Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Annual Report of Groundwater Monitoring at Centralia, Kansas, in 2011

Periodic sampling is performed at Centralia, Kansas, on behalf of the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) by Argonne National Laboratory, in accord with the current interim monitoring program approved by the Kansas Department of Health and Environment (KDHE 2009). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater sitewide (Argonne 2003, 2004, 2005a), as well as the response to the interim measure (IM) pilot test that is in progress (Argonne 2007b). An earlier monitoring plan (Argonne 2005b) was also approved by the KDHE (2005). Under this earlier plan, the groundwater was sampled twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 µg/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. After two years of monitoring under the earlier plan, the CCC/USDA developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed IM was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a).

LaFreniere, L. M.↗

Environmental Restoration of Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada (Funded by the American Reinvestment and Recovery Act)

The mission of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Environmental Restoration Program is to address the environmental impacts of weapons testing conducted on the Nevada National Security Site and the Nevada Test and Training Range. The large physical size of these sites, along with limits on funding and other resources available for remediation efforts, means that environmental restoration activities must be prioritized and accomplished incrementally over time. The remediation of a bomblet target area on the Tonopah Test Range (TTR), which is located within the Nevada Test and Training Range, was originally planned in 2007 but was not carried out until funding became available in the summer of 2009 through the American Reinvestment and Recovery Act. This activity was implemented in accordance with the Federal Facility Agreement and Consent Order established between NNSA/NSO and the Nevada Division of Environmental Protection. This activity which was complete by the end of Fiscal Year 2010, involved the excavation of disposal pits suspected of containing submunitions and the surface clearance of submunitions on seven target areas amounting to approximately 6.7 square kilometers of land at the TTR. The TTR was used by Sandia National Laboratories from the late 1960s through the mid-1980s to conduct research into the deployment of submunitions. Although there were efforts to identify, collect, and dispose various amounts of unexploded ordnance on the TTR in the past, no comprehensive effort to remediate the entire flightline area for submunitions was undertaken before this project.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter). All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Paying it Forward: How an Emerging Unconventional Play can Hit the Ground Running

While every tight oil play is unique, there are lessons that can be transferred from one play to another to improve the efficiency and pace of production operations and development. These improvements may not fit precisely in every basin or play but generally hold to themes that can be tested against and built upon. Themes such as the quantity of proppant, longer lateral length, or the number of stages can be directly tied to increased productivity. However, there are diminishing returns on these investment activities for which each operator, within a given play, will be required to identify and mitigate against. This is especially true as the industry steps in and begins developing new tight oil plays. In their nascent stages, these plays may have limited well penetrations and, as a result, limited geological and performance data from which to extrapolate. Pulling together an understanding of where the industry currently resides in terms of how to exploit these resources can provide a boost in terms of working towards greatly improved well completions. In 2019, the US EIA estimated that nearly 8 million barrels of oil per day were produced from tight oil reservoirs in the United States (US EIA, 2020). This represents over 60% of the domestic crude production, originating from multiple reservoirs in the Permian Basin (TX) as well as the Bakken (MT, ND), Eagle Ford (TX), Niobrara (CO, WY), and Anadarko Basin (OK) formations, among others. As such, there are 1,000s of wells across these numerous tight oil plays that can relate an informative story. To build this story, the interplay of geology, well spacing, lateral length, and stimulation, all critical to economic success, will be explored. This paper proposes to look back at these mature tight oil (and gas) basins and bring forth an understanding of what lessons can be applied to the emerging Powder River Basin tight oil reservoirs (Mowry and the Turner/Frontier). The authors will delve into the four broad topics of geology, well spacing, lateral length, and stimulation, highlighting case studies to demonstrate those lessons from established tight oil plays that will underpin planned activities at a Field Laboratory Test Site in the southern Powder River Basin.

02 PETROLEUM↗

Treatment Planning to Improve Delivery Accuracy and Patient Throughput in Helical Tomotherapy

Purpose: To investigate delivery quality assurance (DQA) discrepancies observed for a subset of helical tomotherapy patients. Methods and Materials: Six tomotherapy patient plans were selected for analysis. Three had passing DQA ion chamber (IC) measurements, whereas 3 had measurements deviating from the expected dose by more than 3.0%. All plans used similar parameters, including: 2.5 cm field-width, 15-s gantry period, and pitch values ranging from 0.143 to 0.215. Preliminary analysis suggested discrepancies were associated with plans having predominantly small leaf open times (LOTs). To test this, patients with failing DQA measurements were replanned using an increased pitch of 0.287. New DQA plans were generated and IC measurements performed. Exit fluence data were also collected during DQA delivery for dose reconstruction purposes. Results: Sinogram analysis showed increases in mean LOTs ranging from 29.8% to 83.1% for the increased pitch replans. IC measurements for these plans showed a reduction in dose discrepancies, bringing all measurements within {+-}3.0%. The replans were also more efficient to deliver, resulting in reduced treatment times. Dose reconstruction results were in excellent agreement with IC measurements, illustrating the impact of leaf-timing inaccuracies on plans having predominantly small LOTs. Conclusions: The impact of leaf-timing inaccuracies on plans with small mean LOTs can be considerable. These inaccuracies result from deviations in multileaf collimator latency from the linear approximation used by the treatment planning system and can be important for plans having a 15-s gantry period. The ability to reduce this effect while improving delivery efficiency by increasing the pitch is demonstrated.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Noncoplanar Beam Angle Class Solutions to Replace Time-Consuming Patient-Specific Beam Angle Optimization in Robotic Prostate Stereotactic Body Radiation Therapy

Purpose: To investigate development of a recipe for the creation of a beam angle class solution (CS) for noncoplanar prostate stereotactic body radiation therapy to replace time-consuming individualized beam angle selection (iBAS) without significant loss in plan quality, using the in-house “Erasmus-iCycle” optimizer for fully automated beam profile optimization and iBAS. Methods and Materials: For 30 patients, Erasmus-iCycle was first used to generate 15-, 20-, and 25-beam iBAS plans for a CyberKnife equipped with a multileaf collimator. With these plans, 6 recipes for creation of beam angle CSs were investigated. Plans of 10 patients were used to create CSs based on the recipes, and the other 20 to independently test them. For these tests, Erasmus-iCycle was also used to generate intensity modulated radiation therapy plans for the fixed CS beam setups. Results: Of the tested recipes for CS creation, only 1 resulted in 15-, 20-, and 25-beam noncoplanar CSs without plan deterioration compared with iBAS. For the patient group, mean differences in rectum D{sub 1cc}, V{sub 60GyEq}, V{sub 40GyEq}, and D{sub mean} between 25-beam CS plans and 25-beam plans generated with iBAS were 0.2 ± 0.4 Gy, 0.1% ± 0.2%, 0.2% ± 0.3%, and 0.1 ± 0.2 Gy, respectively. Differences between 15- and 20-beam CS and iBAS plans were also negligible. Plan quality for CS plans relative to iBAS plans was also preserved when narrower planning target volume margins were arranged and when planning target volume dose inhomogeneity was decreased. Using a CS instead of iBAS reduced the computation time by a factor of 14 to 25, mainly depending on beam number, without loss in plan quality. Conclusions: A recipe for creation of robust beam angle CSs for robotic prostate stereotactic body radiation therapy has been developed. Compared with iBAS, computation times decreased by a factor 14 to 25. The use of a CS may avoid long planning times without losses in plan quality.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-T-65: AutomaticTreatment Planning for High-Dose Rate (HDR) Brachytherapy with a VaginalCylinder Applicator

Purpose: High dose rate (HDR) brachytherapy treatment planning is conventionally performed in a manual fashion. Yet it is highly desirable to perform computerized automated planning to improve treatment planning efficiency, eliminate human errors, and reduce plan quality variation. The goal of this research is to develop an automatic treatment planning tool for HDR brachytherapy with a cylinder applicator for vaginal cancer. Methods: After inserting the cylinder applicator into the patient, a CT scan was acquired and was loaded to an in-house developed treatment planning software. The cylinder applicator was automatically segmented using image-processing techniques. CTV was generated based on user-specified treatment depth and length. Locations of relevant points (apex point, prescription point, and vaginal surface point), central applicator channel coordinates, and dwell positions were determined according to their geometric relations with the applicator. Dwell time was computed through an inverse optimization process. The planning information was written into DICOM-RT plan and structure files to transfer the automatically generated plan to a commercial treatment planning system for plan verification and delivery. Results: We have tested the system retrospectively in nine patients treated with vaginal cylinder applicator. These cases were selected with different treatment prescriptions, lengths, depths, and cylinder diameters to represent a large patient population. Our system was able to generate treatment plans for these cases with clinically acceptable quality. Computation time varied from 3–6 min. Conclusion: We have developed a system to perform automated treatment planning for HDR brachytherapy with a cylinder applicator. Such a novel system has greatly improved treatment planning efficiency and reduced plan quality variation. It also served as a testbed to demonstrate the feasibility of automatic HDR treatment planning for more complicated cases.

60 APPLIED LIFE SCIENCES↗

Long Island Smart Energy Corridor

The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential settings. Farmingdale State College held three international conferences on energy and sustainability and Smart Grid related technologies and policies. These conferences, in addition to public seminars increased understanding and acceptance of Smart Grid transformation by the general public, business, industry, and municipalities in the Long Island and greater New York region. - JOB CREATION: Provided training for the Smart Grid and clean energy jobs of the future at both Farmingdale and Stony Brook. Stony Brook focused its “Cradle to Fortune 500” suite of economic development resources on the opportunities emerging from the project, helping to create new technologies, new businesses, and new jobs. To achieve these features, LIPA and its sub-recipients, FSC and SBU, each have separate but complementary objectives. At LIPA, the Smart Energy Corridor (1) meant validating Smart Grid technologies; (2) quantifying Smart Grid costs and benefits; and (3) providing insights into how Smart Grid applications can be better implemented, readily adapted, and replicated in individual homes and businesses. LIPA installed 2,550 AMI meters (exceeding the 500 AMI meters in the original plan), created three “smart” substations serving the Corridor, and installed additional distribution automation elements including two-way communications and digital controls over various feeders and capacitor banks. It gathered and analyzed customer behavior information on how they responded to a new “smart” TOU rate and to various levels of information and analytical tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spin filtering at COSY and perspectives for PAX

The high physics potential of experiments with stored polarized antiprotons led to the proposal of the PAX [1] experiment (Polarized Antiproton eXperiment) for the High Energy Storage Ring (HESR) of the new FAIR facility at GSI (Darmstadt/Germany). It is proposed to polarize a stored antiproton beam by means of spin filtering by a polarized hydrogen gas target. The feasibility of spin filtering with protons using a transversely polarized hydrogen gas target has been demonstrated in the FILTEX experiment [2] and recently confirmed at the COSY ring in Jülich. A spin filtering experiment using a longitudinally polarized hydrogen gas target is planned after the installation of a siberian snake in 2014. Further measurements including the investigation of pd-breakup reactions [3] and a test of the time reversal (TRIC) [4] are planned using the developed experimental setup. A proposal for a spin-filtering experiment with antiprotons at AD/CERN [5] has been submitted to the CERN SPS comitee to investigate the spin-dependence of the pbar-p and pbar-d interaction. This knowledge is necessary to properly design a dedicated Antiproton-Polarizer Ring.

43 PARTICLE ACCELERATORS↗

Advanced Simulation and Computing Business Plan

To maintain a credible nuclear weapons program, the National Nuclear Security Administration’s (NNSA’s) Office of Defense Programs (DP) needs to make certain that the capabilities, tools, and expert staff are in place and are able to deliver validated assessments. This requires a complete and robust simulation environment backed by an experimental program to test ASC Program models. This ASC Business Plan document encapsulates a complex set of elements, each of which is essential to the success of the simulation component of the Nuclear Security Enterprise. The ASC Business Plan addresses the hiring, mentoring, and retaining of programmatic technical staff responsible for building the simulation tools of the nuclear security complex. The ASC Business Plan describes how the ASC Program engages with industry partners—partners upon whom the ASC Program relies on for today’s and tomorrow’s high performance architectures. Each piece in this chain is essential to assure policymakers, who must make decisions based on the results of simulations, that they are receiving all the actionable information they need.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Study of light $\Lambda$ hypernuclei using precision spectroscopy of charged mesonic decay pions at Jlab

We proposed to the JLAB PAC33 for studying the charged mesonic weak decay pions from ?-hypernuclei with a dedicated spectrometer. Due to large momentum transfer as well as high beam intensity, the quasi-free ? hypernuclear production yield will be much higher than that from other mechanisms with hadronic beams. Some of these highly excited systems from quasi-free production cascade instantaneously to variety of light hypernuclei, possible for certain highly exotic ones, through nucleon emission or fragmentation processes. The Lorentz boost will push most of the pion background to the forward direction, while most of the long lived hypernuclei stop in the thin target foil then decay weakly from ground or long lived low lying states. For light hypernuclei, charged pions from weak mesonic decay provide an excellent tool to measure the binding energy of these states as commonly done in emulsion experiments. The proposed experiment at JLAB can reach high resolution (~130 keV FWHM) and high precision (< ±20keV), both capable to exceed significantly the quality limit of emulsion data. The precision allows a recheck on the basic YN interaction models that were built and tested by emulsion results and a more accurate measurement of the charge symmetry breaking such as that often referred by ?B(4?H - 4?He). Secondly, the fragmentation process may be a better way to produce highly exotic neutron rich hypernuclei that are impossible to be produced directly from the primary reactions. Although heavy ion collision is planned to be used to search and study such hypernuclei, but the level of precision may be key factor. The talk will present the basic ideas of the proposal which was conditionally approved by PAC33 which recommended a beam test. A parasitic test run plan in Hall A will be presented.

Tang, Liguang↗

MRI-Based Radiotherapy Planning to Reduce Rectal Dose in Excess of Tolerance

Background and Purpose. Chronic rectal toxicity significantly decreases the quality of life for men who receive radiotherapy for prostate cancer. The most significant predictor of rectal toxicity is rectal dose-volume exceeding tolerance. To minimize the volume of rectum in the high dose field, it is essential to accurately define the prostate-rectum interface. This can be challenging to do by computed tomography (CT) imaging alone. The current study was undertaken to formally demonstrate in a clinical trial setting that image-guided intensity-modulated radiation therapy (IG-IMRT) planning using magnetic resonance imaging (MRI) can reduce the volume of rectum exceeding 70 Gy, a validated metric that predicts the risk of late rectal toxicity. Materials and Methods. This prospective single-arm study enrolled 15 men treated with IG-IMRT for localized prostate cancer. All participants received a dedicated 3 Tesla MRI examination of the prostate in addition to a pelvic CT examination for treatment planning. Two volumetric modulated arc therapy (VMAT) plans with a prescription dose of 79.2 Gy were designed using identical constraints based on CT- and MRI-defined consensus volumes. The volume of rectum exposed to 70 Gy or more was compared using the Wilcoxon paired signed rank test. Results. For CT-based treatment plans, the median volume of rectum receiving 70 Gy or more was 9.3 cubic centimeters (cc) (IQR 7.0 to 10.2) compared with 4.9 cc (IQR 4.1 to 7.8) for MRI-based plans. This resulted in a median volume reduction of 2.1 cc (IQR 0.5 to 5.3, P < .001). Conclusions. Using MRI to plan prostate IG-IMRT to a dose of 79.2 Gy reduces the volume of rectum receiving radiation dose in excess of tolerance (70 Gy or more) and should be considered in men who are at high risk for late rectal toxicity and are not good candidates for other rectal sparing techniques such as hydrogel spacer. This trial is registered with NCT02470910.

Schmidt, Daniel R.↗

Final Report: Part 1. In-Place Filter Testing Instrument for Nuclear Material Containers. Part 2. Canister Filter Test Standards for Aerosol Capture Rates.

A portable instrument has been developed to assess the functionality of filter sand o-rings on nuclear material storage canisters, without requiring removal of the canister lid. Additionally, a set of fifteen filter standards were procured for verifying aerosol leakage and pressure drop measurements in the Los Alamos Filter Test System. The US Department of Energy uses several thousand canisters for storing nuclear material in different chemical and physical forms. Specialized filters are installed into canister lids to allow gases to escape, and to maintain an internal ambient pressure while containing radioactive contaminants. Diagnosing the condition of container filters and canister integrity is important to ensure worker and public safety and for determining the handling requirements of legacy apparatus. This report describes the In-Place-Filter-Tester, the Instrument Development Plan and the Instrument Operating Method that were developed at the Los Alamos National Laboratory to determine the “as found” condition of unopened storage canisters. The Instrument Operating Method provides instructions for future evaluations of as-found canisters packaged with nuclear material. Customized stainless steel canister interfaces were developed for pressure-port access and to apply a suction clamping force for the interface. These are compatible with selected Hagan-style and SAVY-4000 storage canisters that were purchased from NFT (Nuclear Filter Technology, Golden, CO). Two instruments were developed for this effort: an initial Los Alamos POC (Proof-of-Concept) unit and the final Los Alamos IPFT system. The Los Alamos POC was used to create the Instrument Development Plan: (1) to determine the air flow and pressure characteristics associated with canister filter clogging, and (2) to test simulated configurations that mimicked canister leakage paths. The canister leakage scenarios included quantifying: (A) air leakage due to foreign material (i.e. dust and hair) fouling of o-rings, (B) leakage through simulated cracks in o-rings, and (C) air leakage due to inadequately tightened canister lids. The Los Alamos POC instrument determined pertinent air flow and pressure quantities, and this knowledge was used to specify a customized Isaac® (Z axis, Salt Lake City, UT) leak test module. The final Los Alamos IPFT (incorporating the Isaac® leak test module) was used to repeat the tests in the Instrument Development Plan (with simulated filter clogging tests and canister leak pathway tests). The Los Alamos IPFT instrument is capable of determining filter clogging and leak rate conditions, without requiring removal of the container lid. The IPFT measures pressure decay rate from 1.7E-03 in WC/sec to 1.7E-01 in WC/sec. On the same unit scale, helium leak testing of canisters has a range from 5.7E-07 in WC/sec to 1.9E-03 in WC/sec. For a 5-quart storage canister, the IPFT measures equivalent leak flow rates from 0.03 to 3.0 cc/sec. The IPFT does not provide the same sensitivity as helium leak testing, but is able to gauge the assembled condition of as-found and in-situ canisters.

61 RADIATION PROTECTION AND DOSIMETRY↗

TH-C-12A-12: Veritas: An Open Source Tool to Facilitate User Interaction with TrueBeam Developer Mode

Purpose: To address the challenges of creating delivery trajectories and imaging sequences with TrueBeam Developer Mode, a new open-source graphical XML builder, Veritas, has been developed, tested and made freely available. Veritas eliminates most of the need to understand the underlying schema and write XML scripts, by providing a graphical menu for each control point specifying the state of 30 mechanical/dose axes. All capabilities of Developer Mode are accessible in Veritas. Methods: Veritas was designed using QT Designer, a ‘what-you-is-what-you-get’ (WYSIWIG) tool for building graphical user interfaces (GUI). Different components of the GUI are integrated using QT's signals and slots mechanism. Functionalities are added using PySide, an open source, cross platform Python binding for the QT framework. The XML code generated is immediately visible, making it an interactive learning tool. A user starts from an anonymized DICOM file or XML example and introduces delivery modifications, or begins their experiment from scratch, then uses the GUI to modify control points as desired. The software automatically generates XML plans following the appropriate schema. Results: Veritas was tested by generating and delivering two XML plans at Brigham and Women's Hospital. The first example was created to irradiate the letter ‘B’ with a narrow MV beam using dynamic couch movements. The second was created to acquire 4D CBCT projections for four minutes. The delivery of the letter ‘B’ was observed using a 2D array of ionization chambers. Both deliveries were generated quickly in Veritas by non-expert Developer Mode users. Conclusion: We introduced a new open source tool Veritas for generating XML plans (delivery trajectories and imaging sequences). Veritas makes Developer Mode more accessible by reducing the learning curve for quick translation of research ideas into XML plans. Veritas is an open source initiative, creating the possibility for future developments and collaboration with other researchers. I am an employee of Varian Medical Systems.

07 ISOTOPE AND RADIATION SOURCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 1

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter) for a portion of the Tertiary volcanic section near the water table. Tritium concentrations were at or near the field detection limit in the Lower carbonate aquifer (LCA) while drilling. During drilling, a sample was collected while circulating in the LCA. The sample was submitted for off-site laboratory analysis. The sample results indicated low but measurable tritium concentrations. All Fluid Management Plan requirements were met during drilling activities.

54 ENVIRONMENTAL SCIENCES↗

Searching for millicharged particles with 1 kg of Skipper-CCDs using the NuMI beam at Fermilab

Oscura is a planned light-dark matter search experiment using Skipper-CCDs with a total active mass of 10 kg. As part of the detector development, the collaboration plans to build the Oscura Integration Test (OIT), an engineering test with 10% of the total mass. Here we discuss the early science opportunities with the OIT to search for millicharged particles (mCPs) using the NuMI beam at Fermilab. mCPs would be produced at low energies through photon-mediated processes from decays of scalar, pseudoscalar, and vector mesons, or direct Drell-Yan productions. Estimates show that the OIT would be a world-leading probe for mCPs in the ~MeV mass range.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Vacuum stability bounds on Higgs coupling deviations in the absence of new bosons

We analyze the constraints imposed by Higgs vacuum stability on models with new fermions beyond the Standard Model. We focus on the phenomenology of Higgs couplings accessible at the Large Hadron Collider. New fermions that affect Higgs couplings lead to vacuum instability of the Higgs potential. Above the scale of vacuum instability, bosonic states must stabilize the potential, implying a cut-off to the pure fermion model. Conservatively tuning the models to produce the maximal cut-off for a given Higgs coupling effect, we show that observing a deviation in the Htt, H-diphoton, or H-digluon coupling, larger than 20%, would require that new bosons exist in order to stabilize the Higgs potential below about 100 TeV. For generic parameter configurations, and unless the new fermions are made as light as they can possibly be given current experimental constraints, observing a 10% deviation in any of these couplings would suggest an instability cut-off below 10-100 TeV. Similarly, if new bosons are absent up to a high scale, then a deviation in the Hbb or Hττ coupling, larger than about 20%, should be accompanied by a sizable deviation in the Zbb or Zττ couplings that can be conclusively tested with electroweak precision measurements at planned lepton colliders.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Electronic population manipulation of transition metals in an RFQ ion trap

A pulsed laser system has been installed at the BECOLA facility at NSCL/MSU to develop electronic population manipulation techniques for trapped ions of rare isotopes. A simulation has been developed to evaluate possible optical pumping schemes and estimate expected increase in the population of an energy level used in subsequent laser spectroscopy measurements. Development progress is on time and commissioning tests with stable Zr isotopes are planned.

Lantis, Jeremy↗