Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Initial Scoping Efforts for a Plant-Wide Digital Infrastructure Modernization Business Case Study

This research report describes the preparatory efforts to perform a BCA on an expanded set of digital upgrades envisioned for implementation at the Luminant?s Comanche Peak nuclear plant. It captures efforts to scope the digital upgrade effort to enable performance of the BCA. The final BCA will be the subject of a subsequent report. LWRS pilot research in this area is intended to enable this effort and to provide a roadmap to others to follow. INL appreciates the Luminant?s participation in this research.

99 GENERAL AND MISCELLANEOUS↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗

M2CT-22IN1202096 Design for Carbon Conversion Product Pathways with Nuclear Power Plant Integration

Coal is a globally abundant resource that historically has been used for power generation via combustion. As the power industry replaces coal with cleaner methods of generation, energy-rich coal could be used in other chemical and fuel applications. This study presents a coal utilization option in which coal combustion is replaced with a carbon-free nuclear power plant and the coal is upgraded to valuable products for a variety of markets. Coal is prepared for conversion first by the pyrolysis process, which will optimize solid, liquid, and gaseous products based on the market size and potential product value, maximizing the monetary value of coal. This process is designed using bituminous coal from the Appalachian region as a basis to provide a pathway to preserve or transition coal-related jobs and create new jobs associated with the clean energy transition. Process modeling in the AspenOne Suite will be used to determine each component’s sensitivities, costs, inputs, and outputs. Dispatch modeling in the FORCE toolset will optimize the entire system and calculate the NPV for the refinery lifetime. Advanced and light-water reactors are considerations to supply the heat, steam, and electricity to the process. This paper focuses on the technical and market analysis used to determine the optimal processes and product pathways for the carbon refinery. Product pathways are on activated carbon, formic acid synthesis, and methanol synthesis for further upgrading to marketable chemical and polymer products.

01 COAL, LIGNITE, AND PEAT↗

Design for Carbon Conversion Product Pathways with Nuclear Power Plant Integration (PCC)

Coal is a globally abundant resource that historically has been used for power generation via combustion. As the power industry replaces coal with cleaner methods of generation, energy rich coal could be used in other chemical and fuel applications. This study presents a coal utilization option in which coal combustion is replaced with a carbon-free nuclear power plant and the coal is upgraded to valuable products for a variety of markets. Coal is prepared for conversion first by the pyrolysis process, which will optimize solid, liquid, and gaseous products based on the market size and potential product value, maximizing the monetary value of coal. This process is designed using bituminous coal from the Appalachian region as a basis to provide a pathway to preserve or transition coal-related jobs and create new jobs associated with the clean energy transition. Process modeling will be used to determine each component’s sensitivities, costs, inputs, and outputs Advanced and light-water reactors are considerations to supply the heat, steam, and electricity to the process. This paper focuses on the technical and market analysis used to determine the optimal processes and product pathways for the carbon refinery. Product pathways are on activated carbon, formic acid synthesis, and methanol synthesis for further upgrading to marketable chemical and polymer products.

01 COAL, LIGNITE, AND PEAT↗

Economic and Sustainability Assessment on Bio-Based 2,3-BDO Separation Approaches for Sustainable Aviation Fuel Production

Sustainable aviation fuel (SAF) plays a critical role in aviation decarbonization. SAF can be derived from lignocellulosic biomass, such as corn stover, via 2,3-butanediol (BDO) intermediate. BDO undergoes downstream upgrading, including dehydration, oligomerization, and hydrotreating, to make the hydrocarbon blend stock like SAF. Separating BDO from a fermentation broth is challenging. Water is more volatile than BDO, so energy consumption for ordinary distillation is prohibitively high. For BDO to be a feasible intermediate for sustainable biofuels such as SAF, the total energy usage for the BDO separation target was set to be no greater than 30% of its lower heating value (LHV). We have developed and explored less energy intensive separation technologies for processing dilute fermentation BDO broth into suitable feed for downstream upgrading. The combined economic and sustainability assessment was performed to assess the feasibility of select cost-effective process designs and comparisons with baseline technology (i.e., cascade vacuum distillation).

BIOMASS FUELS↗

Catalytic hot-gas filtration of biomass pyrolysis vapors

The present disclosure relates to a device that includes a filter element and a catalyst, where the filter element is configured to remove particulate from a stream that includes at least one of a gas and/or a vapor to form a filtered stream of the gas and/or the vapor, the catalyst is configured to receive the filtered stream and react a compound in the filtered stream to form an upgraded stream of the gas and/or the vapor, further including an upgraded compound, and both the filter element and the catalyst are configured to be substantially stable at temperatures up to about 500° C.

Magrini, Kimberly A.↗

Development and Performance of RFD Crab Cavity Prototypes for HL-LHC AUP

The US will be contributing to the HL-LHC upgrade at CERN with the fabrication and qualification of RFD crabbing cavities in the framework of the HL-LHC Accelerator Upgrade Project (AUP) managed by Fermilab. AUP received Critical Decision 3 (CD-3) approval by DOE in December 2020 launching the project into the production phase. The electro-magnetic design of the cavity was inherited from the LHC Accelerator Research Program (LARP) but needed to be revised to meet new project requirements and to prevent issues encountered during beam tests performed at CERN in the R&D phase. Two prototype cavities were manufactured in industry and cold tested. Challenges specific to the RFD cavity were the stringent interface tolerances, the pole symmetry, and the higher-order-mode impedance spectrum. Chemical processing and heat treatments were performed initially at FNAL/ANL and are now being transferred to industry for the production phase. HOM dampers are manufactured and validated by JLAB. A summary of cold test results with and without HOM dampers is presented.

43 PARTICLE ACCELERATORS↗

Cryogenic testing of the first HL-LHC Q1/Q3 cryo-assembly at Fermilab

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 cryo-assembly for the high-luminosity LHC upgrade (HL-LHC). The cryo-assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from this first test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Partial Wave Analysis of Strange Mesons Decaying to K+p+p- in the Reaction ¿p ¿ K+p+p-¿(1520) and the Commissioning of the GlueX DIRC Detector

Hadron spectroscopy is a cornerstone of our understanding of the strong nuclear interactions. Studying the hadron spectrum led to the postulation of quarks and gluons, and the development of Quantum Chromodynamics (QCD), the theory of the strong nuclear force. Today hadron spectroscopy provides an important test of QCD, particularly in the non-perturbative energy regime. One such test is the existence of hybrid hadrons that have gluonic degrees of freedom, e.g. q ?qg states, that are allowed by QCD but have remained elusive in experimental searches. The GlueX experiment located at Thomas Jefferson National Accelerator Facility, is designed to map the light meson spectrum, including hybrid mesons, produced by a linearly polarized photon beam that is scattered off of a liquid hydrogen target. This dissertation concerns the installation and commissioning of the GlueX DIRC upgrade and the analysis of three reactions measured by the GlueX experiment. The GlueX DIRC is a particle identification detector installed as an upgrade to the GlueX experiment in 2019 to improve the experiment?s ability to distinguish pions and kaons. The DIRC uses Cherenkov photons radiated by charged particles that travel faster than the speed of light in the detector medium to determine the velocity of said particles. The velocity measurement is used in conjunction with momentum measurements from other detectors to determine the mass of the particle. The DIRC will be essential to the future of strange meson spectroscopy in GlueX. The reactions ?p ? K+K??+??p, ?p ? K+K??0?0p, ?p ? K+K??0?p were initially chosen for this analysis to search for the hybrid meson candidate ?(2170) and related resonances. The ?(2170) has been observed in e+e? collider experiments decaying to K+K??+?? and K+K??0?0, among other final states. The ?(2170) was not observed in this analysis. The reaction ?p ? K+?+???(1520), a subset of the ?p ? K+K??+??p reaction, was analyzed with a Partial Wave Analysis (PWA) in order to study strange mesons that decay to K+?+??. In the PWA, a useful model for the angular distributions was found but no significant structures could be observed due to statistical limitations.

Hurley, Andrew↗

AUP first Pre-Series Cold Mass Installation into the Cryostat

For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of Error Correction Studies in Support of FFA@CEBAF

In this work, we examine the beam correction requirements for the FFA@CEBAF energy upgrade. Both hardware and software diagnostic and corrector components are under investigation; in particular the relationship between hardware and software optimization will be developed. To generate a representative sample of errors---from the machine lattice and other beam properties---we construct a Markov Chain Monte Carlo (MCMC) sampler which considers different probability distributions for different types of errors. This sample is used to investigate the statistical sensitivity of the beam to various diagnostic and corrective schema. Once statistics are acquired, we plan to use a variety of optimization techniques to minimize correction time for the electron beam in the FFA arcs designed for the CEBAF upgrade.

Benesch, J.↗

Utilizing GEOPHIRES-X Beyond Electricity

The GEOPHIRES tool is a techno-economic simulator for evaluating the thermal performance and cost-competitiveness of geothermal plants for electricity, heating, and/or cooling. The tool combines reservoir, wellbore, and surface plant cost and performance models to estimate overall techno-economic metrics such as net present value or levelized cost of electricity, heating, or cooling. We recently upgraded the tool to an object-oriented Python framework, presented in an accompanying paper. As part of the upgrade, we enhanced the capability to simulate the performance of geothermal plants for heating and cooling, which is the topic of this paper. Specifically, we (1) integrated absorption chillers to investigate the performance of utilizing geothermal heat for cooling, (2) integrated a heat pump module to boost the geothermal temperature and thermal output, (3) integrated a district heating module to estimate heating demand for a district based on local weather data, and simulated heat supply with geothermal energy and peaking boilers, and (4) integrated GEOPHIRES as an engine in the dGeo simulator to perform a geospatial analysis of geothermal district heating feasibility across a large region (e.g., a state or the entire United States) utilizing resource and thermal demand maps. This paper presents background information and case studies for several of these heating and cooling end-use options in GEOPHIRES.

absorption chiller↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Size Up or Size Down? National Analysis of Heat Pump Sizing and Impacts

Electrification of on-site fossil fuel combustion in buildings is recognized as a key component of achieving global greenhouse gas emissions targets. Air-source heat pumps are an efficient approach for space heating electrification. However, a major barrier to heat pump adoption is the high installation cost relative to furnaces and air conditioners. Because the installation cost of heat pumps - especially cold climate models - is dependent on their size, it is important to understand the distribution of heat pump sizes using different sizing methods and factors that impact heat pump sizing. In this study, we use sub-hourly physics simulations of 550,000 statistically representative dwelling units to analyze the distribution of heat pump size in the U.S. for three different efficiency levels of heat pumps, with and without building insulation and air sealing upgrades. We will present results from the national analysis of different factors affecting heat pump sizing along with the impact of sizing decisions on upgrade costs and operating costs.

electrification↗

Household Energy Efficiency Analysis for the Hill District, Pennsylvania: Version 2

Many households in the Hill District, Pennsylvania, could save hundreds of dollars annually on their energy bills and reduce carbon emissions with energy efficiency retrofits and upgrades in their homes and apartments. As part of the U.S. Department of Energy's (DOE) Communities LEAP (Local Energy Action Program) pilot, the National Renewable Energy Laboratory (NREL) analyzed energy efficiency and electrification upgrades for the Hill District.

Communities LEAP↗