Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Livermore Site Spill Prevention, Control, and Countermeasures (SPCC) Plan

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

54 ENVIRONMENTAL SCIENCES↗

Livermore Site SPCC Plan - Dececember 2017

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL’s) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

54 ENVIRONMENTAL SCIENCES↗

Aluminum Clad Spent Nuclear Fuel Task 1: Oxyhydroxide Layer Behavior and Chemistry Experimental Test Plan

This document presents the test plan for Task 1 of the Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan, which covers aluminum clad spent nuclear fuel (ASNF) fuel that is currently or may in the future be held in dry storage for an extended period. The objectives of the Task 1 test plan are to: 1. Understand how ASNF performs over extended dry storage periods. 2. Understand mechanisms that could alter aluminum hydroxide/oxyhydroxide layers during extended storage. 3. Characterize thickness and growth rates of oxyhydroxide layers based on fuel history and provide anticipated H2 gas generation rates based on chemical corrosion. 4. Characterize materials properties for oxides present on ASNF. 5. Interface with canister modeling activity to deliver degradation rates for package performance for both sealed and vented configurations. 6. Understand implications of higher temperature drying (250°C) on stability in dry storage. This test plan lays out the technical activities that will be performed to achieve the test objectives described above. Experiments will be performed at Idaho National Laboratory in-town facilities. Specimens for testing will include those supplied by Savannah River National Laboratory. Activities will include both experiments and modeling and will coordinate with other tasks within the project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aluminum Clad Spent Nuclear Fuel Task 3: Sealed and Vented Systems Episodic Breathing and Gas Generation Modeling Plan

This document presents the test plan for Task 3 of the Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan, which covers modeling and predictions of the generations of corrosive gases within both sealed and vented, subject to episodic breathing, storage systems. This includes aluminum clad spent nuclear fuel (ASNF) that is currently or may in the future be held in dry storage for an extended period. The overall objectives of the Task 3 modeling plan are to: 1. Comprehensively model the combined effects of episodic breathing in vented storage systems/canisters using INL INTEC CPP-603 facility as an example. Both bulk gas phase radiolysis reactions and aluminum cladding surface gas generation reactions will be included into a 3-dimensional computational fluid dynamics (CFD) model to model and predict long-term evolutions of the temperature and concentrations of corrosive gases within unsealed canisters subjected to episodic breathing. 2. Comprehensively model sealed and inert canister storage system using DOE standard canister as an example. 3. Closely integrate with Task 1 and Task 2 for identification of main gas-generation reactions and kinetics and provide simulation results back to Task 1 and 2 to further refine experimental designs. This test plan lays out the technical activities that will be performed to achieve the test objectives described above. Simulations will be performed using the Idaho National Laboratory super computer Falcon.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LLNL Livermore Site Spill Prevention, Control, and Countermeasure (SPCC) Plan June 2018

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL ’s) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR) , Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapt er 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for above ground oil storage and use at the Livermore Site.

54 ENVIRONMENTAL SCIENCES↗

Resource Conservation and Recovery Act General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Y-12 National Security Complex. Revision 12

This document, Y/TS-1015/R12, Resource Conservation and Recovery Act General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Y-12 National Security Complex, is for reference purposes. It is a consolidation of the August 10, 2018, versions of Attachment 6, “Contingency Plan,” from Tennessee Hazardous Waste Management Permits TNHW-122 and TNHW-127. It is not intended to supersede any requirements in these permits and any differences are unintentional. The decision to implement this contingency plan, as part of the Emergency Plan, depends upon whether an imminent or actual incident involving a RCRA treatment, storage, or disposal unit could threaten human health or the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Livermore Site Spill Prevention, Control and Countermeasures (SPCC) Plan

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL’s) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

54 ENVIRONMENTAL SCIENCES↗

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

TA-V Sub-Area Plan: Overview & Summary

The TA-V Sub-Area Plan is currently under development. A major input into the plan will be the results of a strategic planning study to be conducted in FY 2016 that will investigate the long-term programmatic future for TA-V. Anticipated planning issues to be explored include: (1) Nature of future programs and facility needs; (2) Recapitalization needed to sustain key facilities and resources; (3) Validation of existing land use as a remote nuclear research and radiation testing site; (4) Physical security requirements including the need to sustain or reconfigure the existing Perimeter Intrusion Detection and Assessment System (PIDAS); (5) Environmental remediation and restoration strategy; and (6) Site design improvements needed to enhance the quality of the working environment.

99 GENERAL AND MISCELLANEOUS↗

Time-Sensitive Value of Efficiency: Use Cases in Electricity Sector Planning and Programs

Most energy efficiency measures produce energy savings that vary over the course of a year. The value of the hourly electricity savings also varies over the course of a year because the cost of generating, transmitting and distributing electricity during peak demand periods may be significantly higher than during off-peak, or lower load, hours. But many planning and program activities across the United States are missing this important element. A variety of trends are changing the electricity system, including increased adoption of other distributed energy resources, electrification of buildings and vehicles, and relative costs for natural gas-fired and renewable energy generation. Knowing when energy efficiency occurs and the value of the energy or demand savings to the electricity system—the time-sensitive value of efficiency—provides public utility commissions, utilities and other decision makers with key information needed to procure the optimal amount of energy efficiency for their system. The report begins with a discussion of our approach to determining use cases and examples, and then examines the need for time-sensitive efficiency data. Next, it examines five use cases in which states, independent system operators/regional transmission operators (ISOs/RTOs), utilities, and efficiency program administrators consider the TSV-EE: (1) energy efficiency program planning and evaluation, (2) distribution system planning, (3) electricity resource planning (4) electricity rate design, and (5) state and local government activities. The report concludes with areas for future research on the time-sensitive value of efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sampling and Analysis Plan for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress

This Sampling and Analysis Plan (SAP) was originally developed as part of the Remedial Design Submittal Package required by the Interagency Agreement (IAG) for the United States Department of Energy/National Nuclear Security Administration (USDOE/NNSA) Pantex Plant. The SAP describes specifications for data collection, methods of sample collection and analysis, and requirements for quality assurance (QA) and quality control (QC) activities implemented during the life cycle of the program to ensure that data are of sufficient quality for their intended purpose (i.e., to support decision making regarding remediation of the groundwater beneath Pantex). The SAP was prepared according to United States Environmental Protection Agency (EPA) guidance on preparation of Quality Assurance Project Plans (QAPPs) QA/R-5 (EPA, 2001) and is designed to be a stand-alone document that describes both field sampling activities as well as QA/QC activities. The SAP is incorporated by reference to the compliance plan provisions of Hazardous Waste Permit No. 50284, issued by the Texas Commission on Environmental Quality, and was submitted as part of the Remedial Design/Remedial Action Work Plan submitted to EPA in accordance with the Interagency Agreement.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Robustness of Asymptotic Optimal Accelerated Test Plans to Small-Sample Settings

Accelerated testing is a form of testing commonly employed in industry, especially at Sandia National Laboratories, in order to extract information about product lifetime behavior that cannot be acquired under normal operating conditions due to the extensive durations of the intended life- times. As of the writing of this report, there is no known guideline for the design of accelerated tests at the laboratories and yet there is an entire field in the statistical literature on the optimal design of accelerated tests covering a wide range of limitations and constraints available for reference. A potential roadblock to incorporating this knowledge is the common difficulty at Sandia of having severely limited data available for such testing. Nearly all of the methodology presented in the statistical literature is based on asymptotic or large-sample theory and so may not be appropriate for the testing conditions present at Sandia. This report investigates optimal accelerated test plans derived based on small-sample or exact methodology for both a basic test setting as well as a more realistic setting and compares the resulting test plans to those derived based on the large- sample methodology from the literature. It is shown that the large-sample test plans are actually quite robust to the presence of limited data and are generally more flexible than the small-sample test plans.

36 MATERIALS SCIENCE↗

Soil Sample Plan in Support of the Site 300 Explosives Waste Treatment Facility Ecological Risk Assessment Pursuant to the Hazardous Waste Facility Permit, Part V, Special Condition #14 a-f. August 2020

The Department of Toxic Substances Control issued the Final Hazardous Waste Facility Permit to Lawrence Livermore National Laboratory, Site 300 in 2017. As part of the continual process to ensure waste treatment emissions are not impacting ecological receptors, LLNL analyzed soil samples in the vicinity of the Explosive Waste Treatment Facility (EWTF) Burn Units (i.e., Burn Cage and Burn Pan) and the Detonation Pad. Soil samples were analyzed by EPA Solid Waste 846 Methods for furans, explosives, metals, and semivolatile compounds. In all samples, furans, explosives, and semi-volatile organic compounds were not detected. Metals were detected at concentrations below background levels. This soil sample plan will sample the same four downwind areas of the Burn Units and the same downwind areas of the Detonation, as well as including four new sample locations. The four new locations will be located to the northeast and southwest of the Burn Units and Detonation (as shown in Figure 3). The constituents to be analyzed are in Tables 2 and 3. Perchlorate was not identified as a constituent of concern in the 2007 Soil Sampling Plan. However, for this plan, all soil samples will be analyzed for perchlorate. After completion of the sampling event, a soil sample report will be submitted to DTSC in accordance with requirements specified in the Hazardous Waste Facility Permit, Part V, Special Conditions 16 a-f. This proposed soil sampling plan will be fully implemented no later than one year after receiving DTSC approval, in accordance with the Hazardous Waste Facility Permit, Part V, Special Condition 15.

54 ENVIRONMENTAL SCIENCES↗

Wind Energy Technologies Office Multi-Year Program Plan Fiscal Years 2021—2025

WETO's Multi-Year Program Plan outlines the Office’s research priorities and plans through the year 2025. With the objectives of reducing the cost of wind energy, enabling the integration of substantial amounts of wind energy into the evolving national energy system, and creating siting and environmental solutions to reduce environmental impacts, the Plan provides insight into DOE’s wind energy research priorities, and will guide planning and execution of future R&D activities. It is organized in six sections: offshore wind, land-based wind, distributed wind, systems integration, modeling and analysis, and crosscutting initiatives.

17 WIND ENERGY↗

Modeling and Simulation Tool to Improve Urban Search Planning (NA22 Final Report)

The venture project Tool to Improve Urban Search Planning (LL14-V-Urban Search Planning ToolPD3RS) supported two major types of effort: 1) development of a software prototype search planning tool, with the goal of transitioning the tool to operational users for evaluation and possible adoption; 2) enabling research to better understand the radiation characteristics of an urban environment, with implications for deployment of radiation detection systems in that environment. The first effort has resulted in prototype software, Optimization Planning Tool for Urban Search (OPTUS), that has been distributed to a limited set of potential users, including users within the NNSA emergency response community. The second effort supported various research topics including high fidelity radiation transport modeling in urban environments, measurement campaigns for model validation, development of vehicle-based high purity germanium (HPGe) detector systems and supporting data analysis, and computational capabilities for archiving and managing large data sets. While some of these related efforts have informed the models and software design of the OPTUS tool, in large part they pursued more basic research, some of which has evolved into separate DNN R&D projects. Project performers included Oak Ridge National Laboratory (ORNL), Lawrence Berkeley National Laboratory (LBNL) and the Remote Sensing Laboratory (RSL), in addition to Lawrence Livermore Laboratory (LLNL), the project lead. The project also supported university research, including several internships at the laboratories.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Site 300 (Facility ID N-472) Toxic Emissions Inventory Plan

The Air Toxics "Hot Spots" Information and Assessment Act (AB 2588 or the “Act”) was enacted in September 1987. Under the Act, stationary sources are required to report the types and quantities of certain toxic substances their facilities routinely release into the air. AB 2588 is designed to provide information to state and local agencies and to the general public on the extent of airborne emissions from stationary sources and the potential public health impacts of those emissions. The San Joaquin Valley Air Pollution Control District (the District) is mandated by the State to implement AB 2588. On March 6, 2015, The State Office of Environmental Health Hazard Assessment (OEHHA) adopted changes to the Air Toxics Hot Spots Program Guidance Manual for the Preparation of Health Risk Assessments. These revisions were designed to incorporate three technical support documents and to provide enhanced protection of children as required under state law (SB 25, Escutia, 1999). Due to these recent changes, and the corresponding potential increases in calculated health risk, the District notified LAWRENCE LIVERMORE NATL SECURITY, LLC that we must be re-evaluated under AB 2588. Pursuant to the Air Toxics "Hot Spots" Information and Assessment Act of 1987, we have prepared a comprehensive, site-specific Toxics Emissions Inventory Plan. The plan specifies in detail how LAWRENCE LIVERMORE NATL SECURITY, LLC will inventory our facility's emissions of all toxic substances on the list of substances subject to the Act. The plan provides a comprehensive and detailed description of the methods that will be used to quantify air releases or potential air releases of listed substances from all points of release. The plan also includes quantification methods which result in accurate and comprehensive characterization of releases and comply with all applicable requirements of the “Hot Spots” regulation.

54 ENVIRONMENTAL SCIENCES↗

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

International Radiological/Nuclear Training for Emergency Response - Major Public Events Virtual Workshop: Nuclear Security Planning and Operations (Day 3) [Slides]

This module will provide an overview of best practices for nuclear security planning requirements to include building a nuclear security plan and a concept of operations. It will introduce best practices for nuclear security planning to include the following: (1) Develop a Nuclear Security Plan, (2) Review 10 key elements of a Concept of Operations, (3) Estimate resources for an MPE, and (4) Capture lessons learned and best practices.

61 RADIATION PROTECTION AND DOSIMETRY↗