Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

The Aviation System Analysis Capability Air Carrier Cost-Benefit Model

To meet its objective of assisting the U.S. aviation industry with the technological challenges of the future, NASA must identify research areas that have the greatest potential for improving the operation of the air transportation system. Therefore, NASA is developing the ability to evaluate the potential impact of various advanced technologies. By thoroughly understanding the economic impact of advanced aviation technologies and by evaluating how the new technologies will be used in the integrated aviation system, NASA aims to balance its aeronautical research program and help speed the introduction of high-leverage technologies. To meet these objectives, NASA is building the Aviation System Analysis Capability (ASAC). NASA envisions ASAC primarily as a process for understanding and evaluating the impact of advanced aviation technologies on the U.S. economy. ASAC consists of a diverse collection of models and databases used by analysts and other individuals from the public and private sectors brought together to work on issues of common interest to organizations in the aviation community. ASAC also will be a resource available to the aviation community to analyze; inform; and assist scientists, engineers, analysts, and program managers in their daily work. The ASAC differs from previous NASA modeling efforts in that the economic behavior of buyers and sellers in the air transportation and aviation industries is central to its conception. Commercial air carriers, in particular, are an important stakeholder in this community. Therefore, to fully evaluate the implications of advanced aviation technologies, ASAC requires a flexible financial analysis tool that credibly links the technology of flight with the financial performance of commercial air carriers. By linking technical and financial information, NASA ensures that its technology programs will continue to benefit the user community. In addition, the analysis tool must be capable of being incorporated into the wide-ranging suite of economic and technical models that comprise ASAC. This report describes an Air Carrier Cost-Benefit Model (CBM) that meets these requirements. The ASAC CBM is distinguished from many of the aviation cost-benefit models by its exclusive focus on commercial air carriers. The model considers such benefit categories as time and fuel savings, utilization opportunities, reliability and capacity enhancements, and safety and security improvements. The model distinguishes between benefits that are predictable and those that occur randomly. By making such a distinction, the model captures the ability of air carriers to reoptimize scheduling and crew assignments for predictable benefits. In addition, the model incorporates a life-cycle cost module for new technology, which applies the costs of nonrecurring acquisitions, recurring maintenance and operation, and training to each aircraft equipment type independently.

Gaier, Eric M.↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Hydrogen Education for a Decarbonized Global Economy (H 2 EDGE) (Final Technical Report)

The energy sector is undergoing rapid growth and transformation, creating urgent demand for a skilled workforce to support emerging technologies and resilient systems. Hydrogen is an emerging solution for “hard to abate” sectors, including heavy industry and transportation that also provides optionality for the electric system and enables long‑duration energy storage. As hydrogen scales from traditional industrial uses to new applications, success depends on knowledgeable engineers, technicians, planners, and operators safely deploying hydrogen technologies across the full value chain: production, delivery, storage, and end use. The H 2 EDGE initiative, funded by the U.S. Department of Energy’s Hydrogen and Fuel Cell Technologies Office from 2020 to 2025, was launched to prepare people for careers hydrogen and related technologies. Through its interactive approach, H 2 EDGE equipped stakeholders with knowledge and tools to build a reliable and sustainable energy future together. H 2 EDGE built a national network of academic and industry partners to deliver modular training, share open-access curricula, and engage diverse talent pipelines. The program leveraged EPRI’s extensive industry membership and expanded on the train-the-trainer model of the GridEd program to connect educators, employers, and community organizations across all regions of the U.S. New methods were introduced to more systematically map hydrogen competencies and assess curricula using traditional and AI-assisted approaches. Outcomes included delivery of professional short courses, developing university curriculum, sponsoring faculty and student projects, and engaging stakeholders through workshops, site tours, and webinars.

08 HYDROGEN↗

Design and testing of a model CELSS chamber robot

A robot system for use in an enclosed environment was designed and tested. The conceptual design will be used to assist in research performed by the Controlled Ecological Life Support System (CELSS) project. Design specifications include maximum load capacity, operation at specified environmental conditions, low maintenance, and safety. The robot system must not be hazardous to the sealed environment, and be capable of stowing and deploying within a minimum area of the CELSS chamber facility. This design consists of a telescoping robot arm that slides vertically on a shaft positioned in the center of the CELSS chamber. The telescoping robot arm consists of a series of links which can be fully extended to a length equal to the radius of the working envelope of the CELSS chamber. The vertical motion of the robot arm is achieved through the use of a combination ball screw/ball spline actuator system. The robot arm rotates cylindrically about the vertical axis through use of a turntable bearing attached to a central mounting structure fitted to the actuator shaft. The shaft is installed in an overhead rail system allowing the entire structure to be stowed and deployed within the CELSS chamber. The overhead rail system is located above the chamber's upper lamps and extends to the center of the CELSS chamber. The mounting interface of the actuator shaft and rail system allows the entire actuator shaft to be detached and removed from the CELSS chamber. When the actuator shaft is deployed, it is held fixed at the bottom of the chamber by placing a square knob on the bottom of the shaft into a recessed square fitting in the bottom of the chamber floor. A support boot ensures the rigidity of the shaft. Three student teams combined into one group designed a model of the CELSS chamber robot that they could build. They investigated materials, availability, and strength in their design. After the model arm and stand were built, the class performed pre-tests on the entire system. A stability pre-test was used to determine whether the model robot arm would tip over on the stand when it was fully extended. Results showed the stand tipped when 50 Newtons were applied horizontally to the top of the vertical shaft while the arm was fully extended. This proved that it was stable. Another pre-test was the actuator slip test used to determine if there is an adequate coefficient of friction between the actuator drive wheels and drive cable to enable the actuator to fully extend and retract the arm. This pre-test revealed that the coefficient of friction was not large enough to prevent slippage. Sandpaper was glued to the drive wheel and this eliminated the slippage problem. The class preformed a fit test in the CELSS chamber to ensure that the completed robot arm is capable of reaching the entire working envelope. The robot was centered in the chamber and the arm was fully extended to the sides of the chamber. The arm was also able to retract to clear the drain pipes separating the upper and lower plant trays.

Davis, Mark↗

Leaving in the lead: Priorities for perovskite photovoltaics

The need for moving electricity generation to a sustainable model requires the development of low cost ubiquitous photovoltaics (PVs) to harvest the planet’s primary energy source, the Sun. Building upon the successes of Si-based and CdTe-based PV technologies, PVs with lower-embodied energy and requiring lower carbon dioxide equivalent to produce will be required to meet long-term sustainability goals. In particular, thin-film technologies, such as high-efficiency metal halide perovskite (MHP) PV modules, provide avenues to reduced embodied energy, lower energy payback times, and enabling energy-dense tandems [H. M. Wikoff et al., Joule 6(7), 1710–1725 (2022) and V. Fthenakis, Renewable Sustainable Energy Rev. 13(9), 2746–2750 (2009)]. The ability to improve efficiency and lower energy payback time of next generation thin-film PV modules is a critical foundation for green H2 and electrification more broadly. In this regard, Pb-based MHP-PVs have separated themselves as a result of the high-efficiencies that can be realized across a range of electronic gaps. Questions regarding Pb-based MHP-PVs that are often asked, as the challenges of efficiency and reliability are met, revolve around the “problem” of the Pb content. Specifically, “does Pb toxicity preclude MHP-PV modules from being deployed at the TW scale?” To provide this sense of scale, in 2021, the United States burned 10.5 quads of coal, with 90% of that used for electricity generation. Given the energy content of coal of 29 MJ/kg and a residual lead content in that coal of 30 mg/kg, electricity generation from coal resulted in more lead emitted into the atmosphere than what would be required to produce over 2 TW of MHP-PV name plate capacity (assuming a 20% module efficiency and an ∼700 nm active layer). This amounts to more PV power than has been deployed across all PV technologies and geographies to date. This only includes US coal consumption; the rest of the world would be much larger. This example illustrates the scale of the material usage relative to the energy production. Imagine a power-generation technology that offsets these Pb emissions from coal and essentially sequesters this Pb content between two sheets of impermeable glass. Why should we let Pb’s history of misuse prevent it from being included in next generation PV modules that can enable a sustainable energy future?

14 SOLAR ENERGY↗

Final Technical Report for Automated Manufacturing of Innovative CPV/PV Modules

Cogenra’s Dense Cell Interconnect system was designed to use traditional front-contact cells and string them together into high efficiency and high reliability “supercells”. This novel stringer allows one to take advantage of the ~100 GW/year of existing cell production capacity and create a solar product for the customer that will produce more power and last longer than traditional PV products. The goal for this program was for Cogenra Solar to design and develop a first-of-kind automated solar manufacturing line that produces strings of overlapping cells or “supercells” based on Cogenra’s Dense Cell Interconnect (DCI) technology for their Low Concentration Photovoltaic (LCPV) systems. This will enable the commercialization of DCI technology to improve the efficiency, reliability and economics for their Low Concentration Photovoltaic systems. In this program, Cogenra Solar very successfully designed, developed, built, installed, and started up the ground-breaking manufacturing tools required to assemble supercells. Cogenra then successfully demonstrated operation of the integrated line at high yield and throughput far exceeding expectations. The development of a supercell production line represents a critical step toward a high volume and low cost Low Concentration Photovoltaic Module with Dense Cell Interconnect technology and has enabled the evaluation of the technology for reliability and yield. Unfortunately, performance and cost headwinds on Low Concentration Photovoltaics systems including lack of diffuse capture (10-15% hit) and more expensive tracker requirements resulted in a move away from LCPV technology. Fortunately, the versatility of Dense Cell Interconnect technology allows for application to flat plate module technology as well and Cogenra has worked with the DOE to utilize the learning from this grant to commercialize DCI technology for the solar market through the on-going grant: Catalyzing PV Manufacturing in the US With Cogenra Solar’s Next-Generation Dense Cell Interconnect PV Module Manufacturing Technology. This program is now very successfully building off of this work and commercializing the technology to enable increased solar adoption.

14 SOLAR ENERGY↗

Techno-Economic Assessment of the Factory Production of Small Modular Reactor

The demand for electricity continues to grow around the world while pressures remain high to reduce carbon emissions. Nuclear energy provides a strong and reliable baseload power component without a high output of greenhouse gases. Global nuclear energy capacity is increasing with 62 reactors under construction in 14 countries. Nuclear energy will be crucial as energy demands are met with a sustainable and diverse energy portfolio. Small modular reactors (SMRs) are small scale (less than 300 MWe) reactors that incorporate the same advanced technologies included in recent LR nuclear reactor designs. SMRs are designed to include the latest reactor technology including passive safety features. SMRs offer economic advantages over LRs such as lower up-front capital and easier integration into the existing power grid. The modular characteristic of SMRs would allow incremental additions to power plants years after its completion. The cost of constructing SMR power plants will determine their future in the energy industry. Three SMR reactors are in advanced stages of design in the United States; the Westinghouse 225 MWe, mPower 180 MWe and nuScale 45 MWe. SMRs are expected to have lower capital expenses of reactor components due to factory production. Current estimates predict these savings to reduce SMR capital 30-40%. Existing studies have estimated SMR capital using economies of scale and holistic discounts applied to an overall capital expense figure, but do not include the expense of an SMR factory facility. To better understand the actual costs associated with construction of an SMR power plant, capital components will be broken down according to its place in the construction phase. The expense of a factory facility will also be included with SMR capital expenses to determine its significance and benefits to overall capital expenses. Results from this study show that SMRs can compete with LRs in terms of startup costs. The capital cost of building a factory for SMRs was previously overlooked for SMR capital estimates. The annualized capital expenses expected for an SMR factory are very small, but offer significant discounts to the overall capital costs for SMRs. Case 3 shows that factory production can reduce SMR capital expenses to the range of 30%-40% when compared to Case 1 in this study. Factory savings of this magnitude would require factory production of several SMR reactor and generator components including the reactor pressure vessel, control rods, steam generation, and chemical and volume control system, containment, condenser and turbo-generator. SMRs will also benefit from lower indirect expenses due to a much smaller construction duration. It is expected that SMRs will have capital costs competitive with LRs. The differences between Case 2 and Case 3 in this study show that SMRs are heavily dependent on the cost reductions coming from factory production. The factory facility represents a small increase in capital expense, but accounts for a large reduction of cost for factory components. SMRs have the potential to meet growing energy demands in the United States and around the world, but their economic viability is dependent on a factory facility that will lower the capital expenses of reactor and generator components. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data Movement Dominates: Final Report

Over the past three years in this project, what we have observed is that the primary reason for data movement in large-scale systems is that the per-node capacity is not large enough—i.e., one of the solutions to the data-movement problem (certainly not the only solution that is required, but a significant one nonetheless) is to increase per-node capacity so that inter-node traffic is reduced. This unfortunately is not as simple as it sounds. Today’s main memory systems for datacenters, enterprise computing systems, and supercomputers, fail to provide high per-socket capacity [Dirik & Jacob 2009; Cooper-Balis et al. 2012], except at extremely high price points (factors of 10–100x the cost/bit of consumer main-memory systems) [Stokes 2008]. The reason is that our choice of technology for today’s main memory systems—i.e., DRAM, which we have used as a main-memory technology since the 1970s [Jacob et al. 2007]—can no longer keep up with our needs for density and price per bit. Main memory systems have always been built from the cheapest, densest, lowest-power memory technology available, and DRAM is no longer the cheapest, the densest, nor the lowest-power storage technology out there. It is now time for DRAM to go the way that SRAM went: move out of the way for a cheaper, slower, denser storage technology, and become a cache instead. This inflection point has happened before, in the context of SRAM yielding to DRAM. There was once a time that SRAM was the storage technology of choice for all main memories [Tomasulo 1967; Thornton 1970; Kidder 1981]. However, once DRAM hit volume production in the 1970s and 80s, it supplanted SRAM as a main memory technology because it was cheaper, and it was denser. It also happened to be lower power, but that was not the primary consideration of the day. At the time, it was recognized that DRAM was much slower than SRAM, but it was only at the supercomputer level (For instance the Cray X-MP in the 1980s and its follow-on, the Cray Y-MP, in the 1990s) that could one afford to build ever- larger main memories out of SRAM—the reasoning for moving to DRAM was that an appropriately designed memory hierarchy, built of DRAM as main memory and SRAM as a cache, would approach the performance of SRAM, at the price-per-bit of DRAM [Mashey 1999]. Today it is quite clear that, were one to build an entire multi-gigabyte main memory out of SRAM instead of DRAM, one could improve the performance of almost any computer system by up to an order of magnitude—but this option is not even considered, because to build that system would be prohibitively expensive. It is now time to revisit the same design choice in the context of modern technologies and modern systems. For reasons both technical and economic, we can no longer afford to build ever-larger main memory systems out of DRAM. Flash memory, on the other hand, is significantly cheaper and denser than DRAM and therefore should take its place. While it is true that flash is significantly slower than DRAM, one can afford to build much larger main memories out of flash than out of DRAM, and we show that an appropriately designed memory hierarchy, built of flash as main memory and DRAM as a cache, will approach the performance of DRAM, at the price-per-bit of flash. In our studies as part of this project, we have investigated Non-Volatile Main Memory (NVMM), a new main-memory architecture for large-scale computing systems, one that is specifically designed to address the weaknesses described previously. In particular, it provides the following features: non-volatility: The bulk of the storage is comprised of NAND flash, and in this organization DRAM is used only as a cache, not as main memory. Furthermore, the flash is journaled, which means that operations such as checkpoint/restore are already built into the system. 1+ terabytes of storage per socket: SSDs and DRAM DIMMs have roughly the same form factor (several square inches of PCB surface area), and terabyte SSDs are now commonplace. performance approaching that of DRAM: DRAM is used as a cache to the flash system. price-per-bit approaching that of NAND: Flash is currently well under $0.50 per gigabyte; DDR3 SDRAM is currently just over $10 per gigabyte [Newegg 2014]. Even today, one can build an easily affordable main memory system with a terabyte or more of NAND storage per CPU socket (which would be extremely expensive were one to use DRAM), and our cycle- accurate, full-system experiments show that this can be done at a performance point that lies within a factor of two of DRAM.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Incentive-Based Control and Coordination of Distributed Energy Resources. Final Report

The rapid growth of low-inertia renewable energy resources represents an immense opportunity for the U.S. to minimize its carbon footprint, while presenting a challenge for system operators as traditional “spinning” generation resources are displaced. This transformation requires solutions to robustly and cost-effectively manage dynamic changes on the grid while ensuring quality of service. There is growing recognition that distributed energy resources (DERs – loads, distributed generation, storage, electric vehicles, etc.) represent a great potential to perform this function. This report details a scalable hierarchical control strategy for coordinating thousands of heterogeneous DERs in order to provide three ancillary gird services: 1) frequency response, a rapid (within 2 seconds) service used to maintain the grid at 60 Hz; 2) regulation response, a larger response used to balance on-going differences in supply and demand on the grid; and, 3) ramping reserve, used to bring on capacity to replace lost generation. The developed control architecture consists of 1) a Distribution Reliability Coordinator (DRC), 2) aggregator controllers, and finally, 3) DER controllers. The DRC coordinates all the flexible loads and distributed energy resources on the distribution system and bids the aggregate flexibility into the wholesale market. The DRC also performs resource allocation (deciding how the flexible devices on the distribution system will be dispatched) to meet the requirements for each of the three ancillary services. The aggregators control a collection of devices that are geographically co-located and provide a platform to aggregate their flexibility and mitigate uncertainty associated with a single flexible load by managing a large aggregation of similar loads (so that any stochastic effects average out). Finally, DER controllers (for example, thermostats for air conditioners, chargers for electric vehicles) adjust the power consumption of individual devices to ensure accurate and reliable delivery of the requested grid services. Evaluation and validation of this approach was conducted with a mixture of simulation and hardware testing for a range of DERs in residential (air conditioners and water heaters), commercial HVAC (ventilation fans and central chiller plants), and micro-grids (battery energy storage, solar PV etc.). This culminated in DER hardware and simulation models operating in conjunction with grid simulations as part of a large scale federated test-bed demonstration. Simulations of over 10,000 controllable residential devices (a combination of air conditioners, water heaters, batteries, and electric vehicles) demonstrated that this advanced control approach could simultaneously meet all three grid services. Furthermore, hardware-in-the-loop testing was performed with operational micro-grid and commercial building HVAC equipment. The micro-grid equipment (representing PV, battery storage, and back-up generators) demonstrated the ability to meet all frequency response requirements (except ramping time). The commercial building HVAC ventilation equipment successfully provided the regulating response service. An Industry Advisory Board (IAB) was formed and engaged throughout the project to get feed-back on project risks and potential commercialization barriers. Their input was invaluable in identify key risks stemming from regulatory and market access challenges, financial risks from under-performance, and competitive threats from utility-scale solutions such as integrated storage. A phased commercialization plan was developed that addresses continued risk reduction (value proposition refinement and performance uncertainty assessments), piloting through field demonstrations with key stakeholders, and finally, deployment as an emerging standard for DER control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Efficient Parallelization of Irregular Applications on GPU Architectures

With the enlarging computation capacity of general Graphics Processing Units (GPUs), leveraging GPUs to accelerate parallel applications has become a critical topic in academia and industry. However, a wide range of irregular applications with the computation-/memory-intensive nature cannot easily achieve high GPU utilization. The challenges mainly involve the following aspects: first, data dependence leads to coarse-grained kernel and inefficient parallelism; second, heavy GPU memory usage may cause frequent memory evictions and extra overhead of I/O; third, specific computation patterns produce memory redundancies; last, workload balance and data reusability conjunctly benefit the overall performance, but there may exist a dynamic trade-off between them. Targeting these challenges, this dissertation proposes multiple optimizations to accelerate two real-world applications: many-body correlation functions to simulate nuclear physics in a large-scale scientific system; the other is the eALS-based matrix factorization recommendation system. To accelerate the calculations of many-body correlation functions, this dissertation presents three frameworks in GPU memory management and multi-GPU scheduling. Firstly, an optimized systematic GPU memory management framework, MemHC, utilizes a series of new memory reduction designs in GPU memory allocation, CPU/GPU communications, and GPU memory oversubscription. Secondly, an enhanced multi-GPU scheduling framework, MICCO, particularly by taking both data dimension (e.g., data reuse and data eviction) and computation dimension into account. MICCO designs a heuristic scheduling algorithm and a machine learning-based regression model to generate the optimal settings of a proposed new concept to manage the trade-off. Thirdly, a locality-aware multi-GPU scheduling framework. This scheduler leverages pipeline batch generation with a looking-ahead strategy by building local dependency graphs for memory transfer reduction and better data reuse, achieving up to 79.92% memory cost reduction and 1.67x speedup. To parallelize the eALS-based recommendation system, this dissertation proposes an efficient CPU/GPU heterogeneous recommendation system, HEALS. HEALS employs newly designed architecture-adaptive data formats to achieve load balance and good data locality on CPU and GPU. To mitigate the data dependence, HEALS presents a CPU/GPU collaboration model for both task parallelism and data parallelism with multiple kernel computation optimizations. In summary, this dissertation efficiently accelerates two typical irregular applications on GPUs by building four frameworks, including CPU/GPU collaboration, GPU memory management, and multi-GPU scheduling.

Wang, Qihan↗

Interconnecting PV on New York City's Secondary Network Distribution System

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to networks in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1 -- PV Deployment Analysis for New York City -- we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2. A Briefing for Policy Makers on Connecting PV to a Network Grid presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3. Technical Review of Concerns and Solutions to PV Interconnection in New York City summarizes common concerns of utility engineers and network experts about interconnecting PV systems to secondary networks. This section also contains detailed descriptions of nine solutions, including advantages and disadvantages, potential impacts, and road maps for deployment. Section 4. Utility Application Process Review -- looks at utility interconnection application processes across the country and identifies administrative best practices for efficient PV interconnection.

14 SOLAR ENERGY↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

D and D of a Large Waste Treatment Plant in Germany - 18458

With its 40 years of nuclear experience, GNS, the world leading supplier of casks for spent fuel, ILW and HLW, also offers services for conditioning and management of all types of radioactive waste, especially for the German NPP. Since 1985, GNS treats and packages ILW and LLW from the operations and phase-out of German NPP in its Duisburg plant. To enable its permanent safe final disposal, solid wastes are compacted and dried before being shipped to an interim storage facility or - later - the Konrad repository. The total premises cover 20.000 m{sup 2} (215.000 sq ft), of which 9000 m{sup 2} (97.000 sq ft) is controlled area. The Duisburg Plant has three large industrial warehouses (each 25 m x 136 m or 82 ft x 446 ft) with a total capacity of 10.200 m{sup 2} or 110.000 sqft. For the treatment of open contaminated waste, six enclosures were built. These enclosures have a special ventilation system including a specific filtration plant. In one enclosure a high compaction plant was used, in another enclosures a drying facility for drums was in operation. During peak periods, more than 900 tonne of waste were treated annually. One enclosure was mainly used for maintenance, restoration and extension of mobile facilities, which were normally used for campaigns in NPP. Due to the decreasing amount of operational waste during the nuclear phase out in Germany, GNS has decided to close the Duisburg Plant. In the first half-year of 2017, the last waste packages were treated but around 80 20'-containers are still located on site. The D and D started in January 2017. The presentation will show the first experience of decommission processes of the first three enclosures. The following steps including the techniques used will be explained in detail: - Dismantling and removal of the high compaction facility; - Dismantling and removal of the drying facility; - Cleaning and wipe tests of the empty enclosures; - Removal of the stainless steel plates of the floor; - Investigations of the lower floor parts for contamination; - Removal of contaminated underground drainpipes; - Decontamination of the concrete floor; - Dismantling of the ventilation system in three enclosures; - Dismantling of the steel constructions. An important aim during the dismantling is to reduce the amount of nuclear waste and maximize the fraction material for free release. Next to the first three enclosures, in one of the enclosure IV - VI, a 150 tons scrap shear had been installed before the construction of the enclosure building. The scrap shear has to be dismantled and handled by heavy duty lifting equipment. Only afterwards is it possible to start the decommissioning of the last three enclosures. Our goal is to transfer this very large controlled area and the whole plant to the site owner, the Duisburg Port company, after 2 years and 5 months and doing so in a way so that the industrial warehouses can be used again for all possible types of industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tribal Renewable Energy: Bishop Paiute Tribe, Residential Solar Program Phase II (Final Report)

The project consisted of the design, installation, inspection, and interconnection of 35 grid-tied, solar electric systems, totaled 123 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation, which provide at least 65-79% savings in displaced electricity. Tribal job trainees were hired for each installation, gaining valuable job experience. Additionally, each homeowner was educated on energy efficiency and renewable energy. The overall project goal was to deploy clean energy systems in order to achieve the Bishop Paiute Tribe’s long-term goals of energy self-sufficiency, environmental protection, and better lives for our Tribal members and community. The energy displaced was 82.4 percent of total electricity used (exceeding estimated 65-79%)or over 170,000 kWh/year generating approximately $1.29 million worth of power for low-income families over their lifespans, while eliminating an estimated 2,640 tons of greenhouse gas emissions. This reduction makes a significant difference on the reservation giving more families money to spend on other essential items, while reducing their carbon footprint in this beautiful mountain community. Also, implementing these 35 systems provided a approximately 132 hours of paid solar installation work for tribal members. Training and good paying jobs are scarce on the reservation and solar is the fastest growing industry in CA and this training offered our members a real chance to learn and then get paid. The program is very significant to the family who qualified, as most families fall below the federal poverty guidelines, and many are living paycheck to paycheck. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase II— affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental, and social self-sufficiency and sovereignty amongst the most needy on the Reservation

14 SOLAR ENERGY↗

{sup 137}Cs sorption into bentonite from Cidadap-Tasikmalaya as buffer material for disposal demonstration plant facility at Serpong

According to co-location principle, near surface disposal type the disposal demonstration plant facility will be build at Serpong nuclear area. The facility also for anticipation of future needs to provide national facility for the servicing of radwaste management of non-nuclear power plant activity in Serpong Nuclear Area. It is needs to study the material of buffer and backfill for the safety of demonstration plant facility. A local bentonite rock from Cidadap-Tasikmalaya was used as the buffer materials. Objective of experiment is to find out the specific data of sorption characteristic of Cidadap bentonite as buffer material in a radwaste disposal system. Experiments were performed in batch method, where bentonite samples were contacted with CsCl solution labeled with Cs-137 in 100 ml/g liquid:solid ratio. Initial Cs concentration was 10{sup −8} M and to study the effects of ionic strength and Cs concentration in solution, 0.1 and 1.0 M NaCl also CsCl concentration ranging 10{sup −8} - 10{sup −4} M were added in solution. As the indicator of Cs saturated in bentonite samples, Kd value was applied. Affected parameters in the experiment were contact time, effects of ionic strength and concentration of CsCl. Results showed that sorption of Cs by bentonite reached constantly after 16 days contacted, and Kd value was 10.600 ml/g. Effect of CsCl concentration on Kd value may decreased in increased in CsCl concentration. Effect of ionic strength increased according to increased in concentration of background and would effect to Kd value due to competition of Na ions and Cs in solution interacts with bentonite. By obtaining the bentonite character data as buffer material, the results could be used as the basis for making of design and the basic of performance assessment the near surface disposal facility in terms of isolation capacity of radwaste later.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Argonne National Laboratory Annual Report of Laboratory Directed Research and Development Program Activities FY 2012

Our plans to upgrade the Advanced Photon Source are proceeding on schedule, and we hope to receive CD-2 approval sometime in spring 2013. When complete, the APS Upgrade will equip this vital facility for continued scientific leadership in the 21st century, providing the 5,000-plus members of our user community with greatly increased time, energy and spatial resolution. We also have successfully installed “Mira,” the new IBM Blue Gene/Q system at the Argonne Leadership Computing Facility. The world’s fourth-fastest supercomputer, Mira is now providing leading-edge computational power across all scientific disciplines. I am also pleased to report that Argonne’s new Energy Sciences Building is proceeding on schedule; we expect it to be finished and ready for occupancy by June 30, 2013. When complete, the ESB will be one of the most modern and most flexible energy labs in the world, creating a new home for researchers focused on a wide range of energy science challenges. Research is under way at the new multidisciplinary Institute for Molecular Engineering (IME), a joint program of the University of Chicago and Argonne. Over the past year, four new faculty members, including IME’s director, – all pre-eminent researchers who hold joint appointments at Argonne – have joined the IME. We look forward to working in collaboration with the IME to find new ways to address the interfaces between molecular-level science and powerful new technologies. In FY 2012, we continued support for the final year of the “Beyond Lithium-Ion” Director’s Grand Challenge LDRD project. That project enabled significant work on the performance of lithium-based energy storage systems, pointing the way to new high-energy-density lithium-air batteries. I believe this Grand Challenge contributed significantly to our successful bid to win designation of the Argonne-based Joint Center for Energy Storage Research (JCESR) as the DOE’s new Batteries and Energy Storage Hub. JCESR, which brings together a world-class “dream team” of national laboratories, universities and private sector partners, strongly benefited from LDRD program investments, both in FY2012 and in previous years. As we move forward in FY2013, the Director’s Grand Challenge is now focused on new ways to address the challenges of “big data” – the acquisition, storage, transfer, and analysis of both experimental and simulated data at scales approaching the limits of our current computational capacities. In managing Argonne’s LDRD program, we have adhered to the requirements of DOE Order 413.2b and associated guidelines. Our program management continually strives for increased efficiency. In addition to meeting all reporting requirements during FY 2012, our LDRD Program Office continues to implement intranet-based process enhancements to better serve all LDRD stakeholders, including our DOE Site Office colleagues. As the following individual project reports demonstrate, Argonne’s researchers are pursuing projects at the leading edge of science and engineering, and making significant contributions to the advancement of our laboratory’s major strategic initiatives. Evidence of the continuing strength of this program is found in the follow-on sponsorship won by many of these research projects, as well as in the numbers of publications, invited presentations, inventions, and new staff hires that are direct results of LDRD. LDRD enables exploration of new scientific directions and makes it possible to adapt quickly to a changing landscape with unexpected opportunities, while enhancing the capabilities of our researchers and our scientific facilities. For these reasons, LDRD remains an invaluable resource to address the future science and technology needs of DOE, and of our nation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Development of Human System Integration at NASA

Human Systems Integration seeks to design systems around the capabilities and limitations of the humans which use and interact with the system, ensuring greater efficiency of use, reduced error rates, and less rework in the design, manufacturing and operational deployment of hardware and software. One of the primary goals of HSI is to get the human factors practitioner involved early in the design process. In doing so, the aim is to reduce future budget costs and resources in redesign and training. By the preliminary design phase of a project nearly 80% of the total cost of the project is locked in. Potential design changes recommended by evaluations past this point will have little effect due to lack of funding or a huge cost in terms of resources to make changes. Three key concepts define an effective HSI program. First, systems are comprised of hardware, software, and the human, all of which operate within an environment. Too often, engineers and developers fail to consider the human capacity or requirements as part of the system. This leads to poor task allocation within the system. To promote ideal task allocation, it is critical that the human element be considered early in system development. Poor design, or designs that do not adequately consider the human component, could negatively affect physical or mental performance, as well as, social behavior. Second, successful HSI depends upon integration and collaboration of all the domains that represent acquisition efforts. Too often, these domains exist as independent disciplines due to the location of expertise within the service structure. Proper implementation of HSI through participation would help to integrate these domains and disciplines to leverage and apply their interdependencies to attain an optimal design. Via this process domain interests can be integrated to perform effective HSI through trade-offs and collaboration. This provides a common basis upon which to make knowledgeable decisions. Finally, HSI must be considered early in the requirements development phase of system design and acquisition. This will provide the best opportunity to maximize return on investment (ROI) and system performance. HSI requirements must be developed in conjunction with capability ]based requirements generation through functional. HSI requirements will drive HSI metrics and embed HSI issues within the system design. After a system is designed, implementation of HSI oversights can be very expensive. An HSI program should be included as an integral part of a total system approach to vehicle and habitat development. This would include, but not limited to, workstation design, D&C development, volumetric analysis, training, operations, and human -robotic interaction. HSI is a necessary process for Human Space Flight programs to meet the Agency Human ]System standards and thus mitigate human risks to acceptable levels. NASA has been involved in HSI planning, procedures development, process, and implementation for many years, and has been building several internal and publicly accessible products to facilitate HSI fs inclusion in the NASA Systems Engineering Lifecycle. Some of these products include: NASA STD 3001 Volumes 1 and 2, Human Integration Design Handbook, NASA HSI Implementation Plan, NASA HSI Implementation Plan Templates, NASA HSI Implementation Handbook, and a 2 ]hour short course on HSI delivered as part of the NASA Space and Life Sciences Directorate Academy. These products have been created leveraging industry best practices and lessons learned from other Federal Government agencies.

Whitmore, Mihriban↗

TCF - Sustainable Well Cement for Geothermal, Thermal Recovery, and Carbon Storage wells

Primary cementing is the most important operation performed on a subterranean well. Cement, placed in the annulus between the casing and the formations, serves as a hydraulic seal preventing fluids and gas migrations, protecting steel casing from corrosion, and supporting the well structure. Poor cementing jobs can be directly responsible for wells not reaching their full capacity, casing corrosion, compromised well integrity and, in the worst-case scenarios, well collapse. Geothermal, thermal recovery, and carbon storage wells offer environments that are especially difficult for cements to survive while the required lifespan of these wells can be years. In these wells currently used cements cannot provide durable well integrity, and new solutions are necessary. The necessity of stabilizing the electric grid, increasing its flexibility, and providing energy on demand will further expand the market of durable cement solutions for applications in high-temperature underground reservoir thermal energy storage wells (HT RTES). The design challenges of special cement systems for such wells originate from chemistry limitations of currently used well cements, aggressive environments, temperature and repeated shock conditions associated with them, and very weak formations that are not uncommon in these wells. During the last 70 years the most common systems for thermal-well construction have been Ordinary Portland Cement (OPC) (absolute majority of the wells), silica-lime system, and high aluminum cement-containing formulations. The major issues of calcium-silicate hydrates, that form during the hydration of OPC resulting in hardened material, are their poor chemical resistance to acids due to the calcium interactions with acid anions followed by its eventual dissolution, even in mild acids, such as carbonic acid from CO 2 dissolution, and inadequate bonding to the steel causing serious casing corrosion problems (Sugama & Pyatina, 2019). Performance of OPC-based cement may be significantly improved with organic additives; however, those are limited by their temperature stability. An alternative to calcium-silicate cement was developed by BNL and commercialized by Halliburton as ThermaLock TM cement. Calcium-aluminate-phosphate-based chemistry of the material allowed overcoming acid-resistance problems of OPC, especially in CO 2 -rich geothermal environments. In 2012-2015, building upon this experience, BNL developed Thermal Shock Resistant Cement (TSRC) with the support of Geothermal Technology Office (GTO) of DOE. TSRC has high-temperature stable chemistry, superior properties of cement-metal casing bond and corrosion protection (4-times better than currently used OPC-based formulation), significantly outperforms common well-cements in thermal-shock tests, has self-healing properties, and like ThermaLock TM is CO 2 resistant incorporating carbonate ions into stable hydrates (Gill et al., 2012).

15 GEOTHERMAL ENERGY↗