Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “subsystem design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

The MIST /MIUS Integration and Subsystems Test/ laboratory - A testbed for the MIUS /Modular Integrated Utility System/ program

The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.

Beckham, W. S., Jr.↗

Regenerative Life Support Evaluation

This paper describes the development plan and design concept of the Regenerative Life Support Evaluation (RLSE) planned for flight testing in the European Space Agency Spacelab. The development plan encompasses the ongoing advanced life support subsystem and a systems integration effort to evolve concurrently subsystem concepts that perform their function and can be integrated with other subsystems in a flight demonstration of a regenerative life support system. The design concept for RLSE comprises water-electrolysis O2 generation, electrochemically depolarized CO2 removal, and Sabatier CO2 reduction for atmosphere regeneration, urine vapor-compression distillation, and wash-water hyperfiltration for waste-water recovery. The flight demonstration by RLSE is an important step in qualifying the regenerative concepts for life support in space stations.

Kleiner, G. N.↗

Air-liquid solar collector for solar heating, combined heating and cooling, and hot water subsystems

A collection of quarterly reports consisting of the installation and layout design of the air collector system for commercial applications, completion of the preliminary design review, detailed design efforts, and preparation of the verification test plan are given. Performance specifications and performance testing of a prototype model of a two manifold, 144 tube air collector array is presented.

Source record↗

Computer Simulation For Multilevel Optimization Of Design

New simulator for multilevel optimization of complex hierarchical systems reduces cost of analysis in experimentation with multilevel design-optimization algorithms. Computer program mimics qualitative behavior and data couplings that occur among subsystems of complex engineering system, such as car, aircraft, or building. Eliminates engineering analyses in subsystems by replacing them with judiciously-chosen analytical functions. Serves as tool for development of strategy for multilevel optimization of design.

Padula, Sharon L.↗

Analysis of a spatial tracking subsystem for optical communications

Spatial tracking plays a very critical role in designing optical communication systems because of the small angular beamwidth associated with the optical signal. One possible solution for spatial tracking is to use a nutating mirror which dithers the incoming beam at a rate much higher than the mechanical disturbances. A power detector then senses the change in detected power as the signal is reflected off the nutating mirror. This signal is then correlated with the nutator driver signals to obtain estimates of the azimuth and elevation tracking signals to control the fast scanning mirrors. A theoretical analysis is performed for a spatial tracking system using a nutator disturbed by shot noise and mechanical vibrations. Contributions of shot noise and mechanical vibrations to the total tracking error variance are derived. Given the vibration spectrum and the expected signal power, there exists an optimal amplitude for the nutation which optimizes the receiver performance. The expected performance of a nutator based system is estimated based on the choice of nutation amplitude.

Win, Moe Z.↗

X-34 Main Propulsion System-Selected Subsystem Analyses

The X-34 hypersonic flight vehicle is currently under development by Orbital Sciences Corporation (Orbital). The Main Propulsion System (MPS) has been designed around the liquid propellant Fastrac rocket engine currently under development at NASA Marshall Space Flight Center. This paper presents selected analyses of MPS subsystems and components. Topics include the integration of component and system level modeling of the LOX dump subsystem and a simple terminal bubble velocity analysis conducted to guide propellant feed line design.

Brown, T. M.↗

Human Factors in Human-Systems Integration

Any large organization whose mission is to design and develop systems for humans, and train humans needs a well-developed integration and process plan to deal with the challenges that arise from managing multiple subsystems. Human capabilities, skills, and needs must be considered early in the design and development process, and must be continuously considered throughout the development lifecycle. This integration of human needs within system design is typically formalized through a Human-Systems Integration (HSI) program. By having an HSI program, an institution or organization can reduce lifecycle costs and increase the efficiency, usability, and quality of its products because human needs have been considered from the beginning.

Fitts, David J.↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗

Centralized, decentralized, and independent control of a flexible manipulator on a flexible base

The dynamics and control of a flexible manipulator arm with payload mass on a flexible base in space are considered. The controllers are provided by one torquer at the center of the base and one torquer at the connection joint of the robot and the base. The nonlinear dynamics of the system is modeled by applying the finite element method and Lagrangian formula. Three control strategies are considered and compared, i.e., centralized control, decentralized control, and independent control. All these control designs are based on the linear quadratic regulator theory. A mathematical decomposition is used in the decentralization process so that the coupling between the subsystems is weak, while a physical decomposition is used in the independent control design process. For both the decentralized and the independent controls, the stability of the overall linear system is checked before a numerical simulations is initiated. Two numerical examples show that the response of the independent control system are close to those of the centralized control system, while the responses of the decentralized control system are not.

Li, Feiyue↗

International Space Station ECLSS Technical Task Agreement Summary Report

This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

Ray, C. D.↗

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Watts, Carly↗

Dynamic attack surfaces in nuclear power plants - 162

In this paper, we will summarize a group of architectural principles that inform the development of secure control system architectures, followed by a methodology that allows designers to understand the attack surface of components and subsystems in a way that supports the integration of these surfaces into a single attack surface. We will then show how this methodology can be used to analyze the control system attack surface from a variety of threats, including knowledgeable insiders. We close the paper with an overview of how this approach can be folded into a more rigorous mathematical analysis of the system to define the system's security posture. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bit timing with pulse distortion and intersymbol interference

Pulse distortion and intersymbol interference due to insufficient filtering in PCM and PSK channels cause performance degradation in terms of both bit error probabilities and timing errors. This paper reports the results of a study analyzing these effects on bit timing subsystems. Consideration is given to both the filter-rectifier and transition tracking type of timing subsystem. Although both these systems perform similarly in high SNR and ideal pulse models, pulse distortion and intersymbol affects each differently. The primary effects in both systems is to cause the presence of an irreducible mean squared timing error due to the intersymbol which limits the ultimate performance. Design procedures to minimize the anomalies of both systems are presented, and indicate modifications of the standard timing subsystems. It is found that specific design directions depend on whether the intersymbol or the receiver noise tends to dominate.

Gagliardi, R. M.↗

Development of NASA's Small Fission Power System for Science and Human Exploration

Exploration of our solar system has brought great knowledge to our nation's scientific and engineering community over the past several decades. As we expand our visions to explore new, more challenging destinations, we must also expand our technology base to support these new missions. NASA's Space Technology Mission Directorate is tasked with developing these technologies for future mission infusion and continues to seek answers to many existing technology gaps. One such technology gap is related to compact power systems (greater than 1 kWe) that provide abundant power for several years where solar energy is unavailable or inadequate. Below 1 kWe, Radioisotope Power Systems have been the workhorse for NASA and will continue, assuming its availability, to be used for lower power applications similar to the successful missions of Voyager, Ulysses, New Horizons, Cassini, and Curiosity. Above 1 kWe, fission power systems become an attractive technology offering a scalable modular design of the reactor, shield, power conversion, and heat transport subsystems. Near term emphasis has been placed in the 1-10kWe range that lies outside realistic radioisotope power levels and fills a promising technology gap capable of enabling both science and human exploration missions. History has shown that development of space reactors is technically, politically, and financially challenging and requires a new approach to their design and development. A small team of NASA and DOE experts are providing a solution to these enabling FPS technologies starting with the lowest power and most cost effective reactor series named "Kilopower" that is scalable from approximately 1-10 kWe.

Solar System↗

Development of NASA's Small Fission Power System for Science and Human Exploration

Exploration of our solar system has brought many exciting challenges to our nations scientific and engineering community over the past several decades. As we expand our visions to explore new, more challenging destinations, we must also expand our technology base to support these new missions. NASAs Space Technology Mission Directorate is tasked with developing these technologies for future mission infusion and continues to seek answers to many existing technology gaps. One such technology gap is related to compact power systems (1 kWe) that provide abundant power for several years where solar energy is unavailable or inadequate. Below 1 kWe, Radioisotope Power Systems have been the workhorse for NASA and will continue to be used for lower power applications similar to the successful missions of Voyager, Ulysses, New Horizons, Cassini, and Curiosity. Above 1 kWe, fission power systems become an attractive technology offering a scalable modular design of the reactor, shield, power conversion, and heat transport subsystems. Near term emphasis has been placed in the 1-10kWe range that lies outside realistic radioisotope power levels and fills a promising technology gap capable of enabling both science and human exploration missions. History has shown that development of space reactors is technically, politically, and financially challenging and requires a new approach to their design and development. A small team of NASA and DOE experts are providing a solution to these enabling FPS technologies starting with the lowest power and most cost effective reactor series named Kilopower that is scalable from approximately 1-10 kWe.

Heat Transfer↗

The Space Infrared Telescope Facility structural design requirements

An effort is currently being carried out by the Jet Propulsion Laboratory (JPL) to study mission feasibility and to define functional requirements for various subsystems of the Space Infrared Telescope Facility (SIRTF). As a major part of this effort, structural design requirements have been derived based on the stated mission objectives. Design concerns addressed by these requirements include the limits on mass and location of the center of gravity, launch stiffness and dynamic characteristics, design loads and analysis criteria, survivability of the TITAN IV/Centaur launch environment, thermal control for maintaining a near absolute-zero operating temperature, and helium cryogen volume and storage for a five-year mission. To illustrate how the structural design requirements can be met, a point design of the SIRTF flight hardware system was developed, modeled, and analyzed. A description of the key features of this point design, along with pertinent modeling and analysis results, are discussed in this Paper.

Macneal, Paul D.↗