Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Polymer Compositions in Critical Experiments: Possibly Not What You Think

The Chlorine Worth Study (CWS) Experiment was performed at the National Criticality Experiments Research Center (NCERC) in December 2021. Its goal was to provide a validation benchmark experiment with chlorine and plutonium in the thermal neutron spectrum. This purpose is necessary to reduce the margin of subcriticality in aqueous chloride operations at the Los Alamos National Laboratory Plutonium Facility (PF-4). Reducing the margin of subcriticality will enable higher throughput, required to meet NNSA mission needs. The experiment used layers of plutonium plates, polyethylene (HDPE), aluminum, and polyvinyl chloride (PVC) or chlorinated polyvinyl chloride (CPVC). They were optimized to match plutonium-chloride solutions of 30 g/L, 300 g/L, and 600 g/L. Upon completion of the experiment, a International Criticality Safety Benchmark Evaluation Program (ICSBEP) report was immediately started. The compositions of all materials were assumed pure unless additional information was known (such as for the plutonium plates). During the benchmark analysis, the assumed CPVC composition was questioned. The follow-on work led to lessons learned on compositions in benchmarks. Materials, and specifically polymers, are often much more complex than a basic chemical formula. The CWS experiment is used as an example in this paper to document the lessons learned.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar Market Pathways Final Report

The Solar Market Pathways program supported the development of successful and replicable solar deployment plans and strategies, and inspired and helped others across the country initiate or improve their own solar strategies based on lessons learned and promising practices. This report shares how the Institute for Sustainable Communities (ISC), as the national coordinator, created and fostered a strong peer network that enabled the transfer of ideas, peer support, and lessons learned between Solar Market Pathways projects. This network accelerated learning and allowed awardees to advance their innovations—building on each other’s successes and mistakes, and effectively streamlining resource use. Within this report, we document the project results and impacts of Solar Market Pathways, which are broad reaching and include jump-starting the community solar market in the Chicago region, creating comprehensive deployment plans in nascent markets in Duluth and Utah, facilitating regional market development in the northeast, and using solar+storage to build community resilience in cities like New York and San Francisco.

14 SOLAR ENERGY↗

1981 LTA technology assessment - Past and present

A four-part presentation is made of (1) lessons learned from the design and operation of the 'classic' airships of the 1920s and 30s, with respect to such issues as construction, propulsion, control, instrumentation, ground handling, habitability, aerodynamics, and structure and construction; (2) lessons learned from the development of such specialized lighter-than-air (LTA) concepts as metal-clad airships, semi-buoyant lifting bodies, experimental, sport and commercial free balloons, high-altitude platforms, and tethered aerostats; (3) the current status of LTA technology in various countries, with emphasis on significant developments in configuration, dynamics, control, structures, materials, and propulsion; and (4) a projection of future trends. It is concluded that socio-economic factors will strongly influence and encourage LTA development in the 1990s.

Ashford, R. L.↗

Leveraging object-oriented development at Ames

This paper presents lessons learned by the Software Engineering Process Group (SEPG) from results of supporting two projects at NASA Ames using an Object Oriented Rapid Prototyping (OORP) approach supported by a full featured visual development environment. Supplemental lessons learned from a large project in progress and a requirements definition are also incorporated. The paper demonstrates how productivity gains can be made by leveraging the developer with a rich development environment, correct and early requirements definition using rapid prototyping, and earlier and better effort estimation and software sizing through object-oriented methods and metrics. Although the individual elements of OO methods, RP approach and OO metrics had been used on other separate projects, the reported projects were the first integrated usage supported by a rich development environment. Overall the approach used was twice as productive (measured by hours per OO Unit) as a C++ development.

Wenneson, Greg↗

Mars Exploration Rover Entry, Descent, and Landing: A Thermal Perspective

Perhaps the most challenging mission phase for the Mars Exploration Rovers was the Entry, Descent, and Landing (EDL). During this phase, the entry vehicle attached to its cruise stage was transformed into a stowed tetrahedral Lander that was surrounded by inflated airbags through a series of complex events. There was only one opportunity to successfully execute an automated command sequence without any possible ground intervention. The success of EDL was reliant upon the system thermal design: 1) to thermally condition EDL hardware from cruise storage temperatures to operating temperature ranges; 2) to maintain the Rover electronics within operating temperature ranges without the benefit of the cruise single phase cooling loop, which had been evacuated in preparation for EDL; and 3) to maintain the cruise stage propulsion components for the critical turn to entry attitude. Since the EDL architecture was inherited from Mars Pathfinder (MPF), the initial EDL thermal design would be inherited from MPF. However, hardware and implementation differences from MPF ultimately changed the MPF inheritance approach for the EDL thermal design. With the lack of full inheritance, the verification and validation of the EDL thermal design took on increased significance. This paper will summarize the verification and validation approach for the EDL thermal design along with applicable system level thermal testing results as well as appropriate thermal analyses. In addition, the lessons learned during the system-level testing will be discussed. Finally, the in-flight EDL experiences of both MER-A and -B missions (Spirit and Opportunity, respectively) will be presented, demonstrated how lessons learned from Spirit were applied to Opportunity.

thermal↗

Space-Based Telemetry And Range Safety Flight Demonstration #1

The basic ability of STARS to maintain a satellite communications link with TDRSS satellites during dynamic aircraft flights was successfully demonstrated during FD 1. The Range Safety and Range User systems' link margins were measured. The ability to acquire/reacquire and maintain lock between a high-dynamic vehicle and a satellite-based system was demonstrated. The Range Safety system simultaneously received and processed command links from space and ground transmitters and provided near real-time Range Safety telemetry to DFRC, which then sent it in near real time to KSC, GSFC, and WFF for monitoring. The GPS receiver maintained track except during extremely dynamic maneuvers. The Range User system sent data at three different data rates. There were excellent cooperation and support from the different Centers, contractors, and Ranges. A large amount of data was recorded and extensive post-flight analysis was performed. The Range User TDRSS link margin met or exceeded the predicted performance at three different data rates. The Range Safety launch-head link margins generally agreed with the predicted performance. The UPS positions and velocities agreed with those from tracking radar to within about 20 m and a few rn/s. The link margins for the Range Safety TDRSS telemetry link were less than expected. The link margin for one TDRSS command link LPT channel was occasionally much less than the other. Additional post-flight testing has yet to identify the root causes of these results. There were many lessons learned from this first set of test flights. The most important one is that more time and testing are needed for each step to deal with the inevitable problems. It is vital that these lessons be among the primary areas of study that will carry over from FD#1 to FD#2, which is currently scheduled for early FY05 at DFRC and will use a specially designed Ku-band phased array antenna for the Range User system. The next series of flight demonstrations scheduled for late 2004 at DFRC will incorporate many lessons learned from FD#1. A specially designed Ku-band phased array antenna will be used with the Range User system. A test flight on a hypersonic vehicle is planned by the end of 2006.

Demspm. Erol↗

Panel Session 6: Interagency Community of Practice in Risk and Performance Assessments

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provide feedback on building the P and RA COP to support risk-informed environmental decision making. Each panelist provided a brief presentation followed by open discussion. Presentations proposed include: 1 - Applying Lessons Learned on Engineered Barrier Service Life to Performance Assessment (Craig Benson, University of Virginia - CRESP (USA)); 2 - Decision Analysis in Integrated Risk and Performance Assessment: Challenges (Paul Black, Neptune and Company, Inc. (USA)); 3 - Managing Uncertainty (Roger Seitz, IEI (USA)); 4 - U.S. EPA Superfund Program's Need for Model Comparison for Radioactive Contamination (Stuart Walker, Office of Remediation and Technology Innovation (OSRTI), US EPA (USA)); 5 - CRESP Activities Supporting Performance and Risk Assessments (Kevin Brown, Vanderbilt University - CRESP (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving Operability via the Mission System Paradigm

In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.

ground systems↗

Practical Applications of Cables and Ropes in the ISS Countermeasures System

As spaceflight durations have increased over the last four decades, the effects of weightlessness on the human body are far better understood, as are the countermeasures. A combination of aerobic and resistive exercise devices contribute to countering the losses in muscle strength, aerobic fitness, and bone strength of today's astronauts and cosmonauts that occur during their missions on the International Space Station. Creation of these systems has been a dynamically educational experience for designers and engineers. The ropes and cables in particular have experienced a wide range of challenges, providing a full set of lessons learned that have already enabled improvements in on-orbit reliability by initiating system design improvements. This paper examines the on-orbit experience of ropes and cables in several exercise devices and discusses the lessons learned from these hardware items, with the goal of informing future system design.

Moore, Cherice↗

Photonics for Space Flight Instruments

For the past 25 years, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Photonics Group in the Engineering Directorate has been substantially contributing to the flight design, development, production, testing and integration of many science and navigational instruments. The group has an extensive background in screening, qualifying, development and integration of commercial components for spaceflight applications. They have been willing to communicate lessons learned in packaging, part construction, materials selection, testing, and other facets of the design and production process critical to implementation for high-reliability systems. Summarized here is the last ten years of instrumentation development lessons learned and data collected from the subsystems down to the optoelectronic component level.

Spaceflight↗

Waste management best practices for decommissioning of nuclear power plants - 15274

Decommissioning of a nuclear power plant involves the safe disposition of a large quantity of radioactive, hazardous and conventional waste. A number of nuclear power plant decommissioning projects have been completed or are nearing completion in the US, Germany and Spain. These projects have used various waste disposal and interim storage options, and have developed successful methods for handling the large quantities of waste created by the decommissioning. Additionally, decommissioning projects in several Asian and European countries are in progress or are in the planning stages such that strategies for the handling of decommissioning waste are being developed and/or implemented to address the regulatory requirements and disposal options available in these countries. These experiences provide important lessons learned and successful strategies for the handling of waste from power plant decommissioning projects. As the handling and disposition of decommissioning waste have a substantial effect on power plant decommissioning cost, schedule and complexity, these lessons learned are valuable for planning future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Fukushima Safety Enhancement Activities in Canada

In the immediate aftermath of the common-cause seismic and tsunami events that triggered the Fukushima Daiichi nuclear accident on March 11, 2011, the nuclear regulator, the Canadian Nuclear Safety Commission (CNSC), requested that all Cass I nuclear facilities re-examine the safety cases for their nuclear facilities. Lessons-learned task forces were established by the CNSC, and the nuclear utilities, Ontario Power Generation (OPG), Bruce Power (BP), and New Brunswick Power (NBP). The purposes of these independent task forces was to develop relevant lessons learned issues for the Candu nuclear power plants operating in Canada and to identify actions that could enhance safety. Subsequently, a CNSC Integrated Action Plan was developed to address the recommendations arising from the CNSC Task Force Report, and the licensees aligned their actions with this plan. The actions were grouped into four categories, as follows. 1. Strengthening defence in depth; Actions included re-assessment of a site-specific external hazards using PSA; physical plant changes to add further cooling water make-up capability to heat sinks; development of new Canadian standards and updated regulatory documents that address requirements for Beyond Design Basis Accidents (BDBA), Probabilistic Safety Assessment (PSA) and Period Safety Review (PSR); development of a new and novel methodology for assessing multi-unit risk that is consistent with the IAEA construct of defence-in-depth (including a safety goal hierarchy and complementary risk analysis methods that address 'Black Swan' events); enhanced management of hydrogen combustion challenges; and enhanced Severe Accident Management Guidelines (SAMG). 2. Enhancing emergency response; Actions included provision of Emergency Mitigation Equipment (EME) such as transportable diesel-driven pumps or fire engines, transportable diesel generators for AC and instrument power; pre-installed connections to in-plant equipment via easily accessible and protected quick-connect points for water and electrical power; upgraded emergency response centres; enhanced communication systems and protocols; and enhanced emergency response programs, training and exercises. 3. Improving the regulatory framework and processes; 4. Enhancing international collaboration. Actions assigned under categories 3 and 4 were placed upon the regulator. This presentation will focus on the assigned actions in categories 1 and 2. The underlying motivation, objectives, and safety benefits associated with the actions will be described within the context of broader aspects of severe accident mitigation in water-cooled reactors. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NASA/MOD Operations Impacts from Shuttle Program

Operations plays a pivotal role in the success of any human spaceflight program. This paper will highlight some of the core tenets of spaceflight operations from a systems perspective and use several examples from the Space Shuttle Program to highlight where the success and safety of a mission can hinge upon the preparedness and competency of the operations team. Further, awareness of the types of operations scenarios and impacts that can arise during human crewed space missions can help inform design and mission planning decisions long before a vehicle gets into orbit. A strong operations team is crucial to the development of future programs; capturing the lessons learned from the successes and failures of a past program will allow for safer, more efficient, and better designed programs in the future. No matter how well a vehicle is designed and constructed, there are always unexpected events or failures that occur during space flight missions. Preparation, training, real-time execution, and troubleshooting are skills and values of the Mission Operations Directorate (MOD) flight controller; these operational standards have proven invaluable to the Space Shuttle Program. Understanding and mastery of these same skills will be required of any operations team as technology advances and new vehicles are developed. This paper will focus on individual Space Shuttle mission case studies where specific operational skills, techniques, and preparedness allowed for mission safety and success. It will detail the events leading up to the scenario or failure, how the operations team identified and dealt with the failure and its downstream impacts. The various options for real-time troubleshooting will be discussed along with the operations team final recommendation, execution, and outcome. Finally, the lessons learned will be summarized along with an explanation of how these lessons were used to improve the operational preparedness of future flight control teams.

Fitzpatrick, Michael↗

Challenges with Electrical, Electronics, and Electromechanical Parts for James Webb Space Telescope

James Webb Space Telescope (JWST) is the space-based observatory that will extend the knowledge gained by the Hubble Space Telescope (HST). Hubble focuses on optical and ultraviolet wavelengths while JWST focuses on the infrared portion of the electromagnetic spectrum, to see the earliest stars and galaxies that formed in the Universe and to look deep into nearby dust clouds to study the formation of stars and planets. JWST, which commenced creation in 1996, is scheduled to launch in 2018. It includes a suite of four instruments, the spacecraft bus, optical telescope element, Integrated Science Instrument Module (ISIM, the platform to hold the instruments), and a sunshield. The mass of JWST is approximately 6200 kg, including observatory, on-orbit consumables and launch vehicle adaptor. Many challenges were overcome while providing the electrical and electronic components for the Goddard Space Flight Center hardware builds. Other difficulties encountered included developing components to work at cryogenic temperatures, failures of electronic components during development and flight builds, Integration and Test electronic parts problems, and managing technical issues with international partners. This paper will present the context of JWST from a EEE (electrical, electronic, and electromechanical) perspective with examples of challenges and lessons learned throughout the design, development, and fabrication of JWST in cooperation with our associated partners including the Canadian Space Agency (CSA), the European Space Agency (ESA), Lockheed Martin and their respective associated partners. Technical challenges and lessons learned will be discussed.

EEE Parts↗

Toward the Instrumentation and Data Acquisition of a Tidal Turbine in Real Site Conditions

The National Renewable Energy Laboratory manufactured, instrumented, and deployed thermoplastic composite blades and a data acquisition system (NDAQ) on one of Verdant Power’s Gen5d 5 m diameter tidal turbines in New York’s East River. The thermoplastic blades had internal strain gages, and the NDAQ was a stand-alone system for monitoring and recording the strain and angular position of the blades. The turbine with thermoplastic blades operated and produced power successfully for 3 months, contributing energy to the New York City electric grid. The NDAQ hardware, instrumentation, and structure all survived the deployment and were still functional upon retrieval of the system, but no data were collected. Even though the data retrieval was not a success, data acquisition for deployed subsea marine renewable structures is a new undertaking, and it is critical to share lessons learned from national laboratory experiences. The successful deployment of thermoplastic composite blades marks a significant advancement toward improved materials for subsea components, as well as an advancement in recyclable composite materials. This article outlines the methodology and lessons learned for the instrumentation and data acquisition system.

16 TIDAL AND WAVE POWER↗

Overview of the Main Propulsion System for the NASA Ares I Upper Stage

A functional overview of the Main Propulsion System (MPS) of the NASA Ares I Upper Stage is provided. In addition to a simple overview of the key MPS functions and design philosophies, major lessons learned are discussed. The intent is to provide a technical overview with enough detail to allow engineers outside of the MPS Integrated Product Team (IPT) to develop a rough understanding of MPS operations, components, design philosophy, and lessons learned.

Quinn, Jason E.↗

A Survey of the Spacecraft Line-Of-Sight Jitter Problem

Predicting, managing, controlling, and testing spacecraft Line-of-Sight (LoS) jit- ter due to on-board internal disturbance sources is a challenging multi- disciplinary systems engineering problem, especially for those observatories hosting extremely sensitive optical sensor payloads with stringent requirements on allowable LoS jitter. Some specific spacecraft jitter engineering challenges will be introduced and described in this survey paper. Illustrative examples of missions where dynamic interactions have to be addressed to satisfy demanding payload instrument LoS jitter requirements will be provided. Some lessons learned and a set of recommended rules of thumb are also presented to provide guidance for analysts on where to initiate and how to approach a new spacecraft jitter design problem. These experience-based spacecraft jitter lessons learned and rules of thumb are provided in the hope they can be leveraged on new space system development projects to help overcome unfamiliarity with previously identified jitter technical pitfalls and challenges.

Dennehy, Cornelius J.↗

Introduction of an Agile Systems Engineering Process to the NASA Armstrong Flight Research Center

This paper will provide background on the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) ARMD Test Data Portal (ATDP) effort along with the rationale that motivated the ATDP team to consider implementing an agile systems engineering (SE) process. The primary motivation for using this new SE process was based on the desire to mitigate a major risk to project success. Since the agile SE process had never been used before at the NASA Armstrong Flight Research Center (AFRC), utilizing this new SE process required a trailblazing effort to introduce it to NASA AFRC leadership. As a result, the ATDP team chose to adhere to the agile SE process in addition to the trusted classical waterfall SE process on ATDP. Through successful execution of this hybrid SE process during Phase I, along with demonstrating the value and rigor of the agile SE process, NASA AFRC leadership ultimately permitted the ATDP project to solely use the agile SE process for developments beyond Phase I. While it is the opinion of the authors that the classical SE process is more effective for most projects at NASA AFRC, some projects may deem that the agile SE process is more advantageous. Although this paper is focused on introducing the agile SE process to NASA AFRC, lessons learned will be valuable to other organizations as well. Details of how the ATDP team implemented the agile SE process during Phase I will be summarized, along with how the team met all required classical SE milestones. Lessons learned throughout Phase I of this effort will also be highlighted.

Daniel S. Jones↗