Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

DOE Bioenergy Technologies Office (BETO) 2023 Project Peer Review: WBS 2.4.1.100 Bench Scale Research & Development

Bench Scale Integration develops and optimizes fermentation processes to produce bio-based fuels and chemicals for commercial scale-up. The project uses fermentation science to achieve high titers and production rates by, for example, manipulating how the microorganisms are fed biomass sugars and nutrients, modifying fermentation conditions (pH, temperature, aeration) or developing online control strategies for better fermentation operations and high titer, rates, and yield (TRY). For this period of performance, we continued our development of a commercial-ready 2,3-butanediol (BDO) fermentation from biomass sugars utilizing NREL's proprietary Zymomonas mobilis microorganism. The engineered Z. mobilis can use all the main sugars in corn stover biomass, which are glucose, xylose, and arabinose. BDO is a versatile, low-carbon chemical which can be catalytically upgraded to a variety of hydrocarbon fuels and chemicals. The project had three goals during this review period; evaluate the technical feasibility of using whole slurry pretreated corn stover to achieve the techno-economic analysis (TEA) performance goals, continue optimizing a liquor-based fed-batch fermentation process for high titer, and develop strategies to enable scale-up. After evaluating different iterations of a whole slurry fermentation that did not meet the TEA goals, a Go/No-Go decision was made to pivot to liquor-only with new TEA performance targets, the main one being 140 g/L titer. We successfully met this goal, producing 141 g/L BDO at 1 g/L-hr productivity and 84% process yield. This titer and productivity attracted industrial interest to scale the fermentation resulting in a Technology Commercialization Fund project award in 2022. We used an NREL developed near-infra red (NIR) spectroscopy method for rapid analysis which allowed for changes to aeration levels and sugar feeding during the fermentation to maximize BDO production. The NIR analysis can be done using a hand-held spectrometer, essentially taking the analysis on to the plant floor during scale-up and preliminary work shows the feasibility of using an online probe for continuous monitoring and control. The other scale-up tool is mapping oxygen transfer coefficient (kLa) and oxygen transfer rate (OTR) in various vessels to find conditions that match the optimized 500 mL vessels. Showing a correlation to the mapping work, which is done with water and a dissolved oxygen probe, can reduce the risk of failed fermentations during scale-up. Our end-of-project goal is to meet the design target BDO titer (140-150 g/L) from DMR corn stover liquor at 1000L or larger scale to demonstrate BDO process design case and transfer the technology to industrial fermentation stakeholders for commercialization.

2 3-butanediol↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 17275

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB), collectively known as LBL; - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the PT Facility; - Completing the design and construction of the HLW Facility; - Resolving the technical issues associated with the PT Facility; - Completing all WTP facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree, establishing revised milestone dates for the Hanford WTP that generally align with DOE's plans for completing the WTP facilities in sequence. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to accommodate direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion of hot commissioning of the WTP facilities needed for DFLAW operations no later than December 31, 2023. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: Radiation Protection Program - 17446

The Port Granby Project is large remediation project currently underway. A comprehensive and effective radiation protection program has been developed and implemented for the Port Granby Project. The potential radiation hazards associated with this project include: external (gamma) radiation, radon, inhalation, contamination and ingestion. Processes to address each of these potential hazards are identified. Measures of the effectiveness of the radiation protection program are also included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Latest experience from Jose Cabrera reactor vessel dismantling project - 15214

Westinghouse is performing a decommissioning project at the Jose Cabrera NPP in Spain. The project was awarded in June 2013 and the main scope is to cut and package the reactor vessel and the reactor vessel head. The project is performed in the necessary sequential steps needed to prepare, segment, separate, and package the individual component segments using under water mechanical techniques. The first activities to be performed on site included e.g. cutting of all pipe penetrations on the reactor, sealing of some of the pipe penetrations, lifting and transportation of the reactor and sealing of the reactor pit. The results of these activities were very good and gave a perfect foundation for the cutting and packaging of the reactor vessel. Cutting of the reactor vessel head and the reactor vessel is made with different types of Westinghouse designed cutting equipment. The flexible nature of the cutting equipment has proved to be very valuable for the execution of the cutting work. The project is planned to be finalized in April 2014. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A 'Method Based Survey' Succeeds in a Spanish Scrap Clearance Project - 15664

During the last years, a Waste Minimization Project has been implemented in Cofrentes NPP in a collaborative effort performed by IBERDROLA and ENRESA. The final result has been more than 760 t of metallic scrap including containerised materials but also massive surface contaminated objects have been managed and finally cleared. The initial project scope included 10 spent fuel pool racks weighting 130 tones but limited testing demonstrated they presented high contamination levels and were managed as radwaste including down-sizing and conditioning in ENRESA standard radwaste containers for metallic scrap (CMT's). This project started in 2008 and finished just in the summer of 2014. During these years planning and licensing, procurement, execution, including, a huge effort in decontamination and clearance measurement, was developed. The project closure is developing actually. The residual materials were stored and initially characterized previously its down-sizing and decontamination using chemical baths (warm diluted sulfuric acid and ultrasounds) , blasting (water jetting with iron grit) and in special cases mopping using industrial cleaners). Some big items were decontaminated previously its down-sizing. The materials were cleared using an approach similar to MARSAME approach based in MARSSIM guidelines. The 160 containers needed six in situ gamma spectrometry measurements each and 115 massive (from 0.45 t to 13.7 t) items need at least so many measurements as total surface in square meters. In total 763 t were cleared with only 0.6 t rejected and treated as radwaste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritizing and Managing Technology Needs to Meet River Protection Project Mission Objectives - 16462

Over 56 million gallons of radioactive waste are stored in 177 large underground tanks at the Hanford Site, located in southeastern Washington State. This nuclear waste resulted from plutonium production for the nation's nuclear defense program. The River Protection Project (RPP) mission is to: - Safeguard and safely manage waste stored in the Hanford tanks, - Treat the waste using the Waste Treatment and Immobilization Plant (WTP), - Ensure safe disposition of the waste to protect the Columbia River and the environment. Each aspect of the mission requires some application of technology in order to meet the mission objectives. The RPP Technology Roadmap document presents a comprehensive, integrated assessment of the technology-related advances needed to ensure successful completion of the Hanford tank waste cleanup mission. This paper describes the development of the RPP Technology Roadmap, summarizes its content, describes integration and collaboration with the Department of Energy's national laboratories to support the work identified, and defines how priorities were identified to ensure near-term RPP mission commitments can be accomplished while preserving the longer term technology development elements necessary for mission completion. The Challenge - Managing a wide variety of technology needs that involve multiple organizations, contractors, and national laboratories presents additional challenges when funding constraints are factored in. A process was needed to ensure the technology needs supporting near term mission priorities were appropriately identified, prioritized, and supported through the fiscal year planning process. Additionally, the national laboratory resources necessary to support many of the technologies require coordination to ensure the most appropriate resources are applied at the appropriate level without duplication or contradiction of effort. The Solution - The RPP Technology Roadmap was developed with the primary purposes to: - Identify technology related items needed to support or enhance the River Protection Project (RPP) mission, - Prioritize technology needs to support fiscal year planning processes, - Organize National laboratory support of the RPP mission and communicate needs to the participating contractors. The Technology Roadmap is consistent with Department of Energy (DOE) Hanford mission priorities and is also in alignment with other Hanford Site technical initiatives and policy and planning documents. The Technology Roadmap highlights the current estimated technology needs and identifies where planning shortfalls exist and where national laboratory participation is needed to support mission success. This information assists fiscal year planning and national laboratory contracting processes to ensure that technology needs are supported. In addition to supporting the RPP baseline mission, the Technology Roadmap provides a basis for strategic planning by identifying opportunities to use technology solutions to enhance mission efficiency. This waste management paper describes the innovative and collaborative processes used to develop, validate, and communicate the results so the project owners and the national laboratories can most effectively plan work scope and resources. A discussion of the following processes is included: - Technology needs and task owner identification, - Functional area grouping and area lead identification, - Needs prioritization, - High priority needs ranking (including validation), - Results compilation and planning gap identification, - Results presentation by project and functional area, - National laboratory coordination and collaboration. Application - The process used to develop the RPP technology roadmap is applicable to any site where multiple national laboratories and contractors are involved in identifying and implementing technology based solutions. This process is also applicable to the DOE HQ role to provide prioritization and coordination of the nationwide technology development activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BWR modernization project: installation of a new digital feedwater control system - 295

A European BWR plant carried out a relevant and pioneering modernization project regarding the Feedwater and Feed Pump Turbine Control System, replacing the legacy analogic control with the new General Electric MarkVIe digital system. This digital instrumentation and control modernization, motivated by obsolescence, had a great impact on the main control room and on the plant operation. Tecnatom collaborated with the nuclear power plant in the project performing the following activities: early installation of the system in the full scope and classroom simulators, Human Factors Engineering (HFE) Verification and Validation (V and V), Simulation Assisted Engineering (SAE), design and implementation of cyber secure communication with the Plant Process Computer (PPC), operating procedures modification and plant operators training. Those activities contributed to the success of the project that was completed during the refueling outage as planned. Scheduling HFE verification before the design freeze allowed the plant to modify the Human Machine Interface (HMI) to comply with the standards and increase safety without overcharging the project. SAE resulted in the reduction of costs and time during the system commissioning through the detection of discrepancies and improvements in the control, covering different plant scenarios. All the activities carried out in the simulators before the implementation of the system in the plant contributed to validate it and to build confidence in the new control among the plant personnel. New digital system communication interfaces with the PPC saved cable laying works and allowed future expansions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An IRSN Project For Experimental Data Acquisition In The Frame Of Criticality Safety And Reactor Physics

In the frame of its research missions for criticality safety assessment support, IRSN performed various experimental programs related to criticality safety in the CEA Valduc facilities. Following the shutdown of these facilities and the cancellation of the MIDAS project, which aimed at refurbishing these facilities, IRSN has initiated a new project named PRINCESS for 'Project for IRSN Neutron physics and Criticality Experimental data Supporting Safety'. PRINCESS is the practical implementation of IRSN's international partnership strategy to build relations with organizations that are equipped with experimental facilities for criticality safety and reactor physics research. The aim is to analyze experimental data from programs already performed and to conduct joint research programs on topics of interest of both parties. This paper presents an overview of the status of the PRINCESS project. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Best practices for documenting a scientific Python project

Documentation is a crucial component of software development that helps users with installation and usage of the software. Documentation also helps onboard new developers to a software project with contributing guidelines and API information. The INTERSECT project is an open federated hardware/software library to facilitate the development of au- tonomous laboratories. A documentation strategy using Sphinx has been utilized to help developers contribute to source code and to help users understand the INTERSECT Python interface. Docstrings as well as reStructuredText files are used by Sphinx to automatically compile HTML and PDF files which can be hosted online as API documentation and user guides. The resulting documentation website is automatically built and deployed using GitLab runners to create Docker containers with NGINX servers. The approach discussed in this paper to automatically deploy documentation for a Python project can improve the user and developer experience for many scientific projects.

Wiggins, Gavin↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

59 BASIC BIOLOGICAL SCIENCES↗

The Bermuda Triangle: The Pragmatics, Policies, and Principles for Data Sharing in the History of the Human Genome Project

The Bermuda Principles for DNA sequence data sharing are an enduring legacy of the Human Genome Project (HGP). They were adopted by the HGP at a strategy meeting in Bermuda in February of 1996 and implemented in formal policies by early 1998, mandating daily release of HGP-funded DNA sequences into the public domain. The idea of daily sharing, we argue, emanated directly from strategies for large, goal-directed molecular biology projects first tested within the “community” of C. elegans researchers, and were introduced and defended for the HGP by the nematode biologists John Sulston and Robert Waterston. In the C. elegans community, and subsequently in the HGP, daily sharing served the pragmatic goals of quality control and project coordination. Yet in the HGP human genome, we also argue, the Bermuda Principles addressed concerns about gene patents impeding scientific advancement, and were aspirational and flexible in implementation and justification. They endured as an archetype for how rapid data sharing could be realized and rationalized, and permitted adaptation to the needs of various scientific communities. Yet in addition to the support of Sulston and Waterston, their adoption also depended on the clout of administrators at the US National Institutes of Health (NIH) and the UK nonprofit charity the Wellcome Trust, which together funded 90% of the HGP human sequencing effort. The other nations wishing to remain in the HGP consortium had to accommodate to the Bermuda Principles, requiring exceptions from incompatible existing or pending data access policies for publicly funded research in Germany, Japan, and France. We begin this story in 1963, with the biologist Sydney Brenner’s proposal for a nematode research program at the Laboratory of Molecular Biology (LMB) at the University of Cambridge. We continue through 2003, with the completion of the HGP human reference genome, and conclude with observations about policy and the historiography of molecular biology.

59 BASIC BIOLOGICAL SCIENCES↗

Costilla County Biodiesel Pilot Project

The Costilla County Biodiesel Pilot Project has demonstrated the compatibility of biodiesel technology and economics on a local scale. The project has been committed to making homegrown biodiesel a viable form of community economic development. The project has benefited by reducing risks by building the facility gradually and avoiding large initial outlays of money for facilities and technologies. A primary advantage of this type of community-scale biodiesel production is that it allows for a relatively independent, local solution to fuel production. Successfully using locally sourced feedstocks and putting the fuel into local use emphasizes the feasibility of different business models under the biodiesel tent and that there is more than just a one size fits all template for successful biodiesel production.

09 BIOMASS FUELS↗

Fort Mojave Indian Tribe Aha Macav Power Service Renewable Energy Project

Aha Macav Power Service (AMPS), on behalf of the Fort Mojave Indian Tribe received a Department of Energy Solar grant. Partnering with Stockbridge Energy Group and the Department of Energy, AMPS was able to construct, install, test and successfully put into operation a 2.3 MW solar field. As provided in the solar data, this project has helped to offset the cost of open market purchase power needed to meet the needs of the Tribe. The estimated value of the solar energy produced in FY2021 currently is more than $294,000. Eventual expansion of the solar project is projected to create future energy independence for the Fort Mojave Indian Tribe.

14 SOLAR ENERGY↗

Identifying and Estimating Project Development Costs [Slides]

This presentation focuses on renewable energy project development and planning and highlights common project costs at each stage of a project's lifecycle. The presentation was produced as part of a series of trainings for awardees of the Energizing Rural Communities prize.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗