Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Active Management of Flap-Edge Trailing Vortices

The vortex hazard produced by large airliners and increasingly larger airliners entering service, combined with projected rapid increases in the demand for air transportation, is expected to act as a major impediment to increased air traffic capacity. Significant reduction in the vortex hazard is possible, however, by employing active vortex alleviation techniques that reduce the wake severity by dynamically modifying its vortex characteristics, providing that the techniques do not degrade performance or compromise safety and ride quality. With this as background, a series of experiments were performed, initially at NASA Langley Research Center and subsequently at the Berlin University of Technology in collaboration with the German Aerospace Center. The investigations demonstrated the basic mechanism for managing trailing vortices using retrofitted devices that are decoupled from conventional control surfaces. The basic premise for managing vortices advanced here is rooted in the erstwhile forgotten hypothesis of Albert Betz, as extended and verified ingeniously by Coleman duPont Donaldson and his collaborators. Using these devices, vortices may be perturbed at arbitrarily long wavelengths down to wavelengths less than a typical airliner wingspan and the oscillatory loads on the wings, and hence the vehicle, are small. Significant flexibility in the specific device has been demonstrated using local passive and active separation control as well as local circulation control via Gurney flaps. The method is now in a position to be tested in a wind tunnel with a longer test section on a scaled airliner configuration. Alternatively, the method can be tested directly in a towing tank, on a model aircraft, a light aircraft or a full-scale airliner. The authors believed that this method will have significant appeal from an industry perspective due to its retrofit potential with little to no impact on cruise (devices tucked away in the cove or retracted); low operating power requirements; small lift oscillations when deployed in a time-dependent manner; and significant flexibility with respect to the specific devices selected.

Greenblatt, David↗

Development progress of the Materials Analysis and Particle Probe

The Materials Analysis and Particle Probe (MAPP) is a compact in vacuo surface science diagnostic, designed to provide in situ surface characterization of plasma facing components in a tokamak environment. MAPP has been implemented for operation on the Lithium Tokamak Experiment at Princeton Plasma Physics Laboratory (PPPL), where all control and analysis systems are currently under development for full remote operation. Control systems include vacuum management, instrument power, and translational/rotational probe drive. Analysis systems include onboard Langmuir probes and all components required for x-ray photoelectron spectroscopy, low-energy ion scattering spectroscopy, direct recoil spectroscopy, and thermal desorption spectroscopy surface analysis techniques.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

Some design constraints required for the use of generic software in embedded systems: Packages which manage abstract dynamic structures without the need for garbage collection

The embedded systems running real-time applications, for which Ada was designed, require their own mechanisms for the management of dynamically allocated storage. There is a need for packages which manage their own internalo structures to control their deallocation as well, due to the performance implications of garbage collection by the KAPSE. This places a requirement upon the design of generic packages which manage generically structured private types built-up from application-defined input types. These kinds of generic packages should figure greatly in the development of lower-level software such as operating systems, schedulers, controllers, and device driver; and will manage structures such as queues, stacks, link-lists, files, and binary multary (hierarchical) trees. Controlled to prevent inadvertent de-designation of dynamic elements, which is implicit in the assignment operation A study was made of the use of limited private type, in solving the problems of controlling the accumulation of anonymous, detached objects in running systems. The use of deallocator prodecures for run-down of application-defined input types during deallocation operations during satellites.

Johnson, Charles S.↗

Outcome after Radiofrequency Ablation of Sarcoma Lung Metastases

Purpose: Resection is the mainstay of management in patients with sarcoma lung metastases, but there is a limit to how many resections can be performed. Some patients with inoperable disease have small-volume lung metastases that are amenable to thermal ablation. We report our results after radiofrequency ablation (RFA). Methods: This is a retrospective study of patients treated from 2007 to 2012 in whom the intention was to treat all sites of disease and who had a minimum CT follow-up of 4 months. Treatment was performed under general anesthesia/conscious sedation using cool-tip RFA. Follow-up CT scans were analyzed for local control. Primary tumor type, location, grade, disease-free interval, prior resection/chemotherapy, number and size of lung tumors, uni- or bilateral disease, complications, and overall and progression-free survival were recorded. Results: Twenty-two patients [15 women; median age 48 (range 10–78) years] with 55 lung metastases were treated in 30 sessions. Mean and median tumor size and initial number were 0.9 cm and 0.7 (range 0.5–2) cm, and 2.5 and 1 (1–7) respectively. Median CT and clinical follow-up were 12 (4–54) and 20 (8–63) months, respectively. Primary local control rate was 52 of 55 (95 %). There were 2 of 30 (6.6 %) Common Terminology Criteria grade 3 complications with no long-term sequelae. Mean (median not reached) and 2- and 3-year overall survival were 51 months, and 94 and 85 %. Median and 1- and 2-year progression-free survival were 12 months, and 53 and 23 %. Prior disease-free interval was the only significant factor to affect overall survival. Conclusion: RFA is a safe and effective treatment for patients with small-volume sarcoma metastases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Power quality load management for large spacecraft electrical power systems

In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

Lollar, Louis F.↗

A Game Changer: Electrifying Remote Communities by Using Isolated Microgrids

Microgrids, as self-contained entities, are of increasing interest in modern electric grids. Microgrids provide a sustainable solution to aggregate distributed energy resources (DERs) [e.g., photovoltaics (PVs), wind turbines], energy storage, and loads in a localized manner, especially in distribution systems. As a controllable unit, a microgrid can manage and balance the source and load power inside it to ensure stable and reliable operation. Moreover, through coordination with upper-level control systems, it can be dispatched and respond to the control commands issued by the central controller in the distribution system-in other words, a system that is effectively a distribution management system (DMS).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Predictive Solar-Integrated Commercial Building Load Control

This report is the final technical report for the Department of Energy SunShot award number EE0007180 to EdgePower Inc., for the project entitled “Predictive Solar-Integrated Commercial Building Load Control.” The goal of this project was to successfully prove that the integration of solar forecasting and building load control can reduce demand charge costs for commercial building owners with solar PV. This proof of concept Tier 0 project demonstrated its value through a pilot project at a commercial building. This final report contains a summary of the work completed through he duration of the project. Clean Power Research was a sub-recipient on the award.

14 SOLAR ENERGY↗

Guidance concepts for time-based flight operations

Airport congestion and the associated delays are severe in today's airspace system and are expected to increase. NASA and the FAA is investigating various methods of alleviating this problem through new technology and operational procedures. One concept for improving airspace productivity is time-based control of aircraft. Research to date has focused primarily on the development of time-based flight management systems and Air Traffic Control operational procedures. Flight operations may, however, require special onboard guidance in order to satisfy the Air Traffic Control imposed time constraints. The results are presented of a simulation study aimed at evaluating several time-based guidance concepts in terms of tracking performance, pilot workload, and subjective preference. The guidance concepts tested varied in complexity from simple digital time-error feedback to an advanced time-referenced-energy guidance scheme.

Vicroy, Dan D.↗

Thermal Management of Wide-Bandgap Semiconductor Amplifiers Used for Plasma Heating and Control

Princeton Fusion Systems (PFS) has designed, built, and tested a Load Switch printed circuit board (PCB) to demonstrate the capabilities of 2 kV silicon carbide (SiC) cascodes in development by Qorvo towards plasma heating and control applications. Initial tests have been conducted at low power (~100 W) for validation with thermal finite element analysis (FEA) modeling performed by the National Renewable Energy Laboratory (NREL). Comparisons of experimental data with the thermal modeling results, along with considerations for operating in plasma systems, will be discussed.

CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND SU↗

An Agent-Based Model for Analyzing Control Policies and the Dynamic Service-Time Performance of a Capacity-Constrained Air Traffic Management Facility

Simple agent-based models may be useful for investigating air traffic control strategies as a precursory screening for more costly, higher fidelity simulation. Of concern is the ability of the models to capture the essence of the system and provide insight into system behavior in a timely manner and without breaking the bank. The method is put to the test with the development of a model to address situations where capacity is overburdened and potential for propagation of the resultant delay though later flights is possible via flight dependencies. The resultant model includes primitive representations of principal air traffic system attributes, namely system capacity, demand, airline schedules and strategy, and aircraft capability. It affords a venue to explore their interdependence in a time-dependent, dynamic system simulation. The scope of the research question and the carefully-chosen modeling fidelity did allow for the development of an agent-based model in short order. The model predicted non-linear behavior given certain initial conditions and system control strategies. Additionally, a combination of the model and dimensionless techniques borrowed from fluid systems was demonstrated that can predict the system s dynamic behavior across a wide range of parametric settings.

Conway, Sheila R.↗

Evolution and Trends of Industrial Control System Cyber Incidents since 2017

The industrial control systems (ICSs) that manage our critical infrastructure are increasingly converging with corporate networks and the Internet as technology and businesses prioritize digital connectivity. These connections make them more vulnerable and available to malicious cyber actors who traditionally targeted the companies’ more public-facing information technology (IT) networks. This paper will review select publicly reported cyber incidents to highlight the continued and growing threat to ICS devices and operational technology (OT) environments. It will summarize the incident and when available, will provide information on the cyber actors, the vulnerabilities they exploited, and any publications the U.S. Government (USG) provided in response. Data belonging to the Department of Homeland Security (DHS) will be used to highlight quantitative trends concerning ICS incidents. This paper builds on “History of Industrial Control System Cyber Incidents” (Hemsley & Fisher 2018), a paper that highlighted select noteworthy threats and incidents to ICS systems up to 2017. This paper will similarly review select incidents occurring after the last previously reviewed incident, Triton/HatMan, December 2017, and will note ICS incident trends including IT/OT convergence and advances in cyber-threat actors’ capabilities in observed in the examined incidents.

99 GENERAL AND MISCELLANEOUS↗

High-performance mass storage system for workstations

Reduced Instruction Set Computer (RISC) workstations and Personnel Computers (PC) are very popular tools for office automation, command and control, scientific analysis, database management, and many other applications. However, when using Input/Output (I/O) intensive applications, the RISC workstations and PC's are often overburdened with the tasks of collecting, staging, storing, and distributing data. Also, by using standard high-performance peripherals and storage devices, the I/O function can still be a common bottleneck process. Therefore, the high-performance mass storage system, developed by Loral AeroSys' Independent Research and Development (IR&D) engineers, can offload a RISC workstation of I/O related functions and provide high-performance I/O functions and external interfaces. The high-performance mass storage system has the capabilities to ingest high-speed real-time data, perform signal or image processing, and stage, archive, and distribute the data. This mass storage system uses a hierarchical storage structure, thus reducing the total data storage cost, while maintaining high-I/O performance. The high-performance mass storage system is a network of low-cost parallel processors and storage devices. The nodes in the network have special I/O functions such as: SCSI controller, Ethernet controller, gateway controller, RS232 controller, IEEE488 controller, and digital/analog converter. The nodes are interconnected through high-speed direct memory access links to form a network. The topology of the network is easily reconfigurable to maximize system throughput for various applications. This high-performance mass storage system takes advantage of a 'busless' architecture for maximum expandability. The mass storage system consists of magnetic disks, a WORM optical disk jukebox, and an 8mm helical scan tape to form a hierarchical storage structure. Commonly used files are kept in the magnetic disk for fast retrieval. The optical disks are used as archive media, and the tapes are used as backup media. The storage system is managed by the IEEE mass storage reference model-based UniTree software package. UniTree software will keep track of all files in the system, will automatically migrate the lesser used files to archive media, and will stage the files when needed by the system. The user can access the files without knowledge of their physical location. The high-performance mass storage system developed by Loral AeroSys will significantly boost the system I/O performance and reduce the overall data storage cost. This storage system provides a highly flexible and cost-effective architecture for a variety of applications (e.g., realtime data acquisition with a signal and image processing requirement, long-term data archiving and distribution, and image analysis and enhancement).

Chiang, T.↗

Using Project Complexity Determinations to Establish Required Levels of Project Rigor

The concepts discussed in this paper 1) focus on using technical competencies and skills in making objective determinations regarding project complexity based on objective scoring criteria and 2) then using the complexity determinations to establish the level of rigor required in initiating, planning, executing, monitoring and controlling, and closing projects to maximize process efficiency. This paper presents a project complexity analysis methodology for defining the levels of project management process rigor a project team needs to employ to maximize project delivery efficiencies without compromising quality and performance. Methods for making project complexity determinations based on project lifecycle size, duration, organizational complexity, requirements, technology readiness, risk, and visibility are discussed. The paper correlates the levels of rigor needed by project management process groups given the determined level of project complexity. Next, the paper presents a graded approach to defining extent of team formation, planning documentation rigor, stakeholder communication rigor, requirements management rigor, acquisition planning, risk management, executing, and monitoring and controlling rigor dependent on project complexity determinations. Methods for integrating and aligning the project complexity determination methods into existing project management procedures and processes are also discussed as well as methods for training personnel in the use of the method and facilitating and monitoring effectiveness of implementation within an organization in which project delivery is a mission focus.

complexity, project, determination, management, tr↗

Upgrading NASA/DOSE laser ranging system control computers

Laser ranging systems now managed by the NASA Dynamics of the Solid Earth (DOSE) and operated by the Bendix Field Engineering Corporation, the University of Hawaii, and the University of Texas have produced a wealth on interdisciplinary scientific data over the last three decades. Despite upgrades to the most of the ranging station subsystems, the control computers remain a mix of 1970's vintage minicomputers. These encompass a wide range of vendors, operating systems, and languages, making hardware and software support increasingly difficult. Current technology allows replacement of controller computers at a relatively low cost while maintaining excellent processing power and a friendly operating environment. The new controller systems are now being designed using IBM-PC-compatible 80486-based microcomputers, a real-time Unix operating system (LynxOS), and X-windows/Motif IB, and serial interfaces have been chosen. This design supports minimizing short and long term costs by relying on proven standards for both hardware and software components. Currently, the project is in the design and prototyping stage with the first systems targeted for production in mid-1993.

Ricklefs, Randall L.↗

Characterization of Tactical Departure Scheduling in the National Airspace System

This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.

Capps, Alan↗