Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Flight testing the fixed-wing configuration of the Rotor Systems Research Aircraft (RSRA)

The Rotor Systems Research Aircraft (RSRA) is a unique research aircraft designed to flight test advanced helicopter rotor system. Its principal flight test configuration is as a compound helicopter. The fixed wing configuration of the RSRA was primarily considered an energy fly-home mode in the event it became necessary to sever an unstable rotor system in flight. While it had always been planned to flight test the fixed wing configuration, the selection of the RSRA as the flight test bed for the X-wing rotor accelerated this schedule. This paper discusses the build-up to, and the test of, the RSRA fixed wing configuration. It is written primarily from the test pilot's perspective.

Hall, G. W.↗

Flight testing the fixed wing configuration of the Rotor Systems Research Aircraft (RSRA)

The Rotor Systems Research Aircraft (RSRA) is a unique research aircraft designed to flight test advanced helicopter rotor system. Its principal flight test configuration is as a compound helicopter. The fixed wing configuration of the RSRA was primarily considered an energy fly-home mode in the event it became necessary to sever an unstable rotor system in flight. While it had always been planned to flight test the fixed wing configuraion, the selection of the RSRA as the flight test bed for the x-wing rotor accelerated this schedule. This paper discusses the build-up to, and the test of, the RSRA fixed wing configuration. It is written primarily from the test pilot's perspective.

Hall, G. W.↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover Final Submission

NASA's Mars 2020 Perseverance Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions to Mars. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality: seven new and/or upgraded scientific payloads, an upgraded arm and sampling system, and a Helicopter demonstration. These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagn

Gonzales, Edward C↗

SLS Test Stand Site Selection

Test site selection is a critical element of the design, development and production of a new system. With the advent of the new Space Launch System (SLS), the National Aeronautics and Space Administration (NASA) had a number of test site selection decisions that needed to be made early enough in the Program to support the planned Launch Readiness Date (LRD). This case study focuses on decisions that needed to be made in 2011 and 2012 in preparation for the April 2013 DPMC decision about where to execute the Main Propulsion Test that is commonly referred to as "Green Run." Those decisions relied upon cooperative analysis between the Program, the Test Lab and Center Operations. The SLS is a human spaceflight vehicle designed to carry a crew farther into space than humans have previously flown. The vehicle consists of four parts: the crew capsule, the upper stage, the core stage, and the first stage solid rocket boosters. The crew capsule carries the astronauts, while the upper stage, the core stage, and solid rocket boosters provide thrust for the vehicle. In other words, the stages provide the "lift" part of the lift vehicle. In conjunction with the solid rocket boosters, the core stage provides the initial "get-off-the-ground" thrust to the vehicle. The ignition of the four core stage engines and two solid rocket boosters is the first step in the launch portion of the mission. The solid rocket boosters burn out after about 2 minutes of flight, and are then jettisoned. The core stage provides thrust until the vehicle reaches a specific altitude and speed, at which point the core stage is shut off and jettisoned, and the upper stage provides vehicle thrust for subsequent mission trajectories. The integrated core stage primarily consists of a liquid oxygen tank, a liquid hydrogen tank, and the four core stage engines. For the SLS program, four RS-25 engines were selected as the four core stage engines. The RS-25 engine is the same engine that was used for Space Shuttle. The test plan for the integrated core stage was broken down into several segments: Component testing, system level testing, and element level testing. In this context, components are items such as valves, controllers, sensors, etc. Systems are items such as an entire engine, a tank, or the outer stage body. The core stage itself is considered to be an element. The rocket engines are also considered an element. At the program level, it was decided to perform a single green run test on the integrated core stage prior to shipment of it to Kennedy Space Center (KSC) for use in the EM-1 test flight of the SLS vehicle. A green run test is the first live fire of the new integrated core stage and engine elements - without boosters of course. The SLS Program had to decide where to perform SLS green run testing.

Crowe, Kathryn↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover

NASA's Mars 2020 Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality. The scientific payload includes a trio of chemical analysis tools (PIXL, SHERLOC, SuperCam), a ground penetrating radar (RIMFAX), an upgraded weather station (MEDA), upgraded high resolution camera (MastCam-Z), and an oxygen-producing experiment (MOXIE). These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft has successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagnetic interference in all mission phases.

Gonzales, Edward C↗

Static Longitudinal and Lateral Stability and Control Data Obtained from Tests of a 1/15-Scale Model of the Goodyear XZP5K Airship, TED No. NACA DE 211

Static longitudinal and lateral stability and control data are presented of an investigation on a l/15-scale model of the Goodyear XZP5K airship over a pitch and yaw range of +/-20 deg and 0 deg to 30 deg, respectively, for various rudder and elevator deflections. Two tail configurations of different plan forms were tested and wake and boundary-layer surveys were conducted. Testing was conducted in the Langley full-scale tunnel at a Reynolds number of approximately 16.5 x 10(exp 6) based on hull length, and corresponds to a Mach number of about 0.12.

Cannon, Michael D.↗

Ground test program for new Atlas payload fairings

To establish the competitiveness of the revitalized family of Atlas launch vehicles (I, II, IIA, and IIAS) a new series of payload fairings, an 11-foot and a 14-foot diameter version, were designed to accommodate the widest possible variety of satellites. Because these aluminum fairings are new designs, the plant at which they are produced is new, and launch customers are very anxious to fly their payloads, an ambitious and efficient test program is essential. Five major tests have been planned for completion within the span of one calendar year. One of these has been completed, with every indication that it was a success, one is currently under way, and two more are scheduled to start in the month of April. Through effective use of test assets, facilities, and personnel, all testing will be completed, allowing the fairing design to be completely characterized and then qualified through analysis prior to first launch of each of the fairings.

Robbins, Michael J.↗

TQM in a test environment

In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

Chambers, Gary D.↗

Air Force NiH2 IPV storage testing

USAF Phillips Laboratory Nickel Hydrogen IPV storage test, performed at the Naval Surface Warfare Center (NSWC) at Crane Indiana, is discussed. The storage tests is just one component of the USAF Phillips Laboratory Nickel Hydrogen IPV Test Program. The plan was to store cells for a defined period and cycle matching cells to determine the effect on cycle life. The storage period was completed in April 95 and the cycling cells have achieved five years of real time LEO cycling. The two main objectives of the storage test are: to investigate various methods on NiH2 cells by using two different manufacturers and two different storage methods or conditions, and to determine the effect of storage method on cycle performance and cycle life by using matching cells cycling at 25% depth of discharge. The comparisons between individual cycle performance as well as cycle life are also reported. During the test the following variables has been considered: constant potential, cell current, open circuit voltage, and temperature. The results of the test are also discussed using charts and tables.

Smellie, Shawn↗

Testing Capabilities for Superconducting Magnets at Fermilab

This presentation will focus on the current testing capabilities for superconducting magnets at Fermilab, highlighting existing systems, recent upgrades, and future plans. The Vertical Magnet Test Facility (VMTF) remains a cornerstone for testing superconducting magnets in R&D applications, maintaining its established capabilities. Stand 4 continues to support the Hi-Lumi AUP production line of magnets in cryostats and has achieved significant improvements through a redesign of lead connections, resolving issues with liquid helium levels and resistance, culminating in a successful endurance test without interruption. Similarly, Stand 7 underwent commissioning and a lead redesign to reduce heat load, while its core testing capabilities remain unchanged. Looking forward, Stand 3 is undergoing a redesign, with plans to restart and begin commissioning by the end of 2025, introducing new features such as background magnetic field testing and upgraded power supplies. Fermilab is also advancing the High Field Vertical Magnet Test Facility (HFVMTF), designed to support the fusion and magnet R&D program, with commissioning scheduled for 2025 and critical components, including the cryostat and power supplies, being delivered. Enhancing all operations, the newly commissioned IB1 cryoplant now offers automated overnight helium production and efficient transfer to a 10,000-liter dewar, streamlining support across all test stands. This talk will provide a comprehensive overview of testing capabilities, and showcasing how Fermilab is advancing its capabilities to meet the evolving demands of superconducting magnet testing.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Smoke detection in low-G fires

Fires in spacecraft are considered a credible risk. To respond to this risk, NASA flew fire detectors on Skylab and the Space Shuttle (STS) and included them in the design for International Space Station Alpha (ISSA). In previous missions (Mercury, Gemini and Apollo), the crew quarters were so cramped that it was not considered credible that the astronauts could fail to observe a fire. The Skylab nodule included approximately 20 UV fire detectors. The space shuttle has 9 ionization detectors in the mid deck and flight deck and Spacelab has six additional ionization detectors. The planned detectors for ISSA are laser-diode, forward-scattering, smoke or particulate detectors. Current plans for the ISSA call for two detectors in the open area of the module and detectors in racks that have both cooling air flow and electrical power. Due to the complete absence of data concerning the nature of particulate and radiant emission from low-g fires, all three of these detector systems were designed based upon 1-g test data. As planned mission durations and complexity increase and the volume of spacecraft increases, the need for and importance of effective, crew independent, fire detection grows significantly. This requires more knowledge concerning low-gravity fires and how they might be detected. To date, no combustion-generated particulate samples have been collected for well-developed microgravity flames. All of the extant data come from drop tower tests and therefore only correspond to the early stages of a fire. The fuel sources were restricted to laminar gas-jet diffusion flames and rapidly overheated wire insulation. These gas-jet drop tower tests indicate, through thermophoretic sampling, that soot primaries and aggregates (groups of primary particles) in micro-g may be significantly larger than those in normal-g (ng). This raises new scientific questions about soot processes as well as practical issues for particulate detection/alarm threshold levels used in on-orbit smoke detectors. Furthermore, it is widely speculated but unverified that the aggregates will grow to very large scales in a microgravity fire of longer duration than available on the ground. Preliminary tests in the 2.2 second drop tower suggest that particulate generated by overheated wire insulation will also be larger in microgravity than in normal gravity. TEM grids downstream of the fire region in the WIF experiment as well as visual observation of long string-like aggregates, further confirm this suggestion. The combined impact of these limited results and theoretical predictions is that direct knowledge of low-g combustion particulate as opposed to extrapolation from 1-g data is needed for a more confident design of smoke detectors for spacecraft.

Urban, David L.↗

Testing the Exploration Conops (Excon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. Tasked by the new Extravehicular Activity and Human Surface Mobility Program(EHP), a team of stakeholders from engineering, flight operations, human health and performance, astromaterials and science, and the crew office worked together to perform EVAs in 3 simulated lunar environments. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into 3 distinct tests titled after the EHP integrated test team: Joint EVA Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1was conducted near Kilbourne Holeby El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept operations(con-ops), risks and technology.JETT3 was conducted near SP Crater by Flagstaff Arizona and focused on simulating the Artemis III mission with a simulated Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Excon mockup space suit. The Excon mockup suit is a light-weight, unpressurized Exploration Extravehicular Mobility Unit (xEMU)simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Infrared On-Orbit RCC Inspection With the EVA IR Camera: Development of Flight Hardware From a COTS System

In November 2004, NASA's Space Shuttle Program approved the development of the Extravehicular (EVA) Infrared (IR) Camera to test the application of infrared thermography to on-orbit reinforced carbon-carbon (RCC) damage detection. A multi-center team composed of members from NASA's Johnson Space Center (JSC), Langley Research Center (LaRC), and Goddard Space Flight Center (GSFC) was formed to develop the camera system and plan a flight test. The initial development schedule called for the delivery of the system in time to support STS-115 in late 2005. At the request of Shuttle Program managers and the flight crews, the team accelerated its schedule and delivered a certified EVA IR Camera system in time to support STS-114 in July 2005 as a contingency. The development of the camera system, led by LaRC, was based on the Commercial-Off-the-Shelf (COTS) FLIR S65 handheld infrared camera. An assessment of the S65 system in regards to space-flight operation was critical to the project. This paper discusses the space-flight assessment and describes the significant modifications required for EVA use by the astronaut crew. The on-orbit inspection technique will be demonstrated during the third EVA of STS-121 in September 2005 by imaging damaged RCC samples mounted in a box in the Shuttle's cargo bay.

Gazanik, Michael↗

Testing the Exploration ConOps (ExCon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗

Testing the Exploration Conops (Excon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗