by focusing on improving the explainability of machine learning to encourage trust from the end-user. Trust and explainability are essential to machine learning adoption. This report focuses on research-developed solutions to some of these barriers while analyzing a non-safety-related system, namely the circulating water system. This system frequently experiences waterbox fouling which our models preemptively diagnoses then explains to the operator how those conclusions were reached. This report presents and discusses the inherent trade-off between machine learning performance (in terms of accuracy) and explainability, where highly accurate machine learning methods (such as deep-learning) are the least explainable, and the most explainable methods (such as decision trees) are the least accurate. In addition, explainability of artificial intelligence techniques in terms of transparency and post-hoc metrics are discussed. This report outlines the importance of data novelty and value of new information in evaluating both the explainability and trustworthiness. Novelty detection helps to establish consistency or inconsistency of the new data with respect to the training data. On the other hand, value of information could be a part of the user-centric visualization recommendation system that request additional information to be collected, thereby strengthening the machine learning outcomes. During this project, a copyrighted user-centric visualization that aligns with a human-in-the-loop approach was developed. The user-centric visualization presents different levels of information and can be tailored as per user credentials to gain user confidence. One of the salient features of the user-centric visualization is it presents machine learning methods with explainability metrics. A simplified version of the user-centric visualization was presented to 32 users with varying levels of machine learning expertise. Feedback was solicited to test the hypothesis that the app contained sufficient explainability and that the users would trust the algorithm. Overall, the app was positively received, and the hypothesis was supported. This report discusses the trust-but-verify framework – a potential approach to build user trust artificial intelligence. The framework discusses trust from the human level to artificial intelligence level. The fundamental premise of the trust but verify framework is derived from an observation of nuclear safety culture (i.e., nuclear power plant personnel do not rely on a singular source of data to make a decision). This also ties back to the user-centric visualization that presents different levels of information to achieve both explainability and trustworthiness of artificial intelligence. Even so, the adoption of artificial intelligence and machine learning in the nuclear industry faces additional barriers, namely regulatory and stakeholder readiness. To overcome these challenges, new solutions must gain regulatory approval and cater to stakeholder needs. The Nuclear Regulatory Committee has a 5-year strategic plan which prepares them for reviewing artificial intelligence technologies in licensee submissions. Early and frequent engagement with the regulator is encouraged. Additionally, artificial intelligence solutions should incorporate human-in-the-loop considerations and offer explainability. Stakeholders must prepare by hiring or training staff to adapt to advancing technology in everyday plant tasks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resolving the Issues with Flywheel Position Sensors

For the past few years, the Advanced Electrical Systems Branch here at NASA Glenn has been pursuing research in the area of flywheels. The purpose of these pursuits has been t o explore the potential for flywheels to replace current battery-powered systems in space. So far it has been learned that flywheels offer large momentum storage capacity, comparatively small volume, high durability, and near- complete discharge capabilities, all of which are advancements over the existing nickel hydrogen and nickel cadmium batteries. Another significant advantage of flywheels is the potential they offer for combining the function of attitude control with energy storage. During the summer of 2004, I worked with Dr. Barbara Kenny in the Advanced Electrical Systems Branch, supporting the work she is doing by analyzing and testing some new components for the new Generation-2 flywheel. To monitor the speed and angular position of the flywheel rotor, a once-around (OAR) signal along with a sensorless algorithm is used. The OAR signal is used for the magnetic bearings that keep the flywheel suspended for frictionless operation. The sensorless algorithm is used for the flywheel motor/generator control. The OAR is generated from position sensors that monitor a circular plate. The plate has a cut down the middle such that one half of the circle is on a slightly lower level than the other. Every half-turn, or 180, the sensors detect the "cut" on the plate, and trigger the OAR, telling the computer that the rotor has made half a revolution. This, however, doesn't provide needed detailed information about the angular position of the rotor, since it only provides a signal alert every half- revolution. This is enough information for the magnetic bearing control but is insufficient for the motor/generator control. A new resolver was designed such that it would give continuous angle information rather than the 180 degree information of the OAR. The new resolver has two separate observable pieces: a flat middle section to monitor vertical motion, and an angled section around the circumference, which, when observed from above, produces a sine-wave displacement through the entire 360" revolution. My first job when I arrived this summer was to calibrate the sensors that would be mounted on the inside of the flywheel casing to monitor the position (angular and vertical) of the shaft. After calibration, I used the sensors to evaluate voltage outputs created by position differences between two pairs of sensors on the angled portion of the resolver for eight different angular positions, moving the resolver vertically and laterally through its entire potential range of motion. The results of these tests will be used to determine the rotor angular (and axial) position from the sensor readings once the new flywheel unit is assembled. The sensorless algorighm mentioned above consists of two operations: the signal injection method and the back electro-motive force (EMF). The signal injection is meant to work at low speeds, while the back EMF algorithm is meant to work at higher speeds. Both work together to determine the correct estimate of rotor position and speed based on the measured motor/generator current. It was determined that we wanted to know exactly how accurate our estimation methods were, and so a resolver (a commercially available mechanical sensor mounted to the motor/generator shaft to measure rotor position and speed) and a "Resolver to Digital" (R2D) circuit board was purchased to make the comparison to the existing estimation. My work related to the R2D board has included the following: creating two connector cables (one to power the circuit and one to get readable output off the board), writing Simulink code to process the board's output, and building a dSpace panel to control and monitor the circuit. The next step in the process will be to perform tests to compare the estimated rotor position and speed from the sensorless algorithm to the actual rotor and speed from the resolver signal.

Fehrmann, Elizabeth A.↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗