Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Ion Exchange Processing of AN-107 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AN-107 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 13.7 L of diluted and filtered supernate from Tank 241-AN-107 (hereafter referred to as AN-107) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AN-107 tank waste to meet this criterion, only 0.147% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 678. Testing with AN-107 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 40% Cs breakthrough after processing ~1700 BVs of feed; the 50% Cs breakthrough was extrapolated from the breakthrough data to occur at 1873 BVs. Testing compared to previous AP-101 and AP-107 testing at 16 °C showed ~300 BV increases in volume processed to reach the WAC limit for both lead and lag columns. The increase in capacity was determined to be due to the significantly lower K concentration in the AN-107 compared to the other tank waste matrices. A comparison in breakthrough curves for the three tests indicated slightly slower kinetic behavior in the AN-107, with variations in feed matrices (high organic complexants) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 1097 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 900 BVs. Cs breakthrough from the lag column began at 500 BVs, reaching 3.06×10 0 µCi/mL, or 2.6 % Cs breakthrough, after processing all 1700 BVs of feed. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Processing of AW-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 9.2 L of diluted and filtered supernate from Tank 241-AW-105 (hereafter referred to as AW-105) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AW-105 tank waste to meet this criterion, only 0.225% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 445. Testing with AW-105 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 83% Cs breakthrough after processing ~1500 BVs of feed; the 50% Cs breakthrough was interpolated from the breakthrough data and occurred at 1041 BVs. Despite the AW-105 having a significantly higher K concentration (0.55 M compared to 0.10 M), testing compared to previous AP-107 ion exchange column testing at 16 °C showed no difference in BVs processed to reach the WAC on the lead column and only an approximate ~20 BV decrease in volume processed to reach the WAC limit on the lag column. The negligible differences in capacity despite the 5x concentration differences in K was determined to be due to the significantly lower NO3 concentration in the AW-105 supernate compared to the AP-107 tank waste matrix. A comparison in breakthrough curves for the two tests also indicated slightly faster kinetic behavior in the AW-105, with the variations in feed matrices (lower NO3 concentration) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 772 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 675 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 1.10×10 1 µCi/mL, or 14.13 % Cs breakthrough, after processing all 1500 BVs of feed. The polish column processed nominally 830 BVs and reached 2.10×10 -1 µCi/mL, or 0.27 % Cs breakthrough at the conclusion of the test. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of the James Webb Space Telescope Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

Achieving Fast Operational Intelligence in NASA's Deep Space Network Through Complex Event Processing

NASA’s Deep Space Network (DSN) is a complex, global project, in which the expertise of human operators remain crucial for its successful operation. To find ways to save costs in operations and to improve its services, a number of modernization efforts are underway in the DSN. One such effort is a research and technology development task at the Jet Propulsion Laboratory that is investigating the use of complex event processing (CEP) for intelligent assessment of situations, trend analysis, and advanced automation. The technology leverages the significant business intelligence (BI) and data science advancements made in the enterprise industries over the last several years. The open source big data processing engine Apache SparkTM and the high-throughput, distributed messaging system Apache Kafka form the core of the DSN Complex Event Processing (DCEP) framework. This paper discusses the system engineering perspective of why achieving efficient, lower-cost operations in the DSN is a challenging problem, how the DCEP system handles the use cases that help realize intelligent operations, and how this solution fits into the overall model of the planned DSN Follow-the- Sun Operations (FtSO).

Choi, Joshua S.↗

An Overview of the James Webb Space Telescope (JWST) Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

An Overview of the James Webb Space Telescope (JWST) Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

Automation of vehicle processing at Space Station Freedom

A methodology for applying the Kennedy Space Center vehicle processing experience to similar operations at Space Station Freedom is described. First, the required on-orbit processing tasks are identified. These tasks are then evaluated for automation suitability, and robotic manipulator and artificial intelligence technologies are investigated to automate selected physical and cognitive tasks. Effects on processing times, extra-vehicular activity savings, and required resources for incorporating these automation enhancements are identified. Results of the following case studies are included: Phobos Gateway Vehicle On-Orbit Assembly and Launch, Lunar Evolution Vehicle On-Orbit Refurbishment, and Mars Mission Vehicle On-Orbit Assembly and Launch.

Vargo, Rick↗

Real-Time Simulation of the X-33 Aerospace Engine

This paper discusses the development and performance of the X-33 Aerospike Engine RealTime Model. This model was developed for the purposes of control law development, six degree-of-freedom trajectory analysis, vehicle system integration testing, and hardware-in-the loop controller verification. The Real-Time Model uses time-step marching solution of non-linear differential equations representing the physical processes involved in the operation of a liquid propellant rocket engine, albeit in a simplified form. These processes include heat transfer, fluid dynamics, combustion, and turbomachine performance. Two engine models are typically employed in order to accurately model maneuvering and the powerpack-out condition where the power section of one engine is used to supply propellants to both engines if one engine malfunctions. The X-33 Real-Time Model is compared to actual hot fire test data and is been found to be in good agreement.

Aguilar, Robert↗

Development of the Next Generation Gas Trap for the Space Station Internal Thermal Control System

The current dual-membrane gas trap is designed to remove non-condensed gases (NCG) from the Internal Thermal Control System (ITCS) coolant on board the International Space Station (ISS). To date it has successfully served its purpose of preventing depriming, overspeed, and shutdown of the ITCS pump. However, contamination in the ITCS coolant has adversely affected the gas venting rate and lifetime of the gas trap, warranting a development effort for a next-generation gas trap. Design goals are to meet or exceed the current requirements to (1) include greater operating ranges and conditions, (2) eliminate reliance on the current hydrophilic tube fabrication process, and (3) increase operational life and tolerance to particulate and microbial growth fouling. In addition, the next generation gas trap will essentially be a 'dropin" design such that no modifications to the ITCS pump package assembly (PPA) will be required, and the implementation of the new design will not affect changes to the ITCS operational conditions, interfaces, or software. This paper will present the initial membrane module design and development work which has included (1) a trade study among several conceptual designs, (2) performance modeling of a hydrophobic-only design, and (3) small-scale development test data for the hydrophobic-only design. Testing has shown that the hydrophobic-only design is capable of performing even better than the current dual-membrane design for both steady-state gas removal and gas slug removal.

Leimkuehler, Thomas O.↗

Welding Development: Marshall Space Flight Center

This paper presents the basic understanding of the friction stir welding process. It covers process description, pin tool operation and materials, metal flow theory, mechanical properties, and materials welded using the process. It also discusses the thermal stir welding process and the differences between thermal stir and friction stir welding. MSFC weld tools used for development are also presented.

Ding, Jeff↗

Safety and Mission Assurance: A NASA Perspective

Safety and Mission Assurance (S&MA) consists of the safety, reliability, maintainability, software assurance and quality disciplines, which are applied to reduce the probability of mishaps and ensure mission success. NASA uses a risk management process which requires various organizations to identify, analyze and mitigate/control risks associated with operations and decision making processes.

Higginbotham, Scott Alan↗

International Space Station Payload Operations Integration

The Payload Operations Integrator (POINT) plays an integral part in the Certification of Flight Readiness process for the Mission Operations Laboratory and the Payload Operations Integration Function that supports International Space Station Payload operations. The POINTs operate in support of the POIF Payload Operations Manager to bring together and integrate the Certification of Flight Readiness inputs from various MOL teams through maintaining an open work tracking log. The POINTs create monthly metrics for current and future payloads that the Payload Operations Integration Function supports. With these tools, the POINTs assemble the Certification of Flight Readiness package before a given flight, stating that the Mission Operations Laboratory is prepared to support it. I have prepared metrics for Increment 29/30, maintained the Open Work Tracking Logs for Flights ULF6 (STS-134) and ULF7 (STS-135), and submitted the Mission Operations Laboratory Certification of Flight Readiness package for Flight 44P to the Mission Operations Directorate (MOD/OZ).

Fanske, Elizabeth Anne↗

On the Maneuvers Operational Response for NASA’s Soil Moisture Active-Passive (SMAP) Mission

The Soil-Moisture Active-Passive (SMAP) spacecraft requires various kinds of in-orbit maneuvers over the course of its three-year mission. The types of maneuvers include pre-planned commissioning maneuvers to reach its science orbit, regularly executed orbit maintenance maneuvers to overcome drag and other nominally occurring phenomena, as well as (the possibility of) collision avoidance maneuvers. The architecture of the spacecraft – in terms of availability of commanding via ground assets, the inherited avionics' ability to sequence and execute commands, and the capability of available subsystems able to carry out maneuvers – was well defined early in the development of the spacecraft and mission, well before the operational plan for responding to maneuver requests was cemented. The systems engineering challenge became: how to accommodate all three types of maneuvers in the confines of this well-defined architecture. This paper will describe how the operations team on SMAP successfully met this challenge. Specifically, it will dive into the three pronged approach that SMAP developed to handle each type of maneuver described above – to meet the timeliness requirements leveraged on the operations team to execute said maneuvers, while continuing to fit within the allotted staffing profile during nominal operations. Defining this paradigm to fit the mission’s architecture meant re-defining the original paradigm, (planned maneuvers being thought of separately than collision avoidance maneuvers), and re-classifying all responses to maneuver requests as variations and permutations of a singular operational response to a maneuver request. This paper will also describe the tools that were created to simplify the human interface and automate as much of the response as was possible. Finally, this paper will describe, at a very high level, some of the problems encountered and lessons learned by the operations team when this process was executed the first four times during the first ninety days of operations. Though the architecture of the operations team's response to maneuver requests will never be repeated exactly, the flexibility that was inserted via redefining the scope of the problem and by redefining the human interfaces should influence future projects' architectures earlier in their development – in the hopes that said influence will save time and money in the future.

Tirona, Joseph↗

Collaborative Communications Between A Human and A Resilient Safety Support System

Successful introductory UAM integration into the NAS will be contingent on resilient safety systems that support reduced-crew flight operations. In this paper, we present a system that performs three functions: 1) monitors an operator’s physiological state; 2) assesses when the operator is experiencing anomalous states; and 3) mitigates risks by a combination of dynamic, context-based unilateral or collaborative dynamic function allocation of operational tasks. The monitoring process receives high data-rate sensor values from eye-tracking and electrocardiogram sensors. The assessment process takes these values and performs a classification that was developed using machine learning algorithms. The mitigation process invokes a collaboration protocol called DFACCto which, based on context, performs vehicle operations that the operator would otherwise routinely execute. This system has been demonstrated in a UAM flight simulator for an operator incapacitation scenario. The methods and initial results as well as relevant UAM and AAM scenarios will be described.

Advanced air mobility↗

Synthetic Failure Mode Generation for Resilience Analysis and Failure Mechanism Discovery

Traditional risk-based design processes seek to mitigate operational hazards by manually identifying possible faults and corresponding mitigation strategies—a tedious process which critically relies on the designer’s limited knowledge. Resilience-based design, on the other hand, seeks to embody generic hazard-mitigating properties in the system to mitigate unknown hazards, often by modelling the system's response to potential hazardous events. This work adapts this approach to the traditional risk-based design process to synthetically generate hazardous modes, by representing them as a unique combination of internal component health-states which can then be injected and simulated in a model of the system failure dynamics. The design process may then reduce the risk of unknown internal hazards by iteratively mitigating the effects of these modes. The performance of this approach is evaluated in a model of an autonomous rover, where cluster analysis shows that elaborating the space of synthetic faults in the drive system using this approach uncovers a wider range of possible hazardous trajectories and failure consequences within each trajectory. However, this increase in hazard information comes at a high computational expense, highlighting the need for advanced, efficient methods to search and sample the hazard space.

Simulation↗

Synthetic Failure Mode Generation for Resilience Analysis and Failure Mechanism Discovery

Traditional risk-based design processes seek to mitigate operational hazards by manually identifying possible faults and corresponding mitigation strategies—a tedious process which critically relies on the designer’s limited knowledge. Resilience-based design, on the other hand, seeks to embody generic hazard-mitigating properties in the system to mitigate unknown hazards, often by modelling the system's response to potential hazardous events. This work adapts this approach to the traditional risk-based design process to synthetically generate hazardous modes, by representing them as a unique combination of internal component health-states which can then be injected and simulated in a model of the system failure dynamics. The design process may then reduce the risk of unknown internal hazards by iteratively mitigating the effects of these modes. The performance of this approach is evaluated in a model of an autonomous rover, where cluster analysis shows that elaborating the space of synthetic faults in the drive system using this approach uncovers a wider range of possible hazardous trajectories and failure consequences within each trajectory. However, this increase in hazard information comes at a high computational expense, highlighting the need for advanced, efficient methods to search and sample the hazard space.

Simulation↗

Point-to-Point! Validation of the Small Aircraft Transportation System Higher Volume Operations Concept

Described is the research process that NASA researchers used to validate the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept. The four phase building-block validation and verification process included multiple elements ranging from formal analysis of HVO procedures to flight test, to full-system architecture prototype that was successfully shown to the public at the June 2005 SATS Technical Demonstration in Danville, VA. Presented are significant results of each of the four research phases that extend early results presented at ICAS 2004. HVO study results have been incorporated into the development of the Next Generation Air Transportation System (NGATS) vision and offer a validated concept to provide a significant portion of the 3X capacity improvement sought after in the United States National Airspace System (NAS).

Williams, Daniel M.↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗