Project Plan 7930 Cell G PaR Remote Handling System Replacement

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Research opportunities in microgravity science and applications during shuttle hiatus

The opportunity to conduct microgravity and related research still exists, even with the temporary delay in the U.S. Space Shuttle program. Several ground-based facilities are available and use of these facilities is highly recommended for the preparation of near and far term shuttle or space station experiments. Drop tubes, drop towers, aircraft, sounding rockets and a wide variety of other ground-based equipment can be used to simulate microgravity. This paper concentrates on the materials processing capabilities available at NASA Lewis Research Center (NASA Lewis), Marshall Space Flight Center (MSFC), and the California Institute of Technology Jet Propulsion Laboratory (JPL). Also included is information on gaining access to these facilities.

Rosenthal, Bruce N.↗

Research opportunities in microgravity science and applications during Shuttle hiatus

The opportunity to conduct microgravity and related research still exists, even with the temporary delay in the U.S. Space Shuttle program. Several ground-based facilities are available, and use of these facilities is highly recommended for the preparation of near and far term Shuttle or Space Station experiments. Drop tubes, drop towers, aircraft, sounding rockets, and a wide variety of other ground-based equipment can be used to simulate microgravity. This paper concentrates on the materials processing capabilities available at NASA Lewis Research Center (NASA Lewis), Marshall Space Flight Center (MSFC), and the California Institute of Technology Jet Propulsion Laboratory (JPL). Also included is information on gaining access to these facilities.

Rosenthal, Bruce N.↗

Doppler-Shifted Raman Spectroscopy Measures Flows

Technique for measuring velocity, static pressure, and translational temperature of flowing molecules by use of stimulated Raman spectroscopy demonstrated in supersonic wind tunnel at NASA Langley Research Center. Nonintrusive, accurate wind-tunnel measurements obtained without seeding flows. Optical equipment for vibration-free Raman doppler velocimetry in wind tunnel includes specially designed retrometer that reduces sensitivity of system to vibrations. This capability very valuable in aerodynamic testing and proves useful in wide variety of laboratory, industrial, and engineering applications.

Exton, Reginald J.↗

Green Propellant Demonstration with Hydrazine Catalyst of F-16 Emergency Power Unit

Some space vehicle and aircraft Auxiliary Power Units (APUs) use hydrazine propellant for generating power. Hydrazine is a toxic, hazardous fuel which requires special safety equipment and processes for handling and loading. In recent years, there has been development of two green propellants that could enable their use in APU's: the Swedish LMP-103S and the Air Force Research Laboratory (AFRL) AF-M315E. While there has been work on development of these propellants for thruster applications (Prisma and Green Propulsion Infusion Mission, respectively), there has been less focus on the application to power units. Beginning in 2012, an effort was started by the Marshall Space Flight Center (MSFC) on the APU application. The MSFC plan was to demonstrate green propellants with residual Space Shuttle hardware. The principal investigator was able to acquire a Solid Rocket Booster gas generator and an Orbiter APU. Since these test assets were limited in number, an Air Force equivalent asset was identified: the F-16 Emergency Power Unit (EPU). In June 2013, two EPU's were acquired from retired aircraft located at Davis Monthan Air Force Base. A gas generator from one of these EPU's was taken out of an assembly and configured for testing with a version of the USAF propellant with a higher water content (AF-M315EM) to reduce decomposition temperatures. Testing in November 2014 has shown that this green propellant is reactive with the Hydrazine catalyst (Shell 405) generating 300 psi of pressure with the existing F-16 EPU configuration. This paper will highlight the results of MSFC testing in collaboration with AFRL.

Robinson, Joel W.↗

Wind-Tunnel Tests of 1/6-Scale Model of Republic P-47C Airplane with External Wing Tank

In order to increase the range of the Republic P-47C airplane for ferrying purposes it has been proposed that the airplane be equipped with streamlined external wing tanks. This report presents the aerodynamic effect of such wing tanks as determined from tests of a l/6-scale model in the 7- by 10-foot tunnel of the Langley Memorial Aeronautical Laboratory.

Marvin J Schuldenfrei↗

Shorepower Truck Electrification Project (STEP) - 1Q - 2Q 2013

The Fleet Test and Evaluation Team at the U.S. Department of Energy's National Renewable Energy Laboratory is evaluating and documenting the use of shorepower at 50 planned American Recovery and Reinvestment Act (ARRA)-funded truck stop electrification (TSE) sites across the nation. Trucks participating in the study have idle-reduction equipment installed that was purchased with rebates through the ARRA. A total of 5,000 rebates will be approved. the ARRA. A total of 5,000 rebates will be approved.

33 ADVANCED PROPULSION SYSTEMS↗

Shorepower Truck Electrification Project (STEP) - Cumulative through June 2014

The Fleet Test and Evaluation Team at the U.S. Department of Energy's National Renewable Energy Laboratory is evaluating and documenting the use of shorepower at 50 planned American Recovery and Reinvestment Act (ARRA)-funded truck stop electrification (TSE) sites across the nation. Trucks participating in the study have idle-reduction equipment installed that was purchased with rebates through the ARRA. A total of 5,000 rebates will be approved.

33 ADVANCED PROPULSION SYSTEMS↗

Closeout Phase II Qualification of the Thermal Conductivity Microscope for IMCL

The FY18 milestone for this work involved the completion of qualification testing of the Thermal Conductivity Microscope (TCM) in preparation for installation in the Irradiated Materials Characterization Laboratory (IMCL). In FY17 the TCM was entered into stage one mockup at the Materials and Fuels Complex (MFC) and initial testing was completed. This initial testing at the MFC centered on the ability operate the equipment remotely using manipulators and functional testing of the instrument. During FY18 issues noted during initial testing were addressed, a sample heater indexing system was developed, software enhancements were integrated and a sputter coater for use in the glove was procured. Additional testing was preformed to ensure instrument accuracy and reproducibility. The Phase II qualification plan, MFC-EQP-0267, completed approval on August 14, 2018.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modeling FLEX Human Actions Using the EMRALD Dynamic Risk Assessment Tool

Most current efforts have modified and applied existing human reliability analysis (HRA) methods to treat human actions related to beyond-design-basis external events in which diverse and flexible coping strategies (FLEX) equipment would be deployed. However, many questions remain regarding the suitability of legacy HRA methods to address FLEX human actions, sparking the need for a new method of reasonably evaluating them. In this context, Idaho National Laboratory (INL) researched a relatively new approach to treating FLEX human actions via Event Modeling Risk Assessment Using Linked Diagrams (EMRALD) software. EMRALD was developed to support the increasing need for dynamic probabilistic risk assessment (PRA) models that can respond to evolving plant conditions during simulations. A couple benefits were identified when analyzing FLEX human actions through this software. In general, it is especially useful for evaluating a strategy’s feasibility, including FLEX human actions that require a relatively long time to perform. In this paper, we suggest how FLEX human actions can be modeled using the EMRALD software. Two different HRA modeling approaches using EMRALD are introduced: (1) procedure-based modeling and (2) PRA/HRA-based modeling. The former approach was introduced in the authors’ previous paper, whereas this paper mainly discusses how the latter approach works for an extended loss of AC power (ELAP) scenario with relevant procedures and PRA models. A hybrid method combining the two modeling approaches is introduced at the paper’s conclusion.

99 GENERAL AND MISCELLANEOUS↗

Engineering Scale Testing of Robotic Inspection Tools for Double Shell Tanks at Hanford - 18349

Waste found in the annulus of the AY-102 double-shell tank (DST) at Hanford has prompted the need for the development of inspection tools that are able to access confined spaces around and underneath the tanks. During the last year, Florida International University (FIU) has been developing inspection tools that are capable of accessing the tank floors through the air supply line, the air refractory channels and the drain lines. This effort has led to the development of a pneumatic pipe crawler and a miniature rover. In this paper, updates to the inspection tool designs and the full scale testing of both systems are presented. The tools provide visual feedback for the operator, carrying with them onboard cameras and light sources. The images are streamed back live via a tether, which also provides power to the devices. To increase the sensing capabilities of both tools, temperature, humidity and radiation sensor modules are being integrated onto the developed systems, and can be interchanged depending on the inspection objectives. The miniature rover measures 7 cm in length and 3.8 cm in width, and travels upside down on the bottom of the tank to avoid debris accumulated in the channels. The video is also being processed real-time to provide control of the unit semi-autonomously. The pipe crawler measures approximately 76 cm in length and 6.4 cm in diameter, and travels using pneumatic actuators that emulate the peristaltic movement contractions typical of worm type robots. A full-scale sectional mock-up of the DST foundation, refractory system and annulus is currently being developed as a test-bed for the testing of the inspection tools. The intention of the test-bed is to demonstrate the viability of using both inspection tools in configurations similar to the actual tank. The test-bed includes a 2.43 m wide section of both tank liners, refractory channels and concrete foundation with drain slots. The test-bed is designed to be modular so that various plate thicknesses can be easily utilized and different refractory configurations can be incorporated. Currently, the refractory channels are of the tree type structure with turns that are approximately 30 degrees. Both inspection tools were demonstrated in the mock-up facility. The miniature rover ran successfully through the drain slots from the annulus to central plenum and had no issues making the 90-degree turns. The peristaltic crawler was able to navigate through the 7.62 cm air supply line from the annulus to the central plenum. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test for Reconditioning RA Waste with Simulated Bitumen and Concrete in a 1,2 MW Plasma Test Facility - 20092

The operation and maintenance of nuclear power plants, the non nuclear fuel cycle, etc generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified, oxidized and purified in an off-gas cleaning system. First the paper describes the new full-scale Plasma Melting Facility (PMF) at the Kozloduy Nuclear Power Plant in Bulgaria which was taken in nuclear operation In May 2018. The plant has a capacity of 250 tons per year and the maximum contact dose rates of the incoming waste is 2 mSv/h. Different mixtures of radioactive waste packed in 200 l drums were successfully treated resulting in a glassy slag free from liquids and organic material with an important volume reduction factor (VRF). The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD through Bulgarian national funding. Plasma is a suitable technology for treatment of problematic waste or even reconditioning waste so Belgoprocess was contracted to do plasma tests with simulated conditioned waste types. One can do tests on a laboratory scale on smaller samples and torch capacities of e.g. 50 kW but Belgoprocess wanted to do more realistic and reliable tests. So Belgoprocess contracted Phoenix Solutions Co who has a full-scope test facility equipped with a 1200 kW plasma torch for full-scope treatment of simulated conditioned waste. For a first confidential contract simulated 200 l (55 gallon) bitumen drums were treated. The drums contained different pucks of compacted waste such as rags, used filters, granulates, etc. The pucks were stacked in the 200 l drums and subsequently embedded with bitumen. A total of 6 drums were treated in the plasma facility. For a second contract simulated homogeneous 200 l (55 gallon) concrete drums with on the one hand concentrates and on the other hand spent resins were selected. A total of 6 drums with concrete and spent resins were treated and melted in the plasma testing facility. The paper describe the test facility, volume reduction factor (VRF) of different waste streams and most important parameters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of NSUF Capabilities Towards Understanding the Emulation of High Dose Neutron Irradiations with Ion Beams

Development of new materials for current nuclear power plants (NPPs) or materials for new NPPs requires extensive research, development, and deployment programs. Central to these efforts, particularly for core internals, are studies on the microstructural and mechanical changes due to neutron irradiation. These radiation effects studies are typically completed using materials test reactors followed by expensive and time-consuming post-irradiation examinations (PIE). This sluggish approach has severely limited the nuclear materials field to develop new materials or verify materials for new reactor design use. It is also very difficult to achieve the high levels of damage proposed for future reactors. A logical approach to accelerating the field is the application of ion beams to simulate neutron damage, especially for high dose applications. Ion beams have been used for decades to study radiation effects but not to emulate high dose reactor irradiations. In this regard, new (or renewed) methods for ion beam irradiations, new developments in materials characterization, and greater understanding on the governing mechanisms controlling observed radiation effects have led to a need for further studies to refine the technique. A primary challenge is the ability to determine the ion irradiation conditions that produce microstructures and mechanical properties relevant to in-core neutron irradiation conditions. A large, multi-disciplinary, multi-laboratory program deemed the High Fidelity Ion Beam Simulation of High Dose Neutron Irradiation has been formed to assess and overcome the challenges associated with emulating high dose neutron irradiations using ion beams. Central to this program is the use of dual-beam ion irradiations and corresponding neutron irradiations within the BOR-60 fast reactor. These irradiations have produced hundreds of specimens for microstructural and mechanical characterization. A significant issue regarding the samples is the radioactivity of the neutron irradiated specimens as well as the need to characterize both irradiation types using the same equipment to maintain consistency and repeatability. The use of the Nuclear Science User Facilities (NSUF) has been central towards overcoming the mentioned issues and thereby enabling robust PIE in both the ion and neutron irradiated specimens of interest. In particular, the electron microscopes housed within the Low Activation Materials Development and Analysis (LAMDA) facility at Oak Ridge National Laboratory (ORNL) - an NSUF partner facility - has been instrumental in gathering high quality data for analysis. This paper will briefly highlight the PIE efforts using the NSUF capabilities within LAMDA.

36 MATERIALS SCIENCE↗

Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Alternatives for Dismantling of the Equipment in Building 117/1 at Ignalina NPP - 13278

Ignalina NPP was operating two RBMK-1500 reactors which are under decommissioning now. In this paper dismantling alternatives of the equipment in Building 117/1 are analyzed. After situation analysis and collection of the primary information related to components' physical and radiological characteristics, location and other data, two different alternatives for dismantling of the equipment are formulated - the first (A1), when major components (vessels and pipes of Emergency Core Cooling System - ECCS) are segmented/halved in situ using flame cutting (oxy-acetylene) and the second one (A2), when these components are segmented/halved at the workshop using CAMC (Contact Arc Metal Cutting) technique. To select the preferable alternative MCDA method - AHP (Analytic Hierarchy Process) is applied. Hierarchical list of decision criteria, necessary for assessment of alternatives performance, are formulated. Quantitative decision criteria values for these alternatives are calculated using software DECRAD, which was developed by Lithuanian Energy Institute Nuclear engineering laboratory. While qualitative decision criteria are evaluated using expert judgment. Analysis results show that alternative A1 is better than alternative A2. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Energetic Particle Data From the Global Positioning System Constellation

Abstract Since 2000, Los Alamos National Laboratory (LANL) Combined X‐ray and Dosimeter (CXD) and Burst Detector Dosimeter for Block II‐R (BDD‐IIR) instruments have been fielded on Global Positioning System (GPS) satellites. Today, 21 of the 31 operational GPS satellites are equipped with a CXD detector and a further 2 carry a BDD‐IIR. Each of these instruments measures a wide range of energetic electrons and protons. These data have now been publicly released under the terms of the Executive Order for Coordinating Efforts to Prepare the Nation for Space Weather Events. The specific goal of releasing space weather data from the GPS satellites is to enable broad scientific community engagement in enhancing space weather model validation and improvements in space weather forecasting and situational awareness. The time period covered by this data release is approximately 16 years, which corresponds to more than 167 satellite years of data. The large number of GPS satellites, distributed over six orbital planes, will provide important context for ongoing and historical science missions, as well as enabling new types of research not previously possible.

54 ENVIRONMENTAL SCIENCES↗

Micromegas detectors for CLAS12

The electron accelerator of the Thomas Jefferson Laboratory (VI, USA) will soon be upgraded to deliver 12 GeV high intensity beams. This increase in the performance will give the opportunity to study the nucleon structure with an unprecedented accuracy. To meet this end, new equipments will be installed in the experimental areas, particularly in the Hall B/CLAS spectrometer. One of the most challenging aspects is the installation of a Central Tracker surrounding the target, dedicated to the detection of particles emitted at large angles. Micromegas detectors have been chosen to be a major element of this new equipment, due to their high rate capability as well as their robustness and light material. Using the recent bulk technology, part of these gaseous detectors are planned to be assembled in thin cylinders to maximize the acceptance. On the other hand, the presence of a strong magnetic field either perpendicular or parallel to the readout strips has important consequences which need to be carefully investigated. Finally, resistive Micromegas have been studied to further improve the rate capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A room temperature electron cyclotron resonance ion source for the DC-110 cyclotron

The project of the DC-110 cyclotron facility to provide applied research in the nanotechnologies (track pore membranes, surface modification of materials, etc.) has been designed by the Flerov Laboratory of Nuclear Reactions of the Joint Institute for Nuclear Research (Dubna). The facility includes the isochronous cyclotron DC-110 for accelerating the intensive Ar, Kr, Xe ion beams with 2.5 MeV/nucleon fixed energy. The cyclotron is equipped with system of axial injection and ECR ion source DECRIS-5, operating at the frequency of 18 GHz. This article reviews the design and construction of DECRIS-5 ion source along with some initial commissioning results.

43 PARTICLE ACCELERATORS↗