Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

A multi-echelon supply chain model for municipal solid waste management system

In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal allocation of series FACTS devices in large‐scale systems

Series flexible AC transmission systems devices, such as the variable series reactor, have the ability to continuously regulate the transmission line reactance so as to control power flow. This study presents a new approach to optimally locating such devices in the transmission network considering multiple operating states and contingencies. To investigate optimal investment, a single target year planning with three different load patterns is considered. The transmission contingencies may occur under any of the three load conditions and the coupling constraints between base case and contingencies are included. A reformulation technique transforms the original mixed integer non‐linear programming model into mixed integer linear programming model. To further relieve the computational burden and enable the planning model to be directly applied to practical large‐scale systems, a two‐phase decomposition algorithm is introduced. Detailed numerical simulation results on IEEE 118‐bus system and the Polish 2383‐bus system illustrate the efficient performance of the proposed algorithm.

Zhang, Xiaohu↗

Battery and backup generator sizing for a resilient microgrid under stochastic extreme events

Owing to the recent power outages caused by extreme events, installing battery energy storage and backup generators is important to improve resiliency for a grid-tied microgrid. In the design stage, the event occurrence time and duration, which are highly uncertain and cannot be effectively predicted, may affect the needed battery and backup generator capacity but are usually assumed to be pre-determined in utility planning tools. This study investigates the optimal battery and backup generator sizing problem considering the stochastic event occurrence time and duration for the grid-tied microgrid under islanded operation. The reliability requirement is quantified by the mean value of the critical customer interruption time in each stochastic islanding time window (ITW), whose length is the duration and the centre is the occurrence time. The stochastic ITW constraint is then transformed to a probability-weighted expression to derive an equivalent Mixed Integer Linear Programming model. Numerical simulations on a realistic grid-tied PV-based microgrid demonstrate that the total cost is reduced by 11.5% considering the stochastic ITW, compared with the deterministic ITW under the same reliability requirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulation of the NuScale SMR and Investigation of the Effect of Load-Following on Component Lifetimes

The NuScale SMR has been modelled using the Virtual Environment for Reactor Applications (VERA) multiphysics environment and the results compared with the publicly reported data in the Design Certification Application (DCA). The results show an excellent agreement for the compared axial and radial power distributions, temperature coefficients of reactivity, boron and control rod worths, and fast neutron flux. This NuScale model is then used to investigate the effect of different operational modes on reactor components to determine how flexible load-following operation may affect control rod and reactor pressure vessel (RPV) lifetimes. The control rod degradation is confirmed to primarily affect the silver-indium-cadmium (AIC) rod tip. The degradation rate is observed to follow a non-linear function of core power level where the increase in degradation decreases with insertion depth. For the variation in core power levels expected with current load-following schemes, the total control rod degradation is found to be mild, at 5-10% of usable life per cycle for a reactor operating at <80% power. Nonetheless, this enables load following strategies to be confirmed and/or modified to ensure that control rods do not need to be replaced during the 60+ year life of the reactor. The RPV degradation was found to be almost directly proportional to the core power level and was not overly sensitive to flux shape perturbations. Future work is planned using these damage functions to optimize operation over multiple NuScale SMR units and develop strategies for prognostics and health management.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Future Physics Programme of BESIII

There has recently been a dramatic renewal of interest in hadron spectroscopy and charm physics. This renaissance has been driven in part by the discovery of a plethora of charmonium-like XYZ states at BESIII and B factories, and the observation of an intriguing proton-antiproton threshold enhancement and the possibly related X(1835) meson state at BESIII, as well as the threshold measurements of charm mesons and charm baryons. We present a detailed survey of the important topics in tau-charm physics and hadron physics that can be further explored at BESIII during the remaining operation period of BEPCII. This survey will help in the optimization of the data-taking plan over the coming years, and provides physics motivation for the possible upgrade of BEPCII to higher luminosity.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Joint Expansion Planning of Power and Water Distribution Networks

This research considers the joint expansion planning of power and water distribution networks, which are interdependent at various levels. We consider the dependency arising through the power consumption of pumps and develop models for integrating new components into existing networks. Then, we formulate the joint expansion planning as a Mixed Integer Nonlinear Program (MINLP). Applying this MINLP to a small-scale test network, we illustrate the advantages offered by joint expansion planning, such as increased flexibility and reduced costs and redundancy, over independently expanding power and water distribution networks.

expansion planning↗

Aperture modulated, translating bed total body irradiation

Purpose: Total body irradiation (TBI) techniques aim to deliver a uniform radiation dose to a patient with an irregular body contour and a heterogeneous density distribution to within {+-}10% of the prescribed dose. In the current article, the authors present a novel, aperture modulated, translating bed TBI (AMTBI) technique that produces a high degree of dose uniformity throughout the entire patient. Methods: The radiation beam is dynamically shaped in two dimensions using a multileaf collimator (MLC). The irregular surface compensation algorithm in the Eclipse treatment planning system is used for fluence optimization, which is performed based on penetration depth and internal inhomogeneities. Two optimal fluence maps (AP and PA) are generated and beam apertures are created to deliver these optimal fluences. During treatment, the patient/phantom is translated on a motorized bed close to the floor (source to bed distance: 204.5 cm) under a stationary radiation beam with 0 deg. gantry angle. The bed motion and dynamic beam apertures are synchronized. Results: The AMTBI technique produces a more homogeneous dose distribution than fixed open beam translating bed TBI. In phantom studies, the dose deviation along the midline is reduced from 10% to less than 5% of the prescribed dose in the longitudinal direction. Dose to the lung is reduced by more than 15% compared to the unshielded fixed open beam technique. At the lateral body edges, the dose received from the open beam technique was 20% higher than that prescribed at umbilicus midplane. With AMTBI the dose deviation in this same region is reduced to less than 3% of the prescribed dose. Validation of the technique was performed using thermoluminescent dosimeters in a Rando phantom. Agreement between calculation and measurement was better than 3% in all cases. Conclusions: A novel, translating bed, aperture modulated TBI technique that employs dynamically shaped MLC defined beams is shown to improve dose uniformity in three dimensions. In comparison with the fixed open beam TBI technique, homogeneity of dose distribution is greatly improved.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-E-T-567: Neutron Dose Equivalent Evaluation for Pencil Beam Scanning Proton Therapy with Apertures

Purpose: To determine the neutron contamination from the aperture in pencil beam scanning during proton therapy. Methods: A Monte Carlo based proton therapy research platform TOPAS and the UF-series hybrid pediatric phantoms were used to perform this study. First, pencil beam scanning (PBS) treatment pediatric plans with average spot size of 10 mm at iso-center were created and optimized for three patients with and without apertures. Then, the plans were imported into TOPAS. A scripting method was developed to automatically replace the patient CT with a whole body phantom positioned according to the original plan iso-center. The neutron dose equivalent was calculated using organ specific quality factors for two phantoms resembling a 4- and 14-years old patient. Results: The neutron dose equivalent generated by the apertures in PBS is 4–10% of the total neutron dose equivalent for organs near the target, while roughly 40% for organs far from the target. Compared to the neutron dose equivalent caused by PBS without aperture, the results show that the neutron dose equivalent with aperture is reduced in the organs near the target, and moderately increased for those organs located further from the target. This is due to the reduction of the proton dose around the edge of the CTV, which causes fewer neutrons generated in the patient. Conclusion: Clinically, for pediatric patients, one might consider adding an aperture to get a more conformal treatment plan if the spot size is too large. This work shows the somewhat surprising fact that adding an aperture for beam scanning for facilities with large spot sizes reduces instead of increases a potential neutron background in regions near target. Changran Geng is supported by the Chinese Scholarship Council (CSC) and the National Natural Science Foundation of China (Grant No. 11475087)

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-F-J-08: Quantitative SPECT Imaging of Ra-223 in a Phantom

Purpose: Ra-223 therapy of prostate cancer bone metastases is being used to treat patients routinely. However, the absorbed dose distribution at the macroscopic and microscopic scales remains elusive, due to the inability to image the small activities injected. Accurate activity quantification through imaging is essential to calculate the absorbed dose in organs and sub-units in radiopharmaceutical therapy, enabling personalized absorbed dose-based treatment planning methodologies and more effective and optimal treatments. Methods: A 22 cm diameter by 20 cm long cylindrical phantom, containing a 3.52 cm diameter sphere, was used. A total of 2.01 MBq of Ra-223 was placed in the phantom with 177.6 kBq in the sphere. Images were acquired on a dual-head Siemens Symbia T16 gamma camera using three 20% full-width energy windows and centered at 84, 154, and 269 keV (120 projections, 360° rotation, 45 s per view). We have implemented reconstruction of Ra-223 SPECT projections using OS-EM (up to 20 iterations of 10 subsets) with compensation for attenuation using CT-based attenuation maps, collimator-detector response (CDR) (including septal penetration, scatter and Pb x-ray modeling), and scatter in the patient using the effective source scatter estimation (ESSE) method. The CDR functions and scatter kernels required for ESSE were computed using the SIMIND MC simulation code. All Ra-223 photon emissions as well as gamma rays from the daughters Rn-219 and Bi-211 were modeled. Results: The sensitivity of the camera in the three combined windows was 107.3 cps/MBq. The visual quality of the SPECT images was reasonably good and the activity in the sphere was 27% smaller than the true activity. This underestimation is likely due to partial volume effect. Conclusion: Absolute quantitative Ra-223 SPECT imaging is achievable with careful attention to compensate for image degrading factors and system calibration.

60 APPLIED LIFE SCIENCES↗

TRANSP-based Optimization Towards Tokamak Scenario Development

An optimization approach that incorporates the predictive transport code TRANSP is proposed for tokamak scenario development. Optimization methods are often employed to develop open-loop control strategies to aid access to high performance tokamak scenarios. In general, the optimization approaches use control-oriented models, i.e. models that are reduced in complexity and prediction accuracy as compared to physics-oriented transport codes such as TRANSP. In the presented approach, an optimization procedure using the TRANSP code to simulate the tokamak plasma is considered for improved predictive capabilities. As a test case, the neutral beam injection (NBI) power is optimized to develop a control strategy that maximizes the non-inductive current fraction during the ramp-up phase for NSTX-U. Simulation studies towards the achievement of non-inductive ramp up in NSTX-U have already been carried out with the TRANSP code. The optimization-based approach proposed in this work is used to maximize the non-inductive current fraction during ramp-up in NSTX-U, demonstrating that the scenario development task can be automated. An additional test case considers optimization of the current ramp rate in DIII-D for obtaining a stationary plasma characterized bya flat loop voltage profile in the flattop phase.

DIII-D↗

Contingency contractor optimization Phase 2, model description and formulation

The goal of Phase 2 the OSD ATL Contingency Contractor Optimization project is to create a prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. Additional features allow the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements and recommend where investments in manpower capabilities might minimize the overall total force costs in future operations.

Gearhart, Jared L.↗

Alternate paddle configuration for improved wear resistance in the saltstone mixer

The Saltstone Production Facility has a 10-inch Readco-Kurimoto continuous mixer that mixes the premix dry feeds and low-level waste salt solution to make fresh (uncured) saltstone. Inspection of the mixer in January 2013 showed significant wear on the third, fourth and fifth paddle pairs after the conveying augers. A 2-inch Readco-Kurimoto continuous mixer was used to test alternate paddle configurations for use in the 10-inch mixer to decrease the wear rate on the paddles. Two wear tests were conducted to investigate a method of reducing wear on the mixer paddles. The first test (wear test 2a) had a paddle configuration similar to the currently installed 10-inch mixer in the SPF. This test established baseline wear. The second test (wear test 2b) had a reconfigured paddle arrangement that replaced the flat paddles with helical paddles for paddle pairs 2 - 6 and aligned paddle pair 1 with the augers. The intent of the reconfiguration was to more effectively convey the partially wetted dry feeds through the transition region and into the liquid feed where paddle wear is reduced due to dry feeds and salt solution being mixed at the intended water to premix ratio. The design of the helical paddles provides conveyance through the transition region to the liquid feed inlet. The alignment with the auger is aimed to provide a smoother transition (minimizing the discontinuity between the auger and paddle pair 1) into the downstream paddles. A soft metal with low wear resistance (6000 series aluminum) was used for the wear testing paddles to determine wear patterns while minimizing run time and maximizing wear rate. For the two paddle configurations tested using the scaled 2-inch Readco-Kurimoto continuous mixer, with the first six paddles after the augers replaced by the wear paddles and the remaining paddles were stainless steel. Since the 10-inch SPF mixer is designed with the liquid inlet centered over paddle pairs 5 and 6, the scaled 2-inch mixer was configured the same way. The wear rate from wear test 2a was approximately double the wear rate from wear test 2b for paddle pairs 4 and 5. For both configurations, there was little or no wear on paddle pairs 1, 2, 3 and 6 based on mass change, indicating that the un-wetted and fully wetted premix materials cause less wear than the partially wetted premix. Additionally, inspection of the wear surface of the paddles showed more deformation on the flat paddles than the helical paddles which was consistent with the wear rates. Aligning of the auger discharge flight with paddle pair 1 resulted in a lower wear rate paddle pair 1 rather than having them misaligned with the feed augers. During the paddle wear tests, polishing wear was observed on the inside barrel of the mixer. The polishing wear is evident on the upper housing clamshell and the lower housing clamshell primarily at paddle pairs 4 and 5, which is the transition region of the mixer. Wear on the mixer barrel increases the space between the paddles and the barrel, resulting in increased grout build up on the barrel. Since the mixer barrel cannot be reconfigured or replaced in the SPF, the method for mitigating wear on the barrel is to move the more viscous grout through the transition region as quickly as possible. In addition, the location of the liquid inlet does not allow for sufficient cleaning of the mixer since residual grout remains on paddle pairs 1 - 4. As the paddles continue to wear and the self-cleaning capability of the paddles is lost, the lack of sufficient flushing would aid in grout build up between the barrel and the paddles which could eventually lead to decreased throughput capacity of the dry feeds. Changing the paddle configuration from flat to helical resulted in no change to the rheological properties of the grout mixture. Both tests produced a grout that is within the processing range of the SPF. Based on the results of this testing, it is recommended for the currently installed SPF mixer that paddle pairs 1 through 6 be helical rather than flat, with the paddle pair 1 aligned with the feed augers in order to minimize the wear occurring in the SPF mixer. Based on the results of this testing, it is recommended that the mixer be inspected and critical measurements be taken whenever the SPF processing schedule allows in order to establish a wear rate of the 10-inch mixer paddles.5 Based on these measurements, the lifetime of paddles in the transition region can be established in order to set up a maintenance schedule for the mixer. Since replacing the entire mixer is very expensive and time intensive, replacing the worn paddles after a specific time period would allow for planned shutdowns as well as process optimization such that the mixer throughput is not compromised. In addition, further testing should be performed to determine an alternate liquid inlet location to better flush the mixer of residual grout at the end of processing. Sufficiently cleaning the mixer will help eliminate another potential source of wear. Another potential method for reducing the wear rate in the mixer is to reduce the mixer speed without affecting the throughput capacity. Since wear rate is a function of impact velocity of the grout and mixing paddles, testing could be done using the 2-inch mixer determine the optimum mixer speed to reduce wear but not adversely impact facility operations (e.g. throughput capacity and grout properties).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Methods for Capturing System Interactions of Combined Technologies: A Study of PV + Battery

The costs of solar photovoltaics (PV) have been dropping in recent years, leading to increasing installations of solar PV systems and growing interest in how the technology will impact the electric grid at higher penetrations. Additionally, as battery costs decline it becomes important to understand the benefits and limitations of battery storage for the grid as well as potential benefits of co-locating battery storage and PV, particularly within the realm of future system planning. However, it is non-trivial to capture these potential benefits within a linearized capacity expansion model (CEM). This paper presents methodological developments to more fully represent the value and limitations of coupled PV and battery systems (PV + Battery) in CEMs using the Resource Planning Model (RPM), which co-optimizes capacity investments, transmission investments, and reduced-order dispatch in the Western Interconnection of North America through 2045. We use the model to simulate the evolution of the generation and transmission system under two core scenarios - a baseline scenario and a high renewable penetration scenario - coupled with sensitivities assuming low and midline PV and battery cost projections. When incorporating PV + battery, we find that it is important for CEMs to capture the ability of the coupled technology to provide firm capacity and reduce expected curtailment, compared to independent systems. These interactions can have even more dramatic impacts at higher solar penetrations.

14 SOLAR ENERGY↗

Financial Assistance for the Inaugural MagNetUS Workshop (Final Technical Report)

The MagNetUS Workshop was primarily scientific in character but also functioned as a joint user group meeting for the WiPPL and BaPSF collaborative user facilities, as well as included a community driven planning component to consider how to optimally form a network of facilities that operate in this general area with the proposed name of MagNetUS.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Residential solar-heating/cooling system

Report documents progress of residential solar-heating and cooling system development program at 5-month mark of anticipated 17-month program. System design has been completed, and development and component testing has been initiated. Report includes diagrams, operation overview, optimization studies of subcomponents, and marketing plans for system.