Apollo command and service module stabilization and control system design survey
Summarized design survey of Apollo command and service module stabilization and control system
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Summarized design survey of Apollo command and service module stabilization and control system
Navigation services satellite systems including position determination, communication and telemetry for ships and aircraft
Federal government contracting, discussing legality of NASA service contracts
Universities and public service education noting NASA requirements and programs
NASA current awareness service SCAN /selected current aerospace notices/, promoting selectivity in information transfer to abstract journals, accession lists and bibliographies
Minimum cleanliness levels for pneumatic and hydraulic systems on Launch Complex 39 service arms of Saturn 5
Prediction of service life of polymeric sealers for fuel tanks from viscoelastic measurements
Impingement loadings on Saturn 5 workshop cluster arrangement due to command service module reaction control motor
Postflight analysis of service propulsion system during Apollo 9 mission
Design characteristics of universal position switches for Launch Complex 39 service arm
Operational procedures for food service in nuclear submarines
Linear elastic fracture mechanics analysis of titanium alloy pressure vessels of block 1 Apollo command and service modules
Flight performance of command module service propulsion system during Apollo 7 mission
Stability analysis of Apollo attitude control during service propulsion thrusting
Postflight analysis of Apollo 6 service propulsion system
Effects on Skylab of thermal control coating degradation by service module reaction control system rocket exhaust
Margins are developed for equipment susceptible to malfunction due to excessive time or operation cycles, and for identifying limited life equipment so monitoring and replacing is accomplished before hardware failure. Method applies to hardware where design service is established and where reasonable expected usage prediction is made.