Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Reentry analysis for low Earth orbiting spacecraft

As a result of recent National Aeronautics and Space Administration (NASA) Management Instruction (NMI), NASA spacecraft programs must limit orbital debris by design and/or by operational procedures. To fulfill this requirement, spacecraft may be required to be removed from their operational orbit after mission completion. Spacecraft disposal by atmospheric reentry is a means to accomplish this task. To assess the risk to man, an analysis must be done to determine which parts of the spacecraft are likely to survive a reentry of the Earth's atmosphere and where those parts will land. These issues are currently being examined for the Earth Observing System (EOS-AM1). The Johnson Space Center (JSC) Aeroscience Branch, supported by the Lockheed Engineering and Sciences Co., has developed a tool which permits the analysis of the thermal effects of reentry on individual spacecraft components to determine which components are expected to survive reentry. This paper presents an examination of the burnup and reentry of EOS-AM1 and describes a method for other spacecraft to use in analyzing similar reentry issues.

Newman, Lauri Kraft↗

Estimation of process steady state with autoregressive models and Bayesian inference

To improve efficiency, separations engineers will typically design process circuits containing recirculating streams, which mix one or more of the process outputs with the feed material. Doing so can improve efficiency, but will cause a delay in the system reaching steady state conditions until the recirculating load mass flows stabilize. In testing separation circuits, engineers will often test a variety of factors and complete an analysis from sample results. Knowledge of if a process is at steady state, as well as the steady state conditions of a process, is essential for a valid techno-economic analysis. However, the definition of process steady state is often poorly defined, or does not include uncertainty quantification. If the performance of a process operating under two different sets of conditions are compared, an engineer who does not test for steady state or quantify steady state conditions risks producing a faulty analysis. In this work, a Bayesian statistical method for testing if all streams are at steady state is further motivated and then derived. Then after testing for steady state, the same model is used with a prior distribution that enforces a steady state assumption to estimate steady state conditions. Further, these methods were validated in a solvent extraction pilot plant where steady state conditions for all outflows were inferred with uncertainty quantification. Analysis is completed with functions available to the reader as part of the BayesMassBal (V 1.1.0) software package written in R.

01 COAL, LIGNITE, AND PEAT↗

The emergence and transmission dynamics of HIV-1 CRF07_BC in Mainland China

A total of 1155 partial pol gene sequences of human immunodeficiency virus (HIV)-1 CRF07_BC were sampled between 1997 and 2015, spanning 13 provinces in Mainland China and risk groups [heterosexual, injecting drug users (IDU), and men who have sex with men (MSM)] to investigate the evolution, adaptation, spatiotemporal and risk group dynamics, migration patterns, and protein structure of HIV-1 CRF07_BC. Due to the unequal distribution of sequences across time, location, and risk group in the complete dataset (‘full1155’), subsampling methods were used. Maximum-likelihood and Bayesian phylogenetic analysis as well as discrete trait analysis of geographical location and risk group were carried out. To study mutations of a cluster of HIV-1 CRF07_BC (CRF07-1), we performed a comparative analysis of this cluster to the other CRF07_BC sequences (‘backbone_295’) and mapped the mutations observed in the respective protein structure. Our findings showed that HIV-1 CRF07_BC most likely originated among IDU in Yunnan Province between October 1992 to July 1993 [95 per cent hightest posterior density (HPD): May 1989–August 1995] and that IDU in Yunnan Province and MSM in Guangdong Province likely served as the viral sources during the early and more recent spread in Mainland China. We also revealed that HIV-1 CRF07-1 has been spreading for roughly 20 years and continues to cause local transmission in Mainland China and worldwide. Overall, our study sheds light on the dynamics of HIV-1 CRF07_BC distribution patterns in Mainland China. Our research may also be useful in formulating public health policies aimed at controlling acquired immune deficiency syndrome in Mainland China and globally.

60 APPLIED LIFE SCIENCES↗

Microeconomic analysis of military aircraft bearing restoration

The risk and cost of a bearing restoration by grinding program was analyzed. A microeconomic impact analysis was performed. The annual cost savings to U.S. Army aviation is approximately $950,000.00 for three engines and three transmissions. The capital value over an indefinite life is approximately ten million dollars. The annual cost savings for U.S. Air Force engines are approximately $313,000.00 with a capital value of approximately 3.1 million dollars.

Hein, G. F.↗

Microeconomic analysis of military aircraft bearing restoration

The risk and cost of a bearing restoration by grinding program was analyzed. A microeconomic impact analysis was performed. The annual cost savings to U.S. Army aviation is approximately $950,000.00 for three engines and three transmissions. The capital value over an indefinite life is approximately ten million dollars. The annual cost savings for U.S. Air Force engines is approximately $313,000.00 with a capital value of approximately 3.1 million dollars. The program will result in the government obtaining bearings at lower costs at equivalent reliability. The bearing industry can recover lost profits during a period of reduced demand and higher costs.

Hein, G. F.↗

Risk of Symptomatic Stroke After Radiation Therapy for Childhood Cancer: A Long-Term Follow-Up Cohort Analysis

Purpose: Long-term childhood cancer survivors are at high risk of late adverse effects, including stroke. We aimed to determine the cumulative incidence of clinically validated symptomatic stroke (transient ischemic attack [TIA], cerebral infarction, and intracerebral hemorrhage [ICH]) and to quantify dose-effect relationships for cranial radiation therapy (CRT) and supradiaphragmatic radiation therapy (SDRT). Methods and Materials: Our single-center study cohort included 1362 survivors of childhood cancer that were diagnosed between 1966 and 1996. Prescribed CRT and SDRT doses were converted into the equivalent dose in 2-Gy fractions (EQD{sub 2}). Multivariate Cox regression models were used to analyze the relationship between the EQD{sub 2} and stroke. Results: After a median latency time of 24.9 years and at a median age of 31.2 years, 28 survivors had experienced a first stroke: TIA (n=5), infarction (n=13), and ICH (n=10). At an attained age of 45 years, the estimated cumulative incidences, with death as competing risk, among survivors treated with CRT only, SDRT only, both CRT and SDRT, and neither CRT nor SDRT were, respectively, 10.0% (95% confidence interval [CI], 2.5%-17.0%), 5.4% (95% CI, 0%-17.0%), 12.5% (95% CI, 5.5%-18.9%), and 0.1% (95% CI, 0%-0.4%). Radiation at both locations significantly increased the risk of stroke in a dose-dependent manner (hazard ratios: HR{sub CRT} 1.02 Gy{sup −1}; 95% CI, 1.01-1.03, and HR{sub SDRT} 1.04 Gy{sup −1}; 95% CI, 1.02-1.05). Conclusions: Childhood cancer survivors treated with CRT, SDRT, or both have a high stroke risk. One in 8 survivors treated at both locations will have experienced a symptomatic stroke at an attained age of 45 years. Further research on the pathophysiologic processes involved in stroke in this specific group of patients is needed to enable the development of tailored secondary prevention strategies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Evaluation of Biologic Effective Dose and Schedule of Fractionation for Preoperative Radiotherapy for Rectal Cancer: Meta-Analyses and Meta-Regression;Rectal cancer; Preoperative radiotherapy; Biologic effective dose; Meta-analysis

Purpose: To evaluate whether the risk of local recurrence depends on the biologic effective dose (BED) or fractionation dose in patients with resectable rectal cancer undergoing preoperative radiotherapy (RT) compared with surgery alone. Methods and Materials: A meta-analysis of randomized controlled trials (RCTs) was performed. The MEDLINE, Embase, CancerLit, and Cochrane Library databases were systematically searched for evidence. To evaluate the dose-response relationship, we conducted a meta-regression analysis. Four subgroups were created: Group 1, RCTs with a BED >30 Gy{sub 10} and a short RT schedule; Group 2, RCTs with BED >30 Gy{sub 10} and a long RT schedule; Group 3, RCTs with BED {<=}30 Gy{sub 10} and a short RT schedule; and Group 4, RCTs with BED {<=}30 Gy{sub 10} and a long RT schedule. Results: Our review identified 21 RCTs, yielding 9,097 patients. The pooled results from these 21 randomized trials of preoperative RT showed a significant reduction in mortality for groups 1 (p = .004) and 2 (p = .03). For local recurrence, the results were also significant in groups 1 (p = .00001) and 2 (p = .00001).The only subgroup that showed a greater sphincter preservation (SP) rate than surgery was group 2 (p = .03). The dose-response curve was linear (p = .006), and RT decreased the risk of local recurrence by about 1.7% for each Gy{sub 10} of BED. Conclusion: Our data have shown that RT with a BED of >30 Gy{sub 10} is more efficient in reducing local recurrence and mortality rates than a BED of {<=}30 Gy{sub 10}, independent of the schedule of fractionation used. A long RT schedule with a BED of >30 Gy{sub 10} should be recommended for sphincter preservation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Spacecraft survivability in the meteoroid and debris environment

A number of methods for providing adequate protection from meteoroid and orbital debris impact are available to space vehicle designers. Several techniques to reduce the risks from meteoroid and debris (M&D) impact are presented and assessed in the context of Space Station Freedom (SSF) applications. Evaluations of these options were made using BUMPER, a computer program to perform M&D analyses. M&D survivability can be improved by conducting an in-depth analysis of spacecraft penetration risks to reveal weak areas of the design and to determine optimal distribution of shielding and/or protection capability around the space vehicle. This paper compares enhanced hypervelocity impact shielding techniques that are more weight efficient than conventional shielding approaches. Other design and operational strategies to reduce meteoroid and debris risks are also discussed.

Christiansen, Eric L.↗

Data-Driven Probabilistic Voltage Risk Assessment of MiniWECC System with Uncertain PVs and Wind Generations using Realistic Data

Here, it is found from actual data that due to generation dispatch and uncertain renewable generations and loads with complicated correlations, inferring the probabilistic distributions for uncertain inputs is challenging. Many probabilistic power flow approaches have been developed in the literature but their validations using realistic systems and data are lacking. This paper proposes a data-driven probabilistic analysis approach for system risk assessment of the miniWECC system using actual data. The sparse Gaussian process (SGP) is advocated to quantify the impacts of uncertain inputs on voltage security. SGP does not need the probability distribution function of uncertain inputs, can handle correlations and is highly computationally efficient. Results on the miniWECC system using realistic data show that SGP outperforms existing approaches and is able to quantify the voltage violation risks.

17 WIND ENERGY↗

Impact Real World System Validation

Introduction NASA has developed a new evidence-based data-driven probabilistic risk assessment and tradespace analysis tool as a successor to the Integrated Medical Model. This updated decision support tool is known as IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces). IMPACT estimates the frequency and consequences of medical conditions that might arise during exploration missions. A validation analysis of IMPACT was performed with respect to a set of International Space Station (ISS) and Shuttle Transportation System (STS) real world system (RWS) referent data due to the limited referent data available from exploration missions. Methods Observed mission and crew characteristics from STS and ISS missions were used as model inputs within MEDPRAT (Medical Extensible Dynamic Probabilistic Risk Assessment Tool). For each mission, two hundred thousand simulations were generated. For each mission, model outputs included occurrence counts for each condition, total medical events (TME), and the probability of loss of crew life (LOCL). These simulated model outputs were compared to the RWS referent data. Results The predicted number of total medical events exceeded the total RWS medical events for ISS missions and combined ISS and STS missions and fell within the 90% confidence interval for STS missions. For the 32 ISS missions simulated by IMPACT, the number of total medical events was overpredicted for 19 missions and fell within the 90% confidence interval for 13 missions. For the 21 STS missions, the total number of medical events was overpredicted for 3 missions, fell within the 90% confidence interval for 16 missions, and was underpredicted for 2 missions. Combined, 29 missions were in range, 22 were overpredicted, and 2 were underpredicted. The predicted LOCL probability for the 32 ISS missions, the 21 STS missions, and the combined ISS and STS missions was consistent with the zero LOCL events observed in the RWS referent data. The validation analysis included a comparison of the number of medical events predicted by IMPACT and the number of medical events observed in the RWS data on a condition-by-condition basis. For ISS missions, 50 conditions were in range, 52 conditions were statistically underpowered (not enough observed sample to draw any conclusions on precision), 8 conditions were overpredicted, and 9 conditions were underpredicted. Overall, only 14% (17/119) of conditions were out of range for STS missions, 40 conditions were in range, 59 conditions were statistically underpowered, 10 conditions were overpredicted, and 10 conditions were underpredicted. Overall, only 17% (20/119) of conditions were out of range. For combined ISS and STS missions, 11 conditions were overpredicted, and 11 conditions were underpredicted. Overall, only 18% (22/119) of conditions were out of range. For combined ISS and STS missions, 49 conditions were in range, 46 conditions were statistically underpowered, 18 conditions were overpredicted, and 8 conditions were underpredicted. Overall, 21% (26/121) of conditions were out of range. Conclusion The results of this validation analysis should not be interpreted as a pass/fail test of the validity of IMPACT. Instead, this validation analysis should be used to assess some of the IMPACT outcomes in terms of consistencies and inconsistencies with the ISS and STS RWS referent data.

L. Boley↗

Risk reporting in the Chinese news media in response to radiation threat from the Fukushima nuclear reactor crisis

On March 11, 2011, the northeastern coast of Japan was struck by 9.0-magnitude earthquake that triggered a devastating tsunami. Aside from the huge toll in people's lives and severe damages to property, the tremor sent the Fukushima Daiichi Nuclear Power Plant on a tailspin, causing hydrogen explosions in three reactors, and sending radioactive materials into the air and bodies of water. Declared the largest nuclear disaster since Chernobyl, the crisis threatened neighboring countries, including China (International Business Times, 2011). On March 28, low levels of iodine-131, cesium-137 and strontium, believed to have drifted from Japan, were detected in the air over Heilongjiang province in the northeast part of China and in seawater samples collected in the eastern coastal areas (Qianjiang Eve News, 2011). Because these chemicals can enter the food chain and adversely affect human health (Ifeng.com, 2011), people became understandably anxious and the government had to avert panic. This study asks: How did the Chinese media report the risks attendant to this event? A content analysis of 45 straight news reports published by the Chinese press from March 16, 2011 to April 25, 2011 was conducted. The analysis focused on how the media explained the risk, portrayed potential harm, reported on government actions to safeguard public health, and provided suggestions to reduce public fear. The sources of information cited in the reports were also identified. The articles examined were collected from People.com, a comprehensive online archive of news reports, using 'Fukushima' and 'nuclear radiation' as search terms. The results indicated journalistic practices that left much to be desired in terms of risk reporting. First, the articles explained little about the technical aspects of the radiation leaks and failed to give audiences a general indication of levels of risk. Second, the media over-emphasized the government's position that the environment was safe despite the more rampant word-of-mouth reports to the contrary, a slant that may have done nothing to allay public fear. Third, there was a dearth of information about what the government intends to do to alleviate the situation and suggestions about what people can do to protect themselves. The themes of news reports may be attributed to experts from research institutions and government officials who were the most frequently cited sources of facts, analyses, interpretations, and opinions. Scientists and nuclear experts were cited the most in the news reports. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A novel risk classification system for 30-day mortality in children undergoing surgery

A simple, objective and accurate way of grouping children undergoing surgery into clinically relevant risk groups is needed. The purpose of this study, is to develop and validate a preoperative risk classification system for postsurgical 30-day mortality for children undergoing a wide variety of operations. The National Surgical Quality Improvement Project-Pediatric participant use file data for calendar years 2012–2014 was analyzed to determine preoperative variables most associated with death within 30 days of operation (D30). Risk groups were created using classification tree analysis based on these preoperative variables. The resulting risk groups were validated using 2015 data, and applied to neonates and higher risk CPT codes to determine validity in high-risk subpopulations. A five-level risk classification was found to be most accurate. The preoperative need for ventilation, oxygen support, inotropic support, sepsis, the need for emergent surgery and a do not resuscitate order defined non-overlapping groups with observed rates of D30 that vary from 0.075% (Very Low Risk) to 38.6% (Very High Risk). When CPT codes where death was never observed are eliminated or when the system is applied to neonates, the groupings remained predictive of death in an ordinal manner.

60 APPLIED LIFE SCIENCES↗

On Space Exploration and Human Error: A Paper on Reliability and Safety

NASA space exploration should largely address a problem class in reliability and risk management stemming primarily from human error, system risk and multi-objective trade-off analysis, by conducting research into system complexity, risk characterization and modeling, and system reasoning. In general, in every mission we can distinguish risk in three possible ways: a) known-known, b) known-unknown, and c) unknown-unknown. It is probably almost certain that space exploration will partially experience similar known or unknown risks embedded in the Apollo missions, Shuttle or Station unless something alters how NASA will perceive and manage safety and reliability

Bell, David G.↗

Modeling Payload Stowage Impacts on Fire Risks On-Board the International Space Station

The purpose of this presentation is to determine the risks of fire on-board the ISS due to non-standard stowage. ISS stowage is constantly being reexamined for optimality. Non-standard stowage involves stowing items outside of rack drawers, and fire risk is a key concern and is heavily mitigated. A Methodology is needed to account for fire risk due to non-standard stowage to capture the risk. The contents include: 1) Fire Risk Background; 2) General Assumptions; 3) Modeling Techniques; 4) Event Sequence Diagram (ESD); 5) Qualitative Fire Analysis; 6) Sample Qualitative Results for Fire Risk; 7) Qualitative Stowage Analysis; 8) Sample Qualitative Results for Non-Standard Stowage; and 9) Quantitative Analysis Basic Event Data.

Anton, Kellie e.↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Marginal Recurrence Requiring Salvage Radiotherapy After Stereotactic Body Radiotherapy for Spinal Metastases

Introduction: We sought to quantify and identify risk factors associated with margin recurrence (MR) requiring salvage radiotherapy after stereotactic body radiation therapy (SBRT) for spinal metastases. Methods: We retrospectively reviewed patients with spinal metastases who were treated with single-fraction SBRT between 2006 and 2009. Gross tumor was contoured, along with either the entire associated vertebral body(ies) or the posterior elements, and included in the planning target volume. No additional margins were used. MR was defined as recurrent tumor within one vertebral level above or below the treated lesion that required salvage radiotherapy. Only patients who presented for 3-month post-SBRT follow-up were included in the analysis. Fine and Gray competing risk regression models were generated to identify variables associated with higher risks of MR. MR was plotted using cumulative incidence analysis. Results: SBRT was delivered to 208 lesions in 149 patients. Median follow-up was 8.6 months, and median survival was 12.8 months. The median prescribed dose was 14 Gy (10-16 Gy). MR occurred in 26 (12.5%) treated lesions, at a median time of 7.7 months after SBRT. Patients with paraspinal disease at the time of SBRT (20.8% vs. 7.6% of patients; p = 0.02), and those treated with <16 Gy (16.3% vs. 6.3% of patients, p = 0.14) had higher rates of MR. Both variables were associated with significantly higher risk of MR on multivariate analysis. Conclusion: SBRT for spinal metastases results in a low overall rate of MR. The presence of paraspinal disease at the time of SBRT and a dose of <16 Gy were associated with higher risks of MR.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

ER Line Phase II Project Risk Assessment Report

The purpose of this risk and opportunity assessment is to report the potential cost impacts from technical and programmatic risks (TPR) and opportunities. This analysis will determine the cost contingency for these TPR impacts. The approach taken to manage risk is consistent with risk and opportunity management guidance contained in DOE Order 413.3B, Project Management for the Acquisition of Capital Assets, the DOE Guide 413.3-7, Risk Management Guide and LANL’s Project Management Procedure AP-350-204 Risk and Opportunity Management.

Engineering(42)↗