Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2008”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Tools, Feasibility, and Cost of Monitoring Plan (SECARB Phase III 9.1.1a, b, c, d, e, f, g)

This report completes several Phase III milestone reporting obligations in Subtask 9.1.1 and Budget Period 3 general reporting requirements, specifically Phase III milestone 9.1.1. g "Subsurface Monitoring Plan" with subparts a-g, Assessment of Feasibility, Cost & Likely Success of Cross-Well EM, crosswell acoustic, CASSM, VSP, borehole logging, repeat seismic, geochemical monitoring, and related methods and backup and archival methods. This report builds on work done for Phase II and in the first year of Phase III and reflects the integration of results of a teamwide planning meeting held in Austin at the Bureau of Economic Geology (BEG) April 8–9, 2008, and a planning and review meeting held September 23, 2008. This report provides the consensus plan for site-specific characterization and monitoring that were used to guide engineering design. The team expected that further plan modifications would be required during the engineering design, cost evaluation, and timeline adjustment that will occur prior to drilling and installation. This report was then updated to include additional adjustments needed as site characterization data were gathered during fieldwork in the summer of 2009 and as the design was finalized.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership (SECARB): Analyze Data Collected, Revise Surface Monitoring Plan to Maximize Benefit and Continue Data Collection

Objectives of the shallow groundwater study at the Cranfield site since 2008, as a part of the SECARB Phase III early test, were to 1) assess potential impacts of CO 2 leakage on groundwater quality; and 2) test and develop monitoring technologies for CO 2 leakage detection. The study did not intend to seek CO2 leakage signals via monitoring groundwater chemistry in the Cranfield shallow aquifer. Instead, quarterly or semi-annually groundwater sampling from the shallow aquifer was used to characterize spatial and temporal variations in geochemical parameters because CO 2 injection into the deep reservoir started in 2008.

01 COAL, LIGNITE, AND PEAT↗

SECARB Semi-Annual Field Review Reports - Early Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). BEG was assisted in the management of site activities by Sandia Technologies (Sandia). BEG and Sandia implemented reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semiannual chronology. The Cranfield Project was located approximately 12 miles east of Natchez, Mississippi. Denbury Onshore, LLC, began operating a commercial CO 2 flood of the field (using the subsurface injection of CO 2 for EOR) in June 2008. Carbon dioxide from the Jackson Dome, a natural source near Jackson, Mississippi, was delivered to the Cranfield oilfield via pipeline. Beginning in October 2008, the SECARB Early Test team characterized the surface and subsurface of the Cranfield site. During the field test CO 2 was injected into the lower Tuscaloosa Formation, a regionally extensive saline formation with the potential to hold millions of tons of CO 2 emissions. By January 2015, the team injected more than 11 million metric tons of CO 2 and monitored a total stored CO 2 mass of 5,326,975 metric tons. SECARB’s study operations occurred in four integrated research program areas within Cranfield field: (1) the High Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” Carbon dioxide injection activities were conducted at the HiVIT and the DAS. Figure 1.1-1 provides a depiction of the DAS.

01 COAL, LIGNITE, AND PEAT↗

Sources of price dispersion in U.S. residential solar installations

Prices of solar PV have dropped dramatically, by half in just the past 6 years. But looking simply at prices paid today, there is considerable heterogeneity. For systems installed in 2014, the 10-90 percentile range for the observed $/W spans nearly a factor of 2. This apparent price dispersion raises policy relevant questions, such as: why are consumers paying more than they need to? And would better-informed consumers increase the social benefits of solar PV? This paper analyzes price dispersion in U.S. residential PV installations between 2008 and 2014. Focusing on the most commonly used metric in previous studies of price dispersion, we use the quarterly coefficient of variation (CV) as our measure of price dispersion. We find higher levels of price dispersion in our data (0.22) than the average of 55 previous studies we reviewed (0.16). We also find that price dispersion has been persistent; it has remained above 0.15 since 2000 with no trend over that period. If anything, price dispersion has been increasing recently during the period for which we have complete data, 2008-14. Econometric analysis of the factors affecting price dispersion supports theories from the economic literature focusing on access to information and the costs and benefits of consumer search. Factors that increase the consumer payoffs of investing time in searching for information—system size and the value of solar— are associated with lower levels of price dispersion. Factors that reduce the costs of search—neighbors who have recently installed solar and having third-party quotes available—are also associated with less price dispersion. These results provide support for the importance of public efforts to enhance access to price information, e.g. by supporting private sector price quote providers. The results also point to the particular need for information in nascent markets for PV in which access to the experience of neighbors is not available.

14 SOLAR ENERGY↗

Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada, Revision 0, with ROTC-1

Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Waste Disposal Sites” and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: • CAS 03-35-01, Burn Pit • CAS 04-08-02, Waste Disposal Site • CAS 04-99-01, Contaminated Surface Debris • CAS 06-19-02, Waste Disposal Site/Burn Pit • CAS 06-19-03, Waste Disposal Trenches • CAS 09-23-01, Area 9 Gravel Gertie • CAS 09-34-01, Underground Detection Station • Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.

54 ENVIRONMENTAL SCIENCES↗

Fast Timing Counters for PSEC: MOU for Testing at MTEST

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and University of Chicago, Argonne National Laboratory (ANL), Saclay/lRFU and the University of Hawaii experimenters who have committed to participate in beam tests to be carried out during the 2008 Meson Test Beam Facility program. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate the appropriate amendments to this memorandum if adjustments are required. The experimenters require beam time at Fermilab during the 2008 Meson Test Beam Run to test time-of-flight particle detectors with the ultimate goal of achieving 1 psec timing resolution. Proposed applications are: diffractive Higgs production background reduction at the LHC; measuring the momentum of muons before and after a 6D cooling setup as proposed by the MANX experiment; particle identification at a Super-B factory, LHC detector upgrades, possible third generation Tevatron Collider flavor experiments, precision kaon measurements, and astro-particle experiments. In addition, the development and testing of the associated electronics and timing algorithms may be directly applicable to advances in medical imaging. Much more information can be found at the PSEC web site, at http://hep.uchicago.edu/psec/.

43 PARTICLE ACCELERATORS↗

Secure Storage: Historical Documentation of TA-08-0032, TA-11-0036, TA-22-0016, TA-22-0023, TA-22-0025, TA-22-0035, TA-37-0006, TA-37-0009, and TA-37-0020

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (NA-LA), is pursuing the decommissioning and demolition (D&D) of facilities contaminated with high-explosives residues at the Los Alamos National Laboratory (Laboratory or LANL). This effort affects nine facilities associated with high-explosives and detonator research, development, and storage: Technical Area (TA) 8 Facility 32 (TA-08-0032), TA-11-0036, TA-22-0016, TA-22-0023, TA-22-0025, TA-22-0035, TA-37-0006, TA-37-0009, and TA-37-0020. All nine facilities proposed for D&D have been evaluated for listing in the National Register of Historic Places (NRHP) and determined eligible. NA-LA previously requested the State Historic Preservation Officer (SHPO) to concur with the NRHP-eligibility determinations of these nine properties presented in four reports: (1) TA-08-0032 was determined eligible for listing in the NRHP in the report, From Ranching to Radiography: An Assessment of Historic Buildings at Anchor West Site (TA-8), Vol. 1 (McGehee et al. 2008a). The SHPO concurred with this eligibility determination on November 26, 2008. (2) TA-11-0036 was determined eligible for listing in the NRHP in the report, ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16, Vol. 1) (McGehee et al. 2003). The SHPO concurred with this eligibility assessment on June 22, 2003. (3) TA-22-0016, TA-22-0023, TA-22-0025, and TA-22-0035 were determined eligible for listing in the NRHP in the report, DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69, Vol. 1 (McGehee et al. 2005a). The SHPO concurred with these eligibility determinations on April 18, 2006. (4) TA-37-0006, TA-37-0009, and TA-37-0020 were determined eligible for listing in the NRHP in the report, High Explosives and the Nuclear Stockpile: An Assessment of Historic Buildings at Magazine Area C (TA-37), Vol. 1 (McGehee et al. 2008b). The SHPO concurred with these eligibility determinations on April 17, 2008. In a letter dated January 24, 2020, NA-LA acknowledged that the D&D of these nine NRHP-eligible facilities was an adverse effect that requires resolution through mitigation. NA-LA proposed the use of standard mitigation practices as defined in the Programmatic Agreement (PA) among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office, and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico. The PA states that adverse effects to NRHP-eligible buildings and structures will be resolved according to the standard practices defined in Part II, Section 10, of the Laboratory’s Cultural Resources Management Plan, A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (Purtzer et al. 2019), and Section 2.B of Appendix D of the PA itself. The standard practice documentation package includes the following components: (1) Interior and exterior photography and production of archival-quality digital photographs; (2) Documentation and curation of historically significant equipment and artifacts; (3) A list of all known drawings for the property; (4) Reduced-scale reproductions of selected drawings for the property; (5) A location map that shows the location of the property relative to the entire Laboratory property; (6) Reproduction of historical TA maps; (7) A TA map that depicts the footprint of each eligible and non-eligible facility; and (8) An expanded historic context that uses oral-history interviews, if available. On March 3, 2020, the SHPO concurred with the adverse effect determination and the mitigation plan. The documentation package, as previously described, is provided in Volumes 1 and 2 of this report.

99 GENERAL AND MISCELLANEOUS↗

Tracking Aerosol Convection Interactions Experiment (TRACER) Field Campaign Report

Convective clouds serve a critical role in the Earth’s energy and water cycles through their transport of heat, moisture, momentum, and chemical species through the troposphere driving the global circulation (e.g., Hartmann et al. 1984, Del Genio et al. 2012, Su et al. 2014). On more local scales, convective clouds impact the atmospheric heating profile through diabatic heating effects, removal of water from the atmospheric column through precipitation, and conditioning of the local environment impacting further development of clouds (e.g., Sullivan and Voigt 2021). These critical roles underscore the importance of realistic representation of convective processes across scales of models from large-eddy simulation (LES), to convection-permitting models (CPM; e.g., Kendon et al. 2020, Marinescu et al. 2021), to numerical weather prediction (NWP) models used for operational weather forecasting, to Earth system models used to predict climate sensitivity (Sanderson et al. 2011, Sherwood et al. 2014, Tomassini et al. 2014, Zhao et al. 2016, Cronin et al. 2017). A key component of improving model representation of convective clouds is better quantification and parameterization of updraft microphysics and dynamics, including their interactions with the surrounding environment and storm organization (Bony et al. 2015, Hagos and Houze 2016, Donner et al. 2016, Morrison et al. 2020). Aerosol is an important environmental factor that could affect convective clouds and precipitation since cloud droplet and ice formation processes are initiated by it. Andrae et al. (2004) hypothesized that aerosols associated with increased biomass burning particles acting as cloud condensation nuclei (CCN) result in smaller and more monodisperse cloud droplets leading to suppression of warm rain formation, ultimately leading to more cloud water being lofted above the freezing level based on observations in the Amazon region. The subsequent increase in latent heat release increases the buoyancy of rising convective parcels invigorating the deep convection. This work was followed by a description of the theoretical basis for this “cold-phase invigoration” by Rosenfeld et al. (2008), who argued that it could have a significant effect for deep convective clouds with warm cloud-bases. Several modeling studies (e.g., Khain et al. 2005, 2009, van den Heever et al. 2006, Fan et al. 2007, 2009, 2012, Lee et al. 2008, Storer et al. 2010, Lebo et al. 2012, Storer and van den Heever 2013, Chen et al. 2020, Dagan et al. 2022) have investigated these aerosol-convection interactions and the environmental factors that influence their relative importance and magnitude. More recently, several studies have indicated that “warm-phase invigoration”, the enhancement of convection through condensational heating, also appears to play a role in enhancing both shallow cumuli (Seiki and Nakajima 2014, Saleeby et al 2015) and deeper tropical convection (Lebo and Seinfeld 2011, Khain et al. 2012, Sheffield et al 2015, Fan et al. 2018, Igel and van den Heever 2021), as well as Houston thunderstorms (Fan et al. 2007, 2020). However, still other studies have provided additional evidence of systematic biases in simulated convective outflow ice size distribution properties, which are consistent with a lack of poorly understood secondary ice production within convective updrafts (e.g., Fridlind et al. 2017). To help address these critical gaps in our understanding of cloud processes, aerosol processes and aerosol-cloud interactions, the Tracking Aerosol Convection Interactions Experiment was designed building upon efforts by the Aerosol, Cloud, Precipitation and Climate (ACPC) Initiative (http://acpcintiative.org/), a joint effort of the International Geosphere-Biosphere Programme (IGBP) and the World Climate Research Program (WCRP) that focused on resolving uncertainties in the interactions between aerosol and clouds towards better understanding the role that these interactions play in the climate system. The TRACER campaign was motivated by recommendations from a number of pilot studies undertaken by ACPC (van den Heever et al. 2017, Fridlind et al. 2019, Hu et al. 2019, Fan et al. 2020, Marinescu et al. 2021, Hernandez-Deckers et al. 2022) that pointed towards the southeastern Texas region as a locale where aerosol-convection interactions could be studied owing to the copious occurrence of isolated convection during the summer months accompanied by diverse and significant sources of aerosols from both anthropogenic and natural sources. The TRACER campaign began on 01 October 2021 and extended through 30 September 2022 with an intensive operational period (IOP) during June-September 2022. Three main sites (Table 1) were managed by the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility.

54 ENVIRONMENTAL SCIENCES↗

E-Area Low-Level Waste Facility Multitiered Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E-Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit (DU) options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA) issued back in 2008 (WSRC 2008), along with several subsequent supporting Special Analyses (SAs). The Savannah River National Laboratory (SRNL) developed the prior PAs and SAs and was tasked to update the facility’s upcoming PA, most likely to be issued during FY2023. For operating the E-Area facility, a Consolidated Waste Tracking System (CWTS) is actively employed by waste generators where every radionuclide entering the facility, to be buried in one of its many DUs1, must be either directly or indirectly tracked. Since there are many radionuclides in existence (>3,000), the International Commission on Radiological Protection (ICRP), specially ICRP Publication 107, has provided guidance on the subset of radionuclides requiring further assessment in landfills such as the ELLWF. The ICRP 107 publication provides critical radiological information on 1,252 radionuclides consisting of 97 elements. This database, along with the current dose coefficients that have been developed for these radionuclides in DOE-STD-1196-2011 (DOE 2011), is the critical starting point for developing a consistent inventory limit system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2016

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and monitored by Mission Support Alliance in 2016. Site monitoring is a continuance of efforts performed by RCCC (2008 through 2015). The report contains data documenting the success status of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of National Priorities List waste sites at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for seventeen sites selected to be representative sites for larger areas planted between the years of 2008 through 2015.

54 ENVIRONMENTAL SCIENCES↗

Mass dependence of overshooting beneath convective envelopes

State of the art stellar evolution codes [Paxton et al., 2010, Demarque et al., 2004, Weiss and Schlattl, 2008, Siess et al., 2013, Christensen-Dalsgaard, 2008] evoke a diffusive process to model convective overshooting. The diffusion coefficient [Freytag et al., 1996, Pratt et al., 2017] used in the model can be set to change with the classification of the convective zone as non-burning, H-burning, He-burning, or metal-burning. It can also be set to change at defined evolutionary points, such as the bottom of the asymptotic giant branch, or during the third dredge up [Herwig, 2000, Lugaro et al., 2003]. Aside from these abrupt changes, the diffusion coefficient is typically locked to a percentage of the pressure scale height measured at the convective boundary. However, there is no theoretical reason for convective overshooting, or indeed other convective properties, to change in the same way that the pressure scale height changes as a star evolves.

79 ASTRONOMY AND ASTROPHYSICS↗

Interim report on fuel cycle neutronics code development.

As part of the Global Nuclear Energy Partnership (GNEP), a fast reactor simulation program was launched in April 2007 to develop a suite of modern simulation tools specifically for the analysis and design of sodium cooled fast reactors. The general goal of the new suite of codes is to reduce the uncertainties and biases in the various areas of reactor design activities by enhanced prediction capabilities. Under this fast reactor simulation program, a high-fidelity deterministic neutron transport code named UNIC is being developed. The final objective is to produce an integrated, advanced neutronics code that allows the high fidelity description of a nuclear reactor and simplifies the multi-step design process by direct coupling with thermal-hydraulics and structural mechanics calculations. Currently there are three solvers for the neutron transport code incorporated in UNIC: PN2ND, SN2ND, and MOCFE. PN2ND is based on a second-order even-parity spherical harmonics discretization of the transport equation and its primary target area of use is the existing homogenization approaches that are prevalent in reactor physics. MOCFE is based upon the method of characteristics applied to an unstructured finite element mesh and its primary target area of use is the fine grained nature of the explicit geometrical problems which is the long term goal of this project. SN2ND is based on a second-order, even-parity discrete ordinates discretization of the transport equation and its primary target area is the modeling transition region between the PN2ND and MOCFE solvers. The major development goal in fiscal year 2008 for the MOCFE solver was to include a two-dimensional capability that is scalable to hundreds of processors. The short term goal of this solver is to solve two-dimensional representations of reactor systems such that the energy and spatial self-shielding are accounted for and reliable cross sections can be generated for the homogeneous calculations. In this report we present good results for an OECD benchmark obtained using the new two-dimensional capability of the MOCFE solver. Additional work on the MOCFE solver is focused on studying the current parallelization algorithms that can be applied to both the two- and three-dimensional implementations such that they are scalable to thousands of processors. The initial research into this topic indicates that, as expected, the current parallelization scheme is not sufficiently scalable for the detailed reactor geometry that it is intended for. As a consequence, we are starting the investigative research to determine the alternatives that are applicable for massively parallel machines. The major development goal in fiscal year 2008 for the PN2ND and SN2ND solvers was to introduce parallelism by angle and energy. The motivation for this is two-fold: (1) reduce the memory burden by picking a simpler preconditioner with reduced matrix storage and (2) improve parallel performance by solving the angular subsystems of the within group equation simultaneously. The solver development in FY2007 focused on using PETSc to solve the within group equation where only spatial parallelization was utilized. Because most homogeneous problems required relatively few spatial degrees of freedom (tens of thousands) the only way to improve the parallelism was to spread the angular moment subsystems across the parallel system. While the coding has been put into place for parallelization by space, angle, and group, we have not optimized any of the solvers and therefore do not give an assessment of the achievement of this work in this report. The immediate task to be completed is to implement and validate Tchebychev acceleration of the fission source iteration algorithm (inverse power method in this work) and optimize both the PN2ND and SN2ND solvers. We further intend to extend the applicability of the UNIC code by adding a first-order discrete ordinates solver termed SN1ST. Upon completion of this work, all memory usage problems are to be identified and studied in the solvers with the intent of making the new version of an exportable production code in either FY2008 or FY2009. This report covers the status of these tasks and discusses the work yet to be completed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ionization Cooling using Parametric Resonances

Ionization Cooling using Parametric Resonances was an SBIR project begun in July 2004 and ended in January 2008 with Muons, Inc., (Dr. Rolland Johnson, PI), and Thomas Jefferson National Accelerator Facility (JLab) (Dr. Yaroslav Derbenev, Subcontract PI). The project was to develop the theory and simulations of Parametric-resonance Ionization Cooling (PIC) so that it could be used to provide the extra transverse cooling needed for muon colliders in order to relax the requirements on the proton driver, reduce the site boundary radiation, and provide a better environment for experiments. During the course of the project, the theoretical understanding of PIC was developed and a final exposition is ready for publication. Workshops were sponsored by Muons, Inc. in May and September of 2007 that were devoted to the PIC technique. One outcome of the workshops was the interesting and somewhat unexpected realization that the beam emittances using the PIC technique can get small enough that space charge forces can be important. A parallel effort to develop our G4beamline simulation program to include space charge effects was initiated to address this problem. A method of compensating for chromatic aberrations by employing synchrotron motion was developed and simulated. A method of compensating for spherical aberrations using beamline symmetry was also developed and simulated. Different optics designs have been developed using the OptiM program in preparation for applying our G4beamline simulation program, which contains all the power of the Geant4 toolkit. However, no PIC channel design that has been developed has had the desired cooling performance when subjected to the complete G4beamline simulation program. This is believed to be the consequence of the difficulties of correcting the aberrations associated with the naturally large beam angles and beam sizes of the PIC method that are exacerbated by the fringe fields of the rather complicated channel designs that have been attempted. That is, while the designs developed and tested using the matrix program OptiM can work well, a real simulation with lumped dipoles, quadrupoles, and solenoids and their associated fringe fields has not succeeded. As a consequence of this realization, a new approach is being attempted that is based on the use of a helical solenoid (HS) channel that is made of simple coils that provide a much more homogeneous magnetic field. However, in order to use the HS a new approach was required to generate a variable dispersion that is needed according to the PIC theory described above. This approach and its first implementation will be described at EPAC08 in June, 2008.

43 PARTICLE ACCELERATORS↗

An Aerial Radiological Survey of Selected Areas of the City of North Las Vegas

As part of the proficiency training for the Radiological Mapping mission of the Aerial Measuring System (AMS), a survey team from the Remote Sensing Laboratory-Nellis (RSL-Nellis) conducted an aerial radiological survey of selected areas of the city of North Las Vegas for the purpose of mapping natural radiation background and locating any man-made radioactive sources. Survey areas were selected in collaboration with the City Manager's office and included four separate areas: (1) Las Vegas Motor Speedway (10.6 square miles); (2) North Las Vegas Downtown Area (9.2 square miles); (3) I-15 Industrial Corridor (7.4 square miles); and (4) Future site of University of Nevada Las Vegas campus (17.4 square miles). The survey was conducted in three phases: Phase 1 on December 11-12, 2007 (Areas 1 and 2), Phase 2 on February 28, 2008 (Area 3), and Phase 3 on March 19, 2008 (Area 4). The total completed survey covered a total of 44.6 square miles. The flight lines (without the turns) over the surveyed areas are presented in Figures 1, 2, 3, and 4. A total of eight 2.5-hour-long flights were performed at an altitude of 150 ft above ground level (AGL) with 300 feet of flight-line spacing. Water line and test line flights were conducted over the Lake Mead and Government Wash areas to ensure quality control of the data. The data were collected by the AMS data acquisition system (REDAR V) using an array of twelve 2-inch x 4-inch x 16-inch sodium iodide (NaI) detectors flown on-board a twin-engine Bell 412 helicopter. Data, in the form of gamma energy spectra, were collected continually (every second) over the course of the survey and were geo-referenced using a differential Global Positioning System. Collection of spectral data allows the system to distinguish between ordinary fluctuations in natural background radiation levels and the signature produced by man-made radioisotopes. Spectral data can also be used to identify specific radioactive isotopes. As a courtesy service, with the approval of the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office, RSL-Nellis is providing this summary to the office of the Mayor of the City of North Las Vegas along with the gross-count-based exposure rate and man-made count contour maps and GIS shape files in electronic format on a compact disk.

54 ENVIRONMENTAL SCIENCES↗

Nevada Test Site 2007 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2007 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2007a; 2008; Warren and Grossman, 2008). Direct radiation monitoring data indicate exposure levels at the RWMSs are at background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. A single gamma spectroscopy measurement for cesium was slightly above the minimum detectable concentration, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. The measured levels of radionuclides in air particulates are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 136.8 millimeters (mm) (5.39 inches [in.]) of precipitation at the Area 3 RWMS during 2007 is 13 percent below the average of 158.1 mm (6.22 in.), and the 123.8 mm (4.87 in.) of precipitation at the Area 5 RWMS during 2007 is 6 percent below the average of 130.7 mm (5.15 in.). Soil-gas tritium monitoring at borehole GCD-05U continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward movement percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Data from the automated vadose zone monitoring system for the operational waste pit covers show that evaporation continues to slowly remove soil moisture that came from the heavy precipitation in the fall of 2004 and the spring of 2005. The vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS effectively removes moisture from the cover by evapotranspiration. During 2007, there was no drainage through 2.4 meters (8 feet) of soil from the Area 3 drainage lysimeters that received only natural precipitation or were vegetated but water drained from the bare-soil Area 3 drainage lysimeter that received 3 times natural precipitation. Elevated tritium levels in plants and animals sampled from the Area 3 and Area 5 RWMSs show tritium uptake by the biota, but the low levels of other radionuclides do not suggest that there has been intrusion into the waste. All 2007 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED

During 2007 and 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was designed and fabricated for use in double-shell tank 241-AN-102. The system was successfully installed in the tank on May 1, 2008. The 241-AN-102 MPCMS consists of one 'fixed' in-tank probe containing primary and secondary reference electrodes, tank material electrodes, Electrical Resistance (ER) sensors, and stressed and unstressed corrosion coupons. In addition to the fixed probe, the 241-AN-102 MPCMS also contains four standalone coupon racks, or 'removable' probes. Each rack contains stressed and unstressed coupons made of American Society of Testing and Materials A537 CL1 steel, heat-treated to closely match the chemical and mechanical characteristics of the 241-AN-102 tank wall. These coupon racks can be removed periodically to facilitate examination of the attached coupons for corrosion damage. Along the way to successful system deployment and operation, the system design, fabrication, and testing activities presented a number of challenges. This document discusses these challenges and lessons learned, which when applied to future efforts, should improve overall project efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE BATCH 5 ACCEPTANCE EVALUATION RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB5 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Five (SB5) for processing in the Defense Waste Processing Facility (DWPF). Part of this SB5 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40 to complete the formation of SB5. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB4. The radionuclide concentrations were measured or estimated in the Tank 51 SB5 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter sample of Tank 51 sludge slurry taken on March 21, 2008. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. Under direction of the Liquid Waste Organization it was then modified by five washes, six decants, an addition of Pu/Be from Canyon Tank 16.4, and an addition of NaNO2. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Ta Determining the radionuclide concentrations in this Tank 51 SB5 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2008-0010. The work with this qualification sample is covered by a Task Technical and Quality Assurance Plan and an Analytical Study Plan. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task 2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task 5) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB5 will be taken and transferred to SRNL for measurement of these radionuclides. Data presented in this report represents the measured or estimated radionuclide concentrations obtained from several standard and special analytical methods performed by Analytical Development (AD) personnel within SRNL. The method for I-129 measurement in sludge is described in detail. Most of these methods were performed on solutions resulting from the dissolutions of the slurry samples. Concentrations are given for twenty-nine radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated. Results also indicate that 98% of the Tc-99 and 92% of the I-129 that could have been in this sludge batch have been removed by chemical processing steps in the SRS Canyons or Tank Farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗