Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Neurophysiological study on visuo-vestibular control of posture and movement in fish during adaptation to weightlessness

We can stand upright and walk smoothly without paying any particular attention to it. This is because we have established in ourselves an integration center that controls our body subconsciously in response to input from eyes, muscles, joints, foot soles, and also from the gravity sensor in the inner ear (the otolith organ). It has been shown that the cerebellum plays an important role for the establishment of the integration center and that the control pattern is comparable to that of a highly sophisticated computer system. The programming for the control, however, may well be acquired for the 1-g ground condition and does not cover the 0-g in space. Although each of the above organs function as it does on the ground, the signal pattern sent to the center must be different under 0-g and, in addition, complementary signals from the otolith organ are missing, leading to confusion in the integration center and causing a variety of symptoms similar to those of car-sickness or sea-sickness. After exposure to microgravity an immediate process of re-programming will begin and be completed in 2-4 days. There is strong supporting evidence for this sensory conflict theory as an explanation for space motion sickness (SMS) episodes. Fish were selected as test organisms for this investigation because they swim around freely in three dimensions and have well-developed organs for vision and gravity detection. They also have an innate nature to orient their back toward a light source. Actually, on the ground, the fish tilts its vertical axis toward the light when illuminated laterally, and the tilt angle is a function of the intensity of light and the magnitude of gravity, while its posture is completely light-dependent in the low-gravity environment produced by aircraft parabolic flight or when the otolith organs are removed. This implies that fish posture is entirely under visual and otolithic control. In this case, the cerebellum will also contribute to the control. In the space shuttle experiment, two fish (one with otolith-removed and the other with intact otoliths) are onboard for 7 days. The arrangement of the experiment is shown. Lamps illuminate each fish alternately from different directions at a duration of 20 seconds for 10 minutes totally, twice a day. The video images and the brain waves from the cerebellum are analyzed later. If the sensory conflict theory is acceptable, then the confusion at the onset and the following recovery process will be manifested both in the light-dependent behavior and also in the cerebellar activity. In addition, there should be some variation in response between the two fish. Even if the results are positive in the present fish experiment, they would not be extensive enough to allow us to understand the complete mechanisms of SMS. However, what is currently needed is a collection of evidence based on animal experiments on which to base future investigations. Countermeasures for SMS are mandatory since SMS-induced vomiting occurring within a space suit could be fatal for a crew member during extravehicular activities. We expect that countermeasures will be developed before the space station era starts, and that the results of these studies will be applied to improving human welfare.

Mori, Shigeo↗

Overview of NASA ISRU Plans, Priorites, and Activities

Introduction:The National Aeronautics andSpace Administration (NASA) of the United States ofAmerica (US) has initiated the Artemis Moon to Marsprogram to send astronauts (the first woman andperson of color) back to the lunar surface, create asustainable human lunar exploration program, andlead the first human exploration mission to the Marssurface in the 2030’s [1]. A major objective of thisprogram is to characterize the resources that exist onthe Moon and Mars, and learn how to utilize them forsustained and affordable exploration. Commonlyknown as In Situ Resource Utilization (ISRU), thesearch for, acquisition, and processing of resources inspace has the potential to greatly reduce thedependency on transporting mission consumables andinfrastructure from Earth, thereby reducing missioncosts, risks, and dependency on Earth.ISRU is Enabling: Through the extraction andprocessing of resources into mission commoditiessuch as rocket propellants, life support consumables,and fuel cell reactants, ISRU enhances and evolvesthe cis-lunar, lander, and surface transportationsystems required for human exploration; expandingand enhancing HOW humans can explore and returnfrom the Moon. Through the extraction andprocessing of resources into metals, silicon, and othermanufacturing and construction feedstock, ISRUenhances and allows for the expansion of criticalinfrastructure using in situ manufacturing andconstruction capabilities that influence WHAT humanscan do on the Moon and in cis-lunar space. Becauseof this, ISRU supports and enables commercialinvolvement beyond NASA and governmentalagencies by both lowering the cost of sustainedtransportation to/from/on the Moon as well assupporting the market required for needing thesetransportation systems. Strategic Framework:To achieve this vision,NASA’s Space Technology Mission Directorate(STMD) ensures the coordinated development ofISRU and other critical space and surfaceinfrastructure elements such as propulsion, power,manufacturing, construction, and robotics through theStrategic Technology Architecture Roundtable(STAR) process. Through STAR, an integratedframework and process has been created allowing forcapabilities and technologies to be linked andassessed, gaps to be identified, specifications andmetrics to be established, and provide a means toprioritize and implement technology development andmissions. A critical part of the STAR effort has beenthe establishment of the Strategic Framework thatorganizes all work under four major Thrusts (Go,Land, Live, and Explore) and identifies the drivingOutcomes for each of these Thrusts. From the Thrustsand Outcomes, all work can be categorized and linkedbetween Capability Areas, and Technology Gaps canbe identified and addressed (Figure 1.)Figure 1. Strategic Framework and STAR FrameworkISRU Envisioned Future: To drive thedevelopment of technologies and capabilities, theSTAR process starts with establishing a ‘grand vision’of where each Outcome and Capability is aiming tobe considered complete. For ISRU, the EnvisionedFuture is “Scalable ISRU production/utilizationcapabilities including sustainable commodities on thelunar and Mars Surface”. This involves starting with10’s of metric tons of products, but evolves into 100’sto 1000’s of metric tons of water, oxygen, propellants,construction and manufacturing feedstock, andcommodities for habitat and food production andoperations. For ISRU, the ‘Prospect to Product’philosophy starts with Destination Reconnaissance &Resource Assessment, followed by ResourceAcquisition, Isolation, and Preparation, leading intoResource Processing (which is further subdivided intomission consumables and feedstocks for constructionand manufacturing). The ISRU Envisioned Futurealso considers what resources are available andattempts to address what and when these resourceswill be evaluated and harnessed, as well asconsidering which products/commodities can beobtained for early use and which ones require moretime and/or users of refined products.It Takes an Architecture: ISRU does not existon its own. By definition, it requires customers/users SHORT TITLE HERE: A. B. Author and C. D. Authorto use the products/commodities produced by ISRUsystems. Also, for an ISRU capability to exist, itmust obtain products and services from other systemsand infrastructure. An important aspect of the STARprocess and the ISRU Envisioned Futures Prioritiesstrategy is to identify and link all of these systems andcapabilities to achieve the desired end state (Figure2).Figure 2. ISRU as Part of a Larger ArchitectureISRU Capability Drivers: The guidingprinciples for NASA’s Space TechnologyDevelopment for Artemis are to develop criticaltechnologies and capabilities that enable (i) asustainable Lunar surface presence, (ii) the future goalof sending humans to Mars, and (iii) promotingcritical technologies to enable future science andcommercial missions. It is a major goal of theArtemis campaign to establish some sort of base campat the lunar South Pole by approximately the end ofthe decade. The ISRU Envisioned Futures Prioritiesstrategy is aligned with the Artemis campaign todevelop and demonstrate ISRU capabilities in thistimeframe that could lead to sustained surfaceoperations, infrastructure growth, and commercialoperations in the next decade (Figure 3).Figure 3. ISRU Dual Path to Full Implementation and CommercializationState of the Art and Gaps: To achieve theenvisioned future, an extensive effort was performedto understand the State of the Art (SOA) for ISRUgoing back decades, and to assess the SOA against thenear and long-term goals and objectives of the ISRUStrategic Outcome objectives. While the releasedISRU Envisioned Futures Priorities only includes atop-level definition of both the SOA and Gaps, furtherinformation on these for ISRU can be found in theISRU Gap Assessment Study performed for theInternational Space Exploration Coordination Group(ISECG) [2]. To provide further guidance to industryand academia, a top level assessment was performedand provide that divides critical areas of ISRUcapabilities and technologies into 3 categories:Significant Funding, Partially Covered/MoreRequired, and Limited/No Funded Activities.Envisioned Future Priorities- Next Steps forISRU: While a significant amount of work over abroad range of technology areas has been performedover the last several years for lunar ISRU, to reach theenvisioned future for ISRU, a lot more work isrequired at the technology level leading to bothsystems and technology demonstrations in the nearfuture. To guide investments within NASA, industry,and academia, 5 specific areas of high priority wereidentified. These are:1.Complete development of the Water and Oxygen Mining Paths and close technology gaps, with emphasis on oxygen extraction from Highland regolith and parallel paths for polar water mining.2.Expand development of metal extraction and feedstock for manufacturing and construction, with emphasis on aluminum and initial/easy to obtain/make construction feedstocks leading to more refined metals and other regolith resources. Also, evaluate biologically inspired/derived technologies in bio-mining, bio-plastic, and other feedstock commodities.3.Ensure the resource assessment needed for future ISRU commercial operations is coordinated with both near/long-term science objectives as well as Artemis mission locations of interest.4.Initiate NASA and industry-led system-level analyses, integration, and testing activities for ISRU capabilities. While significant work has been performed at the technology and subsystemlevel, it is now important to understand how these technology investments can be leveraged and utilized in actual systems and applications5.Initiate lunar ISRU technology flight demonstrations leading to initial ‘Pilot Plant’ end-to-end production capability demonstrations, led by industry

ISRU↗

CERES Monthly Gridded Single Satellite TOA and Surfaces/Clouds (SFC) data in HDF (CER_SFC_Terra-FM2-MODIS_Edition2B)

The Monthly Gridded TOA/Surface Fluxes and Clouds (SFC) product contains a month of space and time averaged Clouds and the Earth's Radiant Energy System (CERES) data for a single scanner instrument. The SFC is also produced for combinations of scanner instruments. All instantaneous shortwave, longwave, and window fluxes at the Top-of-the-Atmosphere (TOA) and surface from the CERES SSF product for a month are sorted by 1-degree spatial regions and by the local hour of observation. The mean of the instantaneous fluxes for a given region-hour bin is determined and recorded on the SFC along with other flux statistics and scene information. These average fluxes are given for both clear-sky and total-sky scenes. The regional cloud properties are column averaged and are included on the SFC. [Location=GLOBAL] [Temporal_Coverage: Start_Date=1998-01-01; Stop_Date=2003-10-31] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=100] [Data_Resolution: Latitude_Resolution=1 degree; Longitude_Resolution=1 degree; Horizontal_Resolution_Range=100 km - < 250 km or approximately 1 degree - < 2.5 degrees; Temporal_Resolution=1 hour; Temporal_Resolution_Range=Hourly - < Daily].

CLOUD INFRARED EMISSIVITY↗

Autonomy Architectures for a Constellation of Spacecraft

Until the past few years, missions typically involved fairly large expensive spacecraft. Such missions have primarily favored using older proven technologies over more recently developed ones, and humans controlled spacecraft by manually generating detailed command sequences with low-level tools and then transmitting the sequences for subsequent execution on a spacecraft controller. This approach toward controlling a spacecraft has worked spectacularly on previous missions, but it has limitations deriving from communications restrictions - scheduling time to communicate with a particular spacecraft involves competing with other projects due to the limited number of deep space network antennae. This implies that a spacecraft can spend a long time just waiting whenever a command sequence fails. This is one reason why the New Millennium program has an objective to migrate parts of mission control tasks onboard a spacecraft to reduce wait time by making spacecraft more robust. The migrated software is called a "remote agent" and has 4 components: a mission manager to generate the high level goals, a planner/scheduler to turn goals into activities while reasoning about future expected situations, an executive/diagnostics engine to initiate and maintain activities while interpreting sensed events by reasoning about past and present situations, and a conventional real-time subsystem to interface with the spacecraft to implement an activity's primitive actions. In addition to needing remote planning and execution for isolated spacecraft, a trend toward multiple-spacecraft missions points to the need for remote distributed planning and execution. The past few years have seen missions with growing numbers of probes. Pathfinder has its rover (Sojourner), Cassini has its lander (Huygens), and the New Millenium Deep Space 3 (DS3) proposal involves a constellation of 3 spacecraft for interferometric mapping. This trend is expected to continue to progressively larger fleets. For example, one mission proposed to succeed DS3 would have 18 spacecraft flying in formation in order to detect earth-sized planets orbiting other stars. A proposed magnetospheric constellation would involve 5 to 500 spacecraft in Earth orbit to measure global phenomena within the magnetosphere. This work describes and compares three autonomy architectures for a system that continuously plans to control a fleet of spacecraft using collective mission goals instead of goals or command sequences for each spacecraft. A fleet of self-commanding spacecraft would autonomously coordinate itself to satisfy high level science and engineering goals in a changing partially-understood environment making feasible the operation of tens or even a hundred spacecraft (such as for interferometry or plasma physics missions). The easiest way to adapt autonomous spacecraft research to controlling constellations involves treating the constellation as a single spacecraft. Here one spacecraft directly controls the others as if they were connected. The controlling "master" spacecraft performs all autonomy reasoning, and the slaves only have real-time subsystems to execute the master's commands and transmit local telemetry/observations. The executive/diagnostics module starts actions and the master's real-time subsystem controls the action either locally or remotely through a slave. While the master/slave approach benefits from conceptual simplicity, it relies on an assumption that the master spacecraft's executive can continuously monitor the slaves' real-time subsystems, and this relies on high-bandwidth highly-reliable communications. Since unintended results occur fairly rarely, one way to relax the bandwidth requirements involves only monitoring unexpected events in spacecraft. Unfortunately, this disables the ability to monitor for unexpected events between spacecraft and leads to a host of coordination problems among the slaves. Also, failures in the communications system can result in losing slaves. The other two architectures improve robustness while reducing communications by progressively distributing more of the other three remote agent components across the constellation. In a teamwork architecture, all spacecraft have executives and real-time subsystems - only the leader has the planner/scheduler and mission manager. Finally, distributing all remote agent components leads to a peer-to-peer approach toward constellation control.

Barrett, Anthony↗

Experimental dehydration of natural obsidian and estimation of DH2O at low water contents

Water diffusion experiments were carried out by dehydrating rhyolitic obsidian from Valles Caldera (New Mexico, USA) at 510-980 degrees C. The starting glass wafers contained approximately 0.114 wt% total water, lower than any glasses previously investigated for water diffusion. Weight loss due to dehydration was measured as a function of experiment duration, which permits determination of mean bulk water diffusivity, mean Dw. These diffusivities are in the range of 2.6 to 18 X 10(-14) m2/s and can be fit with the following Arrhenius equation: ln mean Dw (m2/s) = -(25.10 +/- 1.29) - (46,480 +/- 11,400) (J/mol) / RT, except for two replicate runs at 510 degrees C which give mean Dw values much lower than that defined by the above equation. When interpreted according to a model of water speciation in which molecular H2O is the diffusing species with concentration-independent diffusivity while OH units do not contribute to the transport but react to provide H2O, the data (except for the 510 degrees C data) are in agreement with extrapolation from previous results and hence extend the previous data base and provide a test of the applicability of the model to very low water contents. Mean bulk water diffusivities are about two orders of magnitude less than molecular H2O diffusivities because the fraction of molecular H2O out of total water is very small at 0.114 wt% total water and less. The 510 degrees C experimental results can be interpreted as due to slow kinetics of OH to H2O interconversion at low temperatures.

NASA Program Exobiology↗

International Satellite Cloud Climatology Project (ISCCP) Stage D2 Monthly Cloud Product - Revised Algorithm in Hierarchical Data Format (ISCCP_D2)

Since 1983 an international group of institutions has collected and analyzed satellite radiance measurements from up to five geostationary and two polar orbiting satellites to infer the global distribution of cloud properties and their diurnal, seasonal and interannual variations. The primary focus of the first phase of the project (1983-1995) was the elucidation of the role of clouds in the radiation budget (top of the atmosphere and surface). In the second phase of the project (1995 onwards) the analysis also concerns improving understanding of clouds in the global hydrological cycle. [Location=TROPOSPHERE] [Temporal_Coverage: Start_Date=1983-07-01; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180] [Data_Resolution: Latitude_Resolution=280 Km; Longitude_Resolution=280 Km; Temporal_Resolution=Monthly].

CLOUD TOP PRESSURE↗

A New Statistical Estimate of the Radar Coverage of the Low Earth Orbit Debris Environment

For over three decades, the NASA Orbital Debris Program Office (ODPO) has used the Goldstone Orbital Debris Radar, Haystack Ultrawideband Satellite Imaging Radar (HUSIR), and Haystack Auxiliary (HAX) radar assets to collect data on the low Earth orbit (LEO) debris environment. Each radar, with its unique beamwidth, altitude and inclination coverage, and limiting size threshold, operates in a beam park mode to statistically sample the orbital debris population in LEO. Provided that these assets are shared with other users, the orbital debris data collection is not continuous; rather, intermittent data collects are acquired and sent to the NASA ODPO. To understand the sampling process conducted by each radar over time and any related observational biases, a Statistical Confirmation of Radar Uniformity or Bias (SCRUB) code has been implemented to model the coverage of these assets for informing future operations, as well as usage of the data collected from these ground-based sensors. For this analysis, Right Ascension of the Ascending Node (RAAN) is used as a metric to measure statistical coverage. A complete survey of the LEO environment is understood to be measurements that sufficiently sample all values of RAAN for each altitude-inclination pair visible from the radar asset. Regions of incompleteness or statistical bias can help inform future observation campaigns. The SCRUB tool evaluates the coverage of the LEO environment, not by examining individual objects that may pass through a sensor’s field of view (FOV), but by determining which orbit planes pass through the FOV. Once a pointing geometry for a radar site, observation time, and range extent are configured by the user, SCRUB computes the inclinations and altitudes that are visible by the sensor. For each inclination-altitude pair, there is a distinct pair of possible RAAN values, corresponding to the ascending and descending orbit passing through that point in the sensor cone. Repeating this process for all points in the beam, and for multiple time periods during an observation window, creates a matrix of all inclination-altitude-RAAN combinations that are visible during a sensor run. This process can then be repeated for all observations within a year (for an annual survey), propagating all the RAAN values to a common epoch, typically the start of a calendar year, and combining the observations to assemble a full estimate of the RAAN coverage of the LEO environment. This RAAN coverage can then be analyzed for uniformity of sampling, within a certain inclination-altitude pair, or between larger regions of the space environment. This paper provides a general overview of the radar assets utilized by ODPO, typical analysis data products assuming circular orbits, and a discussion of the algorithms that feed between modeling and measurement operations. Following the description of the algorithm, estimates of coverage using HUSIR radar data collected from multiple years are developed and compared.

Chris L Ostrom↗

Sensor Requirements and Roadmaps

The chapter starts with a brief overview of the state-of-the-art of the sensing technologies. Principles of detection and the stage of integration in conjunction with the need are discussed. Based on the projected sensor requirements to accomplish propulsion systems with distributed active control, the existent gaps and selected types of sensor technologies are addressed, which are foreseen to deliver the required sensitivity, the resolution, the range, and the bandwidth in classes of sensors and which will allow operation under harsh environment conditions. By changing the packaging and/or design of the current sensors, operation environments of 750°C may be possible, which would meet requirements for sensors located towards the engine intake, compressor and in some cases low-pressure turbine. However, the majority of sensors for locations close to the engine combustion chamber or afterburner (with operation temperatures up to 1700°C) do not exist. There is also a need for smart sensors, which would enable future distributed control architecture. In addition a number of sensors, which are of interest for more intelligent gas turbine engines, are being explored or do not yet exist, for example turbine emission species sensors, burning patter factor sensors, fuel property sensors, and exhaust gas composition sensors. Meanwhile, rapid emerging technologies were made available during the three years duration of the Task Group. These include tip clearance measurement technologies such as eddy current, and microwave methods. To meet future sensor requirements, new fabrication and material technologies (MEMS, other), advanced sensing principles (spectroscopy, other), and their potential applications to new sensor types need to be explored. The status of current R&D for new sensors and future expectations are summarized in a comprehensive table. Sensors and associated electronics that have to operate in high temperature are foreseen to be largely available by 2015 (SiC) and 2020 (SiCN). Both of these technologies come with the potential of embedding such high temperature sensors within the structure. The information presented in the chapter represents the state-of-the-art of the sensing technology of the years 2005-2007 to the best knowledge of the authors. The authors are also fully aware of the fact that there may be many ongoing research programs as well as individual research that are not publicly supported and public information is not available. Therefore, the report might miss that section of knowledge. Also, progress in research and development is made every day such that often, the recent information may be fast outdated. The reader should bear in mind these facts.

Ion Stiharu↗

Design Concepts for a Small Space-Based GEO Relay Satellite for Missions Between Low Earth and near Earth Orbits

The main purpose of the Small Space-Based Geosynchronous Earth orbiting (GEO) satellite is to provide a space link to the user mission spacecraft for relaying data through ground networks to user Mission Control Centers. The Small Space Based Satellite (SSBS) will provide services comparable to those of a NASA Tracking Data Relay Satellite (TDRS) for the same type of links. The SSBS services will keep the user burden the same or lower than for TDRS and will support the same or higher data rates than those currently supported by TDRS. At present, TDRSS provides links and coverage below GEO; however, SSBS links and coverage capability to above GEO missions are being considered for the future, especially for Human Space Flight Missions (HSF). There is also a rising need for the capability to support high data rate links (exceeding 1 Gbps) for imaging applications. The communication payload on the SSBS will provide S/Ka-band single access links to the mission and a Ku-band link to the ground, with an optical communication payload as an option. To design the communication payload, various link budgets were analyzed and many possible operational scenarios examined. To reduce user burden, using a larger-sized antenna than is currently in use by TDRS was considered. Because of the SSBS design size, it was found that a SpaceX Falcon 9 rocket could deliver three SSBSs to GEO. This will greatly reduce the launch costs per satellite. Using electric propulsion was also evaluated versus using chemical propulsion; the power system size and time to orbit for various power systems were also considered. This paper will describe how the SSBS will meet future service requirements, concept of operations, and the design to meet NASA users' needs for below and above GEO missions. These users' needs not only address the observational mission requirements but also possible HSF missions to the year 2030. We will provide the trade-off analysis of the communication payload design in terms of the number of links looking above and below GEO; the detailed design of a GEO SSBS spacecraft bus and its accommodation of the communication payload, and a summary of the trade study that resulted in the selection of the Falcon 9 launch vehicle to deploy the SSBS and its impact on cost reductions per satellite. ======================================================================== Several initiatives have taken place within NASA1 and international space agencies2 to create a human exploration strategy for expanding human presence into the solar system; these initiatives have been driven by multiple factors to benefit Earth. Of the many elements in the strategy one stands out: to send robotic and human missions to destinations beyond Low Earth Orbit (LEO), including cis-lunar space, Near-Earth Asteroids (NEAs), the Moon, and Mars and its moons.3, 4 The time frame for human exploration to various destinations, based on the public information available,1,4 is shown in Figure 1. Advance planning is needed to define how future space communications services will be provided in the new budget environment to meet future space communications needs. The spacecraft for these missions can be dispersed anywhere from below LEO to beyond GEO, and to various destinations within the solar system. NASA's Space Communications and Navigation (SCaN) program office provides communication and tracking services to space missions during launch, in-orbit testing, and operation phases. Currently, SCaN's space networking relay satellites mainly provide services to users below GEO, at Near Earth Orbit (NEO), below LEO, and in deep space. The potential exists for using a space-based relay satellite, located in the vicinity of various solar system destinations, to provide communication space links to missions both below and above its orbit. Such relays can meet the needs of human exploration missions for maximum connectivity to Earth locations and for reduced latency. In the past, several studies assessed the ability of satellite-based relays working above GEO in conjunction with Earth ground stations. Many of these focused on the trade between space relay and direct-to-Earth station links5,6,7. Several others focused on top-level architecture based on relays at various destinations8,9,10,11,12. Much has changed in terms of microwave and optical technology since the publication of the referenced papers; Ka-band communication systems are being deployed, optical communication is being demonstrated, and spacecraft buses are becoming increasingly more functional and operational. A design concept study was undertaken to access the potential for deploying a Small Space-Based Satellite (SSBS) relay capable of serving missions between LEO and NEO. The needs of future human exploration missions were analyzed, and a notional relay-based architecture concept was generated as shown in Fig. 1. Relay satellites in Earth through cis-Lunar orbits are normally located in stable orbits requiring low fuel consumption. Relay satellites for Mars orbit are normally selected based on the mission requirement and projected fuel consumption. Relay satellites have extreme commonalities of functions between them, differing only in the redundancy and frequencies used; therefore, the relay satellite in GEO was selected for further analysis since it will be the first step in achieving a relay-based architecture for human exploration missions (see Fig.Figure 2). The mission design methodology developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team13 was used to produce the satellite relay design and to perform various design trades. At the start of the activity, the team was provided with the detailed concept of the notional architecture and the system and communication payload drivers.

Relay Satellites↗

International Satellite Cloud Climatology Project (ISCCP) Stage D2 Monthly Cloud Product - Revised Algorithm in Native (NAT) Data Format (ISCCP_D2_NAT)

Since 1983 an international group of institutions has collected and analyzed satellite radiance measurements from up to five geostationary and two polar orbiting satellites to infer the global distribution of cloud properties and their diurnal, seasonal and interannual variations. The primary focus of the first phase of the project (1983-1995) was the elucidation of the role of clouds in the radiation budget (top of the atmosphere and surface). In the second phase of the project (1995 onwards) the analysis also concerns improving understanding of clouds in the global hydrological cycle. [Location=TROPOSPHERE] [Temporal_Coverage: Start_Date=1983-07-01; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180] [Data_Resolution: Latitude_Resolution=280 Km; Longitude_Resolution=280 Km; Temporal_Resolution=Monthly].

CLOUD OPTICAL THICKNESS↗

Kilopower: Small and Affordable Fission Power Systems for Space

The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.

Space nuclear power↗

Implementing an Applied Science Program

The work implied in the NASA Applied Science Program requires a delicate balancing act for the those doing it. At the implementation level there are multiple tensions intrinsic to the program. For example each application of an existing product to a decision support process requires deep knowledge about the data and deep knowledge about the decision making process. It is highly probable no one person has this range of knowledge. Otherwise the decision making process would already be using the data. Therefore, a team is required. But building a team usually requires time, especially across agencies. Yet the program mandates efforts of relatively short duration. Further, those who know the data are scientists, which makes them essential to the program. But scientists are evaluated on their publication record. Anything which diverts a scientist from the research for his next publication is an anathema to him and potential death to their career. Trying to get another agency to use NASA data does not strike most scientists as material inherently suitable for publication. Also, NASA wishes to rapidly implement often substantial changes to another agency's process. For many reasons, such as budget and program constraints, speed is important. But the owner of a decision making process is tightly constrained, usually by law, regulation, organization and custom. Changes when made are slow, cautious, even hesitant, and always done according a process specific to the situation. To manage this work MSFC must balance these and other tensions. Some things we have relatively little control over, such as budget. These we try to handle by structural techniques. For example by insisting all of our people work on multiple projects simultaneously we inherently have diversification of funding for all of our people. In many cases we explicitly use some elements of tension to be productive. For example the need for the scientists to constantly publish is motivation to keep tasks short and to the immediate point. As another example, the DSS agency and it personnel are treated as integral to the effort at every step. Thus, their ways of doing things, their problems and their assets become part of the solution. MSFC also manages the Applied Science work' within a strategic framework.' First, the scientists are necessarily at the core of all of this work as well as all of the work within the larger' organization. We therefore strive to keep a roughly 50-50 balance between the work done on tasks funded directly by the research side of NASA's Science Mission Directorate and funding from the applied side. Done at both the organization level and the level of the individual, this keeps the scientist both happy and productive over the long term. We also try diligently to remove as much burden from the scientist as practical by employing people such as the authors and others to do tasks not requiring; scientific knowledge. We also have designed our effort to take full use of external partners. We actively seek and support, including fund, people from multiple organizations to join us as committed collaborators. In this we use today's money and today's problem to help us diversify and strengthen for tomorrow. MSFC also considers the Applied Science work holistically. Each element is viewed as a step in a larger process. At a management level we can chose to emphasize or encourage certain areas which service long term goals. Thus, if we think work in a particular area should be developed, we can start with the smaller, less costly elements and grow.

Rickman, Doug↗

In-Flight Operation of the Dawn Ion Propulsion System Through Orbit Capture at Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta -II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. Onboard the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the ?V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The first 80 days after launch were dedicated to the initial checkout of the spacecraft which was followed by about ten months of full-power thrusting leading to a Mars gravity assist in February 2009 that provided 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. Deterministic thrusting for heliocentric transfer to Vesta resumed in June 2009 and was concluded with orbit capture at Vesta in July 2011. IPS was operated for approximately 23,400 hours, consumed approximately 250 kg of xenon, and provided a delta-V of approximately 6.7 km/s to achieve orbit capture at Vesta. IPS performance characteristics are very close to the expected performance characteristics based on analysis performed pre-launch. The only significant problem to have occurred over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in DCIU-1, resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture indicates DCIU-1 is completely operational. After about three weeks of survey operations IPS will be used to maneuver the spacecraft as needed for science operations including orbit transfers. After approximately one year of science operations IPS will then be used for escape from Vesta and begin thrusting for cruise to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through orbit capture and the start of science operations at Vesta.

Garner, Charles E.↗

Functional Task Tests in Partial Gravity During Parabolic Flight

BACKGROUND Understanding how critical mission tasks are performed in partial gravity such as on the moon or Mars is necessary to define effective and comprehensive countermeasure strategies for preserving crew performance during exploration missions. We studied the performance of tasks such as standing, walking, and jumping during the partial gravity phases of parabolic flight. We hypothesized that the acute effects of partial gravity on vestibular, proprioceptive, and sensorimotor functions would negatively impact performance. METHODS Twelve subjects were tested over three flights of 30 parabolas each, including 10 parabolas at 0.25g, 10 parabolas at 0.5g, and 10 parabolas at 0.75g. Subjects also performed tests in 1g between parabolas. During the sit-to-stand with obstacle walk task, subjects rose from a seated position and walked as quickly as possible straight ahead towards a cone (4 m distance), walked around the cone making a 180° left turn, returned, and sat in the chair. On the way to and from the cone, subjects stepped over a 30 cm high obstacle. For the recovery from fall task, subjects lay prone for the pull-up phase and initial 10 sec of the parabola. Then they were asked to rise as quickly as possible and maintain a quiet stance for 10 sec. The tandem rail balance task involved standing with both feet on a 4.5 cm wide rail. The time ended when subjects either stepped off the rail or grabbed on to support straps. The jump down task started with the subjects standing on a 30 cm high platform, then the subjects were instructed to step off the platform, land with both feet simultaneously, and settle in a quiet stance. The cone of stability task involved subjects leaning about the ankles as far as they could in the anterior, posterior, and lateral directions without unfolding their arms or taking a step. The center of pressure distance between endpoints was calculated. Data were collected using inertial measurement units (Opal V2, APDM, Portland, OR) worn on the head and trunk, heart rate monitors (RS800CX, Polar, Kempele, Finland), and a force plate (Bertec, Columbus, OH). RESULTS Gravity level had a significant effect on performance, with the greatest changes from 1g tending to be at the 0.25g level (Table 1). Lower gravity levels were associated with increased times to complete the sit-to-stand obstacle walk task and the recovery from fall task, decreased change in heart rate during the recovery from fall task, decreased rail balance times, and increased cone of stability distance in the anterior-posterior direction. Table 1. Functional task performance at different gravity levels during parabolic flight. Measure0.25g0.5g0.75g1gp-valueSit-to-stand with obstacle walk time (sec)9.8 ±1.4*7.2 ±0.76.9 ±0.8*7.4 ±0.9<0.001Recovery from fall time to settle (sec)5.3 ± 0.9*4.6 ± 0.84.2 ± 0.64.3 ± 0.70.002Recovery from fall change in heart rate (bpm)6.0 ± 7.3*11.2 ± 6.5*14.9 ± 4.915.9 ± 6.5<0.001Rail balance with eyes open time (sec)2.7 ±0.8*4.8 ±2.16.6 ±4.78.4 ±6.70.031Rail balance with eyes closed time (sec)1.6 ±0.4*2.1 ±0.42.4 ±0.62.6 ±0.8<0.001Jump down time to settle (sec)2.1 ± 0.41.9 ± 0.42.0 ± 0.31.8 ± 0.30.328Cone of stability –anterior-posterior (cm)20.8 ±2.7*18.8 ±2.218.6 ±1.717.9 ±2.00.039Cone of stability –lateral (cm)26.8 ±6.624.4 ±2.123.0 ±2.123.8 ±2.30.215p-value: one-way repeated measures analysis of variance; *Significant pairwise difference from 1g (p<0.05). DISCUSSION These data suggest that there is a dose-response relationship between gravity level and functional task performance. The largest changes in performance were expected at the lowest gravity level (0.25g) because subjects would no longer be able to use the gravitational reference for the perception of upright. Understanding the extent of performance deficits informs the risks and design of countermeasures for exploration spaceflight missions. ACKNOWLEDGEMENT This work is supported by NASA’s Human Research Program Human Health Countermeasures Element.

T R Macaulay↗

The Dawn of Vesta Science

The Dawn mission is part of NASA's Discovery Program and has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total ?V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Fullpower thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ?V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 210 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of approximately 2,735 km. To date the IPS has been operated for 23,621 hours, consumed approximately 252 kg of xenon, and provided a delta-V of approximately 6.7 km/s. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. The only significant issue in over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in the Digital Control and Interface Unit-1 (DCIU-1), resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture restored DCIU-1 to full functionality. After about three weeks of Survey orbit operations the IPS will be used to transfer the spacecraft to the other planned science orbit altitudes. After approximately one year of science operations the IPS will be used for escape from Vesta and then for thrusting to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of science operations at Vesta.

electric propulsion↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

Space Resources

Space resources must be used to support life on the Moon and exploration of Mars. Just as the pioneers applied the tools they brought with them to resources they found along the way rather than trying to haul all their needs over a long supply line, so too must space travelers apply their high technology tools to local resources. The pioneers refilled their water barrels at each river they forded; moonbase inhabitants may use chemical reactors to combine hydrogen brought from Earth with oxygen found in lunar soil to make their water. The pioneers sought temporary shelter under trees or in the lee of a cliff and built sod houses as their first homes on the new land; settlers of the Moon may seek out lava tubes for their shelter or cover space station modules with lunar regolith for radiation protection. The pioneers moved further west from their first settlements, using wagons they had built from local wood and pack animals they had raised; space explorers may use propellant made at a lunar base to take them on to Mars. The concept for this report was developed at a NASA-sponsored summer study in 1984. The program was held on the Scripps campus of the University of California at San Diego (UCSD), under the auspices of the American Society for Engineering Education (ASEE). It was jointly managed under the California Space Inst. and the NASA Johnson Space Center, under the direction of the Office of Aeronautics and Space Technology (OAST) at NASA Headquarters. The study participants (listed in the addendum) included a group of 18 university teachers and researchers (faculty fellows) who were present for the entire 10-week period and a larger group of attendees from universities, Government, and industry who came for a series of four 1-week workshops. The organization of this report follows that of the summer study. Space Resources consists of a brief overview and four detailed technical volumes: (1) Scenarios; (2) Energy, Power, and Transport; (3) Materials; (4) Social Concerns. Although many of the included papers got their impetus from workshop discussions, most have been written since then, thus allowing the authors to base new applications on established information and tested technology. All these papers have been updated to include the authors' current work. This overview, drafted by faculty fellow Jim Burke, describes the findings of the summer study, as participants explored the use of space resources in the development of future space activities and defined the necessary research and development that must precede the practical utilization of these resources. Space resources considered included lunar soil, oxygen derived from lunar soil, material retrieved from near-Earth asteroids, abundant sunlight, low gravity, and high vacuum. The study participants analyzed the direct use of these resources, the potential demand for products from them, the techniques for retrieving and processing space resources, the necessary infrastructure, and the economic tradeoffs. This is certainly not the first report to urge the utilization of space resources in the development of space activities. In fact, Space Resources may be seen as the third of a trilogy of NASA Special Publications reporting such ideas arising from similar studies. It has been preceded by Space Settlements: A Design Study (NASA SP-413) and Space Resources and Space Settlements (NASA SP-428). And other, contemporaneous reports have responded to the same themes. The National Commission on Space, led by Thomas Paine, in Pioneering the Space Frontier, and the NASA task force led by astronaut Sally Ride, in Leadership and America's Future in Space, also emphasize expansion of the space Infrastructure; more detailed exploration of the Moon, Mars, and asteroids; an early start on the development of the technology necessary for using space resources; and systematic development of the skills necessary for long-term human presence in space. Our report does not represent any Government-authorized view or official NASA policy. NASA's official response to these challenging opportunities must be found in the reports of its Office of Exploration, which was established in 1987. That office's report, released in November 1989, of a 90-day study of possible plans for human exploration of the Moon and Mars is NASA's response to the new initiative proposed by President Bush on July 20, 1989, the 20th anniversary of the Apollo 11 landing on the Moon: "First, for the coming decade, for the 1990s, Space Station Freedom, our critical next step in all our space endeavors. And next, for the new century, back to the Moon, back to the future, and this time, back to stay. And then a journey into tomorrow, a journey to another planet, a manned mission to Mars." This report, Space Resources, offers substantiation for NASA's bid to carry out that new initiative.

McKay, Mary Fae↗

Henrich Focke —Inventor of the First Successful Helicopter

In 1924, Henrich Focke, Georg Wulf and Dr. Werner Naumann started Focke-Wulf Flugzeugbau GmbH (Focke-Wulf Aircraft Manufacturing Ltd.). Focke-Wulf constructed Juan de la Cierva’s C.19 and C.30 Autogiros under license from 1930 until 1937. This led Focke to design the first successful and fully controllable helicopter, the Fw-61. Model tests in his wind tunnel supported the configuration and in 1932 Focke proposed a helicopter project to the ministry with drawings and calculations, which was granted in that same year. Impressed with the success of the Fw-61, the German Air Ministry suggested that Focke establish a new company dedicated to helicopter development and issued him a requirement for an improved design, capable of carrying a 700 kg (1,500 lbs) payload. Focke and Gerd Achgelis (a test pilot) partnered to establish the Focke–Achgelis company in 1938. The Fw-61 became the Fa-61. Historically, Henrich Focke and his Focke-Achgelis company must surely be considered as the developer of the world’s first successful helicopter. They began development of the Focke Wulf company’s Model Fw-61 helicopter, which had a side-by-side rotor system, in 1932. First flight was achieved on June 26, 1936 with test pilot Ewald Rohlfs at the controls. With the Fw-61’s flight demonstrated success, Professor Focke went on to present three early papers: 1. Das Trag- und Hubschrauberproblem (Autogyro and Helicopter Problems), November 1937 2. Forschung und Entwicklung der Drehflügelflugzeuge (Research and Development of Rotating Wing Aircraft), April 1942 3. Fortschritte des Hubschraubers (Progress of the Helicopter), October 1943 The first paper was also published by the German Museum (Munich) in 1938 and it was translated into English on the order of the Ministry of Aircraft Production by J. Helledoren as R.T.P No. 2128 at the end of 1937. The other two reports, however, appear not to have been translated during or after World War II and thus are made public here – probably for the first time. Translations of the three Focke papers are provided in this report. A careful translation from German to English of the papers has been made. Many of original photos have been recovered from the German Museum (Munich). In several cases, the original graphs have been redrawn to enhance each paper’s technical value. The editors have added footnotes where appropriate. The editors consider Focke’s papers to be of such immense technical and historical value that they deserve wide distribution to the rotorcraft industry. Finally, the editors believe that readers of the many technical points Henrich Focke makes about his development program will see that Focke’s program anticipated even today’s best rotorcraft industry efforts.

Inventor↗