Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INVESTMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Feasibility of Power Ramp Testing in the Advanced Test Reactor

For decades, the Halden Boiling Water Reactor (HBWR) in Norway was an international resource for assessing nuclear fuels and materials behavior and its unexpected shutdown in 2018 represented a significant loss in experimental capability for prototypical irradiation testing. In the aftermath of the closure, a study was performed to assess capability gaps related to the Accident Tolerant Fuels (ATF) program. It was concluded that the primary capability gaps left by the closure of the HBWR were the loss of prototypic in-pile Light Water Reactor (LWR) loops that provide operational transient testing and in-pile Loss-of-Coolant Accident (LOCA) testing capabilities. The study also concluded that the Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) likely have the necessary key capabilities to absorb the breadth of the HBWR mission gaps related to the ATF program, but additional investments in experimental infrastructure were needed. One such investment is the design and installation of additional pressurized water loops in the medium-I positions of the ATR, hereafter referred to as I-Loops, to support power ramp testing and testing in Boiling Water Reactor (BWR) conditions. This paper gives an overview of the planned ATR I-Loops and assesses the feasibility of performing power ramp testing inside such a loop.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

GET FiT Plus: De-risking clean energy business models in a developing country context

GET Fit was first conceived in January 2010 when the United Nations Secretary General's Advisory Group on Energy and Climate Change (AGECC) invited Deutsche Bank Climate Change Advisors (DBCCA) to present new concepts to drive renewable energy investment in developing regions. DBCCA responded with the Global Energy Transfer Feed-in Tariffs Program (GET FiT), a proposal to support both renewable energy scale up and energy access through the creation of new international public-private partnerships. The concept was inspired by the theory that feed-in tariffs could serve as an effective policy structure for both public and private investment and knowledge transfer from the developed world. The original GET FiT concept was designed with input from over 160 individuals from the renewable energy, financial and international development communities. The original GET FiT report was issued in April 2010. This report reflects continued engagement of stakeholders around the world. GET FiT plus is an effort to capture the key outcomes of the GET FiT consultation process and use them to catalyze ongoing dialogue and debate about the future of international support for renewable energy in developing regions. These outcomes have been translated into key research priorities. These priorities, as well as some short issue briefs are part of this report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Application of stochastic optimization to nuclear power plant asset management decisions

We describe the development and application of stochastic optimization models and algorithms to address an issue of critical importance in the strategic allocation of resources; namely, the selection of a portfolio of capital investment projects under the constraints of a limited and uncertain budget. This issue is significant and one that faces decision-makers across all industries. The objective of this strategic decision process is generally self evident - to maximize the value obtained from the portfolio of selected projects (with value usually measured in terms of the portfolio's net present value). However, heretofore, many organizations have developed processes to make these investment decisions using simplistic rule-based rank-ordering schemes. This approach has the significant limitation of not accounting for the (often large) uncertainties in the costs or economic benefits associated with the candidate projects or in the uncertainties in the actual funds available to be expended over the projected period of time. As a result, the simple heuristic approaches that typically are employed in industrial practice generate outcomes that are non-optimal and do not achieve the level of benefits intended. In this paper we describe the results of research performed to utilize stochastic optimization models and algorithms to address this limitation by explicitly incorporating the evaluation of uncertainties in the analysis and decision making process. (authors)

97 MATHEMATICS AND COMPUTING↗

Building Stakeholder Trust: Defensible Government Decisions - 13110

Administrative decisions must be grounded in reasonable expectations, founded on sound principles, and bounded by societal norms. Without these first principles, attaining and retaining public trust is a Herculean task. Decisions made by governmental administrators must be both transparent and defensible: without the former the agency will lose the public's trust and support (possibly prompting a legal challenge to the decision) and without the latter the decision may fail to withstand judicial scrutiny. This presentation and accompanying paper delves into the process by which governmental decisions can achieve both defensibility and openness through building stakeholder trust with transparency. Achieving and maintaining stakeholder trust is crucial, especially in the environs of nuclear waste management. Proving confidence, stability, and security to the surrounding citizenry as well as those throughout the country is the goal of governmental nuclear waste remediation. Guiding administrative decision-making processes and maintaining a broad bandwidth of communication are of incalculable importance to all those charged with serving the public, but are especially essential to those whose decisional impacts will be felt for millennia. A strong, clear, and concise administrative record documenting discrete decisions and overarching policy choices is the strongest defense to a decisional challenge. However, this can be accomplished using transparency as the fundamental building block. This documentation allows the decision-makers to demonstrate the synthesis of legal and technical challenges and fortifies the ground from which challenges will be defended when necessary. Further, administrative actions which capture the public's interest and captivate that interest throughout the process will result in a better-informed, more deeply-involved, and more heavily-invested group of interested parties. Management of information, involvement, and investment on the front-end of the process reaps rewards far more efficiently than attempts to assuage and mitigate the concerns of those parties after the fact and there are a number of tools Savannah River Remediation (SRR) has deployed that render transparency an ally in this context. The makers, applicators, and beneficiaries of policies and decisions will all benefit from strong administrative records which document decisional choices in an open and transparent manner and from timely, up-front management of concerns of interested parties. The strongest defense to decisional challenges is an ability to demonstrate the basis of the decision and the reason(s) that the decision was chosen over other alternatives. Providing a sound basis for defending challenges rather than avoiding or fighting over them allows the deciding entity the greatest opportunity to produce value for its customer. Often, a transparent process that invites public participation and is open for public review and comment will thwart challenge genesis. An entity that has to devote resources to defending its choices obviously cannot utilize those resources to further its mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing the Tools for Geologic Repository Monitoring - Andra's Monitoring R and D Program - 12045

The French Safety Guide recommends that Andra develop a monitoring program to be implemented during repository construction and conducted until (and possibly after) closure, in order to confirm expected behavior and enhance knowledge of relevant processes. To achieve this, Andra has developed an overall monitoring strategy and identified specific technical objectives to inform disposal process management on evolutions relevant to both the long term safety and reversible, pre-closure management of the repository. Andra has launched an ambitious R and D program to ensure that reliable, durable, metrologically qualified and tested monitoring systems will be available at the time of repository construction in order to respond to monitoring objectives. After four years of a specific R and D program, first observations are described and recommendations are proposed. The results derived from 4 years of Andra's R and D program allow three main observations to be shared. First, while other industries also invest in monitoring equipment, their obvious emphasis will always be on their specific requirements and needs, thus often only providing a partial match with repository requirements. Examples can be found for all available sensors, which are generally not resistant to radiation. Second, the very close scrutiny anticipated for the geologic disposal process is likely to place an unprecedented emphasis on the quality of monitoring results. It therefore seems important to emphasize specific developments with an aim at providing metrologically qualified systems. Third, adapting existing technology to specific repository needs, and providing adequate proof of their worth, is a lengthy process. In conclusion, it therefore seems prudent to plan ahead and to invest wisely in the adequate development of those monitoring tools that will likely be needed in the repository to respond to the implementers' and regulators' requirements, including those agreed and developed to respond to potential stakeholder expectations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Footprint Reduction at the Hanford Site - 12406

The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site, Liquid Waste Program, Savannah River Remediation American Recovery and Reinvestment Act Benefits and Lessons Learned - 12559

Utilizing funding provided by the American Recovery and Reinvestment Act (ARRA), the Liquid Waste Program at Savannah River site successfully executed forty-one design, procurement, construction, and operating activities in the period from September 2009 through December 2011. Project Management of the program included noteworthy practices involving safety, integrated project teams, communication, and cost, schedule and risk management. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure were accomplished. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually identified and applied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. The funding of a portion of the Liquid Waste Program at SRS by ARRA was a major success. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure was accomplished. Integrated Project Teams ensured quality products and services were provided to the Operations customers. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually reviewed and reapplied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Cost Implications of an Interim Storage Facility for Commercial SNF+ - 17132

The question of whether or not consolidated interim storage of commercial spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. This paper summarizes an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). In this study, the order-of-magnitude estimates of total system costs were calculated and tabulated. The analyzed scenarios involve shipment of SNF from reactors in dual-purpose storage and transportation canisters (DPCs) currently being used by utilities for dry storage at reactor sites. A number of pertinent conclusions can be drawn from this evaluation, including: - Delay in repository availability increases total system costs. Any delay in opening a repository increases total system costs, regardless of whether the system has an ISF or not. This is due to the increased cost associated with an extended duration for storage, whether at multiple independent spent fuel storage installations (ISFSIs) or at an ISF, until waste can be disposed of.- There is a potential total system lifecycle cost avoidance in realistic scenarios with an ISF when compared to scenarios with no ISF. However, most of the cost avoidance occurs several decades after the ISF is opened. The total WMS cost differential over the long term is mainly attributed to the reduced operational costs of storing the fuel in a consolidated facility rather than at individual reactor sites. - Earlier establishment of an ISF allows for more avoidance of post-shutdown at-reactor storage costs for any repository opening date. An ISF allows earlier acceptance of fuel from reactors, which reduces at-reactor costs from a total system perspective. - Transportation costs have little impact on a WMS with or without an ISF. These impacts range from 3-11% of the total cost in all scenarios. Therefore, transporting the fuel twice does not appear to be a significant cost concern driver relative to other system costs. In conclusion, designing, licensing, and constructing an ISF will require a large near-term financial investment. However, reduced annual operating and maintenance costs for an integrated waste management system with an ISF, compared to a system without an ISF, could eventually result in system-wide (integrated) cost avoidance due to reductions in at-reactor storage costs in the long term. The largest cost avoidances would not occur for several decades, so assumptions about inflation, escalation, and discount rates will have a significant effect on potential economic impacts of an ISF. It should be noted that other benefits associated with the investment of an ISF-such as earlier removal of SNF from shutdown reactor sites, earlier prospects for site re-utilization, and additional overall integrated waste management system flexibility-were not addressed in this study. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NREL Marine Energy Desalination Research and Development Portfolio: Preprint

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue Economy portfolio, and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry. For the Spanish version of this report, see NREL/CP-5700-88483 (https://www.nrel.gov/docs/fy24osti/88483.pdf).

analysis↗

International Standards as Critical Enablers to Development and Diffusion of D and D Technologies - 19372

The U.S. Department of Energy's Office of Environmental Management (DOE EM) has taken a leading role in investing in the research and development (R and D) of critical technologies to support the safe and efficient decommissioning of legacy nuclear facilities. In order to facilitate the complex-wide deployment and adoption of those technologies from the laboratory to end users, and to maximize return on investment of government-sponsored R and D projects, DOE EM proactively solicits and evaluates initiatives intended to enhance achievement of these goals. One such case study emerged and involved the successful deployment of an intumescent fixative technology in support of the SRS 235-F PuFF Facility Risk Reduction Program. A detailed analysis confirmed that a critical enabler and key contributor to this effort was a deliberate, methodical approach to leverage an international, consensus-based standards organization from the onset. There is a substantial body of literature that supports the crucial role of standards in technology programs across all phases of development - from concept, to deployment, to large-scale diffusion - in other industries. Formal standards are the result of a consensual negotiation process carried out by producers, regulators, end users and other interested stakeholders in a voluntary process within standardization organizations (WTO, 2011). Therefore, standard setting is often viewed as a self-regulatory process (Gupta and Lad, 1983), and can often yield better acceptance of technologies in certain industries, particularly if those standards are further referenced in government directives and regulations. This analysis connects several theoretical concepts: information asymmetry, risk adverse markets, and technology diffusion. It is complimented by some initial, rudimentary survey results in a burgeoning academic study conducted by the author, and reinforced by the aforementioned case study on the deployment of a fixative technology at the SRS 235-F PuFF Facility. The importance of managing a holistic technology development program that focuses on not just the technical aspects of the technology itself, but the critical enablers as well, is emphasized. This effort has direct application to potentially enhancing DOE EM technology development programs across the complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Government and Industry Roles to Accelerate Commercialization of Advanced Reactors and Supporting Fuel Cycles

Recent growth in private sector interest and investment in advanced reactor designs signals a new period in the greater than six decade pursuit of commercial nuclear technology. This nuclear entrepreneurship is primarily centered in the North America; meanwhile, national programs in China, France, India, Russia, and South Korea also feature active efforts to design, construct, operate and export advanced reactors .The business case for most private ventures calls for an aggressive commercialization timeline-tied to expectations for returns on investment. Finally, strategic energy portfolio projections and utility resource planning point to the 2030 - 2050 window as the period of greatest need for dispatchable, energy intensive, low-carbon generation options to address retirement of baseload capacity, increased penetration of renewables and economy-scale decarbonization. However, lead times for commercialization range from 30 to 50 years based on more traditional government-centric timelines. Fuel development and fuel cycle infrastructure deployment represent parallel timelines that directly influence the timeline for commercialization of many advanced reactor concepts. While multi-decade development periods appear to be commonplace for new nuclear projects, such timelines were not always the norm-three separate countries set out to develop civilian commercial power from fundamental nuclear principles, in just over a decade, on average. The US led light-water reactor (LWR) development in the 1950's, the UK pioneered a gas-cooled reactor (GCR) concept in the same time period, and Canada forged the path to commercializing the heavy-water reactor (HWR) starting in the mid-1950's and into the mid-1960's. The necessary fuel cycle facilities to support the commercial reactor design also did not appear suddenly, but were a collaborative effort between government and private partners. In this paper, the efforts of these three governments and their private industry partnerships in reactor and fuel cycle development are explored, and a select sample of representative milestones for each is presented, with the roles that each group played. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Molten Salt Reactor Simulations using MPACT-CTF

The US Department of Energy and industry have shown significant interest in advanced reactors, as evidenced by over 1.3 billion dollars of private investments in companies to develop advanced reactor concepts. More than seven of these advanced reactor concepts use molten salt reactor (MSR) technology. Based on this interest in MSR technology, ORNL has invested in the development of the MSR simulation capability, extending some capabilities in VERA to model this high-profile reactor concept. In this paper, the MPACT deterministic neutron transport capability and the COBRA Two-Fluid (CTF) subchannel capability are adapted to handle liquid fuel MSRs. Specifically, this work focuses on modifications to the depletion algorithms to account for isotopic mixing, continuous feed, and continuous removal. Models will be added to account for drift of precursors and decay heat emitters as the liquid fuel flows through the reactor coolant system. Modifications to CTF, including the addition of molten salt properties, are also addressed. Finally, the coupled MPACT-CTF capability is used to simulate the 30-year operation of an MSR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cartera de Investigacion y Desarrollo Sobre Desalinizacion de Energia Marina del NREL: Preprint (Spanish Translation)

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue EconomyTM portfolio [1], and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry. For the English version of this report, see NREL/CP-5700-86724 (https://www.nrel.gov/docs/fy24osti/86724.pdf).

analysis↗

NREL Marine Energy Desalination R&D Portfolio

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue EconomyTM portfolio [1], and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. It should be noted, while WPTO's marine energy portfolio includes wave, tidal, ocean current, thermal gradients, and pressure gradients the bulk of the marine energy desalination work has been focused on wave powered desalination. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry.

desalination↗

Electrolyzer Supply Chain Readiness Level (SCRL)

The U.S. Department of Energy's (DOE's) Office of Manufacturing and Energy Supply Chains (MESC) is revitalizing the U.S. manufacturing base with over $20 billion of direct investment in manufacturing capacity, industrial decarbonization, and workforce development. This work will provide guidance to MESC and other government organizations as to which supply chain components to invest in to reduce material vulnerability for hydrogen electrolyzers as part of the Modeling, Mapping, and Analysis (MMAC) Consortium.

AEC↗