Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engine control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Establishing and Monitoring an Aseptic Workspace for Building the MOMA Mass Spectrometer

Mars Organic Molecule Analyzer (MOMA) is an instrument suite on the ESA ExoMars 2018 Rover, and the Mass Spectrometer (MOMA-MS) is being built at Goddard Space Flight Center (GSFC). As MOMA-MS is a life-detection instrument and it thus falls in the most stringent category of Planetary Protection (PP) biological cleanliness requirements. Less than 0.03 sporem2 is allowed in the instrument sample path. In order to meet these PP requirements, MOMA-MS must be built and maintained in a low bioburden environment. The MOMA-MS project at GSFC maintains three cleanrooms with varying levels of bioburden control. The Aseptic Assembly Cleanroom has the highest level of control, applying three different bioburden reducing methods: 70 IPA, 7.5 Hydrogen Peroxide, and Ultra-Violet C light. The three methods are used in rotation and each kills microbes by a different mechanism, reducing the likelihood of microorganisms developing resistance to all three. The Integration and Mars Chamber Cleanrooms use less biocidal cleaning, with the option to deploy extra techniques as necessary. To support the monitoring of cleanrooms and verification that MOMA-MS hardware meets PP requirements, a new Planetary Protection lab was established that currently has the capabilities of standard growth assays for spore or vegetative bacteria, rapid bioburden analysis that detects Adenosine Triphosphate (ATP), plus autoclave and DHMR verification. The cleanrooms are monitored both for vegetative microorganisms and by rapid ATP assay, and a clear difference in bioburden is observed between the aseptic the other cleanroom.

Contamination Control Engineering↗

Establishing and Monitoring an Aseptic Workspace for Building the MOMA Mass Spectrometer

Mars Organic Molecule Analyzer (MOMA) is an instrument suite on the European Space Agency (ESA) ExoMars 2020 Rover, and the Mass Spectrometer (MOMA-MS) is being built at Goddard Space Flight Center (GSFC). MOMA-MS is a life-detection instrument and thus falls in the most stringent category of Planetary Protection (PP) biological cleanliness requirements. Less than 0.03 spore/m2 are allowed in the instrument sample path. In order to meet these PP requirements, MOMA-MS must be built and maintained in a low bioburden environment. The MOMA-MS project at GSFC maintains three clean rooms with varying levels of bioburden control. The Aseptic Assembly Clean room has the highest level of control, applying three different bioburden reducing methods: 70% Isopropyl Alcohol (IPA), 7.5% Hydrogen Peroxide, and Ultra-Violet C (UVC) light. The three methods are used in rotation and each kills microorganisms by a different mechanism, reducing the likelihood of microorganisms developing resistance to all three. The Integration and Mars Chamber Clean rooms use less biocidal cleaning, with the option to deploy extra techniques as necessary. To support the monitoring of clean rooms and verification that MOMA-MS hardware meets PP requirements, a new Planetary Protection lab was established that currently has the capabilities of standard growth assays for spore or vegetative bacteria, rapid bioburden analysis that detects Adenosine Triphosphate (ATP), plus autoclave and Dry Heat microbial Reduction (DHMR) verification. The clean rooms are monitored for vegetative microorganisms and by rapid ATP assay, and a clear difference in bioburden is observed between the aseptic and other clean room.

Contamination Control Engineering↗

Processing and Characterization of Thousand-Hour 500 C Durable 4H-SiC JFET Integrated Circuits

This work reports fabrication and testing of integrated circuits (ICs) with two levels of interconnect that consistently achieve greater than 1000 hours of stable electrical operation at 500 C in air ambient. These ICs are based on 4H-SiC junction field effect transistor (JFET) technology that integrates hafnium ohmic contacts with TaSi2 interconnects and SiO2 and Si3N4 dielectric layers over approximately 1-micrometer scale vertical topology. Following initial burn-in, important circuit parameters remain stable for more than 1000 hours of 500 C operational testing. These results advance the technology foundation for realizing long-term durable 500 C ICs with increased functional capability for sensing and control combustion engine, planetary, deep-well drilling, and other harsh-environment applications.

Microelectronics↗

Advanced Noise Control Fan: A 20-Year Retrospective

The ANCF test bed is used for evaluating fan noise reduction concepts, developing noise measurement technologies, and providing a database for Aero-acoustic code development. Rig Capabilities: 4 foot 16 bladed rotor @ 2500 rpm, Auxiliary air delivery system (3 lbm/sec @ 6/12 psi), Variable configuration (rotor pitch angle, stator count/position, duct length), synthetic acoustic noise generation (tone/broadband). Measurement Capabilities: 112 channels dynamic data system, Unique rotating rake mode measuremen, Farfield (variable radius), Duct wall microphones, Stator vane microphones, Two component CTA w/ traversing, ESP for static pressures.

turbo fan↗

Processing and Characterization of Thousand-Hour 500 C Durable 4H-SiC JFET Integrated Circuits

This work reports fabrication and testing of integrated circuits (ICs) with two levels of interconnect that consistently achieve greater than 1000 hours of stable electrical operation at 500 C in air ambient. These ICs are based on 4H-SiC junction field effect transistor (JFET) technology that integrates hafnium ohmic contacts with TaSi2 interconnects and SiO2 and Si3N4 dielectric layers over 1-m scale vertical topology. Following initial burn-in, important circuit parameters remain stable for more than 1000 hours of 500 C operational testing. These results advance the technology foundation for realizing long-term durable 500 C ICs with increased functional capability for sensing and control combustion engine, planetary, deep-well drilling, and other harsh-environment applications.

JFET↗

Thermal Vacuum Chamber Repressurization with Instrument Purging

At the end of James Webb Space Telescope (JWST) OTIS (Optical Telescope Element-OTE-Integrated Science Instrument Module-ISIM) cryogenic vacuum testing in NASA Johnson Space Centers (JSCs) thermal vacuum (TV) Chamber A, contamination control (CC) engineers are mooting the idea that chamber particulate material stirred up by the repressurization process may be kept from falling into the ISIM interior to some degree by activating instrument purge flows over some initial period before opening the chamber valves. This memo describes development of a series of models designed to describe this process. These are strung together in tandem to estimate overpressure evolution from which net outflow velocity behavior may be obtained. Creeping flow assumptions are then used to determine the maximum particle size that may be kept suspended above the ISIM aperture, keeping smaller particles from settling within the instrument module.

Repressurization↗

A New Approach to Mission Classification and Risk Management for NASA Space Flight Missions

The NASA risk classification system is meant to uide space mission development from formulation through completion of implementation. It is also meant to be the basis on which program and project managers develop and implement appropriate mission assurance and risk management strategies for the mission. In order to be useful, the risk classification system needs to provide consistent and reproducible classification results so that missions may be designed with the appropriate components, subsystems, and testing philosophy, all of which impacts mission schedule and cost. In a cost-constrained environment, a clear, robust, and reproducible approach to mission implementation becomes more critical than ever before. Once a project's risk classification level is established, the managers can define the appropriate management controls, systems engineering processes, mission assurance requirements, safety, and testing for that mission. The current NASA mission classification system will be reviewed before a new system is proposed.NASA manages space flight missions according to a four-tiered classification which assumes increasing levels of risk. We argue that risk does not change between classes. What changes are the means available to reduce risk. In performance-driven missions, the project will spend money in order to maintain performance without reducing margins. In cost-constrained missions, performance will be reduced in order to stay within budget or to maintain schedule: measurement requirements may be traded, design life may be reduced, or both. We then propose a new approach to the classification of NASA space flight missions, based on an assessment of how flexible the requirements, how exquisite the measurements, how long the lifetime, and how rigid the budget.Our proposed approach makes possible a clearer differentiation between classification levels and more effective guidance to program and project managers.

Bordi, Francesco↗

Evolution of Hardware and Philosophy of Emergency Response Actions on the International Space Station and Future Spacecrafts

Human spaceflight is dangerous for numerous reasons. This ranges from the dynamic environment of launching on a rocket, flying in space among the thousands and thousands pieces of space debris, to the hazards of re-entry & landing, as well as being surrounded by vehicle systems containing hazardous materials or gasses. In-flight emergencies fall into four categories: Rapid Depressurization, Fire, Toxic Spill, and Medical emergency. This paper will address the first three, which fall under the responsibility of the Environmental Control and Life Support (ECLS) Systems flight control and engineering teams. It will review the evolution of the International Space Station’s emergency response philosophy, procedures, training, and equipment changes over the years. The International Space Station (ISS) emergency equipment has evolved over the last two decades of operations in many ways, but in some it has remained the same. The core actions the flight crew takes to ensure team safety, personal safety, vehicle safety, and equipment safety has not changed. However, the equipment and capabilities provided to them have. From early days of minimal capability when the ISS consisted of a few modules, to today’s 30,000 ft^3 vehicle with over a dozen isolatable segments. From use of positive pressure O2 masks, to the development of respirators. From a lack of procedures for a deadly ammonia leak scenario to a memorized response utilizing numerous atmosphere measurement systems. This paper will review all these various areas that fall under the umbrella of “on-board emergencies”. In addition, the comparison to the planned emergency operations on the Orion vehicle will be reviewed. The Orion vehicle differs from the ISS in that it has no isolatable volume, being approximately 2% the size of ISS, as well as not having a quick return to earth capability.

Barry Tobias↗

Controlling Rapid Change Through Systems Engineering the Organization

A new approach to change management has been developed and applied at the Jet Propulsion Laboratory (JPL). It's main focus is on aligning the organization with the strategic plan; and understanding the internal organizational relationships that impact change, which ultimately determine an organizations ability to be transformed and renewed.

change↗

Exponential Convergence of the Tracking Error in Adaptive Systems Without Persistent Excitation

Persistent excitation conditions which ensure parameter convergence in adaptive algorithms have been studied by many researchers. Here, conditions are investigated for exponential convergence of the tracking error in feedforward adaptive systems without persistent excitation. Particular attention is paid to the continuous-time LMS algorithm in the overparametrized case. Results are presented.

control↗

Preparing for Lunar Exploration: Geology and Field Training for Astronauts

NASA astronauts will soon return to the Moon, this time to the lunar south pole. Astronauts will perform traverses, make geologic observations, and collect samples to return to Earth. Lessons from Apollo show that science returns were optimized because crews were well-trained in both spacewalk operations and field geology. In that spirit, our team of geologists introduced a revised geologic training program for in-coming NASA astronauts that includes classroom activities and fieldwork and is split over 2 years. Year 1 focuses on an introduction to geologic concepts capped by a field exercise. Year two focuses on climate change, the Moon, other planets, and additional fieldwork. Our geology curriculum supports astronaut observations from the ISS and is the foundation for future Artemis geology training, which will include lunar science and increasingly complex field training in planetary-relevant locations. A final piece of our training program provides geology and field mapping experiences for NASA engineers, flight controllers, and managers, to help them understand the principles of fieldwork and relevance to lunar exploration. The Year 1 geology training must be an effective introduction for astronauts who have little or no background in geology. We focus the training around a narrowly defined field problem and use a week of classroom training to prepare the astronauts with the specific skills and background they need to carry out a field exercise on volcanic features, structures, and landforms of the Taos Plateau, New Mexico. Classroom modules are hands-on, using satellite imagery, maps, analog models, and samples, and provide the astronauts with specific and relevant experience in how to make observations and describe what they see, recognize, and interpret patterns, infer processes from products, and analyze relationships to build a story based on evidence from a variety of data sources. At the end of each classroom day, astronauts work in teams to build a preliminary geologic map of the field area, adding new observations and interpretations as they learn about topics in the classroom. Each team’s bucket list of target areas to visit helps shape their investigations during their week in the field. On the final day in the field, each astronaut team presents a geologic map, cross section, and geologic interpretation

Geology↗

Evolution of Hardware and Philosophy of Emergency Response Actions on the International Space Station and Future Spacecrafts

Human spaceflight is dangerous for numerous reasons. This ranges from the dynamic environment of launching on a rocket, flying in space among the thousands and thousands pieces of space debris, to the hazards of re-entry & landing, as well as being surrounded by vehicle systems containing hazardous materials or gasses. In-flight emergencies fall into four categories: Rapid Depressurization, Fire, Toxic Spill, and Medical emergency. This paper will address the first three, which fall under the responsibility of the Environmental Control and Life Support (ECLS) Systems flight control and engineering teams. It will review the evolution of the International Space Station’s emergency response philosophy, procedures, training, and equipment changes over the years. The ISS emergency equipment has evolved over the last two decades of operations in many ways, but in some it has remained the same. The core actions the flight crew takes to ensure team safety, personal safety, vehicle safety, and equipment safety has not changed. However, the equipment and capabilities provided to them have. From early days of minimal capability when the ISS consisted of a few modules, to today’s 30,000 ft^3 vehicle with over a dozen isolatable segments. From use of Russian gas masks to positive pressure O2 masks, to the development of respirators. From a lack of procedures for a deadly ammonia leak scenario to a memorized response utilizing numerous atmosphere measurement systems. This paper will review all these various areas that fall under the umbrella of “on-board emergencies”. In addition, the comparison to the planned emergency operations on the Orion vehicle will be reviewed. The Orion vehicle differs from the ISS in that it has no isolatable volume, being approximately 2% the size of ISS, as well as not having a quick return to earth capability.

Emergency↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗

Trajectory Operations of the Artemis I Mission

This paper describes the operational design and execution of the Artemis I trajectory. It was an operationally complex trajectory with powered lunar flybys and insertion into a Distant Retrograde Orbit (DRO). A joint team of trajectory analysts at the NASA Johnson Space Center (JSC) were responsible for the design and operation of nominal and off-nominal in-space trajectories. A process was developed to convert optimized reference trajectories into Orion burn plans that could be uplinked to the vehicle. During the mission, the joint flight controller and engineering team continuously evaluated upcoming translational burns using actual vehicle conditions, monitored the trajectory for opportunities to re-optimize the trajectory in order to reduce propellant usage, and prepared for potential off-nominal scenarios. Overall Orion in-space trajectory performance is compared tomission designs to demonstrate the success of the design and operations work-flows.

Artemis I↗

Method and apparatus for monitoring a hydrocarbon-selective catalytic reduction device

A method for monitoring a hydrocarbon-selective catalytic reactor device of an exhaust aftertreatment system of an internal combustion engine operating lean of stoichiometry includes injecting a reductant into an exhaust gas feedstream upstream of the hydrocarbon-selective catalytic reactor device at a predetermined mass flowrate of the reductant, and determining a space velocity associated with a predetermined forward portion of the hydrocarbon-selective catalytic reactor device. When the space velocity exceeds a predetermined threshold space velocity, a temperature differential across the predetermined forward portion of the hydrocarbon-selective catalytic reactor device is determined, and a threshold temperature as a function of the space velocity and the mass flowrate of the reductant is determined. If the temperature differential across the predetermined forward portion of the hydrocarbon-selective catalytic reactor device is below the threshold temperature, operation of the engine is controlled to regenerate the hydrocarbon-selective catalytic reactor device.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility of EGS Well Control Systems

This report covers the 8th major objective listed in Grant DE-FG36-08GO18185. This objective takes the information and experience gained from the development of 300°C well monitoring system and applies them to concepts envisioned for future geothermal well control systems supporting EGS power production. This report covers a large number of instrumentation and control system engineering issues for EGS wells while also providing a window into existing technology to address those issues.

15 GEOTHERMAL ENERGY↗