Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “vessel”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of Technetium-99 on Ion Exchange Resin - A Case Study at 200 West Pump and Treat - 17303

The 200 West Pump and Treat (P and T), on the U.S. Department of Energy's Hanford Site and operated by CH2M HILL Plateau Remediation Company, has a 9,464 liters per minute capacity designed to capture and treat an 8 km{sup 2} contaminated groundwater plume and reduce the mass of contaminants of concern (COCs) by 95 percent in 25 years. The plume is a complex mix of contaminants including technetium-99 (Tc-99), uranium, carbon tetrachloride, chromium, hexavalent chromium, nitrate, and iodine-129 (I-129). Ion exchange (IX), a common treatment approach for Tc-99 used by many nuclear remediation sites, is used to remove uranium and Tc-99 at 200 West P and T. The IX vessels are arranged in a sequence of three to provide a lead, lag and polish vessel. Tc-99 concentrations are monitored monthly to assure good performance of the system. Performance tracking revealed surprising results. On October 14, 2015, the resin in the lead vessels released Tc-99 at concentrations greater than what was being fed. Although Tc-99 was captured by the downstream lag and polish vessels, the facility staff grabbled with the sudden release of Tc-99 entertaining a variety of scenarios that might result in sudden failure of the IX processes. Subsequent sampling indicated Tc-99 removal began a steady return to normal. The incident raised many questions, chief among them whether the same events could recur and undermine Tc-99 treatment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Ion Exchange Resin Performance - A Case Study at 200 West Pump and Treat - 18103

The 200 West Pump and Treat Facility (200W P and T), located on the U.S. Department of Energy's Hanford site, is a 2,500 gallon per minute (GPM) plant designed to capture and treat an eight square kilometer groundwater plume. The groundwater contamination is largely a result of process liquids disposed from operations involving the separation of nuclear materials and storage of spent nuclear fuel. This document will report on the performance of a full scale uranium ion exchange system used to treat contaminated groundwater and other waste streams. The uranium ion exchange system at 200W P and T was designed as a three vessel operation with a lead, lag and polish vessel, which contain 300 cubic feet of resin in each vessel. The ion exchange system treats a portion of the total plant flow with a maximum capacity of 400 GPM. Prior to start-up, one key issue was the potential to treat feed streams with a wide range of uranium concentrations (22 to 150,000 microgram per liter [μg/L]). The resin change-out frequency was a primary concern. A literature review was performed, resulting in resin capacity and change out frequency that varied by two orders of magnitude (1.2 milligram per gram [mg/g] to 104 mg/g capacity). Since startup in September 2015, the ion exchange system has experienced a dynamic feed stream as wells were brought online, which changed the contaminant concentrations. The plant also treats leachate liquid waste from on-site low-level waste site, known as the Environmental Restoration Disposal Facility (ERDF), which contains uranium as well as other competing anions, such as sulfate. The uranium breakthrough is closely monitored throughout the resin beds with weekly sampling events at the influent, effluent, and intermediate ports in the first vessel. In the influent to the ion exchange system, the uranium concentration fluctuated from 24 μg/L up to 910 μg/L. The information on influent and effluent was used to determine the change out frequency and the capacity of the resin for uranium under these operating conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Approaches to the Decommissioning of a Redundant Plutonium Processing Facility - 20147

At Sellafield, in the North West of the United Kingdom (UK), there are a number of redundant plutonium processing facilities. Over the past three decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. As previously presented at WM2017 (Paper Ref 17081) some of these challenges have recently been addressed through a new approach which introduced a number of innovations. The purpose of these innovations is to seek ways to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. This paper provides an update on the progress of these innovations since 2017. Additionally, the paper also provides details of the new decommissioning technologies which have been introduced over the past 2 years to enable the most challenging aspects of the redundant plutonium processing facility to be decommissioned. These new decommissioning technologies address challenges associated with the preparation of process vessels and pipework to enable their safe in-situ size reduction by remote means: - New decommissioning techniques have been introduced to allow penetrations to be remotely cut into process vessels and pipework to provide a means of accessing and controlling the venting of any potential hydrogen gas present. - Additionally, a new large scale bespoke remote diamond wire cutting machine has been designed and manufactured to enable the process vessels to be size reduced in situ. Both of these new cutting technologies have involved collaborative working with specialist equipment suppliers including extensive development, trialling demonstration and commissioning prior to bringing the equipment into operational service. Several years of work have now culminated in reaching the final stages of decommissioning of the redundant plutonium processing facility with decommissioning of the final process vessels now underway and completion expected by the end of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Nuclear Integration Activities for Mitigation of Radiation Loads to ITER Superconducting Magnets

The Nuclear Integration Unit (NIU) is a trans-departmental team from the ITER Organization and Domestic Agencies, responsible for all nuclear integration aspects of the facility and for ensuring that systems and components are suitable for their radiation environment and satisfy all related performance requirements. This is a very challenging task namely due to the large number of systems, their still evolving designs, the intricate and far-reaching impacts of these in nuclear responses everywhere, and the complex world-wide distribution of procurement responsibilities. A sound systems engineering approach that involves all relevant experts and stakeholders, and trades-off between different performance requirements in an optimum way, needs to be taken and sustained during design evolution and construction, always with the objective of final overall project success. One of the most important current occupations of the NIU is the evaluation of, and protection from, radiation conditions to superconducting magnets during plasma operations, and particularly nuclear heating. This requires neutronic analyses in massive computer resources, with state-of-the-art methods and complex, extensive computer models. The main ITER superconducting magnet systems subject to significant nuclear loads are the toroidal field coils (TFCs) and the poloidal field coils (PFCs). These are illustrated in Fig. 1. Nuclear responses in these depend mostly on the design of all in-vessel (blankets, manifolds, divertor, in-vessel coils, port plugs), vessel and thermal shield components. Sources to consider are the 500 MW DT burning plasma (14.1 MeV neutrons) and the activated water in the in-vessel cooling system (photons up to 7 MeV from N-16 and neutrons up to 3.5 MeV from N-17). This paper discusses a snapshot of the present understanding of nuclear heat conditions in both the TFC and PFC magnets. This includes integral values and distributions, as well as best estimates from computations and conservative upper estimates by consideration of systematic effects and random uncertainties. The computer models, methods and assumptions used for evaluation of these responses are described. Nuclear integration aspects and ongoing efforts to study and implement additional shielding and other mitigating measures are also discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Residual Dose Rates Analyses from Vent Lines Shield Block on the Target Cart at Spallation Neutron Source

The target carriage supports the mercury target vessel in the Spallation Neutron Source (SNS) in a cantilevered fashion and supplies the liquid mercury flowing to and from the target vessel. The target carriage is designed to move the target vessel into its target monolith position to receive the proton beam and then remove it horizontally back into an adjacent service cell, where the target vessel can be exchanged about 2-3 times per calendar year. At the time of the performed studies, the SNS mercury target can accept a proton beam at 1 GeV energy and 1.4 MW power; however, it will be upgraded to receive 1.3 GeV energy at 2 MW by the end of 2024 year [1]. The cart is practically a shield block on wheels to minimize fluxes and dose rates in the service cell downstream of the carriage. There are vent lines located inside a passage on top of the target carriage, and they are covered by a stepping-up steel shield block (vent lines shield block). Vent lines are permanently attached to the shield block. New vent lines with a different design are going to be installed. These lines are shielded by the new steel block to which the vent lines are attached. The estimate of the residual dose rates from the block after it is extracted from the target carriage is performed to estimate the radiation fields and to decide on the type of storage container to be used.

Popova, Irina I↗

Open aperture flow cells for on-line optical analysis of process fluids

A flow cell system includes a vessel and a fluid located in the vessel. A fluid surface of the fluid can be vented to a first gas pressure. The fluid surface can have a first cross-sectional area. The flow cell system includes a conduit in fluid communication with the vessel and positioned downstream of the vessel. The conduit can have a region that includes one or more orifices and has a second cross-sectional area. The second cross-sectional area can be less than the first cross-sectional area. The one or more orifices can be vented to a second gas pressure. The second gas pressure can be equal to or greater than the first gas pressure. Methods for analyzing a process fluid can include characterizing the fluid in the conduit.

Launiere, Cari A.↗

Controlling a power output of a nuclear reactor without using control rods

A nuclear power system includes a reactor vessel that includes a reactor core that includes nuclear fuel assemblies configured to generate a nuclear fission reaction. A representative nuclear power system further includes a riser positioned above there actor core and a primary coolant flow path that extends from a bottom portion of the reactor vessel, through the reactor core, and through an annulus between the riser and the reactor vessel. A primary coolant circulates through the primary coolant flow path to receive heat from the nuclear fission reaction and release the heat to a power generation system configured to generate electric power. The nuclear power system further includes a control rod assembly system positioned in the reactor vessel and configured to position control rods in only two discrete positions.

Callaway, Allyson↗

Scaling of muon remote sensing signals

Few hundred MeV muon beams can penetrate vessels, detect nuclear materials, and differentiate between them from distances of several hundred meters. A companion report provides point estimates of the beam and detector parameters required to do so. This note varies the most sensitive parameters to examine performance over a range of scenarios. In the process it examines the results of the IDA analysis of muon interrogation, finding no serious discrepancies in the cases and parameters it examined, although some parameters are admittedly somewhat arbitrary. This note concentrates on the sensitivity of performance to beam size and to signature path length in targets, i.e., the sizes of the targets and vessels. The main results are shown in the figures. The companion report provides a useful framework for analysis, although it concentrates on a few, perhaps atypical examples. This note uses that framework to explore the beam and standoff requirements for a wider range of engagements. It primarily studies the impact of beam radius and area at varying and constant and fixed dose, and varying vessel thickness. The first two figures show quite distinct variations of signal gammas, background levels, and signal to noise ratios, but their main result is that the signal to noise ratios greater than unity essential for practical application can be achieved at beam radii up to about 1 m. Imposition of required dose limits in Fig. 2 has little impact on that result. The third figure indicates that adequate signal to noise ratios are achievable for thicknesses up to 4-5 m. Those ranges could be improved by smaller beams and other improvements, but exploring them in detail should probably await the improvement of the elements of the model that are stressed for thicker vessels.

99 GENERAL AND MISCELLANEOUS↗

NSTXU Diagnostic Disruption Dynamic Loading Represented by Response Spectra

This article presents the results of transient dynamic simulations of loads due to disruption eddy currents on the NSTXU vacuum vessel. Dynamic loading at diagnostic mounting locations is expressed as response spectra derived from the time history results of the dynamic structural simulations of a variety of disruption scenarios. The disruption simulations draw on a history of the project assessments of worst case disruptions for specific components. Major efforts to assess disruption loading have included the vacuum vessel which is the major structural support for the machine, as well as the passive plates (PPs), high harmonic fast wave (HHFW) antenna, and centerstack casing. Each one of these efforts included transient electromagnetic simulations producing time-dependent eddy current Lorentz loads (and in some cases halo loads) which then were applied to time-dependent structural dynamic analyses intended to obtain the proper dynamic amplification factors. In some instances, the EM model and structural model were identical allowing direct transfer of EM forces to the structural model. In other cases, the EM and structural model were not identical and the vector potential (VP) transfer method was used. The results files from these analyses were available (or re-run) to post process in ANSYS Classic time history postprocessor. In conclusion, the ANSYS command is used to create response spectra from time history data at desired points on the vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Materials Degradation in Light Water Reactors: Life After 60,???

Nuclear reactors present a very harsh environment for components service. Components within a reactor core must tolerate high temperature water, stress, vibration, and an intense neutron field. Degradation of materials in this environment can lead to reduced performance, and in some cases, sudden failure. A recent EPRI-led study interviewed 47 US nuclear utility executives to gauge perspectives on long-term operation of nuclear reactors. Nearly 90% indicated that extensions of reactor lifetimes to beyond 60 years were likely. When polled on the most challenging issues facing further life extension, two-thirds cited plant reliability as the key issue with materials aging and cable/piping as the top concerns for plant reliability. Materials degradation within a nuclear power plant is very complex. There are many different types of materials within the reactor itself: over 25 different metal alloys can be found with can be found within the primary and secondary systems, not to mention the concrete containment vessel, instrumentation and control, and other support facilities. When this diverse set of materials is placed in the complex and harsh environment coupled with load, degradation over an extended life is indeed quite complicated. To address this issue, the USNRC has developed a Progressive Materials Degradation Approach (NUREG/CR-6923). This approach is intended to develop a foundation for appropriate actions to keep materials degradation from adversely impacting component integrity and safety and identify materials and locations where degradation can reasonably be expected in the future. Clearly, materials degradation will impact reactor reliability, availability, and potentially, safe operation. Routine surveillance and component replacement can mitigate these factors, although failures still occur. With reactor life extensions to 60 years or beyond or power uprates, many components must tolerate the reactor environment for even longer times. This may increase susceptibility for most components and may introduce new degradation modes. While all components (except perhaps the reactor vessel) can be replaced, it may not be economically favorable. Therefore, understanding, controlling, and mitigating materials degradation processes are key priorities for reactor operation, power uprate considerations, and life extensions. This document is written to give an overview of some of the materials degradation issues that may be key for extend reactor service life. A detailed description of all the possible forms of degradation is beyond the scope of this short paper and has already been described in other documents (for example, the NUREG/CR-6923). The intent of this document is to present an overview of current materials issues in the existing reactor fleet and a brief analysis of the potential impact of extending life beyond 60 years. Discussion is presented in six distinct areas: (1) Reactor pressure vessel; (2) Reactor core and primary systems; (3) Reactor secondary systems; (4) Weldments; (5) Concrete; and (6) Modeling and simulations. Following each of these areas, some research thrust directions to help identify and mitigate lifetime extension issues are proposed. Note that while piping and cabling are important for extended service, these components are discussed in more depth in a separate paper. Further, the materials degradation issues associated with fuel cladding and fuel assemblies are not discussed in this section as these components are replaced periodically and will not influence the overall lifetime of the reactor.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fukushima inspection manipulator - 15485

After the March 2011 nuclear accident at Fukushima Daiichi NPP it was discovered that there was a large leak inside the Reactor Pressure Vessel (RPV). During the efforts to cool the reactor vessel following the accident, water that was injected into the RPV was found in a lower portion of the facility indicating a leak in the Primary Containment Vessel (PCV). Later, TEPCO announced its high level decommissioning and recovery plan that included equipment locate these leaks and plug them so that the RPV and PCV could be filled with water. Over the past two years Toshiba, IHI and Kurion have been teamed together on projects to find and ultimately to seal these leaks. In the first phase, which was demonstrated in August of 2014, Kurion provided a remote manipulator arm called the Fukushima Inspection Manipulator (FIM) in conjunction with a remotely operated vehicle (ROV) which was developed by Toshiba and IHI to inspect the lower portion of the PCV in Unit 2 of Fukushima Daiichi. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ophthalmic Artery Embolization as Pretreatment of Orbital Exenteration for Conjunctival Squamous Cell Carcinoma

The aim of this study is to describe the effect of transarterial embolization from the ophthalmic artery as a pretreatment for orbital exenteration. A 75-year-old Chinese man with a 7-year history of gradual increase of the left eye swelling showed a massive conjunctival tumor growing outwardly from the interpalpebral fissure and had no light perception in the left eye. Magnetic resonance imaging showed orbital invasion of the tumor around the left eyeglobe. The initial surgery for the planned orbital exenteration was discontinued after skin incision around the orbital margin due to massive hemorrhage. The patient underwent transarterial embolization with gelatin sponge (Spongel) of the feeding arteries from the left ophthalmic artery and, the next day, had orbital exenteration with well-controllable bleeding and reconstruction with free vascularized anterolateral thigh cutaneous flap transfer. Pathologically, well-differentiated squamous cell carcinoma proliferated in exophytic, papillary, and nested fashions, arising from the bulbar conjunctiva. Tumor cells were also found in the conjunctival stroma around the vessels. The sclera at the equator had a perforated site with tumor cell invasion, but no intraocular invasion was found. Hematoxylin-positive gelatin sponges were found inside the orbital vessels and large choroidal vessels. In conclusion, transarterial embolization of feeding arteries arising from the ophthalmic artery is a useful pretreatment to control bleeding at orbital exenteration for malignancy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Superiority of Transcutaneous Oxygen Tension Measurements in Predicting Limb Salvage After Below-the-Knee Angioplasty: A Prospective Trial in Diabetic Patients With Critical Limb Ischemia

Purpose: To assess postprocedural angiograms, the ankle-brachial index (ABI), and transcutaneous oxygen tension (TcPO{sub 2}) to predict outcome after infrageniculate angioplasty (PTA) in diabetic patients with critical limb ischemia (CLI) scheduled for amputation. Materials and Methods: PTA was performed in 28 diabetic patients with CLI confined to infrapopliteal vessels. We recorded patency of crural vessels, including the vascular supply of the foot as well as the ABI and TcPO{sub 2} of the foot. Results: Technical success rate was 92.9% (n = 26), and limb-salvage rate at 12 months was 60.7% (n = 17). The number of patent straight vessels above and below the level of the malleoli increased significantly in patients avoiding amputation. Amputation was unnecessary in 88.2% (n = 15) patients when patency of at least one tibial artery was achieved. In 72.7% (n = 8) of patients, patency of the peroneal artery alone was not sufficient for limb salvage. ABI was of no predictive value for limb salvage. TcPO{sub 2} values increased significantly only in patients not requiring amputation (P = 0.015). In patients with only one tibial artery supplying the foot or only a patent peroneal artery in postprocedural angiograms, TcPO{sub 2} was capable of reliably predicting the outcome. Conclusion: Below-the-knee PTA as an isolated part of therapy was effective to prevent major amputation in more than a half of diabetic patients with CLI. TcPO{sub 2} was a valid predictor for limb salvage, even when angiographic outcome criteria failed.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Feasibility and Safety of Endovascular Stripping of Totally Implantable Venous Access Devices

Purpose: To evaluate the safety and feasibility of percutaneous stripping of totally implantable venous access devices (TIVAD) in case of catheter-related sleeve and to report a technique to free the catheter tip from vessel wall adherence. Materials and Methods: A total of 37 stripping procedures in 35 patients (14 men, 40%, and 21 women, 60%, mean age 53 {+-} 14 years) were reviewed. Totally implantable venous access devices were implanted because of malignancy in most cases (85.7%). Catheter-related sleeve was confirmed as cause of persistent catheter dysfunction despite instillation of thrombolytics. A technique to mobilize the catheter tip from the vessel wall was used when stripping with the snare catheter was impossible. Technical success, complication rate, and outcome were noted. Results: A total of 55.9% (n = 19) of the 34 technically successful procedures (91.9%) could be done with the snare catheter. In 15 cases (44.1%), additional maneuvers to free the TIVAD's tip from the vessel wall were needed. Success rate was not significantly lower before (72.4%) than after (96.7%) implementation of the new technique (P = 0.09). No complications were observed. Follow-up was available in 67.6% of cases. Recurrent catheter dysfunction was found in 17 TIVADs (78.3%) at a mean of 137.7 days and a median of 105 days. Conclusions: Stripping of TIVADs is technically feasible and safe, with an overall success rate of 91.9%. Additional endovascular techniques to mobilize the distal catheter tip from the wall of the superior vena cava or right atrium to allow encircling the TIVAD tip with the snare catheter may be needed in 44.1% of cases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Preclinical Study of the Safety and Efficacy of Occlusin Trade-Mark-Sign 500 Artificial Embolization Device in Sheep

Introduction: This study evaluated the safety, effectiveness, and biodegradation of a new embolic agent, Occlusin Trade-Mark-Sign 503 Artificial Embolization Device (OCL 503). The agent consists of biodegradable poly-lactic-co-glycolic acid microspheres (150-212 {mu}m) coated with type I bovine collagen and was compared with Embosphere{sup Registered-Sign} Microspheres (300-500 {mu}m) in this controlled study of uterine artery embolization (UAE) in sheep. Methods: Unilateral UAE was performed in 32 adult ewes randomly assigned. Vessels were embolized to effective stasis. The cohort was divided into four groups, which were sacrificed at 1, 3, 6, and 12 months. Results: Both agents were 100% effective in achieving stasis. At 6 months, all OCL 503-treated arteries were occluded, the microspheres degraded with time, and at 12 months all four animals examined demonstrated recanalization. OCL 503 was found in the untreated uterine artery in one animal with no other evidence of non target embolization. In the Embosphere-treated group, all vessels remained occluded and microspheres were detected in the contralateral uterine artery in 6 of 15 examined vessels and in 10 vaginal, 2 ovarian, and 1 vesical artery. No procedural-related complications were seen in either group. Conclusions: OCL 503 is as effective an embolic agent as Embosphere{sup Registered-Sign} Microspheres when embolizing ovine uterine arteries and resorbs with time, allowing recanalization of the treated arteries. No device-related issues or adverse events were observed.

60 APPLIED LIFE SCIENCES↗

The Amplatzer Vascular Plug: A Review of the Device and its Clinical Applications

The Amplatzer Vascular Plug (AVP) is an established embolic device that can be an excellent alternative to coils or detachable balloons to embolize medium to large vessels with high flow. The device is easy to use and can be precisely deployed in the target vessel with high resistance to migration and a low recanalization rate. The technical success of this device is high, indications for use are expanding, and no absolute contraindications have been reported. Since its introduction, the AVP has grown from a single device to a group of 4 models (AVP, AVP II, AVP III, and AVP 4). Each model has a unique design and features that fit different vascular anatomies, hemodynamic situations, and clinical scenarios. Therefore, the new models cannot simply be treated as replacements for older ones. Unpredictable occlusion time remains a major shortcoming for the new models of the AVP. Large vessel size, high flow status, and coagulopathy can prolong the occlusion time, which can offset the cost benefit, reduced procedure time, and reduced radiation dose typically seen with use of the AVP alone. Coils or multiple AVPs can be used to expedite the occlusion process, and large Gelfoam particles also can be used as an adjunct to achieve rapid and reliable occlusion with minimal cost.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Visualization of Porphyrin-Based Photosensitizer Distribution from Fluorescence Images In Vivo Using an Optimized RGB Camera

A handheld RGB camera was developed to monitor the in vivo distribution of porphyrin-based photosensitizer (PS) hematoporphyrin monomethyl ether (HMME) in blood vessels during photodynamic therapy (PDT). The focal length, f-number, International Standardization Organization (ISO) sensitivity, and shutter speed of the camera were optimized for the solution sample with various HMME concentrations. After the parameter optimization, it was found that the red intensity value of the fluorescence image was linearly related to the fluorescence intensity under investigated conditions. The RGB camera was then used to monitor the in vivo distribution of HMME in blood vessels in a skin-fold window chamber model. The red intensity value of the recorded RGB fluorescence image was found to be linearly correlated to HMME concentrations in the range 0–24 μM. Significant differences in the red to green intensity ratios were observed between the blood vessels and the surrounding tissue.

60 APPLIED LIFE SCIENCES↗