Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “secure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada (Rev.1)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2011 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Site

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2011 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. During the last 2 weeks of March 2011, gamma spectroscopy results for air particles showed measurable activities of iodine-131 ( 131 I), cesium-134 ( 134 Cs), and cesium-137 ( 137 Cs). These results are attributed to the release of fission products from the damaged Fukushima Daiichi power plant in Japan. The remaining gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below minimum detectable concentrations. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. The 86.3 millimeters (mm) (3.40 inches [in.]) of precipitation at the Area 3 RWMS during 2011 is 44% below the average of 154.1 mm (6.07 in.), and the 64.8 mm (2.55 in.) of precipitation at the Area 5 RWMS during 2011 is 47% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 RWMS operational waste covers was not done during 2011 due to construction of the final evapotranspiration cover at these monitoring locations. Moisture from precipitation did not percolate below 122 centimeters (4 feet) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2011, there was no drainage through 2.4 meters (8 feet) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Ten percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2011 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Investigation Plan for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

CAU 570 comprises the following six corrective action sites (CASs): • 02-23-07, Atmospheric Test Site - Tesla • 09-23-10, Atmospheric Test Site T-9 • 09-23-11, Atmospheric Test Site S-9G • 09-23-14, Atmospheric Test Site - Rushmore • 09-23-15, Eagle Contamination Area • 09-99-01, Atmospheric Test Site B-9A These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 570. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The presence and nature of contamination at CAU 570 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed near the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

54 ENVIRONMENTAL SCIENCES↗

Pre-Shot Simulations of Near-Field and Far-Field Ground Motion for the Source Physics Experiment (SPE) Explosions at the Climax Stock, Nevada National Security Site: SPE3

The Source Physics Experiment (SPE) is designed to improve ground motion prediction capabilities for underground nuclear testing through the development of new physics-based models together with validation via new chemical explosion data. The SPE shots consist of different size and depth chemical explosions in a granite borehole at the Climax Stock on the Nevada National Security Site (NNSS). The third shot in the series (SPE3) will be the same size (1000 kg TNT equivalent) and depth (45 m canister centroid) as the previous shot (SPE2). The main purpose of the SPE3 is to investigate the effects of the damage zone caused by the SPE2 chemical explosion on the SPE3 explosion, keeping all other parameters (e.g. size, depth, explosive type) the same. This SPE3 pre-shot report addresses progress made in simulation of the expected wavefield in the both the near- and the far-field. In this report we consider the far-field to be where seismic wave motion can be characterized by elastic or visco-elastic approximations, in contrast to the near-field where other, often non-linear effects, play a major role. The current simulations build on previous work from the SPE1 and SPE2 shots. The simulations are intended to highlight differences between SPE2 and SPE3 using a variety to approximations intended to mimic the expected effect of the damage zone. The simplest physics of damage zone effects suggest changes in the source region material properties (density, velocity), and in the yield strength (coupling) of the rock, should both impact the far-field signal. We can illustrate this in a simplistic way for P-waves in Figure A using the empirical Mueller-Muphy (1971) far-field explosion model (MM). First if the SPE2 explosion-induced damage reduces velocities and densities without affecting the yield strength or coupling, then by energy conservation the amplitudes for SPE 3 would increase as shown in the top of Figure A. Similarly if the explosion induced damage increased density (say by compacting pore space) the amplitude would decrease. This impedance effect, where the product of the density, wave-velocity, and ground-velocity squared is conserved, is well known. The second and harder effect to quantify, are changes in the energy coupling or yield strength. In the simple MM model this is represented by the coupling factor between cavity radius and yield. If we assume the granite was slightly weakened by SPE2 such that the cavity radius increases slightly then the overall amplitudes of SPE3 decrease relative to SPE2 as shown in the bottom of Figure A. In reality both effects, may exist due to the damage zone, and furthermore we know they are interrelated in complex ways. For S-waves we expect even more complex effects due to motion on joints and faults. For this reason we are developing physics-based near field simulation models coupled to far-field propagation codes to predict the overall effects of changes in the source emplacement region on observed signals. Near-field simulations have been performed using the Eulerian code (GEODYN). An ensemble model, calibrated to match records from past large-scale nuclear events is used. Both 2D axisymmetric (no faults) and fully three-dimensional GEODYN calculations (with /without faults) were conducted in which the damage zones sustained by SPE2 are retained as the initial condition for the SPE3 calculations. The results indicate that the waveform peak amplitudes are slightly decayed since the ensemble model includes no softening mechanism. The pulse widths are reduced, indicating the energy is dissipated more by the damage zone as expected. The dominant motions calculated in all the scenarios are spherically symmetric and non-spherical components are small as seen for the SPE2 calculations. The arrival time of the SPE3 waveform at the boreholes is shorter than SPE2 due to compaction during the previous explosion. As shown in the SPE 1 and 2 observations shear waves are generated, indicating the potential contributions from the induced motion on distributed joints. The effects of joints are evaluated using the Lagrangian hydrocode (GEODYN-L), which was benchmarked against the GEODYN calculations for the ensemble model. A new granite model calibrated for samples from the SPE site is used. The new model includes effects of poroelasticity and water saturation and may be scaled allowing application to both small and large scales. Parametric tests were performed to evaluate the effect of joints within the granite and the results demonstrate that in situ joints introduce anisotropy and significant tangential motions.

58 GEOSCIENCES↗

Soil Composition, Area 6 of the Nevada National Security Site

Three soil samples (two from the surrounding soils and one from the intersecting gravel roadbed) were collected from Frenchman Flat Area 6, across from the DAF at the Nevada National Security Site for analysis of major and trace element compositions.

54 ENVIRONMENTAL SCIENCES↗

Special Analysis of the Area 3 Radioactive Waste Management Site at the Nevada National Security Site, Nye County, Nevada

This report describes the methods and results of a special analysis (SA) of the Area 3 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The purpose of the SA is to determine if the approved performance assessment (PA) and composite analysis (CA) (Shott et al., 2001) remain valid. The Area 3 RWMS PA and CA were prepared as a single document and received conditional approval on October 6, 1999. A conditional Disposal Authorization Statement (DAS) for the Area 3 RWMS was issued on October 20, 1999. Since preparation of the approved PA and CA, new information and additional environmental monitoring data have been used to update the PA and CA. At the same time, continual advancements in computer processors and software have allowed improvement to the PA and CA models. Annual reviews of the PA and CA required by U.S. Department of Energy (DOE) Order DOE O 435.1 have documented multiple changes occurring since preparation of the PA and CA. Potentially important changes include: Development of a new and improved baseline PA and CA model implemented in the probabilistic GoldSim simulation platform. A significant increase in the waste inventory disposed at the site. Revision and updating of model parameters based on additional years of site monitoring data and new research and development results. Although changes have occurred, many important PA/CA issues remain unchanged, including the site conceptual model, important features, events, and processes, and the points of compliance. The SA is performed to document the current status of the PA/CA model and to quantitatively assess the impact of cumulative changes on the PA and CA results. The results of the SA are used to assess the validity of the approved PA/CA and make a determination if revision of the PA or CA is necessary. The SA was performed using the Area 3 RWMS, version 2.102, GoldSim model, the current baseline PA/CA model. Comparison of the maximum SA results with the PA performance objectives indicates that there continues to be a reasonable expectation of compliance. The resident exposure scenario was evaluated for compliance with the air pathway and all-pathways annual total effective dose (TED) performance objectives. The maximum mean air pathway TED, 7E-6 millisievert (mSv) at 1,000 years (y) has decreased relative to the approved PA and is significantly less than the 0.1 mSv limit. The maximum mean all-pathways annual TED, 7E-5 mSv at 1,000 y has increased but remains a small fraction of the 0.25 mSv limit. The SA maximum mean radon-222 (222Rn) flux density, 0.03 becquerel per square meter per second (Bq m-2 s-1), has increased relative to the PA results but is significantly less than the 0.74 Bq m-2 s-1 limit. The SA results continue to support a conclusion that the disposed waste inventory is protective of intruders and groundwater resources. The maximum mean intruder TED, 0.01 mSv for an acute construction scenario at the U-3ah/at disposal unit, was less than the 5 mSv performance measure. Site monitoring data and research results continue to support a conclusion that a groundwater pathway will not exist within the 1,000 y compliance period. Projected releases to the environment are a small fraction of the performance objectives. Cost-effective options for reducing releases further are unlikely to exist. Therefore, releases from the Area 3 RWMS are judged to be as low as reasonably achievable. Comparison of the maximum CA result with the 0.3 mSv CA dose constraint indicates that no action is required to reduce the dose from the Area 3 RWMS and all interacting sources of residual radioactive contamination. The SA maximum mean CA annual TED, 0.02 mSv at 1,000 y, has increased from the approved CA result but remains less than 10% of the dose constraint. The CA TED continues to be due predominantly to inhalation of plutonium-239 resuspended from soils contaminated by nuclear weapons tests conducted near the Area 3 RWMS. The SA results estimated with the Area 3 RWMS version 2.102 model indicate that changes to the PA and CA do not significantly alter the PA/CA results or conclusions. Although increases occur for the all-pathways annual TED, the 222Rn flux density, and the CA annual TED, all PA and CA results are a small fraction of the performance objectives or dose constraints. The same conclusion was reached for the approved PA and CA. The SA results continue to support a conclusion that there is a reasonable expectation of meeting all performance objectives and the CA dose constraint. There is no need to revise the DAS at this time. The SA results support a conclusion that the Area 3 RWMS PA and CA remain valid, and revision is not necessary at this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE, NREL Help DoD Enhance Energy Security (Fact Sheet)

This fact sheet gives an overview of the technical assistance provided by DOE/NREL to the Department of Defense to advance energy security. Specifically, the fact sheet describes the net zero energy project at the U.S. Marine Corps Air Station (MCAS) Miramar.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada

This Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, in Area 7 of the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0 ROTCs 1-2

The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Survey Report for the Characterization of the Five Tanks Located Near the Old Salvage Yard at the Y-12 National Security Complex, Oak Ridge, Tennessee

The purpose if this addendum is to provide clarifying information related to two issues delaying disposal of Tank 2, located west of the Old Salvage Yard at the Y-12 National Security Complex. The two issues are as follows: 1. The discovery and documentation of apparent elevated results on the external rusty surface of Tank 2; 2. The proper interpretation and use of scan data. Oak Ridge Associated Universities (ORAU) health physics technicians (HPTs), operating under the Oak Ridge Institute for Science and Education contract, performed 100% scans over accessible interior and exterior surfaces of the five tanks located near the Old Salvage Yard, per the stakeholder-approved project-specific plan. Three types of measurements were collected, including gamma radiation measurements using a Ludlum model 44-10 gamma scintillation detector connected to a Ludlum model 2221 ratemeter/scaler; alpha radiation measurements using a Ludlum model 43-68 gas proportional detector connected to a 2221 ratemeter/scaler; and alpha-plus-beta radiation measurements also using a Ludlum model 43-68 connected to a 2221 ratermeter/scaler. The alpha-plus-beta characterization data is the primary subject of this addendum.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey Report for the Characterization of the Five Tanks Located Near the Old Salvage Yard at the Y-12 National Security Complex, Oak Ridge, Tennessee

This summary report presents analytical results, radiological survey data, and other data/information for disposition planning of the five tanks located west of the Old Salvage Yard (OSY) at the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. Field personnel from Oak Ridge Associated Universities (ORAU) and URS?CH2M Oak Ridge LLC completed data collection in May 2012 per the project-specific plan (PSP) (ORAU 2012). Deviations from the PSP are addressed in the body of this report. Characterization activities included three data collection modes: visual inspection, radiological survey, and volumetric sampling/analysis. This report includes the final validated dataset and updates associated with the Tank 2 residues originally thought to be a biological bloom (e.g., slime mold) but ultimately identified as iron sulfate crystals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 National Security Complex Biological Monitoring and Abatement Program Plan

This document provides the Biological Monitoring and Abatement Program (BMAP) Plan for East Fork Poplar Creek (EFPC), as required by the Y-12 National Security Complex (Y-12 Complex) National Pollutant Discharge Elimination System (NPDES) permit which became effective December 1, 2011. The BMAP was first developed in 1985 by staff in the Environmental Science Division at the Oak Ridge National Laboratory at the request of the Y-12 Complex. The multidisciplinary and quantitative biological monitoring approaches used for the BMAP were developed, from the beginning, in close consultation with Y-12 Complex Environmental Compliance staff, as well as the State of Tennessee and the Environmental Protection Agency. A draft BMAP Plan was submitted to the Tennessee Department of Environment and Conservation (TDEC) in May 2012 and was approved by TDEC with revision in December 2012. The TDEC’s Plan changes are incorporated in this final BMAP Plan issued in January 2013. The general approach to the 2013 BMAP Plan follows previous precedent, and addresses all BMAP-related NPDES permit requirements. The focus of the monitoring effort is on EFPC and comparable reference streams, including Brushy Fork and Hinds Creek. Two other stream systems near the Y-12 Complex, Bear Creek and McCoy Branch, are similarly monitored using BMAP and TDEC protocols as required in the permit; however, these streams are monitored by Comprehensive Environmental Response, Compensation, and Liability Act -funded programs and are only briefly summarized in this Plan. Three major tasks comprise the current program: fish bioaccumulation, benthic macroinvertebrate community, and fish community. A concomitant task, toxicity testing of storm drains, is also implemented at the Y-12 Complex and briefly described in the Plan. Each BMAP task differs slightly in the number of sites and frequency of sampling, depending on need as determined by previous monitoring. Sampling rationale and specific methods for each task are provided herein. A summary of program integration components, including data management, quality assurance, and reporting aspects, are also provided. The BMAP is an internationally recognized biological monitoring program that is a valuable case study for the U.S. Department of Energy (DOE) and the nation. First and foremost, the program evaluates Tennessee Water Quality Criteria (as required in the NPDES permit) by conducting studies to annually evaluate bioaccumulation of contaminants of concern, and the receiving streams’ biological integrity. The program has been successful in evaluating ecological effects and their causes, and has provided actionable information in the design and application of pollution abatement actions. Most importantly, the program design focuses on assessing spatial and temporal change, and has documented substantial ecological recovery in response to various facility actions. The program results have therefore become a key measure of how well the DOE facilities are doing relative to protecting the environment, and provide assurance to regulators and the public that stream conditions are improving. The DOE’s mission and environmental management in Oak Ridge will continue to evolve as the facilities modernize and various decontamination and decommissioning activities and pollution abatement actions are implemented. Many changes are expected at the Y-12 Complex in the next few years that have the potential to positively affect, or on a short-term basis negatively affect, the stream environment. The BMAP approach described here will continue to provide an important integrated measure of receiving stream conditions and ecological response to future facility actions.

Peterson, Mark J.↗

Analysis of ISO NE Balancing Requirements: Uncertainty-based Secure Ranges for ISO New England Dynamic Inerchange Adjustments

The document describes detailed uncertainty quantification (UQ) methodology developed by PNNL to estimate secure ranges of potential dynamic intra-hour interchange adjustments in the ISO-NE system and provides description of the dynamic interchange adjustment (DINA) tool developed under the same contract. The overall system ramping up and down capability, spinning reserve requirements, interchange schedules, load variations and uncertainties from various sources that are relevant to the ISO-NE system are incorporated into the methodology and the tool. The DINA tool has been tested by PNNL and ISO-NE staff engineers using ISO-NE data.

Etingov, Pavel V.↗

Overview of Los Alamos Support to National Security Missions [Slides]

Los Alamos National Laboratory support for National Security Missions is much broader than what is covered in this introductory briefing. The purpose of this briefing is to provide an introduction to the Laboratory’s support of mission areas that are relevant to the mission of the DNDO and, in particular, to the Operations Support Directorate of DNDO.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Data Report: Meteorological and Evapotranspiration Data from Sagebrush and Pinyon Pine/Juniper Communities at Pahute Mesa, Nevada National Security Site, 2011-2012

Pahute Mesa is a groundwater recharge area at the Nevada National Security Site. Because underground nuclear testing was conducted at Pahute Mesa, groundwater recharge may transport radionuclides from underground test sites downward to the water table; the amount of groundwater recharge is also an important component of contaminant transport models. To estimate the amount of groundwater recharge at Pahute Mesa, an INFIL3.0 recharge-runoff model is being developed. Two eddy covariance (EC) stations were installed on Pahute Mesa to estimate evapotranspiration (ET) to support the groundwater recharge modeling project. This data report describes the methods that were used to estimate ET and collect meteorological data. Evapotranspiration was estimated for two predominant plant communities on Pahute Mesa; one site was located in a sagebrush plant community, the other site in a pinyon pine/juniper community. Annual ET was estimated to be 310±13.9 mm for the sagebrush site and 347±15.9 mm for the pinyon pine/juniper site (March 26, 2011 to March 26, 2012). Annual precipitation measured with unheated tipping bucket rain gauges was 179 mm at the sagebrush site and 159 mm at the pinyon pine/juniper site. Annual precipitation measured with bulk precipitation gauges was 222 mm at the sagebrush site and 227 mm at the pinyon pine/juniper site (March 21, 2011 to March 28, 2012). A comparison of tipping bucket versus bulk precipitation data showed that total precipitation measured by the tipping bucket rain gauges was 17 to 20 percent lower than the bulk precipitation gauges. These differences were most likely the result of the unheated tipping bucket precipitation gauges not measuring frozen precipitation as accurately as the bulk precipitation gauges. In this one-year study, ET exceeded precipitation at both study sites because estimates of ET included precipitation that fell during the winter of 2010-2011 prior to EC instrumentation and the precipitation gauges started collecting data in March 2011.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Plan for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada

This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996 as amended). CAU 366 consists of the following six Corrective Action Sites (CASs) located in Area 11 of the Nevada National Security Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Colloid-Facilitated Radionuclide Transport in Fractured Carbonate Rock from Yucca Flat, Nevada National Security Site

In the Yucca Flat basin of the Nevada National Security Site (NNSS), ~750 nuclear detonations were conducted, primarily within the tuff confining unit (TCU) and the overlying alluvium. The regional carbonate aquifer (lower carbonate aquifer) is located below the TCU and is the most likely pathway for radionuclide migration off the NNSS. The regional carbonate aquifer underlies most of the NNSS and is known to be highly transmissive. Two principal pathways for LCA contamination exist in Yucca Flat. The first is composed of shortcuts (e.g. fractures) through the TCU which may provide a radionuclide transport pathway from tests conducted in the overlying alluvium and volcanics. The second is the release and migration of radionuclides from a small number (four) of tests conducted directly in the carbonate rock. Two of those tests were located near the saturated zone (Nash and Bourbon).

58 GEOSCIENCES↗