Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Cost Controls in the Cloud

The pay-as-you-go model used by most Cloud Service Providers shifts ownership of resource procurement from finance and management teams to IT, engineering, development and other stakeholders. This requires individual contributors to adopt a more "cost conscious" approach to development, and for projects to invest time into the creation of automated cost controls and cost-focused monitoring. This talk will presents some patterns and examples of cost controls based on our experience managing a multi-tenant cloud environment.

circuit breaker↗

Gateway System Requirements

The Gateway Program (GW) System Requirements Document (SRD) is approved for the public domain to support NASA's Lunar Gateway Program. The main intent of these documents is to define top level functional and performance requirements for the systems that facilitate cooperative deep space exploration endeavors and execute lunar missions. The SRD defines NASA requirements for the procurement and development of the GW mission. The Gateway Program is a collaboration of US government, international partners and commercial providers. The Gateway SRD are expected to be used by all parties in development of the Gateway Program elements. For effective development and integration of the Gateway vehicle, all involved entities must use, and have awareness of, these high level program requirements to flow down to their respective developmental responsibilities so all Gateway elements will be operable as an entity. The Gateway SRD represents the requirements that are necessary for the Gateway mission. NASA has determined there is benefit to U.S. and foreign spacecraft developers to approve this information for the public domain because all the parties/participants need a common understanding of the requirements and the parameters under which they operate (size, shape, form fit and function). This will allow systems built by various nations and commercial entities to attach and function together properly and safely in the hostile environment of space.The Gateway SRD provides information regarding the current requirements for Gateway elements. Specifically, the Gateway SRD provide an overview of expected features and capabilities and requirements for safe integration of elements within the Gateway program. The SRD contains top-level functional and performance descriptions of the Gateway and definition of the interfaces limited to the scope necessary for integration purposes between Gateway elements. The documents do NOT contain detailed design information or any specifics of hardware or software implementation. The data approved for release does not include: manufacturing drawings, detailed interface control and design data, software code, detailed CAD models, structural or thermal models of the system, avionics or avionics box, board, or cable manufacturing information.

Adamek, Christopher↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, numerous small satellites have been launched into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks - or worse, be neglected altogether. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities.

Radiation Hardness Assurance (RHA)↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, government agencies, private companies and academic institutions, have launched hundreds of small satellites into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of components within small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities. In this course we suggest RHA strategies that engineers and scientists can apply to a wide range of aerospace systems, including constellations, with a focus on how to manage aggressive system scaling for smaller platforms.

Radiation Hardness Assurance (RHA)↗

MIL/JEDEC Standards Update

MIL/JEDEC standards play a vital role in electronic parts procurement and usage on all NASA missions. Through the NASA Electronic Parts Assurance Group (NEPAG) Program, NASA is an active participant in work related to the standards as they apply to electronic parts. This paper will provide an update on those activities.

Agarwal, S.↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, numerous small satellites have been launched into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks—or worse, be neglected altogether. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities.

Radiation Hardness Assurance (RHA)↗

Improving Reliability and Maintainability (R&M) in Space Life Support

This paper considers how to improve the reliability and maintainability (R&M) of future NASA space life support systems. If these systems are procured under an industry contract, defining the R&M requirements would take precedence over providing technical guidance on designing the system. Imposing a specific R&M design could be over constraining. However, the mission may define the overall R&M approach, as the International Space Station (ISS) did by requiring Orbital Replacement Units (ORUs). Before defining the R&M requirements for the next mission, the life support research program should understand and plan the R&M approach. The recent NASA technical standard on R&M has moved away from requiring specific R&M activities during each of the traditional project phases to instead developing and planning to implement the R&M requirements to meet the top level project R&M objectives. The emphasis is on providing the evidence to show that the R&M requirements are met, rather than on conducting specific prescribed R&M activities. The technical standard on R&M defines a comprehensive hierarchy of specific R&M objectives and identifies particular strategies to implement them at each level. That is, the top level R&M objective is defined and then one or more design strategies to implement it are developed immediately, before the next lower objectives are defined and the strategies to achieve those are designed. This step-by-step, top-down approach is similar to the axiomatic design method. The objectives are the R&M requirements, and the strategies are the hardware designs or operations plans developed to meet these requirements. The new R&M process is aligned with the systems design process and helps ensure that the methods to meet the R&M requirements are built into the design.

Jones, Harry W.↗

Vision and Objectives

The purpose of Industry Day is to exchange information with industry to increase understanding of the Government's current vision and objectives for the xEVA Production and Services Contract. The presentation provides industry with the opportunity to provide input into the xEVAPS procurement strategy and encourage offerors to submit questions and comments. A technical overview of the xEVA System serves as the foundation for the content related to draft requirements in the SOW.

Hansen, Chris↗

Lunar COTS: Using the Moon's Resources to Enable An Economical and Sustainable Pathway to Mars and Beyond

To support NASAs goal of sending humans to Mars, a new plan was constructed to develop and demonstrate cislunar capabilities and services in partnership with commercial industry using the well-proven Commercial Orbital Transportation Services (COTS) Program acquisition model. The NASA COTS Program was a very successful program that developed and demonstrated cost-effective commercial cargo transportation services to the International Space Station (ISS). As a result of NASAs COTS program, two new launch vehicles and spacecraft were developed and have been successfully performing cargo transportation missions to the ISS since 2012. The COTS acquisition strategy utilized a new model than normally accepted in traditional procurement practices. This new model used Space Act Agreements where NASA entered into partnerships with industry to jointly share cost, development and operational risks to demonstrate new capabilities for mutual benefit. This model proved to be very beneficial to both NASA and its industry partners as NASA saved significantly in development and operational costs, as much as tenfold, while industry partners successfully expanded their market share of the global launch transportation business for significant economic benefit. Using the COTS acquisition model as a basis, a new plan, notionally referred to as Lunar Commercial Orbital Transfer Services (or Lunar COTS), has been developed to determine the potential benefits and challenges of a new Lunar COTS plan[1]. The proposed plan includes low-cost, commercial-enabled missions to prospect for resources, determine the economic viability of extracting those resources and assess the value proposition of using these resources in future exploration architectures such as Mars. These missions would be accomplished in partnership with industry to meet these exploration goals but will also have the capability to carry payloads to meet science goals as well.

Zuniga, Allison↗

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg↗

NASA’s Space Launch System: Launch Capability for Lunar Exploration and Transformative Science

Excitement is building for the first launch of NASA’s Space Launch System (SLS), a unique exploration asset for the agency’s Artemis lunar program as well as for a new generation of science missions. SLS is designed for an array of missions beyond Earth’s orbit. The flexible system, which can be configured for Orion, cargo or Orion with co-manifested payload missions, offers high escape velocities to send more mass to deep space destinations. When configured with an 8.4 m-diameter fairing, SLS offers unmatched payload volume for human exploration and science missions. The initial Block 1 variant will insert at least 26 metric tons (t) to trans-lunar injection (TLI) and the more powerful Block 1B vehicle will launch 34-37 t to TLI using a new-development upper stage. Much of the initial SLS Block 1 vehicle is complete, including the upper stage and payload section, the core stage, engines and the solid rocket boosters. The first mission, Artemis I, launching from modernized and upgraded facilities at Kennedy Space Center (KSC), will be an uncrewed test flight of SLS, Orion and ground processing, with a primary objective of testing Orion’s heat shield at lunar re-entry velocity. Artemis I will have accommodations for 13 6U CubeSat payloads. These CubeSat missions will be deployed along the upper stage disposal trajectory after Orion separates from the vehicle. A rare opportunity for CubeSats to be deployed beyond low Earth orbit (LEO), Artemis I CubeSat missions range from searching for hydrogen and other volatiles on the lunar South Pole to studying the acceleration mechanisms of solar and interplanetary particles from a heliocentric trajectory. With manufacturing of the initial vehicle complete, fabrication and procurement is progressing for the second flight of SLS and Orion, Artemis II. Also an SLS Block 1 and Orion flight launching from KSC, Artemis II will mark the return of American astronauts to deep space with a lunar flyby-free return trajectory mission. With the Artemis III flight, NASA has the goal to land the first woman and the next man on the Moon. Infrastructure beyond SLS will be required for this effort, including elements of the lunar Gateway as well as lunar rovers, landers and additional commercially supplied launch services. SLS, as the only vehicle with the capability to lift 26 t of mass to TLI in its initial Block 1 variant, will remain a key component of this new-era exploration program. Future variants – Block 1B and Block 2 –will lift 34-45 t to TLI. This paper will discuss the status of testing and integration for the Artemis I vehicle, manufacturing progress for the second vehicle and the manifest outlook for primary, co-manifested and secondary payloads in the current deep space exploration environment.

Creech, Stephen D.↗

TPSAS-NF1676L-26669-DND

The NASA Langley Research Center has acquired a state-of-art composites fabrication environment to support the Center's research and technology development mission. This overall system described in this paper is named ISAAC, or Integrated Structural Assembly of Advanced Composites. ISAAC's initial operational capability is a commercial robotic automated fiber placement system from Electroimpact, Inc. that consists of a multi-degree of freedom commercial robot platform, a tool changer mechanism, and a specialized automated fiber placement end effector. Examples are presented of how development of advanced composite materials, structures, fabrication processes and technology are enabled by utilizing the fiber placement end effector directly or with appropriate modifications. Several advanced capability end effectors have been procured, and alternate processes with different capabilities can be developed with NASA's partners in industry and academia.

K C Wu↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Reconfiguring COSSIR for the Next Generation of Cloud and Precipitation Science

NASA originally developed the Compact Scanning Sub-millimeter Imaging Radiometer (CoSSIR) in the early 2000s, where it was own in the CRYSTAL-FACE and TC4 field experiments. With renewed interest in sub-millimeter remote sensing motivated by the upcoming launch of the EUMETSAT-sponsored Ice Cloud Imager (ICI), along with its potential for inclusion as part of the NASA Decadal Survey Aerosols, CLouds, Convection, and Precipitation (ACCP) observing architecture, CoSSIR is being refurbished to prepare for routine suborbital submillimeter measurements this decade. Upgrades include hardware (procurement of shared parts so that CoSMIR and CoSSIR can fly concurrently) and a change to the channels, with a focus on differential scattering and polarization at eight frequencies ranging from 170 to 640 GHz. As part of the refurbishment, the instrument name has been changed to Configurable Scanning Sub-millimeter Instrument/Radiometer, retaining the same acronym, in order to emphasize the science objectives that are enabled by CoSSIR's unique scanning geometry and channel set. These anticipated capabilities include two-dimensional pro ling of clouds and precipitation and characterization of the geometry (shape and orientation) of large cloud and precipitating ice particles.

Radiometry↗

Dust Solution Testing Initiative (DuSTI): Infusing Commercial Off the Shelf Dust Mitigation Technologies with NASA Practices

Dust is one of the most significant hazards to human lunar exploration. However, since the Apollo program concluded, limited research has been performed on lunar dust mitigation technologies. The safety of the crew members and sustainability of habitats, science, and supporting hardware depend on effective dust mitigation techniques and technologies. As NASA pursues a new generation of lunar missions with the Artemis program, the project team will pursue dust mitigation solutions with the Dust Solution Testing Initiative (DuSTI). DuSTI is a lunar dust mitigation effort that involves performing tests on commercial off the shelf (COTS) technologies over FY21. DuSTI will preform component and subsystem tests in dusty environments for up to five technologies with high potential. The specific technologies identified for study were selected based on several factors, including a market analysis of current terrestrial dust mitigation applications, availability of the technology, accessibility of various testing facilities, and cost of procurement. These technologies support the active and passive dust mitigation requirements of filtration systems, electro-mechanical systems, electro-static systems, surface coatings, textiles, and silicone polymers. Technology Readiness Level (TRL) will be increased by validating components in relevant environments. For example, if the COTS technology is at a TRL 9 for terrestrial use but at a 4-5 TRL for use in the lunar environment, we will test that technology in a lunar dust environment to increase the TRL for use on the Moon.

lunar dust↗

NASA's Human Lunar Landing Strategy

In early 2020, NASA's Human Landing System Program made awards to a set of American companies to compete for the design, delivery and demonstration of an integrated human landing system to land the next Americans near the South Pole of the Moon by 2024. Awards were made utilizing the NextSTEP Broad Agency Announcement procurement mechanism and kicked off a seven-month Certification Baseline Review, leading up to a Continuation Review and possible down-select by NASA at the end of 2020. This paper discusses the work that has been done thus far for the rapid development of a human landing system to safely carry the first woman and the next man to the lunar surface. It will also provide a preview of the work that remains ahead for the program. Keywords: Artemis, Human Landing System, Mars, Moon, Propulsion

Lisa Watson-Morgan↗

The Ejectable Data Recorder: A Lean, Risk-Informed Approach for Hardware Development

NASA is developing the Orion spacecraft to transport crew from the Earth to the Moon as part of the Artemis series of missions. To provide a crew escape capability from pre-launch through ascent, the Orion vehicle is equipped with a Launch Abort System (LAS), built by Lockheed Martin, which pulls the capsule away from the launch vehicle in the event of an abort scenario. The Ascent Abort 2 (AA-2) test flight occurred on July 2, 2019,and tested a production version of the LAS to ensure that it can operate as intended, and to collect a large data set from hundreds of sensors on the vehicle to support Orion flight certification. In the original AA-2 architecture, a single-string set of communications antennas on the LAS would downlink all of the in-flight test data to ground stations. However, that communications architecture was predicted to have data dropouts during abort and jettison of the LAS, and would not support data transmission at all after LAS jettison. As a result, a comprehensive trade study was completed, yielding the addition of antennas on the crew module (CM), a buffer/rebroadcast capability for key portions of the flight, and an ejectable data recorder (EDR) subsystem. This EDR subsystem would serve as a backup to the radio frequency (RF) communications system, and would be non-flight critical, providing a unique capability that enabled management to take a different approach with the hardware and software development. The Crew Module and Separation Ring were developed as “Class 1”Flight Hardware, albeit with some tailoring approaches to enable efficiencies. The Class 1 designation requires full rigor for flight hardware and software, documenting everything that happens to a piece of hardware from procurement through disposal, requiring a full spectrum of acceptance tests, and the highest rigor of quality assurance processes. At the other end of the spectrum, Class 3hardware is controlled, but not intended for flight, and leaves the level of rigor up to the project manager. This classification is often used for research and development projects. Similarly,Class-1E has been recently defined at NASA for ISS payloads and technology development projects that are not flight critical and do not need the full rigor of Class 1 to be successful. The EDR subsystem was challenged at commencement to adopt a skunkworks and agile-like approach to hardware development, allowing for a different risk posture than the rest of the AA-2 hardware. After initially pursuing Class 1 processes, the EDR subsystem design evolved to incorporating numerous commercial components, leading to re-designation as a Class-1E subsystem. The resulting EDR subsystem was fully successful in meeting all flight system requirements, and achieved 100% retrieval of flight test data. This paper will discuss the risk posture of the EDR subsystem and the subsequent tailoring that was enacted as part of its Class-1E status.

EDR↗

VESAT: The Venus Environmental Satellite Discovery Mission

The Venus Environmental Satellite (VESAT) is being developed by JPL, Ball Aerospace, the University of Wisconsin, and Oxford University as an inexpensive but effective means of assessing numerous and interrelated dynamical and chemical processes within the deep atmosphere of Venus. Utilizing a small array of remote-sensing instruments designed to take advantage of several unique characteristics of this alien environment, VESAT daily acquires quantitative three-dimensional global maps of Venus in key environmental field parameters such as windfields, atmosphere/surface temperature fields, and trace gas abundances. VESAT utilizes a 45-degree inclined, 30,000-km altitude circular orbit to achieve consistent, regular coverage of the entire globe with minimal day-to-day variations in spacecraft operations, allowing uplink/downlink operations to be conducted effectively and inexpensively in a university setting. An integrated hardware procurement approach, wherein a single contractor is responsible for the design, manufacture, and integration of the entire spacecraft, including the instrument payload, enables significant savings in spacecraft/payload cost and schedule.

VESAT↗