Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Transfer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Tank 9H Salt Solution Supernatant Characterization in Support of Potential Operating Strategies of Tank 9H Supernatant Through the Tank Closure Cesium Removal System

Savannah River Remediation (SRR) recently initiated an ion exchange process to remove radioactive cesium from dissolved salt solution in Tank 10H, known as Tank Closure Cesium Removal (TCCR). As part of that ongoing campaign, the salt in Tank 9H will be dissolved and transferred to Tank 10H for processing through the TCCR system, and SRR requested the characterization of the dissolved salt solution in Tank 9H prior to the transfer to Tank 10H. On July 18, 2019, Savannah River Remediation Engineering (SRR-E) delivered two variable depth Tank 9H salt solution samples, identified as samples HTF-9-19-74 and HTF-9-19-75 (combined total sample volume of about 400 mL) to the Savannah River National Laboratory (SRNL) for characterization. These two Tank 9H variable depth samples (HTF-9-19-74 and HTF-9-19-75 taken at ~180” and 42”, respectively) were retrieved from Riser 7 after hydro-lancing activities were complete. Approximately 4200 gallons of water were added to the tank during this activity. This report presents the analytical characterization results for the Tank 9H salt solution variable depth samples HTF-9-19-74 and HTF-9-19-75 and contains mainly the filtrate analytical results for anions, elements, mass spectral data, total cesium characterization results and select radionuclide results, along with the X-ray diffraction characterization of the solid fractions from the liquid /solid separation of the variable depth salt solutions. Most of these analyses were performed in duplicate with the percent relative standard deviation (%RSD), a measure of the variability between each duplicate data set expressed as a percentage, used to estimate the analytical result quality for each analyte.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD SITE WASHINGTON USA - 11507

The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km{sup 2} (2.7 mi{sup 2}) with concentrations greater than 20 {micro}g/L. Concentrations range from 60,000 {micro}g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 {micro}g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 {micro}g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio - 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were 'right-sized' at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Analysis Of Saltstone Disposal Units

SRR requested that SRNL develop a two-dimensional computer simulation model to be capable of predicting grout temperatures attained in Saltstone Disposal Units (SDUs) during the transient addition of saltstone grout and its subsequent storage period. A simulation model was developed to calculate the transient grout temperatures of the SDU facility by taking an axisymmetric and two-dimensional Computational Fluid Dynamics (CFD) approach. The final performance calculations were based on the conduction and radiation model without a convection cooling mechanism for conservative estimate of the grout temperatures and computational efficiency. While convection within the SDU is disabled in the current calculations, the simulation model has the capability of turning convection back on if desired by the user. Hence, the thermal model in its current configuration is best characterized as a finite-volume heat transfer model. However, given that the model can account for convection if desired by the user, it will be referred to as a CFD model. The grout material contains a transient heat source due to the exothermic hydration reactions of the cementitious material mixed with salt solution. The model can predict the transient temperatures at point locations within the poured grout and the overlying vapor space, and at the interior and exterior surfaces of the structure. The thermal model has been developed for two SDUs at the Savannah River Site (SRS); namely, SDU 2A and SDU 6. SDU 2A is a cylindrical unit measuring 150 feet (ft) in diameter, 22 ft tall, and holds approximately three million gallons of grout. SDU 6 is 375 ft in diameter and 43 ft high with a capacity of over thirty million gallons. Prior to performing the thermal calculations for the SDU 6 facility, the benchmarking test for the smaller SDU 2A unit was performed to establish the solution method and to verify the computational results using existing thermocouple data. Based on the Lagrangian discrete method and boundary conditions established by the SDU 2A benchmarking test, the CFD calculations were performed to predict the transient temperatures at local positions of the poured grout and air spaces within the SDU 6 structure.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bench-Scale Electrolytic Dissolution of Quarter-Scale FCA Cans

In 2016, the Savannah River National Laboratory (SRNL) led, in support of and under sponsorship of the Department of Energy’s National Nuclear Security Administration (DOE/NNSA) Office of Material Management and Minimization (M3), the removal and transfer of the plutonium based Fast Critical Assembly (FCA) fuel from the Japan Atomic Energy Agency (JAEA) Tokai facility to the Savannah River Site (SRS). The team also included JAEA, multiple organizations in Savannah River Nuclear Solutions (SRNS), International Nuclear Services, and many other entities. The FCA fuel removal project completion was a key deliverable for M3 to the 2016 Nuclear Security Summit and constituted the largest inventory of weapons-usable plutonium removed under the nonproliferation program. The FCA materials consist of thousands of stainless steel (SS) clad plates and hundreds of SS clad rods. The FCA fuel elements were packaged in a carrier can and stored at SRS pending disposition of the fuel. Following an assessment of candidate disposition options, SRNS identified electrolytic dissolution (ED) as the most promising disposition option for the FCA plates and their preferred option was endorsed by DOE. This option entails electrochemically dissolving the entire FCA carrier can with fuel elements and was based on bench-scale laboratory testing and historical work on processing SS-clad and zirconium-clad uranium-based fuel in the H-Canyon electrolytic dissolver (last operated in 1980). The FCA plate consists of a plutonium-aluminum metal alloy core hermitically sealed in SS cladding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research and Experiment on the Key Technologies of the Spent Fuel Storage in HTR-PM - 18486

High Temperature Reactor demonstration project of China (HTR-PM) is one of the major national science and technology projects, some key technologies for the design and operation of the demonstration project are formed to research according to the main technology. The spent fuel storage system is one of the main systems of the HTR-PM. In order to solve the technical problems related to the operation of spent fuel, several experiments have been conducted, including: spent fuel loading, getting back, spent fuel canister hoisting, storage well cover hoisting, storage canister drop and so on. In the study process, the test facility has been set up to carry on the operation and the experiment verification to ensure the reliability and safety of the spent fuel storage system. Spent fuel storage system undertakes spent fuel receiving, spent fuel canister transfer, storage, lifting and other functions in HTR-PM, the project research need to solve several major technical problems related to the spent fuel operation, which mainly include: Develop the transportable spent fuel canister for HTR-PM, the canister is corrosion resistance, impact resistance, and is in subcritical condition when loaded with fuel. Develop the spent fuel canister hoister, which could hoist the spent fuel canister safely and reliably. Develop the spent fuel storage well cover hoister, which could hoist the well cover safely and reliably. Study the small probability of the spent fuel canister in extreme condition of canister hoist falling accidents, to ensure the radiation protect safety and residual heat removal safety of the canister in case of the canister drop when lifting. Develop the spent fuel charging device and return device, which could load the spent fuel elements into the spent fuel canister, and could take out the fuel elements from the canister. The key technology and equipment of the spent fuel storage system in HTR-PM would be solved through the research of the project. Project research is very important for the implementation and safe operation of the HTR-PM project. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Electrocatalytic Reductive Amination of Aldehydes and Ketones with Aqueous Nitrite

The electrocatalytic utilization of oxidized nitrogen waste for C–N coupling chemistry is an exciting research area with great potential to be adopted as a sustainable method for generation of organonitrogen molecules. The most widely used C–N coupling reaction is reductive amination. In this work, we develop an alternative electrochemical reductive amination reaction that can proceed in neutral aqueous electrolyte with nitrite as the nitrogenous reactant and via an oxime intermediate. We develop a selection criterion for nitrite reduction electrocatalysts suited for oxime electrosynthesis and, in doing so, find Pd to be a highly efficient catalyst for this reaction, reaching an oxime Faradaic efficiency of 82% at −0.21 V vs the reversible hydrogen electrode. The aliphatic or aromatic structure of the carbonyl reactant impacts the efficacy of the catalyst, with aromatic substrates leading to suppressed oxime formation and detrimental reduction of the carbonyl to the alcohol. We developed a Pb/PbO electrocatalyst that selectively performs oxime reduction in the neutral aqueous electrolyte. With acetone as a model substrate, we demonstrate an efficient one-pot, two-step electrochemical reaction for the conversion of acetone to isopropyl amine with 85% yield and 50% global Faradaic efficiency.

catalysts↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Trace Metal Accumulation in Trigonella foenum-graecum Irrigated with Wastewater and Human Health Risk of Metal Access Through the Consumption

The aim of the present research was to determine the trace metal accumulations in Trigonella foenum-graecum irrigated with three different water regimes (ground water, canal water and sugar mill water). Also, transfer factors, pollution load indices, and health risk indices were assessed to evaluate metal transport and accumulation through the food chain. The analysis was conducted by Atomic Absorption Spectrophotometer (Shimadzu model AA-6300) to evaluate the concentration of metals in water, soil and vegetables. Trace metal concentrations in water samples ranged from 0.84 to 1.67, 0.42 to 0.72, 0.45 to 0.85, 2.51 to 9.99, 1.21 to 1.92, 1.82 to 9.98 and 0.64 to 0.91 mg/kg for Cd, Cr, Cu, Fe, Ni, Zn and Mn, respectively. The mean metal concentrations in soil samples were determined as 0.25, 0.86, 0.96, 3.37, 0.4, 0.44 and 2.31 mg/kg for Cd, Cr, Cu, Fe, Ni, Zn and Mn, respectively. Trace metal accumulations in T. foenum-graecum samples gathered from where soil samples were taken are as follows: The contents of Cd, Cr, Cu, Fe, Ni, Zn and Mn ranged from 0.48 to 1.06, 0.11 to 0.35, 0.15 to 0.29, 1.43 to 8.39, 0.39 to 0.54, 2.1 to 3.05 and 0.42 to 0.47 mg/kg, respectively. Statistical analyses showed that the treatments have non-significant effect (p > 0.05) on concentrations of metals in T. foenum-graecum samples collected from three sites for Ni, Cr, Cu, Zn and Mn and significant effect on Fe and Cd.

54 ENVIRONMENTAL SCIENCES↗

Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite{sup R} A530E resin (which has been proven effective in removing Tc-99). The water is then transferred to the biological treatment building for further treatment. When the lead vessel in each of the two treatment trains becomes fully loaded with Tc-99, the Purolite A530E resin is transferred to a separate tank where it is heated to 160 deg. F to remove volatile organics prior to disposal at the Environmental Restoration Disposal Facility. The biological treatment building has a maximum flow capacity of 2,500 gpm. Groundwater from the nonradiological extraction wells and treated groundwater from the RAD building are initially pumped into an equalization tank and then into two parallel fluidized bed reactors (FBRs). The FBRs contain granulated activated carbon in suspension for microbes to populate, a carbon-based food source for the microbes to eat (e.g., MicroCg{sup TM}, molasses, or sodium lactate), and nitrate for the microbes to breathe (represents 'anoxic' conditions that contain little or no dissolved oxygen). The FBRs are maintained at a temperature between 55 deg. F and 90 deg. F, and at a pH between 6.5 and 6.8, to maximize microbial growth. The FBRs break down the nitrate, reduce the hexavalent chromium to trivalent chromium, and break down a good portion of the carbon tetrachloride and TCE. From the FBRs, groundwater is pumped through a carbon separation tank, then through a splitter box that divides the water evenly between four membrane bioreactors (MBRs) that further break down the contaminants. The MBRs have aeration capacity to provide sufficient oxygen for maintaining the aerobic biological process. The MBRs use submerged membranes for filtration. Vertically strung fibers are found in the membrane zone where a vacuum draws water through tiny pores in the fibers. The liquid is then pumped to air strippers to remove any volatile organics that have passed through the bioreactors. Solids from the MBRs are pumped to rotary drum thickeners and centrifuges for dewatering prior to lime being added to kill the bacteria and control odor. The conditioned sludge is then disposed at the Environmental Restoration Disposal Facility. The final treated water is then pumped to the injection well field. The 200 West P and T is a Leadership in Energy and Environmental Design (LEED) gold-certified facility that has an expected 70% energy cost savings over the lifetime of the plant. Fifty percent of the steel used in construction was recycled, 420 tons of recycled concrete were used, and over 75% of construction waste was diverted from landfills. The plant is only staffed one shift per day, and it uses a call-out system if the plant goes down during off-shift hours. Initial sampling results have shown that the 200 West P and T is successfully reducing contaminant levels well below the cleanup levels specified in the Record of Decision, Hanford 200 Area 200-ZP-1 Superfund Site, Benton County, Washington [1]. CHPRC and the U.S. Department of Energy are continuing to look for ways to reduce operational costs, such as testing alternative resins for removing radionuclides and finding less expensive carbon substrate sources. The benefit to others is a LEED gold-certified, 2,500 gpm P and T system that may be used as a model for other complex sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A FRAMEWORK TO DEVELOP FLAW ACCEPTANCE CRITERIA FOR STRUCTURAL INTEGRITY ASSESSMENT OF MULTIPURPOSE CANISTERS FOR EXTENDED STORAGE OF USED NUCLEAR FUEL

A multipurpose canister (MPC) made of austenitic stainless steel is loaded with used nuclear fuel assemblies and is part of the transfer cask system to move the fuel from the spent fuel pool to prepare for storage, and is part of the storage cask system for on-site dry storage. This weld-sealed canister is also expected to be part of the transportation package following storage. The canister may be subject to service-induced degradation especially if exposed to aggressive environments during possible very long-term storage period if the permanent repository is yet to be identified and readied. Stress corrosion cracking may be initiated on the canister surface in the welds or in the heat affected zone because the construction of MPC does not require heat treatment for stress relief. An acceptance criteria methodology is being developed for flaw disposition should the crack-like defects be detected by periodic Inservice Inspection. The external loading cases include thermal accident scenarios and cask drop conditions with the contribution from the welding residual stresses. The determination of acceptable flaw size is based on the procedure to evaluate flaw stability provided by American Petroleum Institute (API) 579 Fitness-for-Service (Second Edition). The material mechanical and fracture properties for base and weld metals and the stress analysis results are obtained from the open literature such as NUREG-1864. Subcritical crack growth from stress corrosion cracking (SCC), and its impact on inspection intervals and acceptance criteria, is not addressed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermo-Hydro-Mechanical Modeling of Brine Migration in a Heated Borehole Test in Bedded Salt

Abstract This research paper focuses on the thermo-hydro-mechanical (THM) modeling of brine migration in a heated borehole test conducted as part of the ongoing Brine Availability Test in Salt (BATS) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. It is a component of the international collaboration project DECOVALEX-2023 (DEvelopment of COupled models and their VALidation against EXperiments), which aims to understand the THM processes governing brine flow in heated rock salt repositories through collaborative analysis by multiple research teams. Using the TOUGH–FLAC simulator, THM simulations were performed and compared with data from the BATS phase 1a. This experiment involved two identical horizontal-borehole arrays, one heated and one serving as a control, both equipped with sensor arrays. Analysis of measurements revealed water flow rate surges during heater power transitions, with the highest jump observed during cooling. Acoustic emission activity exhibited distinct patterns in response to heater power changes, suggesting that damage to rock salt is particularly pronounced during the cooling phase. The THM simulations successfully captured these phenomena, highlighting the significance of thermal effects, brine migration, and mechanical behavior in predicting brine availability in heated and damaged rock salt. Our modeling also revealed the critical interplay between heating and cooling-induced damage and its influence on flow properties, particularly affecting brine inflow estimation. Notably, we found that cooling-induced brine inflow spikes result from increased permeability due to tensile dilatancy. These findings have important implications for the development of robust containment strategies and enhance our understanding of the complex processes involved in repository performance.

58 GEOSCIENCES↗

Characterization of Tank 9H Dissolution Batches in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 1 Preparations

Savannah River Remediation (SRR) is currently preparing the first batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A will consist of dissolved saltcake from Tank 9H. Two batches of salt (Batch 1A and Batch 1B) have been dissolved in Tank 9H and subsequently transferred to Tank 10H to prepare Batch 1 for TCCR 1A. Savannah River National Laboratory (SRNL) received samples from each batch of dissolved salt prior to transfer for characterization. SRNL received both a surface and a variable depth sample from Batches 1A and 1B. In both cases no solids were observed in the surface sample, but were observed in the depth sample. For Batch 1A the variable depth sample was only slightly cloudy, while for Batch 1B the variable depth sample contained a significant amount (10.14 wt%) of solids. The solids were determined to be primarily aluminum containing phases, with only a small fraction (0.22 wt%) being sludge solids. In general, the samples from Batch 1A were more concentrated salt solutions than Batch 1B, with sodium concentrations of 8.53 and 8.57 M for the surface and filtered depth samples in Batch 1A, respectively. The sodium concentrations in Batch 1B samples ranged from 4.27 M for the surface sample to 7.57 M for the depth sample filtrate, indicating some stratification within the tank. The 137 Cs activity as well as the total Cs concentration in the filtered Batch 1A depth sample were approximately double the activity and concentration measured in the filtrate from the Batch 1B depth sample. The total Cs concentration in the Batch 1A depth sample filtrate was 22.4 mg/L, while for the Batch 1B depth sample filtrate the total Cs concentration was calculated to be 12.0 mg/L. These Cs concentrations are significantly higher than was measured in Batches 1-3 from Tank 10H dissolved saltcake which was previously processed through the original TCCR unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microbial Oxidation of Hg(0) - Its Effect on Hg Stable Isotope Fractionation and Methylmercury Production

Mercury (Hg) associated with mixed waste generated by nuclear weapons manufacturing has contaminated vast areas of the Oak Ridge Reservation (ORR). Neurotoxic methylmercury (MeHg) has been formed from the inorganic Hg wastes discharged into headwaters of East Fork Poplar Creek (EFPC). Thus, understanding the processes and mechanisms that lead to Hg methylation along the flow path of EFPC is critical to predicting the impacts of the contamination and the design of remedial action at the ORR. In part I of our project, we investigated Hg(0) oxidation and methylation by anaerobic bacteria. We discovered that the anaerobic bacterium Desulfovibrio desulfuricans ND132 can oxidize elemental mercury [Hg(0)]. When provided with dissolved elemental mercury, D. desulfuricans ND132 converts Hg(0) to Hg(II) and neurotoxic methylmercury [MeHg]. We also demonstrated that diverse species of subsurface bacteria oxidizes dissolved elemental mercury under anoxic conditions. The obligate anaerobic bacterium Geothrix fermentans H5, and the facultative anaerobic bacteria Shewanella oneidensis MR-1 and Cupriavidus metallidurans AE104 can oxidize Hg(0) to Hg(II) under anaerobic conditions. In part II of our project, we established anaerobic enrichment cultures and obtained new bacterial strains from the DOE Oak Ridge site. We isolated three new bacterial strains from subsurface sediments collected from Oak Ridge. These isolates are Bradyrhizobium sp. strain FRC01, Clostridium sp. strain FGH, and a novel Negativicutes strain RU4. Strain RU4 is a completely new genus and species of bacteria. We also demonstrated that syntrophic interactions between fermentative bacteria and sulfate-reducing bacteria in Oak Ridge saprolite mediate iron reduction via multiple mechanisms. Finally, we tested the impact of Hg on denitrification in nitrate reducing enrichment cultures derived from subsurface sediments from the Oak Ridge site, where nitrate is a major contaminant. We showed that there is an inverse relationship between Hg concentrations and rates of denitrification in enrichment cultures. In part III of our project, we examined in more detail the effects of microbial interactions on Hg transformations. We discovered that both sulfate reducing and iron reducing bacteria coexist in freshwater sediments and both microbial groups contribute to mercury methylation. We showed that mercury methylation by sulfate reducing and iron reducing bacteria are temporally and spatially separated processes. We also discovered that methanogens can methylate mercury. We showed that Methanospirillum hungatei JF-1 methylated Hg at comparable rates, but with higher yields, than those observed for sulfate-reducing bacteria and iron-reducing bacteria. Finally, we demonstrated that syntrophic interactions between different microbial groups increase mercury methylation rates. We showed that Hg methylation rates are stimulated via inter-species hydrogen and acetate transfer (i) from sulfate-reducing bacteria to methanogens and (ii) from fermenters to the sulfate-reducing bacteria. In part IV of the project, we studied Hg bioavailability and Hg isotope fractionation. We demonstrated that thiol-bound Hg is bioavailable to mercury resistant bacteria. We found that uptake of Hg from Hg-glutathione and Hg-cysteine complexes does not require functioning glutathione and cystine/cysteine transport systems. We demonstrated that a wide range of methylmercury complexes (e.g. MeHgOH, MeHg-cysteine, and MeHg-glutathione) are bioavailable to mercury resistant bacteria. The rate of MeHg demethylation varies more between different species of mercury resistant bacteria than among MeHg complexes. We showed that microbial demethylation of MeHg depends more on the species of microorganism than on the types and relative concentrations of thiols or other MeHg ligands present. Finally, we demonstrated that Hg methylation by Geobacter sulfurreducens PCA and Desulfovibrio desulfuricans ND132 imparts mass-dependent discrimination against 202Hg relative to 198Hg. G. sulfurreducens PCA and D. desulfuricans ND132 have similar kinetic reactant/product Hg fractionation factors. Using the Hg isotope data, we showed that there are multiple intra- and/or extracellular pools provide substrate inorganic Hg for methylation.

54 ENVIRONMENTAL SCIENCES↗

Corrosion Monitoring in an Irradiated/Used Fuel Dry Storage Container - 19193

A corrosion monitoring system was developed to monitor the corrosion behaviour of steel components embedded in the high density concrete of a Dry Storage Container (DSC). The DSC is a free-standing reinforced concrete container, with an inner carbon-steel liner and an outer carbon-steel shell, for the storage, on-site transfer and off-site transportation of irradiated Candu fuel. Normally, uncontaminated concrete is benign with regards to embedded steel components because high alkalinity in the concrete leads to formation of a passive film on the steel surface, which prevents excessive metal loss. However, corrosion of steel in concrete may be promoted by one or more of local concentration of chloride ions or local loss of alkalinity. For the DSC, it is recognized that the above mechanism(s) are unlikely, however, if any did exist, the corrosion mechanisms that could then occur would include corrosion of carbon steel components and stress corrosion cracking of 304L stainless steel components. In order to confirm that these unlikely events are not occurring, Ontario Power Generation has undertaken a project to investigate the corrosion behaviour of metallic components embedded in the DSC's high density concrete. A corrosion monitoring system that can be installed within the concrete space of a DSC was designed and installed to monitor changes in temperature, corrosion potential, corrosion rate, and electrochemical noise. The corrosion monitoring system was commissioned in July 2012, followed by the commencement of monitoring and measurements. The corrosion data, collected for the three years from year 2012 to 2015, were analyzed. It was concluded that the corrosion rates of both carbon steel and stainless steel within the DSC are very low and consistent with the intended minimum operational life of the DSC. The monitoring system as a whole has allowed a systematic and long term judgement regarding the conditions within the DSCs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STP-ECRTS - THERMAL AND GAS ANALYSES FOR SLUDGE TRANSPORT AND STORAGE CONTAINER (STSC) STORAGE AT T PLANT

The Sludge Treatment Project (STP) is responsible for the disposition of sludge contained in the six engineered containers and Settler tank within the 105-K West (KW) Basin. The STP is retrieving and transferring sludge from the Settler tank into engineered container SCS-CON-230. Then, the STP will retrieve and transfer sludge from the six engineered containers in the KW Basin directly into a Sludge Transport and Storage Containers (STSC) contained in a Sludge Transport System (STS) cask. The STSC/STS cask will be transported to T Plant for interim storage of the STSC. The STS cask will be loaded with an empty STSC and returned to the KW Basin for loading of additional sludge for transportation and interim storage at T Plant. CH2MHILL Plateau Remediation Company (CHPRC) contracted with Fauske & Associates, LLC (FAI) to perform thermal and gas generation analyses for interim storage of STP sludge in the Sludge Transport and Storage Container (STSCs) at T Plant. The sludge types considered are settler sludge and sludge originating from the floor of the KW Basin and stored in containers 210 and 220, which are bounding compositions. The conditions specified by CHPRC for analysis are provided in Section 5. The FAI report (FAI/10-83, Thermal and Gas Analyses for a Sludge Transport and Storage Container (STSC) at T Plant) (refer to Attachment 1) documents the analyses. The process considered was passive, interim storage of sludge in various cells at T Plant. The FATE{trademark} code is used for the calculation. The results are shown in terms of the peak sludge temperature and hydrogen concentrations in the STSC and the T Plant cell. In particular, the concerns addressed were the thermal stability of the sludge and the potential for flammable gas mixtures. This work was performed with preliminary design information and a preliminary software configuration.

08 HYDROGEN↗