Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Experimental Plan for the Vermiculite Study

Homes in which vermiculite, which can contain asbestos, is present are often deferred under the DOE Weatherization Assistance Program (WAP) because of uncertainty in how to safely weatherize such homes from a client and worker perspective and the potential costs associated with alternative approaches. Recognizing this situation, the Department of Energy (DOE) tasked the Oak Ridge National Laboratory (ORNL) to perform a research project that scientifically identifies the asbestos exposure risks in weatherizing homes with existing vermiculite insulation. Current approaches being used by Grantees and Subgrantees to weatherize homes with existing vermiculite insulation were identified as part of the development of this experimental plan based on a review of Grantee Health and Safety Plans and communications with weatherization program staff from seven states. Other than deferral, these approaches include the following:1.) Abating (i.e., removing) the existing vermiculite using funding sources other than WAP (e.g., state funds, utility funds, the Zonolite Attic Insulation Trust Fund, and possibly homeowner contributions) because abatement is not allowed using WAP funds per Weatherization Program Notice (WPN) 17-7. 2.) Weatherizing the house as normal after testing reveals that the vermiculite contains less than 1% asbestos. 3.) Avoiding areas of the house where vermiculite is installed and weatherizing the remaining areas of the house as normal. 4.) Encapsulating the existing vermiculite insulation in an attic by blowing cellulose or other insulation over it. 5.) Weatherizing the areas of the house where vermiculite is installed using unique/alternative approaches developed specifically for that house. Blower door testing is also impacted by the presence of vermiculite due to the concern of bringing asbestos fibers into the space. Some states address this by performing pressurized blower door tests, whereas other states prohibit blower door testing entirely when vermiculite is present. This research project will focus on gathering data on home occupant and weatherization worker exposures to asbestos before, during, and/or after the weatherization of the homes containing vermiculite insulation using five of the six approaches identified above. Abatement of the existing vermiculite insulation will not be studied because it is not allowed using WAP funding per WPN 17-7 and, thus, is not a sustainable approach for WAP.

36 MATERIALS SCIENCE↗

Acoustic Amplification in the Far Infrared Focal Plane Assembly of the Composite Infrared Spectrometer (CIRS) for the Cassini Mission to Saturn

The Composite Infrared Spectrometer (CIRS) of the Cassini mission to Saturn has two interferometers covering the far infrared FIR and mid infrared, MIR wavelength region. The FIR is a polarizing Michelson interferometer which presents a collimated output beam to the FIR focal plane. The focal plane consists of a parabolic focus mirror and an analyzer grid, which splits the output beams into transmitted and reflected components. The two polarizations are focussed onto two thermopile detectors; each consisting of a gold black foil welded to the top of two bismuth pyramids. The gold black is 30 microns thick, and the weld area is approximately 2 microns in diameter. The detectors are extremely fragile and the weld can be broken with a miniscule amount of airflow. The detectors consistently passed acoustic testing to qualification levels that simulated the launch environment of the Titan IV launch vehicle. However, they experienced a 50% failure rate when installed in the focal plane assembly during instrument level acoustic tests. A test focal plane was developed with small pressure transducers in the nominal detector locations. These tests indicated over 10 dB of acoustic amplification in the focal plane within the instrument during testing. New techniques were developed to allow testing of the focal plane without over testing the instrument, and modifications were made the focal plane assembly to successfully attenuate the amplification.

Hagopian, John G.↗

Comparison of CFD Predictions of the TCA Baseline

The computational fluid dynamics (CFD) comparisons being presented are compared to each other and to wind tunnel (WT) data on the baseline TCA. Some of the CFD computations were done prior to the tests and others later. Only force data (CL vs CD) from CFD will be presented as part of this report. The WT data presented comes from the testing of the baseline TCA in the Langley Unitary Plan Wind Tunnel (UPWT), Test Section #2. There are 2 sets of wind tunnel data being presented: one from test 1671 of model 2a (flapped wing) and the other from test 1679 of model 2b (solid wing). Most of the plots show only one run from each of the WT tests per configuration. But many repeat runs were taken during the tests. The WT repeat runs showed an uncertainty in the drag of +/- 0.5 count. There were times when the uncertainty in drag was better, +/- 0.25 count. Test 1671 data was of forces and pressures measured from model 2a. The wing had cutouts for installing various leading and trailing edge flaps at lower Mach numbers. The internal duct of the nacelles are not designed and fabricated as defined in the outer mold lines (OML) iges file. The internal duct was fabricated such that a linear transition occurs from the inlet to exhaust. Whereas, the iges definition has a constant area internal duct that quickly transitions from the inlet to exhaust cross sectional shape. The nacelle internal duct was fabricated, the way described, to save time and money. The variation in the cross sectional area is less than 1% from the iges definition. The nacelles were also installed with and without fairings. Fairings are defined as the build up of the nacelles on the upper wing surface so that the nacelles poke through the upper surface as defined in the OML iges file. Test 1679 data was of forces measured from model 2a and 2b. The wing for model 2b was a solid wing. The nacelles were built the same way as for model 2a, except for the nacelle base pressure installation. The nacelles were only tested with the fairings for model 2a and 2b during test 1679.

Cappuccio, Gelsomina↗

Dynamic response of a freely rotating butterfly valve in the advanced test reactor – dynamic fluid-body interaction modeling

To regulate primary coolant flow in the Advanced Test Reactor (ATR), a butterfly valve was installed between the primary coolant pumps and the reactor core. If the mechanical connection between the valve's disk and its shaft ever fails, the disk will rotate freely. Rapid disk rotation may induce pressure surges that could damage upstream pipes. In the present work, the rotational trajectory and pressure evolution during a disk free-rotation scenario were analyzed via the dynamic fluid-body interaction (DFBI) approach in STAR-CCM+, with the movement of a solid being driven by the forces and moment/torque imposed by its surrounding fluid. Assuming a large initial opening angle, the disk accelerates slowly, but swiftly passes the closed position. As a result of the sudden valve closure, a pressure surge occurs in the upstream pipes, exceeding their maximum allowable pressure. Furthermore, the disk does not stabilize at the closed position but continually oscillates due to the unsteady nature of the coolant flow. Because of the significant and continuous water hammer effect, a fix to the butterfly valve is being implemented to prevent rapid valve closure due to failure at the valve's disk/shaft mechanical connection.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of compact linear accelerator in KBSI

The compact linear accelerator using a 28 GHz ECRIS is under construction in KBSI, South Korea. The main capability of this facility is the production of fast neurons for the neutron radiography. The designing of a superconducting magnet, microwave transmission system, beam extraction, and plasma chamber of ECRIS were finished. The nominal axial design fields of the magnets are 3.6 T at injection and 2.2 T at extraction; the nominal radial design field strength at the plasma chamber wall is 2.1 T. We already installed 10 kW, 28 GHz gyrotron, and tested a microwave power from gyrotron using a dummy load. The current status will be discussed in this paper.

43 PARTICLE ACCELERATORS↗

Pop-up Langmuir probe diagnostic in the water cooled divertor of Wendelstein 7-X

The design, development, and successful implementation of pop-up Langmuir probes installed in the water-cooled divertor of W7-X are described. The probes are controlled by drive coils (actuators) installed behind the divertor plates. These drive coils make use of the magnetic field in W7-X to move the probe tips into and out of the plasma. The drive coils were installed in the vacuum vessel after extensively testing the durability of the coils and analyzing the criteria for safe operation. The probe design is carefully tailored for each of the 36 probe tips in order to be suitable for the different magnetic field configurations used in W7-X and ensure that the probes do not present leading edges to the magnetic flux tubes. An electronic bridge circuit is used for measurement to compensate for the effects of signal propagation time on the long cable lengths used. The diagnostic is integrated with the segment control of W7-X for automated operation and control of the diagnostic. The evaluation of the results from the plasma operation is presented after accounting for appropriate sheath expansion for negative bias voltage on the probes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CUORE cryostat and its bolometric detector

CUORE is a cryogenic detector that will be operated at LNGS to search for neutrinoless double beta decay (0νββ) of 130 Te. The detector installation was completed in summer 2016. Before the installation, several cold runs were done to test the cryogenic system performance. In the last cold run the base temperature of 6.3 mK was reached in stable condition. CUORE-0, a CUORE prototype, has proven the feasibility of CUORE, demonstrating that the target background of 0.01 counts/keV/kg/y and the energy resolution of 5 keV are within reach.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design and construction of the MicroBooNE Cosmic Ray Tagger system

The MicroBooNE detector utilizes a liquid argon time projection chamber (LArTPC) with an 85 t active mass to study neutrino interactions along the Booster Neutrino Beam (BNB) at Fermilab. Additionally, with a deployment location near ground level, the detector records many cosmic muon tracks in each beam-related detector trigger that can be misidentified as signals of interest. To reduce these cosmogenic backgrounds, we have designed and constructed a TPC-external Cosmic Ray Tagger (CRT). This sub-system was developed by the Laboratory for High Energy Physics (LHEP), Albert Einstein center for fundamental physics, University of Bern. The system utilizes plastic scintillation modules to provide precise time and position information for TPC-traversing particles. Successful matching of TPC tracks and CRT data will allow us to reduce cosmogenic background and better characterize the light collection system and LArTPC data using cosmic muons. Here, we describe the design and installation of the MicroBooNE CRT system and provide an overview of a series of tests done to verify the proper operation of the system and its components during installation, commissioning, and physics data-taking.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Proposal for a dedicated search for millicharged and fractionally charged particles at LANL

In this paper, we propose an experiment, LANSCE-mQ, aiming to detect fractionally charged and millicharged particles (mCPs) using an 800 MeV proton beam fixed target at the Los Alamos Neutron Science Center (LANSCE) facility at Los Alamos National Laboratory. This search can shed new light on numerous fundamental questions, including charge quantization, the predictions of string theories and grand unification theories, the gauge symmetry of the Standard Model, dark sector models, and the tests of cosmic reheating. We propose to install two-layer scintillation detectors made of plastic (such as EJ-200) or CeBr 3 to search for mCPs. Dedicated geant4 detector simulations and in situ measurements have been conducted to obtain a preliminary determination of the background rate. The dominant backgrounds are beam-induced neutrons and coincident dark current signals from the photomultiplier tubes, while beam-induced high-energy photons ( γ ’s) and cosmic muons are subdominant. We determined that LANSCE-mQ, the dedicated mCP experiment, has the leading mCP sensitivity for mass between ∼ 1 and 300 MeV.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Delivery verification using 3D dose reconstruction based on fluorescence measurement in a carbon beam scanning irradiation system

The authors have developed a method to reconstruct the 3D dose distribution in a particle beam scanning irradiation system. In this scheme, 3D dose distribution is reconstructed by using the measured images of fluence distribution, which are taken for each iso-energy slice (i.e., the unit of the depth scanning). A fluorescent screen with a CCD camera is used to measure the fluence distribution. This system was installed at the HIMAC experimental port and tested by using carbon ion beams. Since a maximum difference between the reconstructed dose and the ionization chamber measurement was around 5% in the target volume, this system can be useful for quick verification of 3D dose distribution.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Readiness of the ATLAS Tile Calorimeter for LHC collisions

The Tile hadronic calorimeter of the ATLAS detector has undergone extensive testing in the experimental hall since its installation in late 2005. The readout, control and calibration systems have been fully operational since 2007 and the detector has successfully collected data from the LHC single beams in 2008 and first collisions in 2009. This paper gives an overview of the Tile Calorimeter performance as measured using random triggers, calibration data, data from cosmic ray muons and single beam data. The detector operation status, noise characteristics and performance of the calibration systems are presented, as well as the validation of the timing and energy calibration carried out with minimum ionising cosmic ray muons data. The calibration systems' precision is well below the design value of 1%. The determination of the global energy scale was performed with an uncertainty of 4%. © 2010 CERN for the benefit of the ATLAS collaboration.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Low-energy muon and muonium beam source at Fermilab

We describe a high-efficiency source of muonium that can be transported as a beam in vacuum provides opportunities for fundamental muon and precision physics measurements such as sensitive searches for symmetry violation. Although PSI is currently the world leader, the intense 800-MeV PIP-II linac beam at Fermilab could provide world-class low-energy muon and muonium beams, with unparalleled intensity, driving the next generation of precision muon-based physics experiments at the intensity frontier. However, it is critical to initiate the prerequisite R&D now to prepare for the PIP-II era. A low-energy secondary muon line recently installed in an operating facility (the MeV Test Area, which utilizes the intense 400-MeV Fermilab Linac beam) could support the required R&D, and potentially compete for new physics in the immediate term, if approved. This beamline was developed for μ– and will need to be re-optimized for surface μ+ production and transport, making it also suitable for muon spin rotation physics––a unique research and industrial application for which no U.S. facility exists, and whose facilities are oversubscribed worldwide.

43 PARTICLE ACCELERATORS↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

SPR salt wall leaching experiments in lab-scale vessel : data report.

During cavern leaching in the Strategic Petroleum Reserve (SPR), injected raw water mixes with resident brine and eventually interacts with the cavern salt walls. This report provides a record of data acquired during a series of experiments designed to measure the leaching rate of salt walls in a labscale simulated cavern, as well as discussion of the data. These results should be of value to validate computational fluid dynamics (CFD) models used to simulate leaching applications. Three experiments were run in the transparent 89-cm (35-inch) ID diameter vessel previously used for several related projects. Diagnostics included tracking the salt wall dissolution rate using ultrasonics, an underwater camera to view pre-installed markers, and pre- and post-test weighing and measuring salt blocks that comprise the walls. In addition, profiles of the local brine/water conductivity and temperature were acquired at three locations by traversing conductivity probes to map out the mixing of injected raw water with the surrounding brine. The data are generally as expected, with stronger dissolution when the salt walls were exposed to water with lower salt saturation, and overall reasonable wall shape profiles. However, there are significant block-to-block variations, even between neighboring salt blocks, so the averaged data are considered more useful for model validation. The remedial leach tests clearly showed that less mixing and longer exposure time to unsaturated water led to higher levels of salt wall dissolution. The data for all three tests showed a dividing line between upper and lower regions, roughly above and below the fresh water injection point, with higher salt wall dissolution in all cases, and stronger (for remedial leach cases) or weaker (for standard leach configuration) concentration gradients above the dividing line.

02 PETROLEUM↗

SICS: A Sensor-Based In-Line Control System for the Surfaces of Continuously Cast Slabs

The goal of this project was to develop and demonstrate a SICS test unit that meet the need of the steel industry for enhancing the continuous casting process for improved surface quality for the targeted benefits and that is composed of an In-line Imaging Module and a Hybrid Predictive Control Module. The In-line Imaging Module provides the real-time or near real-time Product Information to the Hybrid Predictive Control Module. The latter is able to fuse the Product Information with the Process Information. In order to support the goal, this project had the technical objectives for indexes such as inspection accuracy and in-line service life, based on the inspection coverage of the entire cast slab. The deployment of the SICS systems has the potential to provide benefits in reduction of energy waste, CO 2 emission, waste water amount, toxic waste, and so forth. It will help to uphold the competitiveness of the industry that employs approximately 150,000 people nationwide and consumes about 3% of the energy in the country. The Phase II project has been carried out in accordance to the proposed tasks and budget, based on the original and extended schedule. The R&D team designed and implemented the test unit for the full width coverage, installed the unit in a caster. The development work further included enhanced image processing, in-depth defect study and process control models. The function, operation, and maintenance of the SICS was thoroughly studied during the Phase II research. The experience indicates additional hardware and procedures are required to make the SICS a commercially ready product in operation and maintenance aspect. Such developments have been finished and the team is contacting potential customers for the first commercial installation of SICS. Additionally, OGT is exploring the possibility to team up with a US company that specializes in surface cleaning for slabs/blooms/billets such that the in-line surface inspection can be integrated with in-line surface clean up for the maximum benefit to the steel industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recovery Act - An Interdisciplinary Program for Education and Outreach in Transportation Electrification

1) How the project adds to the education of engineering students in the area of vehicle electrification: This project created and implemented a significant interdisciplinary curriculum in HEV engineering that includes courses focused on the major components (engines, battery cells, e-machines, and power electronics). The new curriculum, rather uniquely, features two new classes and two new labs that emphasize a vehicle level integration of a hybrid electric powertrain that parallels the vehicle development process used by the OEMs - commercial grade software is used to design a hybrid electric vehicle, hardware-in-the-loop testing is performed on each component until the entire powertrain is optimized, the calibration is flashed to a vehicle, ride-and-drives are executed including on board data acquisition. In addition, nine existing courses were modified by adding HEV material to the courses. 2) The educational effectiveness and economic feasibility of the new curriculum: The new courses are offered at both the undergraduate and graduate levels. They are listed across the college in mechanical, chemical, electrical, and materials science and engineering. They are offered both on campus and to distance learning students. Students across the college of engineering and at all degree levels are integrating these courses into their degree programs. Over the three year project the course enrollments on-campus has totaled 1,249. The distance learning enrollments has totaled 315. With such robust enrollments we absolutely expect that these courses will be in the curriculum for the long run. 3) How the project is otherwise of benefit to the public: One outcome of the project is the construction of the Michigan Tech Mobile Lab. Two complete HEV dynamometer test cells, and four work stations are installed in the 16.2 meter Mobile Laboratory and hauled by a class 8 truck. The Mobile Lab is used to teach the university courses. It is also used to deliver short courses to industry, K-12 outreach, and public education. In 2012 the Mobile Lab participated in 22 outreach events, locally, throughout Michigan, and including events in Washington DC, Illinois, and Wisconsin. The Mobile Lab is a hit wherever it goes. In 2013 we will partner with the US Army TARDEC and be featured in their Green Warrior Convoy, a ten city tour starting in Detroit and finishing in Washington DC.

33 ADVANCED PROPULSION SYSTEMS↗

Re-utilization of Industrial CO 2 for Algae Production Using a Phase Change Material

This is the final report of a 36-month Phase II cooperative agreement. Under this project, Touchstone Research Laboratory (Touchstone) investigated the merits of incorporating a Phase Change Material (PCM) into an open-pond algae production system that can capture and re-use the CO 2 from a coal-fired flue gas source located in Wooster, OH. The primary objective of the project was to design, construct, and operate a series of open algae ponds that accept a slipstream of flue gas from a coal-fired source and convert a significant portion of the CO 2 to liquid biofuels, electricity, and specialty products, while demonstrating the merits of the PCM technology. Construction of the pilot facility and shakedown of the facility in Wooster, OH, was completed during the first two years, and the focus of the last year was on operations and the cultivation of algae. During this Phase II effort a large-scale algae concentration unit from OpenAlgae was installed and utilized to continuously harvest algae from indoor raceways. An Algae Lysing Unit and Oil Recovery Unit were also received and installed. Initial parameters for lysing nanochloropsis were tested. Conditions were established that showed the lysing operation was effective at killing the algae cells. Continuous harvesting activities yielded over 200 kg algae dry weight for Ponds 1, 2 and 4. Studies were conducted to determine the effect of anaerobic digestion effluent as a nutrient source and the resulting lipid productivity of the algae. Lipid content and total fatty acids were unaffected by culture system and nutrient source, indicating that open raceway ponds fed diluted anaerobic digestion effluent can obtain similar lipid productivities to open raceway ponds using commercial nutrients. Data were also collected with respect to the performance of the PCM material on the pilot-scale raceway ponds. Parameters such as evaporative water loss, temperature differences, and growth/productivity were tracked. The pond with the PCM material was consistently 2 to 5°C warmer than the control pond. This difference did not seem to increase significantly over time. During phase transitions for the PCM, the magnitude of the difference between the daily minimum and maximum temperatures decreased, resulting in smaller daily temperature fluctuations. A thin layer of PCM material reduced overall water loss by 74% and consistently provided algae densities that were 80% greater than the control pond.

36 MATERIALS SCIENCE↗