Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space flight software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Jet Propulsion Laboratory/Kennedy Space Center telerobotic inspection and manipulation demonstration

The goal of this effort is to demonstrate telerobotic inspection and mainpulation of space shuttle payloads in the presence of substantial communications time delays between the operator station and the robotic work space. The processing of space shuttle payloads provides a variety of tasks which are typical of both space shuttle ground operations and Space Station in-flight operations, and communications time delays are inevitable in space operations where the operator station will be light-seconds away from the telerobot. With this demonstration we hope to show the efficacy and safety of robotic technology for ground and space operations. Our approach is to develop an experimental telerobotic system with the remote sensing, actuation and reflex portions located at KSC in Florida, while the operator control station will be located at Jet Propulsion Laboratory (JPL) in California. The JPL portion of the system includes a high-level operator interface, intelligent spatial planning and machine vision, while the KSC portion includes the robot arm, end effectors, cameras and proximity sensors, and the necessary control and communications computers and software. The communications between JPL and KSC are over a limited-bandwidth network channel (19200 baud) with unpredictable and unrepeatable time delays. In FY89 we integrated a basic version of the robotic, communications, and computer hardware, and we developed the software to perform an operator-supervised inspection of a PAM-D satellite upper stage rocket motor and its shuttle support cradle. The demonstration, though severely limited by the bulk of the available computer arm, showed the potential of telerobotics for inspection tasks. In the future, we plan to develop additional capabilities which will allow manipulation tasks to be performed, including removal of dust covers and lens caps, insertion of connectors and batteries, and installation of payload objects.

Wilcox, Brian↗

Antigenic Protein In Microgravity-Grown Human Mixed Mullerian Tumor (LN1) Cells Preserved In RNA Stabilizing Agent

Cells treated with RNAlater(TradeMark) have previously been shown to contain antigenic proteins that can be visualized using Western blot analysis. These proteins seem to be stable for several months when stored in RNA stabilizer at 4 C. Antigenic protein can be recovered from cells that have been processed using an Ambion RNAqueous(Registered TradeMark) kit to remove RNA. In this set of experiments, human mixed Mullerian tumor (LNI) cells grown on the International Space Station during Expedition 3 were examined for antigenic stability after removal of RNA. The cells were stored for three months in RNAlater(TradeMark) and RNA was extracted. The RNA filtrate containing the protein was precipitated, washed, and suspended in buffer containing sodium dodecyl sulfate (SDS). Samples containing equal concentrations of protein were loaded onto SDS-polyacrylamide gels. Proteins were separated by electrophoresis and transferred by Western blot to polyvinylidene fluoride (PVDF) membrane. The Western blots were stained with an enhanced chemiluminescent ECL(Registered Trademark) Plus detection kit (Amersham) and scanned using a Storm 840 gel image analyzer (Amersham, Molecular Dynamics). ImageQuant(Registered TradeMark) software was used to quantify the densities of the protein bands. The ground control and flight LN1 cell samples showed a similar staining pattern over time with antibodies to vimentin, glyceraldehyde-3-phosphate dehydrogenase, and epithelial membrane antigens.

Hammond, Dianne K.↗

The Space Operations Simulation Center (SOSC) and Closed-loop Hardware Testing for Orion Rendezvous System Design

The Space Operations Simulation Center (SOSC) at the Lockheed Martin (LM) Waterton Campus in Littleton, Colorado is a dynamic test environment focused on Autonomous Rendezvous and Docking (AR&D) development testing and risk reduction activities. The SOSC supports multiple program pursuits and accommodates testing Guidance, Navigation, and Control (GN&C) algorithms for relative navigation, hardware testing and characterization, as well as software and test process development. The SOSC consists of a high bay (60 meters long by 15.2 meters wide by 15.2 meters tall) with dual six degree-of-freedom (6DOF) motion simulators and a single fixed base 6DOF robot. The large testing area (maximum sensor-to-target effective range of 60 meters) allows for large-scale, flight-like simulations of proximity maneuvers and docking events. The facility also has two apertures for access to external extended-range outdoor target test operations. In addition, the facility contains four Mission Operations Centers (MOCs) with connectivity to dual high bay control rooms and a data/video interface room. The high bay is rated at Class 300,000 (. 0.5 m maximum particles/m3) cleanliness and includes orbital lighting simulation capabilities.

D'Souza, Christopher↗

Crew Autonomy through Self-Scheduling: Scheduling Performance Pilot Study

Within the domain of human spaceflight, crew scheduling for International Space Station (ISS) remains a human-driven planning task. Large teams of flight controllers (called Ops Planners) spend weeks creating violation-free schedules for all crewmembers. As NASA considers long-duration exploration missions, the necessary shift of scheduling and planning management from Ops Planners to crew members requires significant research and investigation of crew performance to complete these scheduling tasks. This pilot study was conducted to evaluate non-expert human performance for the task of planning and scheduling, focusing on scheduling problems that increased in complexity based on the number of activities to be scheduled and the number of planning constraints. Nine non-expert planners were recruited to complete scheduling tasks using Playbook, a scheduling software. The results of this pilot study show that scheduling performance decreased as scheduling workload (i.e. number of activities and percent of activities with planning constraints) increased. This paper provides evidence towards developing a model for scheduling task difficulty and identifies potential implications for future automated aids for flight crew scheduling.

planning↗

Crew Autonomy Through Self-Scheduling: Scheduling Performance Pilot Study

Within the domain of human spaceflight, crew scheduling for International Space Station (ISS) remains a human-driven planning task. Large teams of flight controllers (called Ops Planners) spend weeks creating violation-free schedules for all crewmembers. As NASA considers long-duration exploration missions, the necessary shift of scheduling and planning management from Ops Planners to crew members requires significant research and investigation of crew performance to complete these scheduling tasks. This pilot study was conducted to evaluate non-expert human performance for the task of planning and scheduling, focusing on scheduling problems that increased in complexity based on the number of activities to be scheduled and the number of planning constraints. Nine non-expert planners were recruited to complete scheduling tasks using Playbook, a scheduling software. The results of this pilot study show that scheduling performance decreased as scheduling workload (i.e. number of activities and percent of activities with planning constraints) increased. This paper provides evidence towards developing a model for scheduling task difficulty and identifies potential implications for future automated aids for flight crew scheduling.

planning↗

Evaluating The Relationships Between Supine Propriorception Assessments with Upright Functional Mobility and Balance Tests

INTRODUCTION Upon return to Earth, spaceflight sensorimotor adaptations can result in impaired posture and locomotion [1], [2], and current exercise countermeasures in the International Space Station are not sufficient to maintain sensorimotor function. In-flight countermeasures and assessment tools for sensorimotor function are needed to mitigate risks associated with mission-critical task performance upon return to Earth or arrival to 0.38 G on Mars. One proposed countermeasure for proprioceptive deconditioning includes training on a tilt board device [3], which will be tested in an upcoming bed rest study. In preparation for the said study, the objective of this pilot study is to compare performance in supine proprioceptive assessments to performance in functional upright activities. The results are intended to guide the selection of supine assessment tools for the upcoming bedrest study and the development of future inflight proprioceptive training and assessment tools for exploration missions. METHODS Seventeen healthy participants (8 males and 9 females, 27.9 ± 8.5 years) provided informed consent as approved by the Institutional Review Board (IRB) at NASA. A horizontal air-bearing sled was used to provide a proprioceptive challenge in a supine body orientation, allowing for mediolateral motion with minimal friction during supine stance [4]. Participants were loaded axially (30 to 60% body weight) with their feet on a vertically oriented tilt board and instructed to perform supine assessment activities using custom software that displays a cursor controlled by tilting the tilt board. In a single-leg static activity on the tilt board (TB-St), performance was measured as the percent time spent on a center target during a 30-second trial. During a two-feet dynamic activity on the tilt board (TB-Dy), performance was measured as the number of targets captured in 30 seconds. These supine tasks were compared to performance during two upright activities used to represent upright performance: completion time for a functional mobility task (FMT) [2],[5] and a performance score from force plate sway data during 30-second single-leg upright standing (USL). RESULTS AND DISCUSSION A Spearman's rank-order correlation was run to assess the relationship between upright and supine assessments. There were statistically significant, strong correlations between scores for the FMT and each TB activity, including TB-St, rs(17) = 0.50, p<0.05, TB-Dy3, rs(17) = 0.73, p<0.001, and TB-Dy9, rs(15) = 0.53, p<0.05. There were no statistically significant correlations between USL and each TB activity. Despite a lack of correlation with upright single-leg balance, the ability of the TB to indicate upright performance in the FMT is promising, as this task is a standard post-flight measure designed to characterize locomotor dysfunction [2], [5]. CONCLUSION These efforts will inform the selection of an appropriate sensorimotor assessment method for the upcoming bed rest study and similar future studies. While current work uses a bed rest analog to develop these technologies, future work aims to prepare capabilities for future in-flight sensorimotor training and assessment to mitigate the risks of proprioception impairment after spaceflight. ACKNOWLEDGEMENTS This work was supported by the University Space Research Association Internship Program. REFERENCES [1] Mulavara A.P. et al (2018) Med Sci Sports Exerc, 50(9), 1961-1980. [2] Mulavara A.P. et al (2010) Exp Brain Res, 202(3), 649-659. [3] Macaulay T.R. et al (2021) Front. Syst. Neurosci., 15, 658-985. [4] Goel R. et al (2017) Front. Syst. Neurosci, 11. [5] Koppelmans V. et al (2013) BMC Neurology, 12.

R Bellisle↗

Spacecraft attitude control using a smart control system

Traditionally, spacecraft attitude control has been implemented using control loops written in native code for a space hardened processor. The Naval Research Lab has taken this approach during the development of the Attitude Control Electronics (ACE) package. After the system was developed and delivered, NRL decided to explore alternate technologies to accomplish this same task more efficiently. The approach taken by NRL was to implement the ACE control loops using systems technologies. The purpose of this effort was to: (1) research capabilities required of an expert system in processing a classic closed-loop control algorithm; (2) research the development environment required to design and test an embedded expert systems environment; (3) research the complexity of design and development of expert systems versus a conventional approach; and (4) test the resulting systems against the flight acceptance test software for both response and accuracy. Two expert systems were selected to implement the control loops. Criteria used for the selection of the expert systems included that they had to run in both embedded systems and ground based environments. Using two different expert systems allowed a comparison of the real-time capabilities, inferencing capabilities, and the ground-based development environment. The two expert systems chosen for the evaluation were Spacecraft Command Language (SCL), and NEXTPERT Object. SCL is a smart control system produced for the NRL by Interface and Control Systems (ICS). SCL was developed to be used for real-time command, control, and monitoring of a new generation of spacecraft. NEXPERT Object is a commercially available product developed by Neuron Data. Results of the effort were evaluated using the ACE test bed. The ACE test bed had been developed and used to test the original flight hardware and software using simulators and flight-like interfaces. The test bed was used for testing the expert systems in a 'near-flight' environment. The technical approach, the system architecture, the development environments, knowledge base development, and results of this effort are detailed.

Buckley, Brian↗

STS-91 Day 05 Highlights

On this fifth day of the STS-91 mission, the flight crew, Cmdr. Charles J. Precourt, Pilot Dominic L. Pudwill Gorie and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet L. Kavandi, and Valery Victorovitch Ryumin and cosmonauts continue to move experiment hardware, logistical supplies and water between the two vehicles. They transfer additional bags of water from Discovery to Mir, bringing the total amount of water transferred to 683 pounds. Just over half of the 317 items scheduled to be transferred have now been moved between the two craft. Mission Specialists Wendy Lawrence and Janet Kavandi spend some time today checking out the shuttle's 50-foot long robot arm. This checkout evaluates new electronics and software for use on upcoming assembly missions for the new International Space Station. Today's checkout also tests the arm's dexterity in maneuvering around components of an orbiting space station.

Source record↗

Hardware in-the-Loop Demonstration of Real-Time Orbit Determination in High Earth Orbits

This paper presents results from a study conducted at Goddard Space Flight Center (GSFC) to assess the real-time orbit determination accuracy of GPS-based navigation in a number of different high Earth orbital regimes. Measurements collected from a GPS receiver (connected to a GPS radio frequency (RF) signal simulator) were processed in a navigation filter in real-time, and resulting errors in the estimated states were assessed. For the most challenging orbit simulated, a 12 hour Molniya orbit with an apogee of approximately 39,000 km, mean total position and velocity errors were approximately 7 meters and 3 mm/s respectively. The study also makes direct comparisons between the results from the above hardware in-the-loop tests and results obtained by processing GPS measurements generated from software simulations. Care was taken to use the same models and assumptions in the generation of both the real-time and software simulated measurements, in order that the real-time data could be used to help validate the assumptions and models used in the software simulations. The study makes use of the unique capabilities of the Formation Flying Test Bed at GSFC, which provides a capability to interface with different GPS receivers and to produce real-time, filtered orbit solutions even when less than four satellites are visible. The result is a powerful tool for assessing onboard navigation performance in a wide range of orbital regimes, and a test-bed for developing software and procedures for use in real spacecraft applications.

Moreau, Michael↗

Antigenic Protein In Microgravity-Grown Human Mixed Mullerian Tumor (LN1) Cells Preserved In RNA Stabilizing Agent

Cells treated with RNAlater(TradeMark) have previously been shown to contain antigenic proteins that can be visualized using Western blot analysis. These proteins seem to be stable for several months when stored in RNA stabilizer at 4 C. Antigenic protein can be recovered from cells that have been processed using an Ambion RNAqueous(Registered TradeMark) kit to remove RNA. In this set of experiments, human mixed Mullerian tumor (LN1) cells grown on the International Space Station during Expedition 3 were examined for antigenic stability after removal of RNA. The cells were stored for three months in RNAlater(TradeMark) and RNA was extracted. The RNA filtrate Containing the protein was precipitated, washed, and suspended in buffer containing sodium dodecyl sulfate (SDS). Samples containing equal concentrations of protein were loaded onto SDS-polyacrylamide gels. Proteins were separated by electrophoresis and transferred by Western blot to polyvinylidene fluoride (PVDF) membrane. The Western blots were stained with an enhanced chemiluminescent ECL(Registered TradeMark)Plus detection kit (Amersham) and scanned using a Storm 840 gel image analyzer (Amersham, Molecular Dynamics). ImageQuant(Registered TradeMark)a software was used to quantify the densities of the protein bands. The ground control and flight LN1 cell samples showed a similar staining pattern over time with antibodies to vimentin, glyceraldehyde-3-phosphate dehydrogenase, and epithelial membrane antigens.

Hammond, Dianne K.↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗

T-38 Primary Flight Display Prototyping and HIVE Support Abstract & Summary

This fall I worked in EV3 within NASA's Johnson Space Center in The HIVE (Human Integrated Vehicles & Environments). The HIVE is responsible for human in the loop testing, getting new technologies in front of astronauts, operators, and users early in the development cycle to make the interfaces more human friendly. Some projects the HIVE is working on includes user interfaces for future spacecraft, wearables to alert astronauts about important information, and test beds to simulate mock missions. During my internship I created a prototype for T-38 aircraft displays using LabVIEW, learned how to use microcontrollers, and helped out with other small tasks in the HIVE. The purpose of developing a prototype for T-38 Displays in LabVIEW is to analyze functions of the display such as navigation in a cost and time effective manner. The LabVIEW prototypes allow Ellington Field AOD to easily make adjustments to the display before hardcoding the final product. LabVIEW was used to create a user interface for simulation almost identical to the real aircraft display. Goals to begin the T-38 PFD (Primary Flight Display) prototype included creating a T-38 PFD hardware display in a software environment, designing navigation for the menu's, incorporating vertical and horizontal navigation bars, and to add a heading bug for compass controls connected to the HSI (Horizontal Situation Indicator). To get started with the project, measurements of the entire display were taken. This enabled an accurate model of the hardware display to be created. Navigation of menu's required some exploration of different buttons on the display. The T-38 simulator and aircraft were used for examining the display. After one piece of the prototype was finished, another trip of to the simulator took place. This was done until all goals for the prototype were complete. Some possible integration ideas for displays in the near future are autopilot selection, touch screen displays, and crew member preferences. Complete navigation, control, and function customization will be achievable once a display is fully developed. Other than the T-38 prototyping, I spent time learning how to design small circuits and write code for them to function. This was done by adding electronic circuit components to breadboard and microcontroller then writing code to speak to those components through the microcontroller. I went through an Arduino starter kit to build circuits and code software that allowed the hardware to act. This work was planned to assist in a lighting project this fall but another solution was discovered for the lighting project. Other tasks that I assisted with, included hands on work such as mock-up construction/removal, logic analyzer repairs, and soldering with circuits. The unique opportunity to be involved work with NASA has significantly changed my educational and career goals. This opportunity has only opened the door to my career with engineering. I have learned over the span of this internship that I am fascinated by the type of work that NASA does. My desire to work in the aerospace industry has increased immensely. I hope to return to NASA to be more involved in the advancement of science, engineering, and spaceflight. My interests for my future education and career lie in NASA’s work - pioneering the future in space exploration, scientific discovery and aeronautics research.

Boniface, Andrew↗

Results from 1984 airborne Doppler lidar wind measurement program. Flight 6: Analysis of line-of-sight elevation angle errors and apparent Doppler velocities

During the summer of 1984 the Marshall Space Flight Center's Airborne Doppler Lidar System (ADLS) made a series of wind measurements in the California Central Valley. This study quantifies the lidar beam angle errors and velocity errors through analysis of ground return signals. Line-of-sight elevation (LOSE) angle errors are under 1 deg. Apparent Doppler ground velocities, as large as 2m/s, are considerably less than in a previous flight experiment in 1981. No evidence was found of a Schuler resonance phenomenon common to inertial navigation systems (INS), however the aperiodic nature of the apparent velocities implies an error in the INS-derived ground speeds. Certain features and subtleties in the ground returns are explained in terms of atmospheric structure and characteristics of the ADLS hardware and software. Finally, least squares and low-pass filtering techniques are suggested for eliminating errors during post-processing.

Rothermel, Jeffry↗

Spacecraft Data Simulator for the test of level zero processing systems

The Microelectronic Systems Branch (MSB) at Goddard Space Flight Center (GSFC) has developed a Spacecraft Data Simulator (SDS) to support the development, test, and verification of prototype and production Level Zero Processing (LZP) systems. Based on a disk array system, the SDS is capable of generating large test data sets up to 5 Gigabytes and outputting serial test data at rates up to 80 Mbps. The SDS supports data formats including NASA Communication (Nascom) blocks, Consultative Committee for Space Data System (CCSDS) Version 1 & 2 frames and packets, and all the Advanced Orbiting Systems (AOS) services. The capability to simulate both sequential and non-sequential time-ordered downlink data streams with errors and gaps is crucial to test LZP systems. This paper describes the system architecture, hardware and software designs, and test data designs. Examples of test data designs are included to illustrate the application of the SDS.

Shi, Jeff↗

Deep Space Networking Experiments on the EPOXI Spacecraft

NASA's Space Communications & Navigation Program within the Space Operations Directorate is operating a program to develop and deploy Disruption Tolerant Networking [DTN] technology for a wide variety of mission types by the end of 2011. DTN is an enabling element of the Interplanetary Internet where terrestrial networking protocols are generally unsuitable because they rely on timely and continuous end-to-end delivery of data and acknowledgments. In fall of 2008 and 2009 and 2011 the Jet Propulsion Laboratory installed and tested essential elements of DTN technology on the Deep Impact spacecraft. These experiments, called Deep Impact Network Experiment (DINET 1) were performed in close cooperation with the EPOXI project which has responsibility for the spacecraft. The DINET 1 software was installed on the backup software partition on the backup flight computer for DINET 1. For DINET 1, the spacecraft was at a distance of about 15 million miles (24 million kilometers) from Earth. During DINET 1 300 images were transmitted from the JPL nodes to the spacecraft. Then, they were automatically forwarded from the spacecraft back to the JPL nodes, exercising DTN's bundle origination, transmission, acquisition, dynamic route computation, congestion control, prioritization, custody transfer, and automatic retransmission procedures, both on the spacecraft and on the ground, over a period of 27 days. The first DINET 1 experiment successfully validated many of the essential elements of the DTN protocols. DINET 2 demonstrated: 1) additional DTN functionality, 2) automated certain tasks which were manually implemented in DINET 1 and 3) installed the ION SW on nodes outside of JPL. DINET 3 plans to: 1) upgrade the LTP convergence-layer adapter to conform to the international LTP CL specification, 2) add convergence-layer "stewardship" procedures and 3) add the BSP security elements [PIB & PCB]. This paper describes the planning and execution of the flight experiment and the validation results.

automated data communication↗

NASA’s Space Launch System Successfully Launches Artemis I Mission and Hardware Progress Continues for Next Artemis Missions

NASA’s Artemis I mission will be the first flight of the agency’s Space Launch System (SLS) rocket. It will launch an uncrewed Orion spacecraft to the Moon, where it will enter a highly elliptical retrograde orbit. In 2022, final tests, checkouts, and preparations were on schedule to be completed, including the vital wet dress rehearsal (WDR) at Kennedy Space Center’s (KSC) Launch Complex 39B. Following successful completion of WDR, which is expected in summer 2022, the Artemis I launch vehicle will be returned to the Vehicle Assembly Building (VAB) at KSC where it will be prepared for launch. Important data were collected during launch and will be shared as applicable. While the Artemis I hardware and mission took center stage in 2022, significant progress was made on hardware and software for future Artemis missions, including for the first crewed launch and the following SLS Block 1B and Block 2 variants of the rocket.

John Honeycutt↗

An Overview of Distributed Spacecraft Autonomy at NASA Ames

Autonomous decision-making significantly increases mission effectiveness by mitigating the effects of communication constraints, like latency and bandwidth, and mission complexity on multi-spacecraft operations. To advance the state of the art in autonomous Distributed Space Systems (DSS), the Distributed Spacecraft Autonomy (DSA) team at NASA's Ames Research Center is developing within five relevant technical areas: distributed resource and task management, reactive operations, system modeling and simulation, human-swarm interaction, and ad hoc network communications. DSA is maturing these technologies - critical for future large autonomous DSS - from concept to launch via simulation studies and orbital deployments. A 100-node heterogenous Processor-in-the-Loop (PiL) testbed aids distributed autonomy capability development and verification of multi-spacecraft missions. The DSA software payload deployed to the D-Orbit SCV-004 spacecraft demonstrates multi-agent reconfigurability and reliability as part of an ESA-sponsored in-orbit technology demonstration. Finally, DSA's primary flight mission showcases collaborative resource allocation for multipoint science data collection with four small spacecraft as a payload on NASA's Starling 1.0 satellites.

Caleb Ashmore Adams↗

Modeling, simulation and control for a cryogenic fluid management facility, preliminary report

The synthesis of a control system for a cryogenic fluid management facility was studied. The severe demand for reliability as well as instrumentation and control unique to the Space Station environment are prime considerations. Realizing that the effective control system depends heavily on quantitative description of the facility dynamics, a methodology for process identification and parameter estimation is postulated. A block diagram of the associated control system is also produced. Finally, an on-line adaptive control strategy is developed utilizing optimization of the velocity form control parameters (proportional gains, integration and derivative time constants) in appropriate difference equations for direct digital control. Of special concern are the communications, software and hardware supporting interaction between the ground and orbital systems. It is visualized that specialist in the OSI/ISO utilizing the Ada programming language will influence further development, testing and validation of the simplistic models presented here for adaptation to the actual flight environment.

Turner, Max A.↗