Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Transfer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Leveraging Available Data to Support Extension of Transportation Packages Service Life

Data obtained from testing shipping package materials have been leveraged to support extending the service life of select shipping packages while in nuclear materials transportation. Increasingly, nuclear material inventories are being transferred to an interim storage location where they will reside for extended periods of time. Use of a shipping package to store nuclear materials in an interim storage location has become more attractive for a variety of reasons. Shipping packages are robust and have a qualified pedigree for their performance in normal operation and accident conditions within the approved shipment period and storing nuclear material within a shipping package results in reduced operations for the storage facility. However, the shipping package materials of construction must maintain a level of integrity as specified by the safety basis of the storage facility through the duration of the storage period, which is typically well beyond the one year transportation window. Test programs have been established to obtain aging data on materials of construction that are the most sensitive/susceptible to aging in certain shipping package designs. The collective data are being used to support extending the service life of shipping packages in both transportation and storage.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IAEA Initiatives that Integrate Stakeholders, Models and Decision Making - 18646

The International Atomic Energy Agency (IAEA) has initiated an effort to provide stakeholder support services as part of Phase II of the Constraints to Implementing Decommissioning and Environmental Remediation (CIDER II) programs. The intent of this sub-group of CIDER II is to provide members states support in areas of stakeholder communication, engagement and participation, with the goal of building trust in decommissioning and environmental remediation (D and ER) decisions for radioactive contamination and facilities. IAEA has also initiated a follow-on effort to address Modeling and Data for Radiological Impact Assessments (MODARIA II), which is aimed at enhancing the capabilities of Member States to simulate radionuclide transfer in the environment, and to ensure appropriate levels of protection from ionizing radiation. Working Group 1 of MODARIA II is focused on the integration of modeling and decision analysis. These two groups have complementary and supporting objectives, which provides an opportunity for collaboration and mutual benefit. The technical integrator is the approach of structured decision making, which follows a five-step process that combines stakeholder values with models through a technically defensible decision analysis. Briefly, the steps are: 1. Provide the context and decision context for the problem; 2. Obtain costs, values and concerns from stakeholders, to develop objectives that need to be achieved (e.g., improve human health, minimize costs, increase jobs); 3. Identify options that might achieve the objectives (e.g., cleanup, institutional controls, education); 4. Develop probabilistic models that connect options to objectives so that the objectives can be evaluated collectively (e.g., a fate and transport and risk model to address the objective of reducing human health risk, a cost model to address costs of taking action); and, 5. Model evaluation, including sensitivity analysis, to determine if an action can be taken with sufficient certainty, or if collection of more data is needed to decrease uncertainty before a decision is made. This approach also supports adaptive management as new data are collected. This approach clarifies the roles of stakeholders and subject matter experts in the decision-making process, where stakeholders specify values, and subject matter experts focus on the models that are needed to evaluate the options. It also provides a technically defensible, reproducible, transparent and traceable approach to all of the components necessary to properly solve the types of complex decision problems that plague radioactive waste management, decommissioning and environmental remediation. This paper introduces the major challenges to implementing such a broad scale of decision analysis, and approaches to overcoming those challenges, which include not only the technical challenges, but also the need to develop capacity in a range of skills not usually accommodated in environmental modeling and includes the need for the IAEA to address decision making in different countries, and with different cultures, religions, political affiliations, and languages. This paper explores the potential for IAEA to benefit from both the CIDER II and MODARIA II programs, and hence to develop a fully integrated approach to effective decision making for radioactive waste management and environmental remediation. Note that there are many people involved in these efforts at the IAEA, and credit belongs to those people for the progress that has been made to date. Our intent here is simply to introduce these IAEA programs at the WM2018 Symposium to provide our perspective and some awareness of some of the directions in which IAEA appears to be headed regarding stakeholder engagement, environmental and risk modeling, data science, and decision analysis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive Examination of Shipping Package 9975-02731

Destructive and non-destructive examinations were performed on the components of the package 9975-02731 as part of a comprehensive Savannah River Site surveillance program for plutonium materials stored in the K-Area Complex (KAC). The package stored nuclear materials in KAC for 13.8 years. Inspection of the package during opening in KAC noted one non-conforming condition: a large discolored area on the upper fiberboard subassembly. The package was subsequently transferred to Savannah River National Laboratory for more detailed examination. In addition to the observation noted in KAC, the following conditions were observed: (1) Axial gap of 1.021 inch slightly exceeded the 1 inch maximum criterion, and (2) Lead shield height exceeded drawing tolerance of 24.7 inch by 0.019 inch. Visual examination of the upper fiberboard assembly and analysis of the discolored fiberboard indicate the discoloration was due to wood glue residue. The physical, thermal, and mechanical properties of the fiberboard met the acceptance criteria and/or were within the range of previously tested fiberboard and baseline samples. The visual, microscopic and tensile testing results were consistent with previous O-ring and baseline Viton results. The lead shield surface was covered with corrosion product as observed on other shields but there was no evidence of excessive blistering, flaking, or spalling. Besides minor and expected corrosion, no evidence of a degraded condition was found in this package. Examination of the 9975-02731 corroborates existing evidence that the 9975 package is robust and the components can perform their expected functions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dry Storage of Encapsulated Defective Fuel Rods at Doel 1 and 2 in Belgium - 17581

The project of removing all fissile and non-fissile material out of the spent fuel ponds of Belgian Doel power plant is on-going and in that framework, a solution was needed for evacuating all used fuel elements from Doel 1 and 2 storage pool, including Defective Fuel Assemblies (DFA) and Defective Fuel Rods (DFR). Following the moving out of storage pool, all used fuel elements are intended to be loaded in dry storage casks, this used fuel management option being the one implemented today in Belgium while waiting for final management. Synatom, in charge of all fuel cycle related activities for the nuclear power plants of Belgium and Engie-Electrabel, the operator of both Belgium power plants (Doel and Tihange), had then to find an industrial solution for emptying Doel 1 and 2 used fuel pool and loading DFR in dry storage casks. After having thoroughly reviewed the possible options for implementing dry storage of DFR, Synatom selected AREVA technology. It consists in: - encapsulating each DFR by loading the fuel rod in a capsule, drying the fuel rod using a process which allows to physically verify with high accuracy the residual water content inside the DFR, and welding the capsule, - assembling the capsules in a capsule canister (a skeleton with external dimensions similar to fuel assembly's) and - transferring this capsule canister along with intact fuel assemblies in an associated dry transport and storage (dual purpose) cask, as already used for interim storage of used fuel at Doel site. The French as well as the Belgian competent authorities are parties to the licensing process project. The purpose of the paper is to present the on-going industrial project related to dry storage of dried and encapsulated DFR - along with intact used fuel in dual purpose casks - at Doel 1 and 2 in Belgium, its challenges and progress. The paper presents: - why the drying method, welded capsule and associated cask is the best available technology for dry storage of DFR; - a focus on fuel assembly repair operations (initial step before encapsulation) per-formed in 2015 which consisted in successful extraction of four DFR from their original fuel assembly, using proven and experienced methods and tools; - in conclusion, an update of Doel 1 and 2 DFR dry storage project: reaching of major qualifications and licensing milestones and overview of the project perspectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Research Needs Workshop on Compact Accelerators for Security and Medicine: Tools for the 21st Century, May 6-8, 2019

Accelerator-based radiation sources are ubiquitous tools for imaging and treatment in the fields of medicine and security that save millions of lives, impact billions of dollars of commercial goods annually, and fulfill a critical role in US national security. Today’s commercially available accelerator technology has fallen significantly behind the state-of-the-art. Advancing and transferring state-of-the-art compact accelerator technology into broader use holds the promise of achieving greater control, power, and automation, which can significantly enhance society’s ability to sense and control the world around us. The Workshop identified a wealth of opportunities to advance these technologies from today’s commercial baselines, largely based on half-century old developments, by employing emerging concepts in charged particle acceleration and radiation generation and detection, along with modern ways of thinking about and utilizing developments in systems engineering, advanced materials, supply chain management, manufacturing, advanced computation, energy storage, and artificial intelligence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning and Startup of a New Category 2 Nuclear Facility for RH TRU Sludge Packaging - 18614

For many years the Department of Energy (DOE) has been executing a plan to eliminate all threats of Radiological release to the Columbia River from the Hanford site, in Richland, Washington. While the River Corridor Closure Project is nearing completion, one of the last remaining facilities along the Columbia River is the 100K reactor complex. Since the 1950's the 105KW fuel storage basin has contained varying levels of spent reactor fuel and products of the degradation of aging stored fuel. Having previously removed all of the distinguishable spent fuel components, CH2M HILL Plateau Remediation Company (CH2M) is now in the final stages of readiness review to commence removal of the residual sludge material that has accumulated in the basin throughout the years of operation. There is approximately 27 m3 of sludge in the 105KW basin currently. This sludge material exhibits a very high radiation dose rate with levels reaching 100 R/hr. It is also very difficult to mobilize and transfer due to its physical characteristics. CH2M engineers have developed a novel mechanical system for mobilization and transfer of the sludge to specially designed storage containers. Once transferred to these containers, the sludge will be moved away from the river and taken to T Plant, a decontamination and repair facility on site, for interim storage, while a project to treat and package the material for final disposition is established. The Sludge Removal Project (SRP) is a $309 M capital line item project that was established to achieve the goals of this mission. Part of the project is to develop and install the equipment needed to do the transfer, and part of the project is to construct a new Category 2 sludge packaging facility. Construction of the facility is now complete, all equipment is installed and the project is well into the commissioning phase. Over the final three months of 2017, the project progressed into the final stages of readiness to transition to operations. This will represent the first commissioning of a new Category 2 process and facility at Hanford in over 10 years. The SRP team has crossed over many hurdles in establishing a workable plan for the safety basis for installing, commissioning and transitioning to operations within the boundaries of an existing Facility Safety Analysis Report. The project team has also applied extensive use of a mockup facility in the development and execution of the path to readiness and commencement of operations. At the time of the conference, the project will have completed a DOE Operational Readiness Review and will be very near of just entering full operation. This paper will share the experiences of the project team through these final steps and lessons learned on making the project successful. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Computational and Experimental Examination of Simulated Core Damage and Relocation Dynamics of a BWR Fuel Assembly - 16013

The Japan Atomic Energy Agency (JAEA) plans a large-scale test to evaluate damage and relocation behavior of Boiling Water Reactor (BWR) core materials consisting of fuel rods (zirconia as fuel simulant), channel boxes, control blade assemblies as well as lower core-support structures. Its purpose is to contribute to the understanding of the core material relocation behavior in the event of severe accidents with the BWR design conditions for which existing experimental database is quite limited. Prior to large-scale testing anticipated at JAEA in the future, JAEA desires preliminary investigations to examine melting test pieces, being composed of a mixture of zirconia and metals by a non-transferred thermal plasma heating system. The purpose of such tests is to verify the materials and test piece will be heated by plasma as a primary heat source to the target temperature of ca. 2900 K and to collect data about the relocation behavior of the high-temperature materials. This paper describes the first in a series of tests demonstrating the effective use of thermal plasma technology to recreate the dynamics of a typical fuel core bundle channel assembly section. Results from preliminary computational simulations of simplified fuel bundle assemblies are presented illustrating the effectiveness of a 150 kW, non transferred (NTR) configuration of a thermal plasma argon jet to heat the assembly within a highly-insulated containment vessel. An experimental test program using the computational analyses as a basis and a Phoenix Solutions Co (PSC) commercial model PT150, 150 kW plasma torch is described and the test results are presented illustrating the time versus temperature history of the fuel bundle assembly melting dynamics. Details on plasma operation are discussed including: power requirements, current flow, voltage levels achieved, argon gas flow rates, processing times and standoff distances of the torch discharge from the top of the fuel bundle assembly (achieved with remote control of the axial (vertical) translation of the torch within the containment processing chamber). Photos taken from the top of the processing chamber are presented illustrating the various phases of melting characteristics of the zircaloy-clad, zirconium oxide filled fuel tubes, all within a stainless steel tube bundle channel centered within an insulated zirconia crucible. Based on lessons learned from this initial test campaign, a brief discussion of the requirements and features of a follow-on Phase II test program is provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heritage Center Cleanup, Closure, and Revitalization - 17426

For the past 20 years, Heritage Center, located at the East Tennessee Technology Park (ETTP), has been undergoing re-industrialization (RI) at the same time that legacy contamination from the Manhattan Project has been cleaned up. The DOE Oak Ridge Office of Environmental Management (OREM), cleanup contractor URS - CH2M Oak Ridge LLC (UCOR), and the Community Reuse Organization of East Tennessee (CROET) have developed a roadmap to achieve the desired end state for the site. The plan builds on ETTP cleanup, which will complete remediation to regulatory requirements, followed by closure activities that have identified all of the activities necessary to fully transition the site from closure to Heritage Center Revitalization. The ultimate goal is to eliminate or minimize DOE's long-term financial responsibility by transferring ownership of all of the property within the former ETTP site. DOE OREM is in the unique position of nearing the completion of cleanup scope at ETTP, planned for fiscal year (FY) 2020, and finalizing closure of the site (minimizing DOE's long-term liability and responsibility). In tandem, CROET is revitalizing and transforming the site into a unique end state, including a private industrial park and a National Historical Park with conservation activities integrated around and through the site. The closure and revitalization planning efforts were initiated during FY 2016 and will be finalized in FY 2017. The Closure Plan identifies all of the potential gaps between environmental cleanup of the site per the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the ultimate preferred end state. CROET, involved throughout the development of the closure strategy, is building upon the Closure Plan by completing the Revitalization Plan. The Revitalization Plan takes advantage of the Heritage Center's diverse amenities and uniqueness while maximizing its economic development potential, including a private-sector industrial park, conservation area, National Historical Park, and proposed regional airport. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE PARTICLE SEPAPATION EFFICIENCIES DURING SETTLER TANK RETRIEVAL INTO SCS-CON-230

The purpose of this document is to release, into the Hanford Document Control System, FA1/0991, Sludge Particle Separation Efficiencies for the Rectangular SCS-CON-230 Container, by M. Epstein and M. G. Plys, Fauske & Associates, LLC, June 2009. The Sludge Treatment Project (STP) will retrieve sludge from the 105-K West Integrated Water Treatment System (IWTS) Settler Tanks and transfer it to container SCS-CON-230 using the Settler Tank Retrieval System (STRS). The sludge will enter the container through two distributors. The container will have a filtration system that is designed to minimize the overflow of sludge fines from the container to the basin. FAI/09-91 was performed to quantify the effect of the STRS on sludge distribution inside of and overflow out of SCS-CON-230. Selected results of the analysis and a system description are discussed. The principal result of the analysis is that the STRS filtration system reduces the overflow of sludge from SCS-CON-230 to the basin by roughly a factor of 10. Some turbidity can be expected in the center bay where the container is located. The exact amount of overflow and subsequent turbidity is dependent on the density of the sludge (which will vary with location in the Settler Tanks) and the thermal gradient between the SCS-CON-230 and the basin. Attachment A presents the full analytical results. These results are applicable specifically to SCS-CON-230 and the STRS filtration system's expected operating duty cycles.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geomechanical in situ testing of fault reactivation in argillite repositories

Abstract. Pressurization of natural faults as a result of repository-induced effects can lead to their reactivation and permeability generation in case such features are present near disposal tunnels. Potential driving forces for such pressurization are the temperature increase caused by heat-producing high-level radioactive waste and the generation of hydrogen and other gases due to corrosion of engineered materials. We are primarily concerned about pressurization and fault activation in host rocks and faults that have very low natural permeability for pore pressure increases to dissipate, such as the argillite rocks currently investigated in Switzerland, France and other countries. This presentation discusses a series of in situ experiments of fault activation by fluid injection conducted in the argillite rock (Opalinus clay) at the Mont Terri underground research laboratory in Switzerland. A multi-model monitoring test bed was installed at Mont Terri that includes distributed fiber optics for strain, temperature, and acoustics; local fault pore pressure and three-dimensional displacement sensors; active seismic imaging; and passive seismic monitoring. The fault experiments (and their subsequent analysis via hydromechanical modeling) provide a new fundamental understanding of the coupling between pore pressure, fault deformation and permeability generation as a function of time and allow exploring how seismic and aseismic events may impact the integrity of faulted argillite host rock. Our experimental observations demonstrate that significant flow (and transport) can occur along the initially impermeable argillite fault when rupture is activated. However, the fault permeability decreases to almost its pre-activation value when fluid injection ceases and fluid pressure drops. Dilatant slip on the fault plane alone does not explain the observed increase in fault permeability; pressure-induced fault opening also plays a role, favored by the softness of the shale along with the fact that the structure of the fault zone prevents fluids from diffusing into the adjacent damage zone. Rupture initiation and permeability generation is initially aseismic, associated only with an increase in noise level and emerging tremors. Micro-earthquakes are initiated later in the experiments and typically occur away from the fluid-pressurized area. Hydromechanical models show that stress transferred from the initial aseismic deformation can build up to stress criticality and later induce seismic rupture. After presenting the experimental results, we will close the presentation with an outlook to future experimental campaigns using the fault test bed at Mont Terri. We are currently planning a controlled thermal stimulation of the fault, where instead of fluid injection as a trigger mechanism we will heat up the nearby rock volume and measure potential effects on fault stability. Lessons learned from our past and future experiments will help inform the safety assessment of geologic disposal in argillite host rock.

Birkholzer, Jens T.↗

Characterization of Tank 9H Salt Dissolution Batch 2B in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Mission Completion (SRMC) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The second batch of salt to make up processing Batch 2 (Batch 2B) has recently been dissolved in Tank 9H and transferred to Tank 10H where it was composited with the first part of the batch (Batch 2A) in preparation for processing through the TCCR 1A unit. Savannah River National Laboratory (SRNL) received samples from the recent batch (2B) of dissolved salt for characterization. Two samples from Batch 2B were received for characterization, a surface sample and a variable depth sample (VDS). Neither sample contained significant solids, although the VDS appeared slightly cloudy as compared to the surface sample. The sodium concentrations of both the surface and VDS filtrate samples were approximately 5.8 M, and the 137 Cs activity was 9.8E+07 dpm/mL in the surface sample and 9.5E+07 dpm/mL in the VDS. The total Cs concentrations were 2.5 mg/L and 2.4 mg/L in the surface sample and VDS, respectively, using the gamma activity and the Cs isotopic ratios determined by ICP-MS. The alpha activity was below the detection limit in both samples. Nitrate was the dominant anion present, and the samples were primarily concentrated sodium nitrate solutions with hydroxide, nitrite, and carbonate present at 0.1 – 0.2 M. In general, the Batch 2B samples were more dilute than the previously characterized Batch 2A samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Metallographic examinations and hydrogen measurements of high-burnup spent nuclear fuel cladding

In the US, commercial spent nuclear fuel (SNF) is transferred to interim dry storage casks where it will be stored for decades awaiting transport to a consolidated interim storage facility or a geologic repository. Because the fuel rod cladding is the first barrier against any radioactive material release, understanding the behavior of SNF cladding, particularly at high burnup (HBU), in dry storage conditions is crucial to safely store and transport the spent fuel. In this study, a series of metallographic examinations and cladding hydrogen measurements were conducted on HBU SNF cladding at Oak Ridge National Laboratory as a part of the High Burnup Spent Fuel Data Project, which is sponsored by the US Department of Energy (DOE) Office of Nuclear Energy (NE). Here, t o investigate the effect of simulated drying conditions on the cladding, three as-received fuel rods with different cladding materials—M5, ZIRLO, and Zircaloy-4—were heated to 400°C and then slow-cooled to room temperature. The pellet and cladding were then qualitatively and quantitatively analyzed and compared in terms of pellet crack morphology, HBU rim, waterside oxide, cladding H, and cladding hydride morphologies. This paper presents and discusses the results of these analyses in detail.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from FUSRAP - 16200

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970's, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM's inventory of sites for long-term surveillance and maintenance (LTS and M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for unrestricted industrial use or remediated to the cleanup standards at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE's LTS and M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS and M requirements for the sites, and (3) greater involvement in the transition process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the computer code for multi-calculations of source term of spent fuel - 15351

Many PWR spent fuels have been transferred between the neighboring nuclear power plants at Kori, Hanbit, Hanwul site, and from nuclear power plant to the KAERI(Korea Atomic Energy Research Institute) for the research purpose in Korea. In case of the PHWR type spent fuels, these have been transferred from the spent fuel pool to an on-site dry storage facility. Total radioactivity of spent fuels has to be calculated before transport in advance by the regulation requirement. In case of PWR, KN-12 transport cask can transfer 12 spent fuel assemblies at one time and in case of PHWR, Hi-STAR 63 transport cask can transfer 120 spent fuel assemblies at one time. Therefore, total radioactivity of all transported spent fuel assemblies that are transported generally are calculated by using the ORIGEN-ARP to meet this regulatory requirement. Basically, ORIGEN-ARP calculates the one fuel assembly at one time. SCALE code including this code provides the batch mode to perform the multi-calculations of the source term. In this study, in order to use the batch mode of ORIGEN-ARP, ARP-auto program was developed to generate input files and batch file of ORIGEN-ARP automatically and to make the summary file extracting the result from output files of ORIGEN-ARP. This code enhances the efficiency at the field. The working time to complete the calculation of source terms of 120 spent fuel assemblies take only 20 minutes. In order to confirm the credibility of this code, total radioactivity of 12 spent fuel assemblies of 17x17 Westinghouse type were calculated and compared to the previous result. The initial enrichments of these spent fuels are 3.46 ∼ 3.50 w/o and burnups are 29 ∼ 43 GWD/MTU. As the results, the relative errors are about 0.9 ∼ 3.0%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEAMS Update: Quarterly Report for October - December 2011

The Advanced Modeling and Simulation Office within the DOE Office of Nuclear Energy (NE) has been charged with revolutionizing the design tools used to build nuclear power plants during the next 10 years. To accomplish this, the DOE has brought together the national laboratories, U.S. universities, and the nuclear energy industry to establish the Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program. The mission of NEAMS is to modernize computer modeling of nuclear energy systems and improve the fidelity and validity of modeling results using contemporary software environments and high-performance computers. NEAMS will create a set of engineering-level codes aimed at designing and analyzing the performance and safety of nuclear power plants and reactor fuels. The truly predictive nature of these codes will be achieved by modeling the governing phenomena at the spatial and temporal scales that dominate the behavior. These codes will be executed within a simulation environment that orchestrates code integration with respect to spatial meshing, computational resources, and execution to give the user a common 'look and feel' for setting up problems and displaying results. NEAMS is building upon a suite of existing simulation tools, including those developed by the federal Scientific Discovery through Advanced Computing and Advanced Simulation and Computing programs. NEAMS also draws upon existing simulation tools for materials and nuclear systems, although many of these are limited in terms of scale, applicability, and portability (their ability to be integrated into contemporary software and hardware architectures). NEAMS investments have directly and indirectly supported additional NE research and development programs, including those devoted to waste repositories, safeguarded separations systems, and long-term storage of used nuclear fuel. NEAMS is organized into two broad efforts, each comprising four elements. The quarterly highlights October-December 2011 are: (1) Version 1.0 of AMP, the fuel assembly performance code, was tested on the JAGUAR supercomputer and released on November 1, 2011, a detailed discussion of this new simulation tool is given; (2) A coolant sub-channel model and a preliminary UO{sub 2} smeared-cracking model were implemented in BISON, the single-pin fuel code, more information on how these models were developed and benchmarked is given; (3) The Object Kinetic Monte Carlo model was implemented to account for nucleation events in meso-scale simulations and a discussion of the significance of this advance is given; (4) The SHARP neutronics module, PROTEUS, was expanded to be applicable to all types of reactors, and a discussion of the importance of PROTEUS is given; (5) A plan has been finalized for integrating the high-fidelity, three-dimensional reactor code SHARP with both the systems-level code RELAP7 and the fuel assembly code AMP. This is a new initiative; (6) Work began to evaluate the applicability of AMP to the problem of dry storage of used fuel and to define a relevant problem to test the applicability; (7) A code to obtain phonon spectra from the force-constant matrix for a crystalline lattice has been completed. This important bridge between subcontinuum and continuum phenomena is discussed; (8) Benchmarking was begun on the meso-scale, finite-element fuels code MARMOT to validate its new variable splitting algorithm; (9) A very computationally demanding simulation of diffusion-driven nucleation of new microstructural features has been completed. An explanation of the difficulty of this simulation is given; (10) Experiments were conducted with deformed steel to validate a crystal plasticity finite-element code for bodycentered cubic iron; (11) The Capability Transfer Roadmap was completed and published as an internal laboratory technical report; (12) The AMP fuel assembly code input generator was integrated into the NEAMS Integrated Computational Environment (NiCE). More details on the planned NEAMS computing environment is given; and (13) The NEAMS program website (neams.energy.gov) is nearly ready to launch.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗