Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Cyber-Threat Assessment for the Air Traffic Management System: A Network Controls Approach

Air transportation networks are being disrupted with increasing frequency by failures in their cyber- (computing, communication, control) systems. Whether these cyber- failures arise due to deliberate attacks or incidental errors, they can have far-reaching impact on the performance of the air traffic control and management systems. For instance, a computer failure in the Washington DC Air Route Traffic Control Center (ZDC) on August 15, 2015, caused nearly complete closure of the Centers airspace for several hours. This closure had a propagative impact across the United States National Airspace System, causing changed congestion patterns and requiring placement of a suite of traffic management initiatives to address the capacity reduction and congestion. A snapshot of traffic on that day clearly shows the closure of the ZDC airspace and the resulting congestion at its boundary, which required augmented traffic management at multiple locations. Cyber- events also have important ramifications for private stakeholders, particularly the airlines. During the last few months, computer-system issues have caused several airlines fleets to be grounded for significant periods of time: these include United Airlines (twice), LOT Polish Airlines, and American Airlines. Delays and regional stoppages due to cyber- events are even more common, and may have myriad causes (e.g., failure of the Department of Homeland Security systems needed for security check of passengers, see [3]). The growing frequency of cyber- disruptions in the air transportation system reflects a much broader trend in the modern society: cyber- failures and threats are becoming increasingly pervasive, varied, and impactful. In consequence, an intense effort is underway to develop secure and resilient cyber- systems that can protect against, detect, and remove threats, see e.g. and its many citations. The outcomes of this wide effort on cyber- security are applicable to the air transportation infrastructure, and indeed security solutions are being implemented in the current system. While these security solutions are important, they only provide a piecemeal solution. Particular computers or communication channels are protected from particular attacks, without a holistic view of the air transportation infrastructure. On the other hand, the above-listed incidents highlight that a holistic approach is needed, for several reasons. First, the air transportation infrastructure is a large scale cyber-physical system with multiple stakeholders and diverse legacy assets. It is impractical to protect every cyber- asset from known and unknown disruptions, and instead a strategic view of security is needed. Second, disruptions to the cyber- system can incur complex propagative impacts across the air transportation network, including its physical and human assets. Also, these implications of cyber- events are exacerbated or modulated by other disruptions and operational specifics, e.g. severe weather, operator fatigue or error, etc. These characteristics motivate a holistic and strategic perspective on protecting the air transportation infrastructure from cyber- events. The analysis of cyber- threats to the air traffic system is also inextricably tied to the integration of new autonomy into the airspace. The replacement of human operators with cyber functions leaves the network open to new cyber threats, which must be modeled and managed. Paradoxically, the mitigation of cyber events in the airspace will also likely require additional autonomy, given the fast time scale and myriad pathways of cyber-attacks which must be managed. The assessment of new vulnerabilities upon integration of new autonomy is also a key motivation for a holistic perspective on cyber threats.

Complex Networks↗

The Disruptive Technology That is Additive Construction: System Development Lessons Learned for Terrestrial and Planetary Applications

Disruptive technologies are unique in that they spawn other new technologies and applications as they grow. These activities are usually preceded by the question, "What If?" For example, "What if we could use an emerging technology and in-situ materials to promote exploration on the Moon or Mars, and then use that same technology to keep our troops out of harm's way and/or help the worlds' homeless?" This question allows us to flip the mindset of "how can people create more valuable innovation?" to "how can innovation create more valuable people?." This approach allows us to view augmented human labor as an inclusive opportunity, not a threat. The discipline of Additive Construction is growing rapidly due to the flexibility, speed, safety and logistics benefits offered as compared to standard construction techniques. Additive construction is a disruptive technology in that it employs the principles of additive manufacturing on a human habitat structure scale. Developed initially for emergency management and disaster relief applications, additive construction has now grown into military infrastructure and planetary (Moon and Mars) surface infrastructure applications as well. Additive Construction with Mobile Emplacement (ACME) is a NASA technology development project that seeks to demonstrate the feasibility of constructing shelters for human crews, and other surface infrastructure, on the Moon or Mars for a future human presence. The ACME project will allow, for the first time, the 3-dimensional printing of surface structures on planetary bodies using local materials for construction, thereby tremendously reducing launch and transportation mass and logistics. Some examples of infrastructure that could be constructed using robotic additive construction methods are landing pads, rocket engine blast protection berms, roads, dust free zones, equipment shelters, habitats and radiation shelters. Terrestrial applications include the development of surface structures using Earth-based materials for emergency response, disaster relief, general construction, and housing at all economic levels. This paper will describe the progress made by the NASA ACME project with a focus on prototypes and full scale additive construction demonstrations using both Portland cement concrete and other indigenous material mixtures. Rationale for the use of additive construction for both terrestrial and planetary applications will be explored and a thorough state-of-the-art of additive construction techniques will be presented. An evolutionary history of NASA's additive construction development efforts, dating back to 2004, will be included. The paper will then step through a series of trade studies performed to inform key processing and design decisions in the development of the full-scale ACES-3 system developed by NASA and the Jacobs Space Exploration Group for the U.S. Army Corps of Engineers (USACE) Construction Engineers Research Laboratory (CERL) in Champaign, IL. The selection of aggregate and binders, based on in-situ materials, will also be presented and discussed

Space Processing↗

NASA Platform for Autonomous Systems (NPAS)

NASA Platform for Autonomous Systems (NPAS) is a disruptive software platform and processes being developed by the NASA Stennis Space Center (SSC) Autonomous Systems Laboratory (ASL). Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including the Gateway, and for the future of cost-effective ground mission operations. NPAS represents the embodiment of an innovative paradigm for “thinking” autonomy in contrast to brute-force autonomy. NPAS uniquely addresses the requirements and integrates the primary functionalities for autonomous operations, in one platform that includes: (1) Integrated System Health Management (ISHM); (2) autonomy strategies, guided by system health and concepts of operations; (3) domain objects (system elements) and infrastructure to create complete application domain knowledge models (4) infrastructure to create, schedule, and execute mission plans; (5) infrastructure to develop user interfaces for comprehensive awareness; and (6) infrastructure to integrate distributed autonomous applications across networks. NPAS is a single platform that can be used to make any system operate with any desirable degree of autonomy, as well as provide comprehensive system awareness to operators and users.

Figueroa, Fernando↗

Urban Air Mobility (UAM) Market Study

The Booz Allen Team explored market size and potential barriers to Urban Air Mobility (UAM) by focusing on three potential markets – Airport Shuttle, Air Taxi, and Air Ambulance. We found that the Airport Shuttle and Air Taxi markets are viable, with a significant total available market value in the U.S. of $500 billion, for a fully unconstrained scenario. In this unconstrained best-case scenario, passengers would have the ability to access and fly a UAM at any time, from any location to any destination, without being hindered by constraints such as weather, infrastructure, or traffic volume. Significant legal and regulatory, weather, certification, public perception, and infrastructure constraints exist, which reduce the market potential for these applications to only about 0.5% of the total available market, or $2.5 billion, in the near term. However, we determined that these constraints can be addressed through ongoing intra-governmental partnerships, government and industry collaboration, strong industry commitment, and existing legal and regulatory enablers. We found that the Air Ambulance market is not a viable market if served by electric vertical takeoff and landing (eVTOL) vehicles due to technology constraints but may potentially be viable if a hybrid VTOL aircraft are utilized. The barriers and challenges we characterized in this study can be stratified according to their applicability or potential mitigation through technology as well as market maturity (Figure 1). In the near term, high cost of service will be a key economic challenge. We found potential for significant reduction in service cost through increased vehicle and component efficiency, and automation in a more mature market scenario. Weather conditions also pose a challenge to the UAM market, though there is potential for mitigation of some of these impacts through technology such as sensors enabling operations in low visibility. However, even in a mature market with advanced technology, disruptions are still likely to occur due to weather events such as thunderstorms and strong winds. High density operations will likely stress the current Air Traffic Management (ATM) system in the near term, but technology and new initiatives such as the Air Traffic Management -eXploration project (ATM-X) will enable safe and efficient integration of UAM into the National Airspace System (NAS). Current battery technology creates a barrier in the near term, especially for the Air Ambulance market, as battery weight and extensive recharging times would be needed for these operations. Advancements in battery technology, as well as use of hybrid VTOLs, could significantly reduce this barrier in the longer term. As UAM emerges as a viable mode of transportation in the near term, adverse energy and environmental impacts, particularly noise, may impact community acceptance and potentially persist as the market matures into larger-scale operations. For non-technology related challenges, we found that infrastructure constraints will create a significant barrier to UAM in the near term but could be addressed in the longer term through development and expansion of vertiports. Competition from existing modes of transportation such as ride-sharing (e.g., Lyft, Uber) and ground taxi’s pose a key barrier to UAM in the short term, which will likely evolve into competition from other emerging technologies such as autonomous cars and electric trains in the longer term. Weather events will influence other components of the operation such as passenger comfort (e.g., extreme temperatures, turbulence) and infrastructure (e.g., winter weather causing cracks and degradation in vertiports). There is also potential for these impacts to be heightened in the longer term from the increased frequency of adverse weather such as thunderstorms due to changing climatic conditions. We also found that the public has strong concerns about safety as a passenger in a piloted UAM, including “lasing” of pilots, unruly passengers, and sabotage. They would prefer that all passengers pass through a security screening process before boarding a vehicle. They would also prefer to use UAM for longer regional trips, such as flying from Washington, DC to Baltimore, MD or San Diego, CA to Los Angeles, CA. A longer term automated UAM vehicle market will face challenges due to public apprehension about automation and unmanned operations, and a preference to fly with passengers they know in an autonomous (unmanned) operational scenario.

Rohit Goyal↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗

NASA Power: Global Solar Insolation, Meteorological Parameter Data, and Web Services to Support Sustainable Building Design and Operations

The buildings industry is currently striving to adopt green solutions to make infrastructure more energy-efficient in order to meet the 2050 net-zero climate goals. This planning requires reliable environmental datasets that are crucial in designing, building, and maintaining our world’s-built environment, as well as other energy-related processes and investments. This webinar for the National Institute of Building Sciences provides an overview of NASA’s Prediction Of Worldwide Energy Resources (POWER) Project that informs decision-making and development for sustainable building design and operations by enabling public open discovery, efficient access, and convenient distribution of NASA’s Earth Observations and global atmospheric model datasets. POWER’s datastore is comprised of solar radiation and surface meteorology parameters, spanning nearly 40 years of hourly data, that are easily accessible via several access methods and tools to support three focus areas: 1) renewable energy deployment and management, 2) sustainable infrastructure, and 3) agroclimatology applications. POWER and NASA Earth Science both plan future data parameters, updated tools, and improved observations that could directly support U.S. and international sustainable development goals, climate strategies, and building information modeling. To this end, solar data from several NASA projects and meteorological data from NASA assimilation models have already been reformatted and disseminated to the public via a user-friendly web GIS-enabled based data portal through the POWER Project. POWER data is analysis-ready and accessible through an Application Programming Interface (API), ArcGIS Image Services, and the project’s Data Access Viewer enhanced (DAVe), an interactive online tool. The POWER DAVe also features data consistent with ASHRAE Climate Design Conditions and has developed web image services showing Building Climate Zones and their variability. Through those tools, the data can be downloaded into multiple formats that support the infrastructure community, including CSV and Energy Plus Weather (EPW). POWER’s entire data product catalog is available through Amazon Web Services (AWS) Open Data Registry (ODR) via a free and publicly accessible Simple Storage Service (S3). This webinar provides a full overview of the NASA POWER Project's data and services developed in collaboration with the sustainable infrastructure community. Examples of how the renewable energy and building communities have utilized POWER data products to make decisions and a preview of future data product expansion, including climate projections, and web services will also be provided. Additionally, use case stories from our broad community of users will be presented.

Paul W. Stackhouse↗

Terrestrial Proving Ground Capabilities Needed for Lunar In Situ Resource Utilization (ISRU) & Construction Concepts of Operation

Incorporating any new technology or system into a human exploration mission or architecture requires development well in advance of the mission to eliminate technology, cost, and schedule risk concerns. It is often stated that technologies need to be at a Technology Readiness Level (TRL) of 6, i.e. ‘system/subsystem model or prototype demonstration in a relevant environment (ground or space)’, by Authority To Proceed (ATP) or by the Preliminary Design Review (PDR) for the mission at the latest. There are two game changing capabilities for sustained human exploration of space that can have a significant effect on the overall exploration architecture and the technologies and systems included in the architecture. The first game changing capability, known as In Situ Resource Utilization (ISRU), involves the search for, acquisition, and processing of resources on the Moon and Mars into mission consumables and usable products, and the second is the ability to utilize space resources in the construction of roads, structures, and surface infrastructure. ISRU and surface construction capabilities have the potential to greatly reduce the cost and risk of human exploration while enabling sustained lunar surface and commercial operations. However, ISRU and surface construction systems are complex and must operate in extremely harsh environments, with abrasive regolith and pervasive dust, for long-periods of time, with potentially limited opportunities for maintenance and repair by humans. The complexity of these capabilities and operations also means that there are a limited number of companies that can design, build, and operate end-to-end systems on their own. The majority of the technologies being developed for these systems are by small companies and at the component or subsystem level. With the overarching strategy of the United States National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) to enable industry to implement ISRU and surface infrastructure for Artemis and space commercialization, it is therefore important to establish processes and capabilities to promote and foster collaborations among large and small companies involved in ISRU and surface infrastructure development. For ISRU and infrastructure systems and capabilities to be used in Artemis missions and future commercial lunar surface operations, a coordinated framework with virtual/physical integration and testing locations, or ‘Proving Grounds’, needs to be established and operated on a regular basis and open to all. This paper will discuss the ISRU and surface construction near and long-term concepts of operations, and review operations and lessons-learned from the previous ISRU analog field tests. From this information, requirements and capabilities will be proposed to support and enable the integration and testing of ISRU and construction systems with industry, academia, and international agencies, as well as what facilities and organizations could help establish these Proving Grounds.

ISRU↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Charging Decision Making for Automated Electric Vehicles

Abstract: Overview/Significance With the emerging of autonomous driving and its application in electric vehicles, the charging decision making should be taken over by the vehicles. Autonomous electric vehicles will require the capability to make charging decisions according to the battery energy state, the travel demand and also the available charging infrastructure. The introduction of autonomous driving technology would remove the challenge of co-locating charging infrastructure with driver destinations and presents a driver-free method for EVs to reach nearby charging stations. This will significantly change the charging behavior of electric vehicles. EV driver will no longer need to be present at charging stations for charging actions. Automated EVs can drive to nearby charging stations to perform charging actions by themselves when necessary. Meanwhile, connected vehicles technology makes electric vehicles have the capability to sense and obtain pertinent information from nearby charging station networks and then calculate the corresponding costs and availability for charging. All these promising capabilities bring new opportunities to construct an automatic charging decision making system and improve energy efficiency of charging actions for automatic electric vehicles. Abstract: Methodology This research introduces optimization tools and case studies on charging decision making for automated electric vehicles under personal usage scenario. The designed optimization tools aim to provide charging strategies, i.e. the optimal choice of charging station outside home and the amount of charged energy, by considering constraints from personal daily itineraries and existing charging infrastructure. Abundant real world EV data is utilized to construct stochastic energy consumption prediction model under realistic driving conditions. Advanced dynamic programming technology is utilized to model and solve the potential multi-stage decision making process by considering realistic uncertainties of EV energy cost and dynamics of itinerary information. Large-scale simulation studies using Chicago itinerary data are demonstrated to illustrate energy benefits from automatic charging decision making for future autonomous EVs. Abstract: Results/Conclusions Optimal automatic charging decision making and its energy benefits have been studied for personal automated electric vehicles. A data-driven method based on large amount of real-world data and the corresponding real-time update algorithm have been proposed to construct multi-channel stochastic energy consumption prediction model. Based on the energy cost prediction, dynamic multi-stage charging decision-making models are established for optimal strategies during a daily itinerary. Derived charging strategies can minimize the monetary and energy cost of charging actions for autonomous vehicles. Simulations and case studies show the potential ability of autonomous electric vehicles to reduce the range anxiety and charging infrastructure dependency. Automatic charging decision making can mitigate the pain from electric vehicle charging necessity outside home. In conclusion, automated electric vehicles equipped with an appropriate automatic charging decision making system will help EV driver to relieve from heavy time cost of recharging, reduce the energy cost of performing charging actions and improve the energy efficiency in future electrified transportation system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Nuclear Security Administration Strategic Vision Strengthening our Nation through Nuclear Security

The National Nuclear Security Administration’s enduring mission is to protect our nation by maintaining a safe, secure, and effective nuclear weapons stockpile, reducing global nuclear threats, and providing our submarines and aircraft carriers with militarily effective nuclear propulsion. Although we have numerous strategic partners that enable, contribute to, and benefit from our efforts, no other organization, government or civilian, can accomplish our unique mission on behalf of the American people. In this area, we stand alone. This strategic vision pursues urgent change at a significant scale to develop creative approaches, make sustained investments, and be disciplined in our approach to develop a nuclear capability for our time and for the foreseeable future. It is incumbent on us to anticipate our future security challenges and ensure our country is ready to meet them. Not doing so would have far-reaching consequences. Failure to meet our vital mission objectives will erode confidence in the security that the United States strategic deterrent umbrella provides. In assessing the current mission environment in NNSA, we can count on one thing—change: The geopolitical environment for our deterrent is ever-changing Threats from rogue states and terrorists are evolving Our nuclear weapons and the infrastructure that supports them are aging Science and technology continue to move forward at an ever-increasing pace In this dynamic environment, it is not sufficient to remedy today’s situation and meet our current mission requirements. We must lean forward in the development, planning, and execution of programs that address our current challenges while developing the workforce, infrastructure, tools, and governance systems that will enable us to meet our deterrence, non-proliferation, and naval propulsion mission requirements for the next 50 years. We must embrace a next-generation enterprise that is flexible enough to respond to future challenges. With decades of stagnation following the end of the Cold War, we find ourselves in the unenviable position of implementing near-term fixes while using those lessons learned to better prepare for the future. Without sustained and predictable investments to restore and modernize our infrastructure, we will rapidly lose our ability to deliver on our promise of a safe and reliable nuclear weapons stockpile, which will degrade our deterrent capability and render legacy weapon systems irrelevant to the defense of our nation. We must not and will not allow the next generation of our nuclear security enterprise to simply maintain the status quo. We have a storied past that guides us. For 75 years our enterprise has overcome every challenge, led the country in incredible scientific and engineering endeavors and discoveries, and successfully ensured constant vigilance in maintaining an effective deterrent, reducing global nuclear threats, and powering our nuclear navy. Now is the time for us to take decisive action in forging the enterprise of the future. As I have traveled to all of our labs, plants, and sites and met with people across our complex, I have been left with one overwhelming impression: the incredible workforce that makes up our nuclear security enterprise is up to all of the challenges we have before us. Together we can and will ensure that those in the future workforce have the resources and the responsive, agile infrastructure they need to maintain the systems of today and to design and field the systems of tomorrow.

Source record↗

Urban Energy Systems: Research at Oak Ridge National Laboratory

In the coming decades, our planet will witness unprecedented urban population growth in both established and emerging communities. The development and maintenance of urban infrastructures are highly energy-intensive. Urban areas are dictated by complex intersections among physical, engineered, and human dimensions that have significant implications for traffic congestion, emissions, and energy usage. In this chapter, we highlight recent research and development efforts at Oak Ridge National Laboratory (ORNL), the largest multipurpose science laboratory within the U.S. Department of Energy’s (DOE) national laboratory system, that characterizes the interactions between the human dynamics and critical infrastructures in conjunction with the integration of four distinct components: data, critical infrastructure models, and scalable computation and visualization, all within the context of physical and social systems. Discussions focus on four key topical themes: population and land use, sustainable mobility, the energy-water nexus, and urban resiliency, that are mutually aligned with DOE’s mission and ORNL’s signature science and technology capabilities. Using scalable computing, data visualization, and unique datasets from a variety of sources, the institute fosters innovative interdisciplinary research that integrates ORNL expertise in critical infrastructures including energy, water, transportation, and cyber, and their interactions with the human population.

Bhaduri, Budhu↗

Plan for a Data Base Approach to Evaluating LWR Plant Integration with Hydrogen and Industrial Facilities

The purpose of this report is to provide an outline and scope of a database tool that could be used to identify the most beneficial locations to site a hydrogen, chemical facility or other industrial facility that would be powered by nuclear energy. This energy may be in the form of electricity produced by the plant, heat in the form of steam or both. In addition, this siting tool should consider factors such as economics, geography, industries, residences, geological hydrogen storage, and key infrastructure. The infrastructure to be considered could include pipelines or other storage and transportation facilities to carry the created products from the production facility to the end user. Also considered should be infrastructure that could deliver needed chemicals or gasses to allow the production of desired products such as ammonia or biofuels. This data base tool should allow a screening study of all U.S. nuclear plants to identify opportunities and barriers to creating hydrogen hubs around nuclear power plants. For this effort, it has been decided that the Siting Tool for Advanced Nuclear Development (STAND) would be used to conduct this screening study which is a follow-on research project to this present effort. Currently, plans are being developed to modify the STAND tool to provide the capability necessary to perform screening of each US commercial nuclear plant to identify the best locations to site hydrogen or chemical production facilities. Many features of the current STAND tool will be employed to meet this objective, but additional infrastructure data (such as the location of pipelines) may need to be added to allow these locations to be fully vetted. In addition, new analysis capabilities may need to be added so economic considerations can be understood

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Industrial Steerable Needle for Inspecting Extremely Confined Spaces in Nuclear Facilities - 18316

We present a novel, compliant mechanism inspired by steerable needles for endoscopic surgery that provides the capability to navigate extremely confined spaces for the purpose of infrastructure inspection. Extremely confined spaces are commonly encountered during infrastructure inspection of nuclear facilities. These spaces can include pipes and ventilation ducts. Often these infrastructure features go uninspected simply because there is no viable way to access their interior. In addition, it is not uncommon for extremely confined spaces to be laid-out in a spider-web fashion that must be selectively navigated in order to execute an inspection. Recently, millimeter-scale imagers have become commercially available. These imagers are small enough to fit inside an extremely confined space, but there is currently no means to bring the imager to the portion of the structure that must be inspected. In this work this problem is addressed by taking inspiration from the field of steerable needles used in endoscopic surgery. Steerable needles are long flexible shafts that are capable of being directed through the human body using control forces applied external to the body. Unfortunately, steerable needles cannot be directly applied to the problem of navigating maze-like arrangements of extremely confined spaces. Traditional steerable needles must operate within a solid medium that can be penetrated in order to be steered so they are not directly applicable to navigating extremely confined spaces. However surgical steerable needles do suggest an approach to the problem. Steerable needles are typically made from super-elastic nitinol. This material has the property that it can experience high strain without yielding. Furthermore, superelastic nitinol is stiff enough that it is possible to push the tube down a long, maze-like arrangement of a confined space without buckling. The stiffness properties of nitinol combined with its high yield strain makes it an attractive material for navigating a tube through a maze-like arrangement of extremely confined spaces. The ability to selectively navigate extremely confined spaces opens up new possibilities to use emerging miniature imaging technology for infrastructure inspection. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-functional cementitious materials with ultra-high damage tolerance and self-sensing ability

Cementitious materials having high damage tolerance and self-sensing ability are described herein. These materials may replace conventional concrete to serve as a major material component for infrastructure systems with greatly improved resistance to cracking, reinforcement corrosion, and other common deterioration mechanisms under service conditions, and prevents fracture failure under extreme events. These materials can also be used for the repair, retrofitting or rehabilitation of existing concrete structures or infrastructure systems. Furthermore, these materials may offer capacity for distributed and direct sensing of cracking, straining and deterioration with spatially continuous resolution wherever the material is located, without relying on installation of sensors. The present invention relates to multifunctional cementitious structural or infrastructure materials that integrate self-sensing with damage tolerance for improving safety, extending service life, and health monitoring of structures, components, and infrastructure systems.

Li, Mo↗

Latency Analysis of the Nexus Digital Twin Framework

Real-time digital catalogs are increasingly relied upon to track metadata and connect disparate data sources for cloud-based data integration efforts. One such tool, Deeplynx Nexus is supporting real-time digital twin efforts through event-driven data integration and time-series queries. Nexus’s usefulness for these applications depends critically on how quickly individual records can be uploaded and downloaded, since delays directly affect the responsiveness of any system built on top of it. However, the actual latency a user should expect from Nexus has not been systematically measured before, particularly for the small, frequent transactions typical of live sensor feeds. Here we show that single-record round-trip latency is 61.1 ms on a local Nexus instance and 391.7 ms on the hosted production infrastructure, a roughly 6.4x difference driven primarily by fixed per-request overhead rather than data volume. This overhead dominates at small scale: comparing single-record and ten-record trials suggests approximately 56 ms of each single-record request is fixed connection and authentication cost rather than data-transfer time, meaning batching even a handful of records is substantially more efficient than transmitting them individually. At large batch sizes, this pattern reverses for uploads, which converge to near parity between local and hosted environments by 25,000-50,000 records, while download latency remains persistently 5.7-6.4x slower on hosted infrastructure even at scale. These results suggest that Nexus deployments intended for real-time digital twin applications should prioritize record batching over single-record transactions, and that download-path optimization on hosted infrastructure offers the largest remaining opportunity to reduce latency at scale. We anticipate these baseline measurements will serve as a reference point for future digital twin projects evaluating whether Nexus’s latency profile meets their real-time requirements, and as a benchmark for tracking the effect of future infrastructure or API changes.

99 - GENERAL AND MISCELLANEOUS↗

CISR Graduate Certificate and Foundations Course Development

Protecting US critical infrastructure is a vast and complex problem. Recent years have seen a shift in perception and an growth of importance in critical infrastructure protection (CIP). A multidisciplinary problem will require a multidisciplinary solution. This paper outlines the efforts of one university to build a graduate certificate program that seeks to bridge the knowledge and communications gap between information assurance and infrastructure protection.

Critical Infrastructure Protection↗

Need Help Planning for the Future of Electric Vehicles?

This brochure helps states find tools to make informed decisions about implementing electric vehicles (EVs) and their charging infrastructure. To do so, many states will use funds from the Environmental Mitigation Trust Agreements from the Volkswagen Clean Air Act Settlement. The U.S. Department of Energy (DOE) and its national laboratories provide extensive information on EVs including both community planning and charging infrastructure. This information can help states implement EV and charging infrastructure projects using settlement funds. The tools in this brochure represent a sampling of key DOE resources available to states and other jurisdictions.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗