Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Thermal Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Importance Of Quality Control in Reducing System Risk, a Lesson Learned From The Shuttle and a Recommendation for Future Launch Vehicles

This paper presents lessons learned from the Space Shuttle return to flight experience and the importance of these lessons learned in the development of new the NASA Crew Launch Vehicle (CLV). Specifically, the paper discusses the relationship between process control and system risk, and the importance of process control in improving space vehicle flight safety. It uses the External Tank (ET) Thermal Protection System (TPS) experience and lessons learned from the redesign and process enhancement activities performed in preparation for Return to Flight after the Columbia accident. The paper also, discusses in some details, the Probabilistic engineering physics based risk assessment performed by the Shuttle program to evaluate the impact of TPS failure on system risk and the application of the methodology to the CLV.

Safie, Fayssal M.↗

Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration

Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Grey-box and ANN-based building models for multistep-ahead prediction of indoor temperature to implement model predictive control

Model-based predictive control (MPC) strategies for heating, ventilation, and air-conditioning (HVAC) systems present an opportunity to lower building energy consumption and operational costs. Such approaches rely on the development of a model to precisely forecast building thermal dynamics, such as room air temperature or heating/cooling rate, and make control-related decisions. The control-oriented modeling of building energy systems should be accurate in predicting indoor conditions and present low computational complexity. These features are the key challenge of implementing advanced control methods such as MPC. Extant studies on building modeling for MPC have focused on step-ahead forecasting techniques to forecast building thermal dynamics, while multistep-ahead forecasting is essential. Moreover, machine learning model suitable in case of the domain-based engineering expertise are also not available. To this aim, we perform a comparative analysis of the grey-box model based on a resistance-capacitance (RC) thermal network and a machine learning model composed of an artificial neural network (ANN) for multistep-ahead prediction of building thermal dynamics using current and historical data. Actual experimental data obtained from the Flexible Research Platform (FRP) in Oak Ridge National Laboratory (US) are used for estimation and validation purposes. The average root mean squared error (RMSE) of the grey-box and ANN models are 0.89 °C and 1.02°C, respectively. Finally, the results indicate that the grey-box model outperforms the ANN model in the considered validation periods in terms of accuracy and prediction stability.

42 ENGINEERING↗

Control system development for an organic Ranking cycle engine

An organic Rankine cycle engine is used as part of a solar thermal power conversion assembly (PCA). The PCA, including a direct-heated cavity receiver and a shaft-mounted alternator, is mounted at the focal point of a parabolic dish concentrator. The engine controls are required to maintain approximately constant values of turbine inlet temperature and shaft speed, despite variation in the concentrated solar power input to the receiver. The controls design approach, system models, and initial stability and performance analysis results are presented herein.

Bergthold, F. M., Jr.↗

Recent Advancements in Modeling and Simulation of Entry Systems at NASA

This paper describes recent development of modeling and simulation technologies for entry systems in support of NASA's exploration missions. Mission-tailored research and development in modeling of entry systems occurs across the Agency (e.g., within the Orion and Mars 2020 Programs), however the aim of this paper is to discuss the broad, cross-mission research conducted by NASA's Entry Systems Modeling (ESM) Project, which serves as the Agency's only concerted effort toward advancing entry systems across a range of technical disciplines. Technology development in ESM is organized and prioritized from a system-level perspective, resulting in four broad technical areas of investment: (1) Predictive material modeling, (2) Shock layer kinetics and radiation, (3) Computational and experimental aerosciences, and (4) Guidance, navigation, and control. Investments in thermal protection material modeling are geared toward high-fidelity, predictive models capable of handling complex structures, with an eye toward optimizing design performance and quantifying thermal protection system reliability. New computational tools have been developed to characterize material properties and behavior at the microstructural level, and experimental techniques (molecular beam scattering, micro-computed tomography, among others) have been developed to measure material kinetics, morphology, and other parameters needed to inform and validate detailed simulations. Advancements have also been made in macrostructural simulation capability to enable 3-D system-scale calculations of material response with complex topological features, including differential recession of tile gaps. Research and development in the area of shock layer kinetics has focused on air and CO2-based atmospheres. Capacity and capability of the NASA Ames Electric Arc Shock Tube (EAST) have been expanded in recent years and analysis of resulting data has led to several improvements in kinetic models, while simultaneously reducing uncertainties associated with radiative heat transfer predictions. First-principles calculations of fundamental kinetic, thermodynamic, and transport data, along with state-specific models for non-equilibrium flow regimes, have also yielded new insights and have the potential to vastly improve model fidelity. Aerosciences is a very broad area of interest in entry systems, yet a number of important challenges are being addressed: Coupled fluid-structure simulations of parachute inflation and dynamics; Experimental and computational studies of vehicle dynamics; Multi-phase flow with dust particles to simulate entry environments at Mars during dust storms; Studies of roughness-induced heating augmentation relevant to tiled and woven thermal protection systems; and Advanced numerical methods to optimize computational analyses for desired accuracy versus cost. Guidance and control in the context of entry systems has focused on development of methods for multi-axis control (i.e. pitch and yaw, rather than bank angle alone) of spacecraft during entry and descent. With precision landing requirements driven by Mars human exploration goals, recent efforts have yielded 6-DOF models of multi-axis control with propulsive descent of both inflatable and rigid ellipsled-like architectures.

Barnhardt, Michael D.↗

Recent Advancements in Modeling and Simulation of Entry Systems at NASA

This paper describes recent development of modeling and simulation technologies for entry systems in support of NASA’s exploration missions. Mission-tailored research and development in modeling of entry systems occurs across the Agency (e.g., within the Orion and Mars 2020 Programs), however the aim of this paper is to discuss the broad, cross-mission research conducted by NASA’s Entry Systems Modeling (ESM) Project, which serves as the Agency’s only concerted effort toward advancing entry systems across a range of technical disciplines. Technology development in ESM is organized and prioritized from a system-level perspective, resulting in four broad technical areas of investment: (1) Predictive material modeling, (2) Shock layer kinetics and radiation, (3) Computational and experimental aerosciences, and (4) Guidance, navigation, and control. Investments in thermal protection material modeling are geared toward high-fidelity, predictive models capable of handling complex structures, with an eye toward optimizing design performance and quantifying thermal protection system reliability. New computational tools have been developed to characterize material properties and behavior at the microstructural level, and experimental techniques (molecular beam scattering, micro-computed tomography, among others) have been developed to measure material kinetics, morphology, and other parameters needed to inform and validate detailed simulations. Advancements have also been made in macrostructural simulation capability to enable 3-D system-scale calculations of material response with complex topological features, including differential recession of tile gaps. Research and development in the area of shock layer kinetics has focused on air and CO2-based atmospheres. Capacity and capability of the NASA Ames Electric Arc Shock Tube (EAST) have been expanded in recent years and analysis of resulting data has led to several improvements in kinetic models, while simultaneously reducing uncertainties associated with radiative heat transfer predictions. First-principles calculations of fundamental kinetic, thermodynamic, and transport data, along with state-specificmodels for non-equilibrium flow regimes, have also yielded new insights and have the potential to vastly improve model fidelity. Aerosciences is a very broad area of interest in entry systems, yet a number of important challenges are being addressed: Coupled fluid-structure simulations of parachute inflation and dynamics; Experimental and computational studies of vehicle dynamics; Multi-phase flow with dust particles to simulate entry environments at Mars during dust storms; Studies of roughness-induced heating augmentation relevant to tiled and woven thermal protection systems; and Advanced numerical methods to optimize computational analyses for desired accuracy versus cost. Guidance and control in the context of entry systems has focused on development of methods for multi-axis control (i.e. pitch and yaw, rather than bank angle alone) of spacecraft during entry and descent. With precision landing requirements driven by Mars human exploration goals, recent efforts have yielded 6-DOF models of multi-axis control with propulsive descent of both inflatable and rigid ellipsled-like architectures. Results for both configurations have demonstrated the ability to land within the 50-meter precision requirement demanded by Mars human exploration missions, while also reducing propellant requirements by enabling more efficient control through entry and descent. Ongoing research in GN&C is developing mechanical specifications for the systems and establishing engineering feasibility.

aerothermodynamics↗

Mars transit vehicle thermal protection system: Issues, options, and trades

A Mars mission is characterized by different mission phases. The thermal control of cryogenic propellant in a propulsive vehicle must withstand the different mission environments. Long term cryogenic storage may be achieved by passive or active systems. Passive cryo boiloff management features will include multilayer insulation, vapor cooled shield, and low conductance structural supports and penetrations. Active boiloff management incorporates the use of a refrigeration system. Key system trade areas include active verses passive system boiloff management (with respect to safety, reliability, and cost) and propellant tank insulation optimizations. Technology requirements include refrigeration technology advancements, insulation performance during long exposure, and cryogenic fluid transfer system for mission vehicle propellant tanking during vehicle buildip in LEO.

Brown, Norman↗

Multi-Node Thermal System Model for Lithium-Ion Battery Packs: Preprint

Temperature is one of the main factors that controls the degradation in lithium ion batteries. Accurate knowledge and control of cell temperatures in a pack helps the battery management system (BMS) to maximize cell utilization and ensure pack safety and service life. In a pack with arrays of cells, a cells temperature is not only affected by its own thermal characteristics but also by its neighbors, the cooling system and pack configuration, which increase the noise level and the complexity of cell temperatures prediction. This work proposes to model lithium ion packs thermal behavior using a multi-node thermal network model, which predicts the cell temperatures by zones. The model was parametrized and validated using commercial lithium-ion battery packs. neighbors, the cooling system and pack configuration, which increase the noise level and the complexity of cell temperatures prediction. This work proposes to model lithium ion packs thermal behavior using a multi-node thermal network model, which predicts the cell temperatures by zones. The model was parametrized and validated using commercial lithium-ion battery packs.

25 ENERGY STORAGE↗

Thermally managed LED arrays assembled by printing

Provided herein are electronic devices including arrays of printable light emitting diodes (LEDs) having device geometries and dimensions providing enhanced thermal management and control relative to conventional LED-based lighting systems. The systems and methods described provide large area, transparent, and/or flexible LED arrays useful for a range of applications in microelectronics, including display and lightning technology. Methods are also provided for assembling and using electronic devices including thermally managed arrays of printable light emitting diodes (LEDs).

Rogers, John A.↗

AEOSS design guide for system analysis on Advanced Earth-Orbital Spacecraft Systems

Advanced Earth Orbital Spacecraft System (AEOSS) enables users to project the requried power, weight, and cost for a generic earth-orbital spacecraft system. These variables are calculated on the component and subsystem levels, and then the system level. The included six subsystems are electric power, thermal control, structure, auxillary propulsion, attitude control, and communication, command, and data handling. The costs are computed using statistically determined models that were derived from the flown spacecraft in the past and were categorized into classes according to their functions and structural complexity. Selected design and performance analyses for essential components and subsystems are also provided. AEOSS has the feature permitting a user to enter known values of these parameters, totally and partially, at all levels. All information is of vital importance to project managers of subsystems or a spacecraft system. AEOSS is a specially tailored software coded from the relational database program of the Acius; 4th Dimension with a Macintosh version. Because of the licensing agreement, two versions of the AEOSS documents were prepared. This version AEOSS Design Guide, is for users to exploit the full capacity of the 4th Dimension. It is for a user who wants to alter or expand the program structures, the program statements, and the program procedures. The user has to possess a 4th Dimension first.

Lee, Hwa-Ping↗

AEOSS runtime manual for system analysis on Advanced Earth-Orbital Spacecraft Systems

Advanced earth orbital spacecraft system (AEOSS) enables users to project the required power, weight, and cost for a generic earth-orbital spacecraft system. These variables are calculated on the component and subsystem levels, and then the system level. The included six subsystems are electric power, thermal control, structure, auxiliary propulsion, attitude control, and communication, command, and data handling. The costs are computed using statistically determined models that were derived from the flown spacecraft in the past and were categorized into classes according to their functions and structural complexity. Selected design and performance analyses for essential components and subsystems are also provided. AEOSS has the feature permitting a user to enter known values of these parameters, totally and partially, at all levels. All information is of vital importance to project managers of subsystems or a spacecraft system. AEOSS is a specially tailored software coded from the relational database program of the Acius' 4th Dimension with a Macintosh version. Because of the licensing agreements, two versions of the AEOSS documents were prepared. This version, AEOSS Runtime Manual, is permitted to be distributed with a finite number of the restrictive 4D Runtime version. It can perform all contained applications without any programming alterations.

Lee, Hwa-Ping↗

Novel concept for detection of a fluid flow fault in a pumped fluid heat rejection system

A pumped fluid heat rejection system (HRS) requires continuous flow of the working fluid to ensure that the components controlled by the HRS stay within their allowable temperature limits. An interruption of flow could result in violations of hardware qualification limits and mission failure. Some of these violations can happen within a few hours. Hence, quick detection of a flow fault to invoke mitigation measures is very critical. In typical pumped fluid HRS, dual or triple pumps are employed to switch the backup units in case the primary unit were to fail. The key metric for the selection of a fault detection system is that it should detect the fault much before the fault’s impact on the thermal health of the HRS controlled components is realized. A trade study was conducted to select such a system for the Europa Clipper Mission to Europa, a moon of Jupiter that is planned for a launch in 2023. Out of the several concepts studied, the most attractive one was a novel and simple concept that uses a low power film heater attached to a section of the HRS tubing. While the fluid flows at its nominal rate, the high thermal coupling of the flowing fluid leads to the tube being close to the fluid’s temperature. However, when the flow stops, the heater warms the small thermal mass of the tubing to a high temperature in a short span of time (~15 minutes). This large temperature rise would then imply that the flow must have stopped. This paper will describe the various concepts considered, the chosen concept, its implementation, and the results of developments tests to validate its performance.

Schmidt, Tyler↗

Integration of thermally anisotropic building envelopes with TES and advanced controls to tailor HVAC loads

Heating, ventilation, and air conditioning (HVAC) systems are the primary energy consumers in buildings to meet heating or cooling energy demands. The building envelope can play an active role in reducing this demand and associated costs by collecting thermal energy naturally available, such as diurnal temperature swings, solar irradiance, and night sky radiation cooling, to offset heating and cooling loads.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Low-Lift Chiller Controller and Simplified Precooling Control Algorithm. Final Report

KGS Buildings LLC (KGS) and Pacific Northwest National Laboratory (PNNL) have developed a simplified control algorithm and prototype low-lift chiller controller suitable for model-predictive control in a demonstration project of low-lift cooling. Low-lift cooling is a highly efficient cooling strategy conceived to enable low or net-zero energy buildings. A low-lift cooling system consists of a high efficiency low-lift chiller, radiant cooling, thermal storage, and model-predictive control to pre-cool thermal storage overnight on an optimal cooling rate trajectory. We call the properly integrated and controlled combination of these elements a low-lift cooling system (LLCS). This document is the final report for that project.

25 ENERGY STORAGE↗

Distributed Attitude Control and Maneuvering for Deep Space SmallSats

The aim of the Distributed Attitude Control and Maneuvering for Deep Space SmallSats project is to advance a multi-purpose, deep space mission-enabling technology for low-power attitude and thermal control of small satellites to a flight demonstration technology readiness level (TRL). The film-evaporation microelectromechanical systems tunable array (FEMTA) small satellite technology combines innovative microelectromechanical systems (MEMS) microfabrication and microscale effects in fluid surface tension to produce a thermally actuated capillary valve. Using water as the propellant, the FEMTA thruster can generate finely controllable thrust at a thrust to power ratio of about 200 microNewton per Watt (W).

thermal control↗

Deep reinforcement learning control for co-optimizing energy consumption, thermal comfort, and indoor air quality in an office building

With the recent demand for decarbonization and energy efficiency, advanced HVAC control using Deep Reinforcement Learning (DRL) becomes a promising solution. Due to its flexible structures, DRL has been successful in energy reduction for many HVAC systems. However, only a few researches applied DRL agents to manage the entire central HVAC system and control multiple components in both the water loop and the air loop, owing to its complex system structures. Moreover, those researches have not extended their applications by incorporating the indoor air quality, especially both CO2 and PM2.5concentrations, on top of energy saving and thermal comfort, as achieving those objectives simultaneously can cause multiple control conflicts. What's more, DRL agents are usually trained on the simulation environment before deployment, so another challenge is to develop an accurate but relatively simple simulator. Therefore, we propose a DRL algorithm for a central HVAC system to co-optimize energy consumption, thermal comfort, indoor CO2 level, and indoor PM2.5 level in an office building. To train the controller, we also developed a hybrid simulator that decoupled the complex system into multiple simulation models, which are calibrated separately using laboratory test data. The hybrid simulator combined the dynamics of the HVAC system, the building envelope, as well as moisture, CO2, and particulate matter transfer. Three control algorithms (rule-based, MPC, and DRL) are developed, and their performances are evaluated on the hybrid simulator environment with a realistic scenario (i.e., with stochastic noises). The test results showed that, the DRL controller can save 21.4 % of energy compared to a rule-based controller, and has improved thermal comfort, reduced indoor CO2 concentration. The MPC controller showed an 18.6 % energy saving compared to the DRL controller, mainly due to savings from comfort and indoor air quality boundary violations caused by unmeasured disturbances, and it also highlights computational challenges in real-time control due to non-linear optimization. Finally, we provide the practical considerations for designing and implementing the DRL and MPC controllers based on their respective pros and cons.

Guo, Fangzhou↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗