Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

STS-114: Discovery Day 13 Mission Status Briefing

LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He reports that the vehicle is in good shape, consumable status is excellent, and the shuttle crew is in high spirits and preparing for de-orbit and landing. LeRoy and his team have completed the entry system check up, flight control check up, reactor control system check up, and noted that all are at nominal performance; weather forecast is very good, the Entry team is ready and looking forward to de-orbit and landing at the Kennedy Space Center on Monday, August 8th. Re-entry, personal feelings, Columbia accident, data gathering, consumable situation, back up sites, weather, communication block out, night and day landing, and Commander Collin's piloting skills during night flight are some of the topics covered with the News media.

Source record↗

STS-114: Discovery Post Landing Press Briefing from JSC

LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He noted that the successful flight and return of Discovery is another important milestone, a fresh start, and a new beginning as part of NASA's commitment to the President's vision of man's return to the Moon, Mars and beyond. From this successful test flight, NASA will have a lot of learning and hard work to do in preparation for the next flight. Weather factors, safe landing, touch down, communications, re-entry, the Columbia, were some topics covered with the News media.

Source record↗

STS-114: Discovery Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director and Wayne Hale, Space Shuttle Deputy Program Director is shown during this mission status briefing. Hill talks about the first 24 hours of the Space Shuttle Discovery in orbit. He expresses that he has acquired data from the launch through imagery and hand held photographs of the external tank. Hale answers questions from the news media about how the engineers may be managing this data and if there is an overwhelming amount of data. Live downlink television pictures from the end-effectors camera on the Robotic Arm as it has completed its reberthing of the Orbiter Boom Sensor System (OBSS) are shown.

Source record↗

STS-114: Crew Training Clip from JSC

STS-114 Discovery crew is shown in various training exercises at Johnson Space Center. The crew consists of Eileen Collins, Commander; James Kelley, Pilot; Charles Camarda, Mission Specialist; Wendy Lawrence, Mission Specialist; Soichi Noguchi, Mission Specialist; Steve Robinson, Mission Specialist; and Andy Thomas, Mission Specialist. The exercises include: 1) EVA training in the VR lab; 2) Neutral Buoyancy Laboratory (NBL) EVA Training; 3) Walk to Motion Base Simulator; 4) EVA Preparations in ISS Airlock; and 7) Emergency Egress from Crew Compartment Trainer (CCT). A crew photo session is also presented. Footage of The Space Shuttle Atlantis inside the Kennedy Space Center Vehicle Assembly Building (VAB) after its demating from the Solid Rocket Booster and External Tank is shown. The video ends with techniques for inspecting and repairing Thermal Protection System tiles, a video of external tank production at the Michoud Assembly Facility (MAF) and redesign of the foam from the bipod ramp at Michoud Assembly Facility (MAF).

Source record↗

STS-114: Crew Interviews 1. Andy Thomas 2. Steve Robinson

STS-114 Mission Specialists, Andy Thomas and Steve Robinson, are seen in this pre-flight interview. Andy Thomas begins by talking about his interest in spaceflight as a young boy growing up in Australia. He expresses that the chances of an Australian boy studying to eventually become an astronaut was very remote. His Mechanical Engineering Degree in Australia and a Doctorate enabled him to acquire unique skills to come to the United States to work for Lockheed Martin. On the topic of return to flight, he reflects on experiences that he had working with the Michael Anderson and Kalpana Chawla of the ill-fated Space Shuttle Columbia. He also talks about the safety of the Space Shuttle Discovery and repairs to its Thermal Protection system. He explains in detail the Logistics Flight (LF) 1, spacewalks, Multipurpose Logistics Module (MPLM) and the External Stowage Platform (ESP)-2. Steve Robinson expresses that he had many interests as a child and becoming an astronaut was one of them. He was fascinated with things that fly and wanted to find out how they flew. He also designed hang gliders as a teenager. He expresses how his family feels about the risky business of spaceflight. He talks about how the space shuttle discovery crew will remember the Columbia crew by including seven stars on their patch so that they can bring them into orbit and then back home. Robinson also talks about his primary job, and the spacewalks that he and Soichi Noguchi will be performing.

Source record↗

STS-114: Discovery Mission Status Briefing (incl. Statement from Cmdr. Collins and Crew)

Commander Eileen Collins and crew briefly thanked everyone who worked hard to get the Shuttle back in space, and dedicated the mission to the Columbia crew as she bids their first "good night" to the Mission Control Room in Houston. Video continues with the Mission Status Briefing by Phil Engelauf, STS-114 Mission Operations Representative, and John Shannon, Manager of the Space Shuttle Operations and Integration. Phil noted that launching and ascent had gone extremely well, the crews and the flight control team performed well and the vehicle performed exceptionally as well. The launch is the beginning of a 12 day mission period. John details the tasks of the Engineering team processing the radar data taken during ascent and checking frame by frame the imagery from both on vehicle imagery and ground imagery. John further detailed the two debris event from ascent video clips of tile loss and an unidentified material falling off from the external tank; the release of TYVEK covers, and bird impact on the external tank nose cone. Tile shearing, tile damage, tile repair, landing gear door seals, repair capabilities, debris assessment, safety, inspections criteria, data acquisitions and data analysis were topics covered with the News media.

Source record↗

STS-114: Discovery Question & Answer with Joint Crew on ISS

STS-114 Commander Eileen Collins, Pilot James Kelly, Mission Specialists Souichi Noguchi, Stephen Robinson, Charles Camarda, Andrew Thomas, Wendy Lawrence, and Expedition 11 Commander Sergei Krikalev and Flight Engineer John Phillips answers questions from United States, Japanese and Russian News media in the Destiny laboratory of the International Space Station. Risk, safety, extravehicular activities, spacewalks, re-entry, gap fillers, tiles, flight operations, flight crew activities, team work, and life in space are topics covered with the News media.

Source record↗

STS-114: Discovery Day 6 Post MMT Meeting

Wane Hill, Deputy Manager of the Space Shuttle Program, and Steve Poulos, Manager, Orbiter Project Office discussed damage assessments caused during ascent. Steve further detailed the damage analysis and assessments with chart presentation of composite tile damage and gap filler sites evaluation, protruding ceramic shim, left wing tile damage, comparisons of ground test results versus FD5 focused inspection, and the window 1 blanket. Gap fillers, the STS-73, thermal protection, temperature range, heating and heating range, aerodynamics, aerothermodynamics, risk, foam damage, tile adhesions, and extravehicular activities are topics covered with the News media.

Source record↗

STS-114: Discovery Launch Readiness Press Conference

Michael Griffin, NASA Administrator; Wayne Hale, Space Shuttle Deputy Program Manager; Mike Wetmore, Director of Shuttle Processing; and 1st Lieutenant Mindy Chavez, Launch Weather Officer-United States Air Force 45th Weather Squadron are in attendance for this STS-114 Discovery launch readiness press conference. The discussion begins with Wayne Hale bringing to the table a low level sensor device for everyone to view. He talks in detail about all of the extensive tests that were performed on these sensors and the completion of these ambient tests. Chavez presents her weather forecast for the launch day of July 26th 2005. Michael Griffin and Wayne Hale answer questions from the news media pertaining to the sensors and launch readiness. The video ends with footage of Pilot Jim Kelly and Commander Eileen Collins conducting test flights in a Shuttle Training Aircraft (STA) that simulates Space Shuttle landing.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager, is presented in this STS-114 Discovery Post Mission Management Team (MMT) briefing. He begins by talking about obtaining clearance from the Reinforced Carbon-Carbon (RCC) material. He then describes the supplies such as eleven water containers and the transfer of 50 additional pounds of Oxygen to the International Space Station. Hale presents a video of a billowed thermal blanket next to the commander's window on the port side of the Space Shuttle Discovery that seems to be of some concern. He answers questions from the news media about the dimensions of this blanket, and the dangers of getting close to this blanket during the Extravehicular Activity (EVA) to repair the gap fillers.

Source record↗

STS-114: Discovery Mission Status Briefing

Phil Engelauf, STS-114 Mission Operations Representative reports: the orbital rendezvous was successful, and today's activities includes initial preparations of the next day's extravehicular activities (EVA); he specifically mentioned tile repair, wiring on the outside of the vehicle to try to recover CMG2 (Control Moment Gyro), and preparation for the external stowage platform. John Shannon, Manager of the Space Shuttle Operations and Integration reports from Engineering standpoint that the composites of the underside of the tile surface seen from pictures taken during the pitch maneuver were extremely clean; the Engineering staff continues to look at the focus inspection data from the orbital boom sensor system (OBSS) and other data to assess the condition of the vehicle. Solid rocket boosters were retrieved and are towed back to the Air Force hangar in Cape Carneval. Six target inspection (nose gear doors, gap fillers, chine area, external tank doors, trailing edge, and ice), and arm operations, foam, conservation measures, shuttle air lock, aerodynamics assessment and re-entry were topics covered with the News media.

Source record↗

Combustion Module-2 Achieved Scientific Success on Shuttle Mission STS-107

The familiar teardrop shape of a candle is caused by hot, spent air rising and cool fresh air flowing behind it. This type of airflow obscures many of the fundamental processes of combustion and is an impediment to our understanding and modeling of key combustion controls used for manufacturing, transportation, fire safety, and pollution. Conducting experiments in the microgravity environment onboard the space shuttles eliminates these impediments. NASA Glenn Research Center's Combustion Module-2 (CM-2) and its three experiments successfully flew on STS-107/Columbia in the SPACEHAB module and provided the answers for many research questions. However, this research also opened up new questions. The CM-2 facility was the largest and most complex pressurized system ever flown by NASA and was a precursor to the Glenn Fluids and Combustion Facility planned to fly on the International Space Station. CM-2 operated three combustion experiments: Laminar Soot Processes (LSP), Structure of Flame Balls at Low Lewis-Number (SOFBALL), and Water Mist Fire Suppression Experiment (Mist). Although Columbia's mission ended in tragedy with the loss of her crew and much data, most of the CM-2 results were sent to the ground team during the mission.

Over, Ann P.↗

Forward Technology Solar Cell Experiment (FTSCE) for MISSE-5 Verified and Readied for Flight on STS-114

The Forward Technology Solar Cell Experiment (FTSCE) is a space solar cell experiment built as part of the Fifth Materials on the International Space Station Experiment (MISSE-5): Data Acquisition and Control Hardware and Software. It represents a collaborative effort between the NASA Glenn Research Center, the Naval Research Laboratory, and the U.S. Naval Academy. The purpose of this experiment is to place current and future solar cell technologies on orbit where they will be characterized and validated. This is in response to recent on-orbit and ground test results that raised concerns about the in-space survivability of new solar cell technologies and about current ground test methodology. The various components of the FTSCE are assembled into a passive experiment container--a 2- by 2- by 4-in. folding metal container that will be attached by an astronaut to the outer structure of the International Space Station. Data collected by the FTSCE will be relayed to the ground through a transmitter assembled by the U.S. Naval Academy. Data-acquisition electronics and software were designed to be tolerant of the thermal and radiation effects expected on orbit. The experiment has been verified and readied for flight on STS-114.

Jenkins, Phillip P.↗

STS-121: TCDT (Terminal Countdown Demonstration Test) Compilation

STS-121/Discovery Flight Crew; Steve Lindsey(Commander), Mark Kelley(pilot), Mike Fossum, Lisa Nowak, Stephanie Nowak, Pierce Sellers, and Thomas Ryder completed the TCDT. The activities consisted of 1) Crew Arrival; 2) Pad 39B Media Event; 3) STA Flights at SLF; 4) Pad Walkdown and Slidewire; 5) Breakfast, Suiting, Walkout; 6) Crew Ingress in Orbiter; 7) Crew Egress and Slidewire; 8) M-113 Training; 9) Crew Payload Inspection; and 10) Crew Departure fro the SLF.

Source record↗

STS-121: Discovery Post Landing Press Conference

On July 17, 2006 Dean Acosta (NASA Press Secretary), Mike Griffin (Administrator), Bill Gerstenmaier (Associate Administrator of Space Operations), and Mike Leinbach (NASA Launch Director) expressed how proud they were to be a part of the STS-121/ Discovery team. They also explained how flawlessly the mission performed and how it was the best mission ever flown. They proceeded to answer numerous questions from the press.

Source record↗

STS-121: Crew Activities

STS-121/Discovery Flight Crew; Steve Lindsey(Commander), Mark Kelley(pilot), Mike Fossum, Lisa Nowak, Stephanie Nowak, Pierce Sellers, and Thomas Ryder performed the following activities: 1) Crew equipment interface test at SSPF; 2) Crew equipment interface test at Kennedy Space Center; and Payload Crew equipment interface test in SSPF.

Source record↗

STS-121/Discovery L-3 Countdown Status Briefing

The briefing started with opening remarks from George Diller (NASA Public Affairs). Jeff Spaulding (NASA Test Director) discussed the Shuttle launch status and the return to the International Space Station 12 day mission. Debbie Hahn (STS-121 Payload Manager) discussed the installation of mid-decks on ISS and the 2 tons of cargo (mainly crew supplies and food) and the oxygen regeneration system. Kathy Winters (Shuttle Weather Officer) discussed the weather forecast for the launch. The team also answered questions from the press.

Source record↗

STS-121: Discovery Entry Flight Director Post Landing Press Conference

Steve Stitch, STS-121 Entry Flight Director, and Wayne Hale, Space Shuttle Program is shown in this post landing press conference. Steve Stitch begins with discussing the following topics: 1) Weather at Kennedy Space Center; 2) Gap filler protrusion; 3) De-orbit burn; 4) Space Shuttle Landing; 5) Global Position Satellite System (GPSS) performance; and 6) Post-landing rain showers. Wayne Hale discusses external tank observations at launch and the goals that were obtained by this flight, which are to deliver 4000 pounds of scientific equipment, increase the crew members to three on the International Space Station (ISS), and repair the ISS. Questions from the press on lessons learned from the Auxiliary Power Unit (APU) leak, and flight readiness reviews are addressed.

Source record↗