Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “KEYING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Demonstration of A Long Duration Crop in the Advanced Plant Habitat Engineering Demonstration Unit: Key Factors to Consider Prior to Testing and Lessons Learned

The Advanced Plant Habitat (APH) is a fully enclosed, closed-loop, plant growth facility currently deployed on the International Space Station (ISS). It is equipped with complete environmental control (i.e.spectral qualityandlight intensity, temperature, relative humidity, and CO2),root module which containsa growth substrate(typically arcillite) and a porous tube based automated water delivery system. Two APH units, one ground unitidentical to the on-orbit versionand an Engineering Development Unit (EDU; a high fidelity test version), currently reside at Kennedy Space Center. Prior to conducting tests on-orbit, these APH ground units areutilized to conductbothScience Verification Tests(SVT; primarilyinthe EDU) and Experiment Verification Tests (EVT; primarily in the Ground Unit). In February 2020, a 122 day experiment was concluded in the APH EDU where four 'Numex Española Improved' pepper plants (Capsicum annuum) were successfully grown from seed to harvestyieldingover 50 fruit, demonstrating the capabilityand versatilityof this APH EDU system to support plant growth for long life cycle flowering/fruiting plants.

L. E. Spencer↗

Key Opportunities in Aeronautics Enterprise

Opportunities for college students studying aerospace. Presentation covers trends in aircraft manufacturing, supply chain, and airspace operations as well as research and development opportunities at NASA.

Aeronautics↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

CCD Star Tracker Experience -- Key Results from Astro 1 flight

Charge-coupled devices (CCDs) have now flown successfully in a number of space scientific and engineering instruments, and have rapidly become the preferred technology for most imaging applications. One of their earliest planned applications in space was in the precision (subarcsecond) star tracker for the Astro series of UV missions.

Astro↗

Keys to Subcontracting Space Hardware with JPL

The Jet Propulsion Laboratory’s (JPL), process of subcontracting space systems and hardware with suppliers varies somewhat from the industry-standard supply chain process. This paper is an overview of the contracting process with JPL, a division of the California Institute of Technology (Caltech), in Pasadena, CA. The goal of this paper is to present and clarify the JPL way of subcontracting in order to help both current and potential suppliers understand the JPL nuances and ease their process of contracting with JPL.

Pasko Heuchert, Susan↗

Modeling Key Predictors of Airport Runway Configurations Using Learning Algorithms

Advanced traffic flow management automation will need accurate predictions of airport runway configurations. Terminal area weather and traffic demand are generally considered to be the most significant factors in predicting runway configuration. Weather information is forecasted across multiple features, including wind direction, wind speed, gusts, cloud ceilings, visibility, temperature, and precipitation, among many others. We use machine learning techniques on historical weather and runway data to determine weather features that correlate well with runway configurations. We analyze the predictive capability of weather features using different learning models trained on data from four major U.S. airports: Atlanta (ATL), Washington – Dulles (IAD), New York – Kennedy (JFK), and San Francisco (SFO). Wind direction alone is strongly correlated with runway configurations above all other examined factors, as expected. This correlation is the most significant component of the ~80% prediction accuracy in selecting between the two most frequently used runway configurations. However, individual airports show variations on how well the runway configuration decisions correlate with wind direction. While wind direction was identified as the most significant indicator of configuration decisions in ATL, IAD, and JFK, it did not emerge as such at SFO. Traffic demand was not found to be a strong factor in predicting runway configurations at any of the airports analyzed. In rare instances, when high demand cannot be accommodated within the current configuration, temporary changes are likely to be attributable to demand. However, these occurrences are so limited in number that their overall effect is not sufficient to consider traffic demand as a major indicator of runway configuration at the airports analyzed.

Bilimoria, Karl D.↗