Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing tank”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Testing of an Integrated Nitrogen Oxide Catcher

A gas-purification system with maximum capacity 50 m{sup 3}/h was developed, fabricated, and tested to catch nitrogen oxides released during hydrometallurgical processing of spent fuel from the BREST reactor. To catch nitrogen oxides, the setup employs water aerosols introduced into the gas duct; it also includes a tank for mixing water aerosols with gas flow, coarse and fine filters, and BRUNS and SMOG apparatus. The filtering complex (mixing tank, FCGO and FAROS filters) gave 72–76% conversion of nitrogen dioxide with initial concentration of 11 g/m{sup 3}; this confirmed that aerosol fiberglass filters can be used to catch nitrogen dioxide. In the tests, the complex of units comprising the setup gave 95.4–98.5% conversion of nitrogen oxide with initial concentration 11–50 g/m{sup 3}. After the design of the mixing tanks is improved and remote extraction of the cartridges of the gas purification apparatus is organized, the tested gas purification setup can be used in radiochemical production.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Detailed Evaluation of Electric Demand Load Shifting Potential of Heat Pump Water Heaters

Future utilities will emphasize home appliances to reduce greenhouse gas emissions while providing electric load shifting and demand profile management. Heat pump water heaters (HPWH) have demonstrated the ability to cut water heating energy by more than 65% compared with conventional electric resistance waters (ERWH). Laboratory research was conducted on the load shifting potential of grid-connected heat pump water heaters (HPWH), compared to ERWHs. Testing applied different CTA-2045 command designs. Highly-controlled laboratory experiments were conducted on one ERWH and four HPWHs, including a prototype incorporating the new CTA-2045-B protocol feature allowing ‘advanced’ load up above the tank setpoint. The prototype unit with the B-protocol increased tank temperature by 15oF (8.3C) under the advanced load up providing an increase of 1.8 kWh of storage for a 50-gallon (189 liter) tank. The prototype includes a built-in mixing valve to meet anti-scalding codes. With the load-shaping ability of CTA-2045-B, utilities might be able to store excess renewable energy in connected tanks when renewable wind and solar resource production is high. Tests were performed under baseline conditions (no load shift) and under several load-shifting schemes, including load up and advanced load up, ahead of shed commands. Grid-connected HPWHs reduced peak demand by as much as 0.5 kW, depending on tank volume, time of day, control scheme, and draw profile.

heat pump water heater, Demand flexibility, load s↗

Performance-based simulants for Hanford radioactive waste treatment process testing

Radioactive wastes from nuclear fuel processing are stored in large underground storage tanks at the Hanford Nuclear Reservation. Treatment and remediation require that waste feed from the storage tanks be delivered to the Hanford Tank Waste Treatment and Immobilization Plant continually for the duration of the treatment mission. Furthermore, the complex physical and chemical processes required for this mission, the significant scale, and the hazardous nature of the waste necessitate the use of simulants in process testing. A new class of simulants, “performance-based simulants,” has been developed to match the process performance of the simulant to actual waste performance data.

Hanford tank waste treatment↗

ENHANCED CHEMICAL CLEANING: EFFECTIVENESS OF THE UV LAMP TO DECOMPOSE OXALATES

Enhanced Chemical Cleaning is a new process scheduled to begin cleaning Savannah River Site High Level Waste Tanks in 2012. It is an improvement over the current chemical cleaning method, in that it minimizes downstream impacts on the High Level Waste System. It is based on a state of the art scale removal process used on the secondary side of nuclear power plants, with modifications to accommodate the unique constraints created by the tanks. Both Enhanced Chemical Cleaning and the scale removal process are founded on dissolving metal oxides/hydroxides using oxalic acid, with subsequent oxalate decomposition via hydroxylation using ozone or peroxide, and UV light as a catalyst. A divergence Enhanced Chemical Cleaning has from nuclear power scale removal is the significantly increased solids concentration during oxalate decomposition. These solids can limit the ability of the UV light to create hydroxyl radicals, either by limiting the ability of the light to penetrate through the solution, or by increasing the fouling rate on the UV light. Both will decrease the overall catalytic effectiveness, thereby decreasing the concentration of formed hydroxyl radicals. The hydroxyl radicals are the driving force behind the oxalate decomposition. To understand the impact of increased solids, testing was performed using a medium pressure UV light inside an ozone supplied Oxalate Decomposition Reactor. Using a dissolved metal sludge simulant with an initial oxalate concentration greater than 12,000 ppm, and an initial pH of about 2.0, the spent acid solution was recirculated through the reactor, while the UV light was allowed to foul. For the first few hours, the oxalate decomposition rate was about 1,300 ppm/hour. After about 3 hours, enough time for the UV lamp to foul, the oxalate decomposition rate decreased to about 500 ppm/hour. The decomposition rate then remained roughly constant for the next 16 hours. Overall, testing showed that the oxalate destruction rate decreased by about 2.8. Results from very similartests with similar chemistry suggest that the impact should be about 10. Based on the limited reaction pathwayfor the creation of hydroxyl radicals with iron, ozone, and no UV, the discrepancy suggests that initially, at 'time zero' the UV light failed to perform up to expectations. It is therefore concluded that regardless of the fouling rate, either the increased solids concentration is impacting the initial penetrability (i.e. to many solids), or the light is not adequately sized/configured to have the appropriate flux.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modeling Spacecraft Fuel Slosh at Embry-Riddle Aeronautical University

As a NASA-sponsored GSRP Fellow, I worked with other researchers and analysts at Embry-Riddle Aeronautical University and NASA's ELV Division to investigate the effect of spacecraft fuel slosh. NASA's research into the effects of fuel slosh includes modeling the response in full-sized tanks using equipment such as the Spinning Slosh Test Rig (SSTR), located at Southwest Research Institute (SwRI). NASA and SwRI engineers analyze data taken from SSTR runs and hand-derive equations of motion to identify model parameters and characterize the sloshing motion. With guidance from my faculty advisor, Dr. Sathya Gangadharan, and NASA flight controls analysts James Sudermann and Charles Walker, I set out to automate this parameter identification process by building a simple physical experimental setup to model free surface slosh in a spherical tank with a simple pendulum analog. This setup was then modeled using Simulink and SimMechanics. The Simulink Parameter Estimation Tool was then used to identify the model parameters.

Schlee, Keith L.↗

Validation of numerical models for seismic fluid-structure-interaction analysis of nuclear, safety-related equipment

Seismic design, qualification, and risk assessment of nuclear safety-related vessels filled with liquid will have to consider the interaction between the vessel (tank), the contained liquid, and submerged components, if any. Seismic fluid-structure-interaction (FSI) analysis of nuclear vessels will rely on numerical models, which are required to be verified and validated. This study validates previously-verified numerical models using test data generated from earthquake-simulator experiments involving a cylindrical tank. Two solvers in LS-DYNA for FSI simulations are used for the numerical analysis: Arbitrary-Lagrangian-Eulerian (ALE) and Incompressible Computational Fluid Dynamics (ICFD). Numerical and test results are compared for responses critical to seismic design of advanced reactor vessels: hydrodynamic pressures on the tank wall, reactions at the support, and wave heights of the contained liquid. Analysis is performed for one-, two-, and three-directional seismic inputs with a range of intensity, and rocking motions. The accuracy of the numerical results and different methods for outputting wave heights are discussed. Recommendations for validation of seismic FSI numerical models of advanced reactors are provided. As a result, the validation exercise presented in this study is broadly applicable to cylindrical tanks, regardless of industry sector.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SLUDGE CHARACTERIZATION AND SRAT SIMULATIONS USING A NITRITE-FREE SLUDGE SIMULANT

Understanding catalytic hydrogen generation is fundamental to the safe operation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC). Two Sludge Receipt and Adjustment Tank (SRAT) simulations were completed at the Aiken County Technology Laboratory (ACTL) of the Savannah River National Laboratory (SRNL) using a nitrite-free starting simulant. One simulation was trimmed with Rh and Hg and the other with Ru and Hg. The two noble metals were trimmed at the upper end of the recent Rh-Ru-Hg study. Mercury was trimmed at 1.5 wt% in the total solids. Excess acid comparable in quantity to that in the recent Rh-Ru-Hg matrix study was used. In spite of the favorable conditions for hydrogen generation, virtually no hydrogen production was observed during either SRAT simulation. The Rh test result confirmed the postulated significance of nitrite ion to the catalytic reactions producing hydrogen in CPC testing with normal DWPF sludge simulants. As for Ru, however, previous testing has shown that Ru activated for hydrogen generation only after nitrite destruction. Therefore, Ru could have potentially been catalytically active from the start of the nitrite-free SRAT test, but no such activity was seen. The nitrite-free Ru test result suggests that the intermediate form detected in the bead-frit melter feed preparation Ru solubility profiles was some form of nitro-Ru complex. The nitro-Ru complex is apparently not catalytically active for hydrogen generation but is a precursor to the catalytically active form (presumably a different complex not involving nitrite ligands). Removing nitrite ion from the system prevented the Ru catalyst precursor from forming and consequently blocked formation of the catalytically active form. These results, along with the results of a simulation in which sodium nitrite was metered into the SRAT to prevent ligand substitution reactions that occur during nitrite destruction from occurring in order to reduce hydrogen generation, have greatly clarified the role of the nitrite ion in SRAT hydrogen generation. The new findings add to the overall fundamental understanding of catalytic hydrogen generation during waste processing in the DWPF. These findings also address one of the issues raised in the Future Work section of the recent summary document concerning catalytic hydrogen generation in the CPC. The knowledge gained should facilitate planning future experiments.

08 HYDROGEN↗

ALUMINUM READINESS EVALUATION FOR ALUMINUM REMOVAL AND SODIUM HYDROXIDE REGENRATION FROM HANFORD TANK WASTE BY LITHIUM HYDROTALCITE PRECIPITATION

A Technology Readiness Evaluation (TRE) performed by AREV A Federal Services, LLC (AFS) for Washington River Protection Solutions, LLC (WRPS) shows the lithium hydrotalcite (LiHT) process invented and patented (pending) by AFS has reached an overall Technology Readiness Level (TRL) of 3. The LiHT process removes aluminum and regenerates sodium hydroxide. The evaluation used test results obtained with a 2-L laboratory-scale system to validate the process and its critical technology elements (CTEs) on Hanford tank waste simulants. The testing included detailed definition and evaluation for parameters of interest and validation by comparison to analytical predictions and data quality objectives for critical subsystems. The results of the TRE would support the development of strategies to further mature the design and implementation of the LiHT process as a supplemental pretreatment option for Hanford tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report for the Corrosion Testing of Solutions to Aid in the Removal of 241-AP-106 Waste: Dilution Series Testing

Corrosion analyses were conducted at the 222-S Laboratory in support of proposed liquid waste removal from tank 241-AP-106 (AP-106) in preparation for its use in direct feed low activity waste treatment. The work reported here builds upon previous corrosion testing performed at the 222-S Laboratory that used a high-density caustic and an AP-106 tank waste sample. In this current study, a second liquid grab sample from AP-106 was diluted, 50:50 vol%, with raw water, and this dilution was repeated for a total of 5 dilutions steps. Following each dilution step, the resulting solution was tested for pitting corrosion using linear polarization resistance followed by cyclic potentiodynamic polarization.

241-AP-106↗

Thermal response of a series- and parallel-connected solar energy storage to multi-day charge sequences

The thermal response of a multi-tank thermal storage was studied under variable charge conditions. Tests were conducted on an experimental apparatus that simulated the thermal charging of the storage system by a solar collector over predetermined (prescribed) daylong periods. The storage was assembled from three standard 270 L hot-water storage tanks each charged through coupled, side-arm, natural convection heat exchangers which were connected in either a series- or parallel-flow configuration. Both energy storage rates and tank temperature profiles were experimentally measured during charge periods representative of two consecutive clear days or combinations of a clear and overcast day. During this time, no draw-offs were conducted. Of particular interest was the effect of rising and falling charge-loop temperatures and collector-loop flow rate on storage tank stratification levels. Results of this study show that the series-connected thermal storage reached high levels of temperature stratification in the storage tanks during periods of rising charge temperatures and also limited destratification during periods of falling charge temperature. This feature is a consequence of the series-connected configuration that allowed sequential stratification to occur in the component tanks and energy to be distributed according to temperature level. This effect was not observed in the parallel charge configuration. A further aspect of the study investigated the effect of increasing charge-loop flow rate on the temperature distribution within the series-connected storage and showed that, at high flow rates, the temperature distributions were found to be similar to those obtained during parallel charging. A disadvantage of both the high-flow series-connected and parallel-connected multi-tank storage is that falling charge-loop temperatures, which normally occur in the afternoon, tend to mix and destratify the storage tanks. (author)

14 SOLAR ENERGY↗

CRYogenic Orbital TEstbed Ground Test Article Thermal Analysis

The purpose of this study was to anchor thermal and fluid system models to CRYOTE ground test data. The CRYOTE ground test artide was jointly developed by Innovative Engineering Solutions, United Launch Alliance and NASA KSC. The test article was constructed out of a titanium alloy tank, Sapphire 77 composite skin (similar to G10), an external secondary payload adapter ring, thermal vent system, multi layer insulation and various data acquisition instrumentation. In efforts to understand heat loads throughout this system, the GTA (filled with liquid nitrogen for safety purposes) was subjected to a series of tests in a vacuum chamber at Marshall Space Flight Center. By anchoring analytical models against test data, higher fidelity thermal environment predictions can be made for future flight articles which would eventually demonstrate critical cryogenic fluid management technologies such as system chilldown, transfer, pressure control and long term storage. Significant factors that influenced heat loads included radiative environments, multi-layer insulation performance, tank fill levels and pressures and even contact conductance coefficients. This report demonstrates how analytical thermal/fluid networks were established and includes supporting rationale for specific thermal responses.

Piryk, David↗

Design of Hypervelocity Flow Generator (HFG) and Its Diagnostics

Ground facilities for hypersonic research are a key element for successful development of aerodynamically proven hypervelocity vehicles. Design concepts and diagnostics of a hypervelocity flow generator (HFG) were made as a test platform for hypersonic/hypervelocity spacecraft models at the NASA Langley Research Center. The HFG is a hypersonic flow field generator using optically heated gas which is blown into an 80 cu m vacuum chamber. The vacuum chamber is kept at a stable vacuum pressure with a combination of three large vacuum pumps, while the HFG is in the test mode. The HFG provides a relatively small test section with approximately a 20 cm window. This facility was designed to generate 2.45 km/sec of flow speed, and potentially generate a continuous flow with the nozzle and vacuum system. The window in test section provides a direct view of the shock wave around a model in order to measure temperature, pressure, and density profile within the shock layer. One of the key test goals under this project is to understand why the emission spectra from the standing shockwave plasma predicted by Lora-Loran codes are significantly different from the measured emission spectra from the Flight Investigation Reentry Environment (FIRE II) Flight. The correct estimate of the thermal loading on the leading edge of hypersonic vehicles greatly affects the aerodynamic design, the material selection for the vehicle, and the cooling requirement and can be obtained by the precise modeling of emission spectra from shockwave plasma. However, the estimation of thermal loading is not an easy task due to complex non-equilibrium radiative process within high temperature shock layers that still falls into a category of cold plasma. Direct flight experiments are the most desirable, but not a cost-effective approach. Analysis by computational fluid dynamics (CFD) offers many test flexibilities. However, the CFD codes must be fully tested and validated with experimental data before the codes are effectively used for practical design. Large discrepancies between experiments and codes appear in hypersonic/hypervelocity flow regimes at high altitudes of 60 km ~ 90 km. This HFG facility offers some important parameters for CFD code validation, such as collision cross-sections, relaxation times, reaction rate coefficients and transportation coefficients. The HFG test facility is based on the ejection flow of high temperature gas heated over to 3500 K through a nozzle. The tungsten gas chamber of the HFG is heated up to a desired temperature by a 60 kW optical power beam source. This system consists of an optical power source, a thermal chamber, an expansion nozzle, a test section, and an 80 cu m vacuum tank. 60 kW optical input power is obtained from the 150 kW Vortek arc lamp system (by Vortek Industries, Vancouver, Canada). This optical beam is focused to heat the gas chamber within which a flow media is heated. The maximum achievable temperature of the flow medium reached approximately 3500 K or even higher but is limited by the melting point of the chamber material used. The exhaust velocity through the nozzle was determined by the stagnation temperature and the molecular weight of the working medium at the test section. To provide design parameters, a NASA Chemical Equilibrium with Application (CEA) computer program is used for the simulation of aerothermal data. This CEA program can calculate chemical equilibrium and properties of complex mixtures using shock tube parameters. For nitrogen gas at 2666 K stagnation temperature, the maximum achievable velocity at the test section is approximately 2.45 km/sec which is within the range of the thermal velocity of 8000 K shock layer. Based on the calculation through the CEA program, the design parameters of a HFG were determined and implemented for the test section that includes an expansion nozzle. The installed test section of the experimental facility can sustain a condition of a re-entry vehicle from the Space at an altitude of 60-90 km. After installation of the HFG, the system was fully tested and its operational parameters were measured. An 80 cu m vacuum chamber of HFG was set at 1 torr level to keep a stable downstream condition. The pumping time to reach the minimum vacuum pressure (~ 1 torr) at the test chamber from atmospheric pressure was approximately an hour using Kinney (MBV-14000/MB -1600/KT-300) and Stokes (Model 1772 and 412) pumps. Such a setup condition allowed a continued stable operation of the HFG experiment with flowrates through 1-, 3-, or 5-mm diameters of nozzle throat. The flow characteristics of the HFG for various operating conditions were performed using a focused Schlieren method. At 0.8 torr chamber pressure, a barrel shock was observed at the test section. With a sphere obstacle of 12 mm diameter in the flow, a bow shock (~ 2-mm thickness) was observed by a focused Schlieren visualization method.

Hypervelocity flow↗

TRIPLICATE SODIUM IODIDE GAMMA RAY MONITORS FOR THE SMALL COLUMN ION EXCHANGE PROGRAM

This technical report contains recommendations from the Analytical Development (AD) organization of the Savannah River National Laboratory (SRNL) for a system of triplicate Sodium Iodide (NaI) detectors to be used to monitor Cesium-137 ({sup 137}Cs) content of the Decontaminated Salt Solution (DSS) output of the Small Column Ion Exchange (SCIX) process. These detectors need to be gain stabilized with respect to temperature shifts since they will be installed on top of Tank 41 at the Savannah River Site (SRS). This will be accomplished using NaI crystals doped with the alpha-emitting isotope, Americium-241({sup 241}Am). Two energy regions of the detector output will be monitored using single-channel analyzers (SCAs), the {sup 137}Cs full-energy {gamma}-ray peak and the {sup 241}Am alpha peak. The count rate in the gamma peak region will be proportional to the {sup 137}Cs content in the DSS output. The constant rate of alpha decay in the NaI crystal will be monitored and used as feedback to adjust the high voltage supply to the detector in response to temperature variation. An analysis of theoretical {sup 137}Cs breakthrough curves was used to estimate the gamma activity expected in the DSS output during a single iteration of the process. Count rates arising from the DSS and background sources were predicted using Microshield modeling software. The current plan for shielding the detectors within an enclosure with four-inch thick steel walls should allow the detectors to operate with the sensitivity required to perform these measurements. Calibration, testing, and maintenance requirements for the detector system are outlined as well. The purpose of SCIX is to remove and concentrate high-level radioisotopes from SRS salt waste resulting in two waste streams. The concentrated high-level waste containing {sup 137}Cs will be sent to the Defense Waste Processing Facility (DWPF) for vitrification and the low-level DSS will be sent to the Saltstone Production Facility (SPF) to be incorporated into grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRAT CHEMISTRY AND ACID CONSUMPTION DURING SIMULATED DWPF MELTER FEED PREPARATION

Due to higher than expected hydrogen generation during the Tank 51-Sludge Batch 4 (SB4) qualification run, DWPF engineering requested the Savannah River National Laboratory (SRNL) to expand the ongoing catalytic hydrogen generation program. The work presented in this Technical Report was identified as part of SRNL/Liquid Waste Organization (LWO) meetings to define potential causes of catalytic hydrogen generation as well as from an external technical review panel commissioned to evaluate SRNL hydrogen related data and programs. New scope included improving the understanding of SRAT/SME process chemistry, particularly as it related to acid consumption and hydrogen generation. The expanded hydrogen program scope was covered under the technical task request (TTR): HLW-DWPF-TTR-2007-0016. A task technical and quality assurance plan (TT&QAP) was issued to cover focus areas raised in meetings with LWO plus a portion of the recommendations made by the review panel. A supporting analytical study plan was issued. It was also noted in the review of catalytic hydrogen generation that control of the DWPF acid stoichiometry was an important element in controlling hydrogen generation. A separate TTR was issued to investigate ways of improving the determination of the acid requirement during processing: HLWDWPF-TTR-0015. A separate TT&QAP was prepared for this task request. This report discusses some progress on this task related to developing alternative acid equations and to performing experimental work to supplement the existing database. Simulant preparation and preliminary flowsheet studies were already documented. The prior work produced a sufficient quantity of simulant for the hydrogen program and melter feed rheology testing. It also defined a suitable acid addition stoichiometry. The results presented in this report come from samples and process data obtained during sixteen 22-L SRAT/SME simulations that were performed in the second half of 2007 to produce eight SME products with frit 418 and a matching set of eight SME products with spherically beaded frit 418. The requirement to produce two 25 gallon batches of melter feed for the melter feed rheology modifier program fell under a separate task plan. One supporting 4-L SRAT simulation was performed with mercury, since the 22-L melter feed preparation runs had no mercury due to melter off-gas constraints. As a result of this work, a timeline of reactions has been developed showing the sequence of major reactions occurring during and shortly after acid addition. The traditional-style simulant used in this testing had fairly well defined speciation which enabled the reactions being observed to be related to acid consumption. The new coprecipitated simulants have somewhat different speciation, and it will be necessary to validate some of the conclusions from this testing using sample data from SRAT simulations with coprecipitated simulant. Noble metal dissolution data on timing and concentration were presented in a separate report discussing hydrogen generation. A few of those results will be brought into this report as part of the description of the SRAT chemistry timeline. The noble metal and mercury concentrations used in the preliminary flowsheet studies are summarized in Table 1 along with the ranges covered in this study.

08 HYDROGEN↗

Tank 21 and tank 24 blend and feed study: blending times, settling times, and transfers

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where salt solutions of up to 1.2 million gallons will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. In particular, Tanks 21 and 24 are planned to be used for blending and transferring to the SDI feed tank. These tanks were evaluated here to determine blending times, to determine a range of settling times for disturbed sludge, and to determine that the SWPF Waste Acceptance Criteria that less than 1200 mg/liter of solids will be entrained in salt solutions during transfers from the Tank 21 and Tank 24 will be met. Overall conclusions for Tank 21 and Tank 24 operations include: (1) Experimental correction factors were applied to CFD (computational fluid dynamics) models to establish blending times between approximately two and five hours. As shown in Phase 2 research, blending times may be as much as ten times greater, or more, if lighter fluids are added to heavier fluids (i.e., water added to salt solution). As the densities of two salt solutions converge this effect may be minimized, but additional confirmatory research was not performed. (2) At the current sludge levels and the presently planned operating heights of the transfer pumps, solids entrainment will be less than 1200 mg/liter, assuming a conservative, slow settling sludge simulant. (3) Based on theoretical calculations, particles in the density range of 2.5 to 5.0 g/mL must be greater than 2-4 {micro}m in diameter to ensure they settle adequately in 30-60 days to meet the SWPF feed criterion (<1200 mg/l). (4) Experimental tests with sludge batch 6 simulant and field turbidity data from a recent Tank 21 mixing evolution suggest the solid particles have higher density and/or larger size than indicated by previous analysis of SRS sludge and sludge simulants. (5) Tank 21 waste characterization, laboratory settling tests, and additional field turbidity measurements during mixing evolutions are recommended to better understand potential risk for extended (> 60 days) settling times in Tank 21.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on Level Sensor Development

This report details the development of sensors capable of measuring the level of liquid sodium at the Mechanisms Engineering Test Loop (METL) of Argonne National Laboratory. A differential pressure level sensor and variations of a mutually inductive level sensor have been designed, built, and tested in sodium at METL. A differential pressure level sensor was successfully calibrated during the initial dump tank sodium fill and continues to operate effectively. A differential pressure level sensor has been procured for use in the expansion tank. Three variations of mutually inductive level sensors have been designed, built, and tested in an out-of-sodium testing station in Building 308. The most advanced variation consists of a coil wound mineral insulated cable capable of continuous level measurement of liquid sodium up to 538°C over a range of 70”. Successful in-sodium testing occurred in late 2018.

47 OTHER INSTRUMENTATION↗

IAPS (8-cm) ion thruster cyclic endurance test

Attention is given to the cyclic endurance qualification test, performed in a vacuum facility with a liquid nitrogen-cooled cryosurface and a frozen mercury target, to which a mercury-ion thruster representative of Ion Auxiliary Propulsion System (IAPS) thrusters was subjected. At the time that the endurance test was successfully concluded, upon consumption of the IAPS propellant tank's mercury, 8,471 hours of 'beam-on time' and 599 cycles had been accumulated. The system's Power Electronics Unit accumulated 10,268 hours of test time with high voltage applied to the operating thruster or dummy load.

Dulgeroff, C. R.↗

Green Monopropellant Status at Marshall Space Flight Center

NASA Marshall Space Flight Center is continuing investigations into the use of green monopropellants as a replacement for hydrazine in spacecraft propulsion systems. Work to date has been to push technology development through multiple activities designed to understand the capabilities of these technologies. Future work will begin to transition to mission pull as these technologies are mature while still keeping a solid goal of pushing technology development as opportunities become available. The AF-M315E activities began with hot-fire demonstration testing of a 1N monopropellant thruster in FY 14 and FY15. Following successful completion of the preliminary campaign, changes to the test stand to accommodate propellant conditioning capability and better control of propellant operations was incorporated to make testing more streamlined. The goal is to conduct hot-fire testing with warm and cold propellants using the existing feed system and original thruster design. Following the 1N testing, a NASA owned 100 mN thruster will be hot-fire tested in the same facility to show feasibility of scaling to smaller thrusters for cubesat applications. The end goal is to conduct a hot-fire test of an integrated cubesat propulsion system using an SLM printed propellant tank, an MSFC designed propulsion system electronic controller and the 100 mN thruster. In addition to the AF-M315E testing, MSFC is pursuing hot-fire testing with LMP-103S. Following our successful hot-fire testing of the 22N thruster in April 2015, a test campaign was proposed for a 440N LMP-103S thruster with Orbital ATK and Plasma Processes. This activity was funded through the Space Technology Mission Directorate (STMD) ACO funding call in the last quarter of CY15. Under the same funding source a test activity with Busek and Glenn Research Center for testing of 5N AF-M315E thrusters was proposed and awarded. Both activities are in-work with expected completion of hot-fire testing by the end of FY17. MSFC is continuing to coordinate with the AF and academia on understanding the chemical reactions that occur in AF-M315E. An on-going investigation of the catalyst bed species using Raman Spectroscopy through the NASA Technology Research Fellowship Program (NSTRF) is looking for ways to minimize the amount of computation required by understanding the intermediate species created in the catalyst bed. The MSFC team is also working with commercial partners through Cooperative Agreement Notices (CAN's). Partnerships with commercial and academia include work in non-catalytic ignition of AF-M315, spark ignition of hybrid cubesat systems, printed SLM tanks, and dual-mode (electric and chemical) propulsion systems is continuing.

Burnside, Christopher G.↗