Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Transfer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

Selective Recovery of Rare Earth Elements from Coal Fly Ash Leachates Using Liquid Membrane Processes

Coal combustion residues and other geological waste materials have been proposed as a resource for rare earth elements (REEs, herein defined as the 14 stable lanthanides, yttrium, and scandium). The extraction of REEs from residues often generate acidified leachates that require highly selective separation methods to recover the REEs from other major soluble ions in the leachates. We studied two liquid membrane processes (liquid emulsion membranes, LEM, and supported liquid membranes, SLM) and compared them to standard solvent extraction techniques for selective recovery and concentration of REEs from a leachate of coal fly ash. All separation methods involved an organic solution of di(2-ethylhexyl)phosphoric acid dissolved in kerosene or mineral oil and an acid strippant solution of 5 M nitric acid for the liquid-based separations. The LEM configuration, which separated REEs by immersing an acid-in-oil emulsion in the ash leachate, resulted in similar recovery percentages of individual REEs as the conventional solvent extraction approach. The recovery of REEs in the SLM configuration, which involved the impregnation of the solvent in a hydrophobic membrane, was slower than the LEM process. However, the SLM process was notably more selective for the heavy (and higher value) REEs, while the conventional extraction and LEM processes were more selective for the light REEs. A flux-based model of the extraction processes suggested that recovery rates were limited by REE affinity for the solvent chelator in the SLM, while the rates of REEs separation via LEM were limited by diffusive mass transfer across the liquid membrane. Altogether, these results help to identify specific steps in the recovery process that future work should target in the development of scalable liquid membrane separations for REE recovery.

42 ENGINEERING↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Encapsulation of Defective Fuel Rods for Transport and Dry Storage - 18190

Removing of the whole inventory of fissile and non-fissile material out of the spent fuel pool is performed when the power plant is about to start its last operation phases or may occur during the extended operating life cycle due to plant storage space limitation. Removal of defective spent fuel is then definitely required for emptying the pool and may in addition also be performed in the course of plant operation for reducing pool contamination. Depending on the general used fuel management solution chosen for post-storage pool operations, specific management of a defective fuel assembly (DFA) and/or a defective fuel rod (DFR) should be implemented accordingly to the regulation requirements to be followed. For meeting these DFA and/or DFR management needs, Framatome together with New AREVA offer wide portfolio of solutions with flexibility and adaptability advantages: - from simple to advanced technologies; - for several types of fuel assemblies and/or defective rods; - for suitable and compatible cask designs; - for compatible solution with both used fuel final management strategies (closed and open fuel cycles). For instance, a technology is jointly proposed and developed by New AREVA and Framatome for implementing dry storage of DFR. It consists in: - encapsulating each DFR by loading the fuel rod in a respective capsule, drying the fuel rod using a process which allows to physically verify with high accuracy the dryness inside the DFR, and seal welding the capsule - assembling the capsules in a capsule canister (a skeleton with external dimensions similar to a respective fuel assembly) and - transferring the capsule canister along with intact spent fuel assemblies in an associated dry transport and storage (dual purpose) cask. Such a project is currently being implemented in Belgium. After successfully obtaining the cask transport and storage license extensions for including the encapsulated DFR content, the first encapsulation campaign has been started in 2017. The purpose of the paper is to present the industrial solutions proposed by Framatome and New AREVA together, for management of DFR, notably the one related to dry storage of encapsulated DFR implemented in Belgium and the perspectives opened by this successful project. The paper presents: - the available solutions for management of DFA and/or DFR depending on applicable requirements - the drying method, welding of a capsule and associated cask as the state of art technology for dry storage of DFR and/or DFA; - lessons learned from project management and encapsulation campaign performed in Belgium; - perspectives for management of DFR and/or DFA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Hydrology and Interim Measure Performance in the Chromium Plume at Los Alamos National Laboratory - 20498

Hexavalent chromium, Cr(VI), is present in the regional aquifer beneath Los Alamos National Laboratory (LANL) at concentrations greater than the New Mexico groundwater standard (50 ppb). The source of the Cr is blowdown from a power plant where potassium dichromate was used as a corrosion inhibitor from 1956 to 1972. Blowdown comingled with effluent from another source and migrated approximately 3 miles down a canyon, primarily as surface flow, until reaching an alluvial infiltration zone. The infiltrating water moved vertically through a thick (approximately 900 ft), complex stratigraphic sequence of unsaturated tuffs, basalt, and unconsolidated alluvial deposits. Horizontal transport also took place within spatially limited perched groundwater horizons in the vadose zone (VZ). Breakthrough at the regional aquifer water table is thought to have occurred in multiple hydraulic windows or 'drip points' located approximately 3 miles from the initial release site at the power plant. The regional aquifer is highly heterogeneous and anisotropic, and displays unconfined behavior in an upper zone and confined behavior at depth. The Cr(VI) contamination has so far remained confined to the upper approximately 25 m of the aquifer. The ambient hydraulic gradient in the regional aquifer is toward the east/southeast, but the water table is extremely flat in the Cr plume area compared to surrounding areas. There is some local variability in flow direction, potentially related to effects of seasonal pumping from nearby Los Alamos county water-supply wells, which draw from the regional aquifer several hundred feet below the water table. An interim measure (IM) is currently operating at the site to achieve hydraulic control of plume migration using a series of extraction wells, ion-exchange treatment, and injection along the downgradient portion of the plume. The migration of Cr contamination in the aquifer has been previously evaluated using a calibrated probabilistic numerical model, which has also been used to design the spatial configuration of extraction and injection wells for the IM, and to identify locations for monitoring wells. The model is built using the Finite Element Heat and Mass (FEHM) transfer code, and the Model Analysis and Decision Support (MADS) software is used for analyses. To date, the portion of the IM system that has operated in a continuous manner has been very effective at hydraulic control. Modifications to the flow field associated with the influence of IM pumping and injection are evaluated here, with modeling constraints to be provided by recent observations of tracers injected into both monitoring wells and IM injection wells, as well as opportunistic observations of geochemical signatures of treated ion-exchange effluent injected into IM injection wells. The tracer and geochemical data provide insights into modified flow directions within the Cr plume area that cannot be otherwise obtained. Results of the modeling work are being used to inform adaptive management of IM operations and will be a valuable tool for development and refinement of long-term remediation strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Alternative Vacuum Pumps for Tritium Service

In tritium process systems, vacuum pumps are typically used to evacuate volumes and piping, as well as transfer gas to other parts of the process. This was done using the combination of an all-metal scroll pump with a metal bellows backing pump. The all-metal scroll pump, manufactured by Normetex, has been unavailable since 2012, and efforts continue to find a suitable replacement. The main obstacle is finding a pump that has no oils or polymer components, which degrade when exposed to tritium and introduce corrosive and/or hazardous impurities into the process. Since turbomolecular pumps are used in tritium processing, it is thought that pumps similar to the turbomolecular pumps would be of interest. The pumps would need to operate at lower rotational speeds to handle higher pressures and flow rates, which is best suited for Molecular Drag Pumps (MDP). To determine this, the vacuum pump characteristics must be determined for the MDP. This report details pump characteristics using an MDP backed by a Metal Bellows (Met-Bel) pump under static and flow conditions for various gases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evapotranspiration And Geochemical Controls On Groundwater Plumes At Arid Sites: Toward Innovative Alternate End-States For Uranium Processing And Tailings Facilities

Management of legacy tailings/waste and groundwater contamination are ongoing at the former uranium milling site in Tuba City AZ. The tailings have been consolidated and effectively isolated using an engineered cover system. For the existing groundwater plume, a system of recovery wells extracts contaminated groundwater for treatment using an advanced distillation process. The ten years of pump and treat (P&T) operations have had minimal impact on the contaminant plume – primarily due to geochemical and hydrological limits. A flow net analysis demonstrates that groundwater contamination beneath the former processing site flows in the uppermost portion of the aquifer and exits the groundwater as the plume transits into and beneath a lower terrace in the landscape. The evaluation indicates that contaminated water will not reach Moenkopi Wash, a locally important stream. Instead, shallow groundwater in arid settings such as Tuba City is transferred into the vadose zone and atmosphere via evaporation, transpiration and diffuse seepage. The dissolved constituents are projected to precipitate and accumulate as minerals such as calcite and gypsum in the deep vadose zone (near the capillary fringe), around the roots of phreatophyte plants, and near seeps. The natural hydrologic and geochemical controls common in arid environments such as Tuba City work together to limit the size of the groundwater plume, to naturally attenuate and detoxify groundwater contaminants, and to reduce risks to humans, livestock and the environment. The technical evaluation supports an alternative beneficial reuse (“brownfield”) scenario for Tuba City. This alternative approach would have low risks, similar to the current P&T scenario, but would eliminate the energy and expense associated with the active treatment and convert the former uranium processing site into a resource for future employment of local citizens and ongoing benefit to the Native American Nations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Anoxic Iron Corrosion on WIPP Brine Geochemistry FY23 Final Report (U)

A 280-day study was completed to evaluate the effect of zero-valent iron (Fe 0 ) on the Waste Isolation Pilot Plant (WIPP) brine geochemistry under anticipated reducing conditions. Hydrogen (H 2 ) gas is expected to be present in the repository after closure due to the anoxic corrosion of a vast quantity of iron contained in the waste forms disposed at WIPP; therefore, a background argon atmosphere containing H 2 was chosen for this study. WIPP groundwater brine pH and E h will impact the mobility and fate of plutonium within the repository. Modeling and laboratory results for Castile WIPP brine indicate that equilibrium fa values relative to the standard hydrogen electrode (SHE) are 40 mV more reducing (i.e., more negative) than those for Salado WIPP brine (-480 mV vs. -440 mV, respectively) because of the higher pH of the Castile brine (pH 9 .3 for Castile vs. pH 8.8 for Salado). The E h and pH data were corrected for the effects of high ionic strength. The experimental results for both brines are consistent with thermodynamic predictions using OLI Systems' Mixed Solvent Electrolyte chemical equilibrium model. The measured and corrected pH and E h data from this study are provided in Table ES-I and Table ES-2, respectively. The experimental study, with four test conditions in triplicate, was performed in a dual glovebox with a nominally 3 vol.% H 2 in argon atmosphere (target H 2 range: 3 ± I vol.%). Simulants containing MgO only ( experimental control) and MgO+Fe 0 (WIPP base case) were prepared for both the Salado and Castile brines. MgO was included in all simulants to account for the use of bulk magnesium oxide in the WIPP repository. Fe 0 was included in some simulants to incorporate the effects of the anoxic corrosion of iron and in-situ hydrogen generation in the study. The brine compositions were developed by Sandia National Laboratory (SNL; Xiong, 2008) and have been used in previous WIPP evaluations. The test method (agitation, etc.) is partially based on ASTM D3987-12. Twelve rounds of periodic measurements of pH and E h were performed over the course of the study. Chemical analysis results for liquids and solids (ICP-MS, ICP-ES, IC Anion, TIC, SEM-EDX) are consistent with the pH, E h , and thermodynamic modeling results. This study included the following conditions that deviate from anticipated post-closure conditions following brine intrusion, but were selected to facilitate bench-scale testing to validate modeling of pH and E h for the post-closure WIP P repository: an anoxic glove box atmosphere containing ≤ 4 vol. % H 2 vs. substantially higher H 2 gas concentrations assumed in the WIPP Performance Assessment (PA); a significantly higher liquid-to-solid test ratio compared to the much lower phase ratio anticipated in the WIP P repository; agitation of the simulant bottles to maximize mass transfer; and finally the use of Fe 0 reagents having a much greater surface area than expected in the WIP P repository. Non-representative conditions were chosen for various reasons such as: to provide bounding conservative results, to provide a margin of safety for testing, or to facilitate simulant sub-sampling and analysis. In a parallel effort, aqueous electrolyte thermodynamic models were developed for the synthetic Salado and Castile brines to inform the experimental design, facilitate laboratory data interpretation, and allow extension of evaluations beyond the parameters tested. Thermodynamic modeling simulations including the MgO and Fe 0 additives that are directly relevant to the experimental measurements (e.g., pH calibration curve, ORP corrections) are included in this report. The measured fa of the simulants was close to the OLI model predictions for both brines and was largely controlled by the background H 2 partial pressure in the vapor phase as well as H 2 generated in situ in the aqueous phase by the Fe 0 corrosion. The H 2 gas-phase concentration tested and thermodynamically evaluated was much lower than is assumed in the WIPP PA; however, H 2 (g) concentrations significantly below this level are still predicted to result in very reducing conditions. In conclusion: • The experimental results are consistent with thermodynamic model predictions for fa, pH, and the effects of high ionic strength. • Evidence to date suggests that the H2 concentration in the glovebox atmosphere ultimately determined the final E h values of the simulants and resulted in highly reducing conditions. As a result, little difference was observed between the control simulants containing only MgO and the WIPP base-case simulants that contained MgO and Fe 0 . • This test methodology is recommended for future studies evaluating WIPP repository conditions. The methodology includes: (1) background H 2 in argon with agitation ( or could alternatively include in-situ-generated H 2 in sealed bottles); (2) carefully measured and corrected ORP data ( with much effort focused on allowing the probes to fully stabilize); and (3) ionic-strength-corrected pH data. Other best practices, such as simulant sparging/handling, ORP probe replacement, etc., should also be considered. • The coupling of experimental studies and thermodynamic modeling is also highly recommended because these methods inform and direct one another leading to greater confidence in and understanding of the results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 13H (HTF-13-14-156, 157) Surface and Subsurface Supernatant Samples in Support of Enrichment Control, Corrosion Control and Sodium Aluminosilicate Formation Potential Programs

The 2H Evaporator system includes mainly Tank 43H (feed tank) and Tank 38H (drop tank) with Tank 22H acting as the DWPF recycle receipt tank. The Tank 13H is being characterized to ensure that it can be transferred to the 2H evaporator. This report provides the results of analyses on Tanks 13H surface and subsurface supernatant liquid samples to ensure compliance with the Enrichment Control Program (ECP), the Corrosion Control Program and Sodium Aluminosilicate Formation Potential in the Evaporator. The U-235 mass divided by the total uranium averaged 0.00799 (0.799 % uranium enrichment) for both the surface and subsurface Tank 13H samples. This enrichment is slightly above the enrichment for Tanks 38H and 43H, where the enrichment normally ranges from 0.59 to 0.7 wt%. The U-235 concentration in Tank 13H samples ranged from 2.01E-02 to 2.63E-02 mg/L, while the U-238 concentration in Tank 13H ranged from 2.47E+00 to 3.21E+00 mg/L. Thus, the U-235/total uranium ratio is in line with the prior 2H-evaporator ECP samples. Measured sodium and silicon concentrations averaged, respectively, 2.46 M and 1.42E-04 M (3.98 mg/L) in the Tank 13H subsurface sample. The measured aluminum concentration in Tanks 13H subsurface samples averaged 2.01E-01 M.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantity, Quality, and Availability of Waste Heat from United States Thermal Power Generation

Secondary application of unconverted heat produced during electric power generation has the potential to improve the life-cycle fuel efficiency of the electric power industry and the sectors it serves. Here this work quantifies the residual heat (also known as waste heat) generated by U.S. thermal power plants and assesses the intermittency and transport issues that must be considered when planning to utilize this heat. Combining Energy Information Administration plant-level data with literature-reported process efficiency data, we develop estimates of the unconverted heat flux from individual U.S. thermal power plants in 2012. Together these power plants discharged an estimated 18.9 billion GJ th of residual heat in 2012, 4% of which was discharged at temperatures greater than 90 °C. We also characterize the temperature, spatial distribution, and temporal availability of this residual heat at the plant level and model the implications for the technical and economic feasibility of its end use. Increased implementation of flue gas desulfurization technologies at coal-fired facilities and the higher quality heat generated in the exhaust of natural gas fuel cycles are expected to increase the availability of residual heat generated by 10.6% in 2040.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Alternative Canister Processing Operations at an Interim Storage Facility - 16617

The US Department of Energy (DOE) is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) in response to recommendations by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published January 2012. These efforts include planning for a Pilot Interim Storage Facility (ISF) and a Larger ISF. In March 2014, the DOE employed the CB and I team to evaluate design alternatives for cask handling operations and storing SNF at an ISF. The report, 'Generic Design Alternatives for Dry Storage of Used Nuclear Fuel', (Alternatives Report) evaluates different aspects of an ISF, including a study on alternative approaches for processing SNF canisters such as different cask handling methods and configurations which might be used to transfer canisters from shipping casks into storage locations at an ISF. The purpose of this paper is to report on the development of alternative cask handling operations that have been evaluated for the receipt and storage of the SNF at an initial Pilot ISF and a Larger ISF. This design study is relevant for host communities considering near-term development of a Pilot ISF. DOE-sponsored system analyses indicate that a processing rate of up to 3,000 MTU/yr (approximately 230 to 300 canisters) would be needed for a single Larger ISF (less if more than one ISF were developed) to remove SNF from commercial nuclear plants in a reasonable amount of time. The study evaluated different canister processing operation methodologies in order to reduce the complexity, cost, and personnel exposure associated with processing operations at an ISF. The conclusions from this design study could help to inform the selection of future canister processing operations for an ISF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification assistance program: international co-operation on vitrification technology

With 10 vitrification lines in operation (3 on WVP in Sellafield, 1 on AVM in Marcoule and 6 on AVH in La Hague), Sellafield Ltd and Areva NC benefit from the most in-depth experience worldwide in the vitrification of highly active liquors within a framework of commercial operations. Based on the two-step process design, using a calciner and an induction-heated hot melter, which was initially deployed in Marcoule in 1978, core vitrification equipment has been continuously improved by the independent development programmes of the two companies. In March 2005, Sellafield Ltd and Areva NC signed the Vitrification Assistance Program (hereafter referred to as VAP); a co-operative project lasting 4 years during which Areva NC is to share some areas of their experience and expertise with Sellafield Ltd. Now at the halfway point of this project, this paper summarises the work performed by the VAP team to date, highlighting the early benefits and lessons learned. The following points will be developed: - Equipment delivery and preparation for implementation on WVP - Training organization and dissemination to WVP teams - Lessons learned from the early changes implemented in operations (Calciner, Melter, Dust Scrubber and Primary off gas system), and initial feedback from the first campaign using a VAP equipped line. In conclusion: The vitrification process and technology implemented at Sellafield and at La Hague, based on the two-step process, have proved to be efficient in treating high active liquor of various types. Ten lines based on this principle have been successfully operated for more than 15 years in France and in the UK. The process has also been demonstrated to be sufficiently versatile to benefit from continuous improvement and development programmes. VAP, as a complete package to support vitrification technology and knowledge transfer from AREVA NC to Sellafield Ltd, has provided the framework for fruitful technical exchanges and discussions between the two companies. From equipment delivery to knowledge embedding within the WVP teams, both companies have worked hard together to respect the tight schedule of the contract, despite growing external constraints. This has been closely managed in order to achieve the best results for the VAP without jeopardizing the continuing production operations on both the Sellafield and La Hague sites. For future campaigns, WVP1 will be equipped with an automatic heating control system similar to the one used at La Hague (i.e. based on 4 kHz). This will facilitate the work of the WVP operators and finalise the conversion of WVP melter control systems from manual to automatic, meaning that the melters on all 3 lines will be automatically controlled. Further implementation of VAP equipment is also planned on the other lines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SOLIDS PRECIPITATION EVENT IN MCU CAUSAL ANALYSIS AND RECOMMENDATIONS FROM SOLIDS RECOVERY TEAM

A process upset occurred in the Modular Caustic-Side Solvent Extraction Unit (MCU) facility on April 6th, 2014. During recovery efforts, a significant amount of solids were found in the Salt Solution Feed Tank (SSFT), Salt Solution Receipt Tanks (SSRTs), two extraction contactors, and scrub contactors. The solids were identified by Savannah River National Laboratory (SRNL) as primarily sodium oxalate and sodium alumina silicate (NAS) with the presence of some aluminum hydroxide. NAS solids have been present in the SSFT since simulant runs during cold chemical startup of MCU in 2007, and have not hindered operations since that time. During the process upset in April 2014, the oxalate solids partially blocked the aqueous outlet of the extraction contactors, causing salt solution to exit through the contactor organic outlet to the scrub contactors with the organic phase. This salt solution overwhelmed the scrub contactors and passed with the organic phase to the strip section of MCU. The partially reversed flow of salt solution resulted in a Strip Effluent (SE) stream that was high in Isopar™ L, pH and sodium. The primary cause of the excessive solids accumulation in the SSRTs and SSFT at MCU is attributed to an increase in the frequency of oxalic acid cleaning of the 512-S primary filter. Agitation in the SSRTs at MCU in response to cold weather likely provided the primary mechanism to transfer the solids to the contactors. Sources of the sodium oxalate solids are attributed to the oxalic acid cleaning solution used to clean the primary filter at the Actinide Removal Process (ARP) filtration at 512-S, as well as precipitation from the salt batch feed, which is at or near oxalate saturation. The Solids Recovery Team was formed to determine the cause of the solids formation and develop recommendations to prevent or mitigate this event in the future. A total of 53 recommendations were generated. These recommendations were organized into 4 focus areas: • Improve understanding of oxalate equilibrium and kinetics in salt solutions • Reduction/elimination of oxalic acid cleaning in 512-S • Flowsheet optimization • Improving diagnostic capability The recommendations implemented prior to resumption of MCU operations provide a risk mitigation or detection function through additional sampling and observation. The longer term recommendations provide a framework to increase the basic process knowledge of both oxalate chemistry and filtration behavior and then facilitate decisions that improve the salt flowsheet as a system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Transport in Silicon Nanowires at High Temperature up to 700 K

Thermal transport in silicon nanowires has captured the attention of scientists for understanding phonon transport at the nanoscale, and the thermoelectric figure-of-merit (ZT) reported in rough nanowires has inspired engineers to develop cost-effective waste heat recovery systems. Thermoelectric generators composed of silicon target high-temperature applications due to improved efficiency beyond 550 K. However, there have been no studies of thermal transport in silicon nanowires beyond room temperature. High-temperature measurements also enable studies of unanswered questions regarding the impact of surface boundaries and varying mode contributions as the highest vibrational modes are activated (Debye temperature of silicon is 645 K). Here, we develop a technique to investigate thermal transport in nanowires up to 700 K. Furthermore, our thermal conductivity measurements on smooth silicon nanowires show the classical diameter dependence from 40 to 120 nm. In conjunction with Boltzmann transport equation, we also probe an increasing contribution of high-frequency phonons (optical phonons) in smooth silicon nanowires as the diameter decreases and the temperature increases. Thermal conductivity of rough silicon nanowires is significantly reduced throughout the temperature range, demonstrating a potential for efficient thermoelectric generation (e.g., ZT = 1 at 700 K).

77 NANOSCIENCE AND NANOTECHNOLOGY↗

ALTERNATE APPROACH TO HAZARD CATEGORIZATION FOR SALTSTONE FACILITY AT SRS

The Saltstone Facility at Savannah River Site (SRS) was originally segmented into two segments: the Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). Based on the inventory of radionuclides available for release the SPF and SDF were categorized as Nonreactor Hazard Category (HC)-3. The hazard categorization recognized the SDF will contain contributions of radionuclides which would exceed the HC-2 Threshold Quantity (TQ) in the form of grout. However it was determined not to impact the facility hazard categorization based on the grout being in a solid, monolithic form which was not easily dispersible. But, the impact of a quantity of unset grout expected to be present at the vault following operation of the process was not addressed. A Potential Inadequacy in Safety Analysis (PISA) was later issued based on the hazard categorization determination for the facility not addressing unset grout. This initiated a re-evaluation of the accident scenarios within the hazards analysis. During this re-evaluation, the segmentation of the facility was challenged based on the potential interaction between facility segments; specifically, the leachate return line and the grout transfer line, which were considered separate segments, are located in close proximity at one point. such that for certain events (NPH as well as External Vehicle Impact) both could be damaged simultaneously and spill contents on the ground that could commingle. This would violate the guideline for segmentation. Therefore, the Hazard Categorization (HC) was reevaluated based on the facility being a single segment and including the additional unset grout as part of total inventory. This total inventory far exceeded the limit for HC-2 TQ and made the facility's initial categorization as HC-2. However, alternative analysis methodology based on credible release fractions allowed in DOE-STD-1027-92 (Ref.1) showed that the Saltstone facility could still be categorized as Hazard Category 3 Nuclear Facility with no segmentation. Since it was the first time any facility at SRS tried this alternate approach safety analyst had to face substantial resistance and reservations from both the facility and local DOE customers which were eventually overcome with approval and acceptance from DOE-HQ.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aluminum Clad Spent Nuclear Fuel Task 4: Performance of Aluminum SNF in Dry Storage Experiment Test Plan

This document presents the activities to be performed in support of understanding the performance of aluminum spent nuclear fuel (ASNF) in dry storage. These activities will visually examine and acquire baseline samples of as-irradiated ATR fuel assembly components to determine fuel condition and the morphology of the aluminum oxyhydroxides present on the fuel external surfaces. Because the boehmite phase of oxyhydroxide is projected to be a significant contributor to radiolytic hydrogen production and general corrosion, being able to quantify its presence is of major importance to long term storage of aluminum spent nuclear fuel. Baseline samples will be taken from irradiated end adapters, removed from ATR SNF elements, stored in the ATR Canal. These will be transferred to Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) to perform non-destructive and destructive testing to determine the degree of hydration of the wet-stored aluminum components prior to drying and air storage. Examination of the dry stored SNF at Idaho Nuclear Technology and Engineering Center (INTEC) in CPP-603 Irradiated Fuel Storage Facility (IFSF) will allow the opportunity to identify gross degradation and as conditions permit, sample the surface oxide on fueled and un-fueled portions of the stored assemblies. The information resulting from analysis of the ATR Canal samples will be used to support validation of surrogate samples prepared under Task 6, sample surrogate preparation, and used in Task 1, oxyhydroxide layer behavior and chemistry, Task 2, oxide layer radiolytic gas generation, and Task 5, oxide layer response to drying. Surface oxide samples collected from SNF in IFSF dry storage will SNF dry storage prediction modeling from Task 3, sealed and vented system episodic breathing and gas generation prediction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Tank 26 Evaporator Feed Pump Transfer Analysis

The transfer of liquid salt solution from Tank 26 to an evaporator is to be accomplished by activating the evaporator feed pump, located approximately 72 inches above the sludge layer, while simultaneously turning on the downcomer. Previously, activation of the evaporator feed pump was an isolated event without any other components running at the same time. An analysis of the dissolved solution transfer has been performed using computational fluid dynamics methods to determine the amount of entrained sludge solids pumped out of the tank to the evaporator with the downcomer turned on. The analysis results showed that, for the maximum and minimum supernate levels in Tank 26 (252.5 and 72 inches above the sludge layer, respectively), the evaporator feed pump will entrain between 0.03 and 0.1 wt% sludge undissolved solids weight fraction into the eductor, respectively, and therefore are an order of magnitude less than the 1.0 wt% undissolved solids loading criteria to feed the evaporator. Lower tank liquid levels, with respect to the sludge layer, result in higher amounts of sludge entrainment due to the increased velocity of the plunging jets from the downcomer and evaporator feed pump bypass as well as decreased dissipation depth. Revision 1 clarifies the analysis presented in Revision 0 and corrects a mathematical error in the calculations for Table 4.1 in Revision 0. However, the conclusions and recommendations of the analysis do not change for Revision 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Returning HEU Fuel from the Czech Republic to Russia

In December 1999, representatives from the United States, Russian Federation, and International Atomic Energy Agency began working on a program to return Russian supplied, highly enriched, uranium fuel stored at foreign research reactors to Russia. Now, under the Global Threat Reduction Initiative’s Russian Research Reactor Fuel Return Program, this effort has repatriated over 800 kg of highly enriched uranium to Russia from over 10 countries. In May 2004, the “Agreement Between the Government of the United States of America and the Government of the Russian Federation Concerning Cooperation for the Transfer of Russian Produced Research Reactor Nuclear Fuel to the Russian Federation” was signed. This agreement provides legal authority for the Russian Research Reactor Fuel Return Program and establishes parameters whereby eligible countries may return highly enriched uranium spent and fresh fuel assemblies and other fissile materials to Russia. On December 8, 2007, one of the largest shipments of highly enriched uranium spent nuclear fuel was successfully made from a Russian-designed nuclear research reactor in the Czech Republic to the Russian Federation. This accomplishment is the culmination of years of planning, negotiations, and hard work. The United States, Russian Federation, and the International Atomic Energy Agency have been working together. In February 2003, Russian Research Reactor Fuel Return Program representatives met with the Nuclear Research Institute in Rež, Czech Republic, and discussed the return of their highly enriched uranium spent nuclear fuel to the Russian Federation for reprocessing. Nearly 5 years later, the shipment was made. This article discusses the planning, preparations, coordination, and cooperation required to make this important international shipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗