Improved resource utilization by advanced burner reactors with breed-and-burn blankets
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Distributed Energy Resource Cybersecurity Framework (DER-CF) provides a holistic assessment for evaluating the cybersecurity posture of DER systems - filling an important gap that expands upon existing cybersecurity frameworks for more modern energy systems. The DER-CF is available as a written framework and an interactive Web tool. Distributed Energy Resource Risk Manager (DER-RM) process adheres closely to NIST's seven risk management steps: prepare, categorize, select, implement, assess, monitor, and authorize. This added feature is independent of the DER-CF's existing self-assessment and allows managers to focus on the RMF process.
This paper aims at characterizing the groundwater flow in a highly dynamic karst aquifer using a global modeling approach based on rainfall and spring discharge time series. The Dardennes aquifer (SE France) was studied as it is used for drinking water supply and it also produces karst flash floods that increase the flood hazard downstream in urban areas. Three years of data were available, including a normal rainy year, a wet year and a dry year. Modeling was performed with the new platform KarstMod, a rainfall-discharge model with calibration tools. The Dardennes aquifer model was structured with three interconnected reservoirs: Epikarst, Matrix, and Conduit. Using this modeling approach, we were able to determine the groundwater hydrograph separation of the karst spring discharge, at the annual scale and at the event scale (flood). This gives insight into the low flow (Matrix) available for the drinking water demand and the fast flow (Conduit) that generates flash floods. In such a dynamic aquifer, part of the water budget cannot be accounted for by water resources as fast flow is not stored within the aquifer and is not available for the drinking water demand. The results were compared with the current groundwater management to determine whether the withdrawal is sustainable. Depending on whether it is a wet or a dry year, the proportion of slow flow ranges from 27 to 61% of the total discharge, respectively. During floods in high water periods, the proportion of quickflow increases drastically up to more than 90% of the spring discharge. In the case of a 300 mm/d simulated Mediterranean rainfall event, the mean daily peak value may reach 74 m 3 /s. This discharge can be reduced if the aquifer is previously depleted, which increases the storage within the aquifer. Coupling the geological context and the model results opens up future perspectives for the active management of the karst aquifer.
We report complex storage stacks providing data compression, indexing, and analytics help leverage the massive amounts of data generated today to derive insights. It is challenging to perform this computation, however, while fully utilizing the underlying storage media. This is because, while storage servers with large core counts are widely available, single-core performance and memory bandwidth per core grow slower than the core count per die. Computational storage offers a promising solution to this problem by utilizing dedicated compute resources along the storage processing path. We present DeltaFS Indexed Massive Directories (IMDs), a new approach to computational storage. DeltaFS IMDs harvest available (i.e., not dedicated) compute, memory, and network resources on the compute nodes of an application to perform computation on data. We demonstrate the efficiency of DeltaFS IMDs by using them to dynamically reorganize the output of a real-world simulation application across 131,072 CPU cores. DeltaFS IMDs speed up reads by 1,740x while only slightly slowing down the writing of data during simulation I/O for in situ data processing.
Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)
Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)
The Nuclear Computational Resource Center provides a portal by which industry professionals, educational staff, students, national laboratory employees, and others may request access to certain engineering software tools. As the tools provided through the Nuclear Computational Resource Center portal are not open-source and freely available, a set of approvals are necessary before access is granted. All code recipients must be associated with an institution that has a license with Idaho National Laboratory for the code requested. Information about these licenses is controlled by Idaho National Laboratory’s Technology Deployment organization and housed in a Technology Deployment database. Those requesting code access who are not citizens of the United States must also have a security plan, mandated by Idaho National Laboratory policy. Security plans are managed by the International Access Program and are stored in an International Access Program database known as IFacts. Granting access to software thus depends on information stored in the Technology Deployment database and IFacts. In the past, no connection between the Nuclear Computational Resource Center portal and these databases existed, making checking the status of license agreements and security plans time consuming and error prone. This report demonstrates that the Nuclear Computational Resource Center portal now connects to both the Technology Deployment database and IFacts, greatly improving the ease of use of the Nuclear Computational Resource Center system for administrators, which leads to a better overall experience for those requesting code access.
Not Available
In an effort to strengthen the cybersecurity posture for federal agencies and reduce the time and complexities of following the Risk Management Framework (RMF) six-step process, the National Renewable Energy Laboratory has dedicated research into expanding the existing Distributed Energy Resources Cybersecurity Framework to provide functionality that aids in the RMF steps. Users will have the opportunity to learn, document, and review the framework, saving time and resources. Existing functionality within the web application will continue to be available with added features for usability.
The HIV/AIDS Information Resources from the National Library of Medicine training is designed specifically for the UNCFSP HBCU Screening, Testing, Outreach, and Prevention (STOP) HIV/AIDS Program project members to provide valuable health information resources from the National Library of Medicine and other reliable sources to increase awareness of the wealth of treatment information and educational materials that are available on the Internet and to improve prevention and treatment education for their clients. These resources will also meet the needs of community-based organizations
The Equal Access Initiative: HIV/AIDS Information Resources from the National Library of Medicine training is designed specifically for the National Minority AIDS Council 2010 Equal Access Initiative (EAI) Computer Grants Program awardees to provide valuable health information resources from the National Library of Medicine and other reliable sources to increase awareness of the wealth of treatment information and educational materials that are available on the Internet and to improve prevention and treatment education for their clients. These resources will also meet the needs of community-based
Wildlife-vehicle collisions introduce a considerable amount of carrion into the environment, but scavenger use of this resource has not been extensively investigated. Scavengers may use roads for reliable foraging opportunities, but might also use roads for other purposes and encounter carrion opportunistically. We examined scavenging of carrion along linear features by placing 52 rabbit carcasses in each of three treatments in forested habitat during winter (Dec 2016-Mar 2017) in South Carolina, USA: roads, power line clearings (linear feature with fewer carcasses than roads due to lack of road kill), and forest interior. We used motion-activated cameras to compare arrival times and presence of vertebrate scavengers among treatments. There was no difference in proportion of carcasses scavenged or scavenger arrival time across treatments. No species arrived at roads quicker than other treatments. Turkey vultures (Cathartes aura) and coyotes (Canis latrans) scavenged equally across treatments, whereas gray foxes (Urocyon cinereoargenteus) scavenged along roads and power lines, but not in forests. We suggest that scavenger use of carrion near roads at this location during winter relates to factors other than carrion availability. Because some scavengers readily consumed carrion on roads, this resource has the potential to influence the ecology of these species.
Restoration of end-use loads during bulk transmission system outages is a key challenge for electric utilities. During those outages, utilities often do not have enough resources to fully restore the end-use loads. Additionally, not all available switching options are feasible due to voltage and load limits. Incentivizing non-utility flexible assets to provide their flexibility during resiliency events is a potential solution to improve resiliency. This paper presents a new transactive energy system framework (TESF) to incentivize distributed energy resources (DERs) to provide reactive power for supporting the self-healing functions of distribution management system (DMS). TESF engages non-utility DERs during resiliency events by incentivizing them through transactive signals computed using marginal cost of producing reactive power and marginal benefit of additional switching operations. TESF calculates additional switching options, which DMS then leverages to identify new optimal switching plans to restore additional loads. Test system consisting of multiple IEEE-13 node distribution feeders is used to demonstrate the performance of the proposed method. For the given system configuration and use-case, TESF results in 24.82 % additional load restoration and one additional switching operation.
The importance of biodiversity in supporting ecosystem functioning is generally well accepted. However, most evidence comes from small-scale studies, and scaling-up patterns of biodiversity–ecosystem functioning (B-EF) remains challenging, in part because the importance of environmental factors in shaping B-EF relations is poorly understood. In this study, using a forest research platform in which 26 ecosystem functions were measured along gradients of tree species richness in six regions across Europe, we investigated the extent and the potential drivers of context dependency of B-EF relations. Despite considerable variation in species richness effects across the continent, we found a tendency for stronger B-EF relations in drier climates as well as in areas with longer growing seasons and more functionally diverse tree species. Finally, the importance of water availability in driving context dependency suggests that as water limitation increases under climate change, biodiversity may become even more important to support high levels of functioning in European forests.
The CMS Global Pool, based on HTCondor and glideinWMS, is the main computing resource provisioning system for all CMS workflows, including analysis, Monte Carlo production, and detector data reprocessing activities. The total resources at Tier-1 and Tier-2 grid sites pledged to CMS exceed 100,000 CPU cores, while another 50,000 to 100,000 CPU cores are available opportunistically, pushing the needs of the Global Pool to higher scales each year. These resources are becoming more diverse in their accessibility and configuration over time. Furthermore, the challenge of stably running at higher and higher scales while introducing new modes of operation such as multi-core pilots, as well as the chaotic nature of physics analysis workflows, places huge strains on the submission infrastructure. This paper details some of the most important challenges to scalability and stability that the CMS Global Pool has faced since the beginning of the LHC Run II and how they were overcome.
In this paper we use our previously developed projective phase space generator for the calculation of the hadronic production of a vector boson with one additional jet at Next-to-Leading Order. The projective phase space generator allows us to make physical predictions in novel ways, speeding up both evaluation time and attainable accuracy. For the numerical evaluation we explore a computational model which combines the use of both multi-threading and distributed resources through the use of grid or cloud computing without depending on local institutional computer availability. The projective phase space method is well suited for this approach and gives through the use of cloud computing instant access to a large pool of resources.
Purpose: The development of computer-aided diagnostic (CAD) methods for lung nodule detection, classification, and quantitative assessment can be facilitated through a well-characterized repository of computed tomography (CT) scans. The Lung Image Database Consortium (LIDC) and Image Database Resource Initiative (IDRI) completed such a database, establishing a publicly available reference for the medical imaging research community. Initiated by the National Cancer Institute (NCI), further advanced by the Foundation for the National Institutes of Health (FNIH), and accompanied by the Food and Drug Administration (FDA) through active participation, this public-private partnership demonstrates the success of a consortium founded on a consensus-based process. Methods: Seven academic centers and eight medical imaging companies collaborated to identify, address, and resolve challenging organizational, technical, and clinical issues to provide a solid foundation for a robust database. The LIDC/IDRI Database contains 1018 cases, each of which includes images from a clinical thoracic CT scan and an associated XML file that records the results of a two-phase image annotation process performed by four experienced thoracic radiologists. In the initial blinded-read phase, each radiologist independently reviewed each CT scan and marked lesions belonging to one of three categories (''nodule{>=}3 mm,''''nodule<3 mm,'' and ''non-nodule{>=}3 mm''). In the subsequent unblinded-read phase, each radiologist independently reviewed their own marks along with the anonymized marks of the three other radiologists to render a final opinion. The goal of this process was to identify as completely as possible all lung nodules in each CT scan without requiring forced consensus. Results: The Database contains 7371 lesions marked ''nodule'' by at least one radiologist. 2669 of these lesions were marked ''nodule{>=}3 mm'' by at least one radiologist, of which 928 (34.7%) received such marks from all four radiologists. These 2669 lesions include nodule outlines and subjective nodule characteristic ratings. Conclusions: The LIDC/IDRI Database is expected to provide an essential medical imaging research resource to spur CAD development, validation, and dissemination in clinical practice.
Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.